SlideShare une entreprise Scribd logo
1  sur  5
CURRICULUM VITAE
NAME : MAMOON JAMIL HAWASH
NATIONALITY : JORDANIAN
DATE OF BIRTH : 07 - 02 - 1966
LANGUAGES : ENGLISH, ARABIC
MARITAL STATUS : MARRIED
EDUCATIONAL : B.Sc. CIVIL ENGINEERING
QUALIFICATION ADAMSON UNIVERSITY, PHILIPPINES.
: Engineers Orientation course for Building Projects
: AutoCAD - Release 12
STAAD III – Release 18
Microsoft Office 97
PROFESSIONAL
EXPERIENCE
Oct. 1997 to present : ACTCO General Contracting Co.
December 2014 to till date
Position : QA/QC Manager
Project Description : Jumeirah Park Villas package (P-7A-226 Villas &
P-7B & C-190 Villas total of 416 Villas 4 Bed room
legacy type) comprises the Execution and completion
of Earth, Architectural, Structural, MEP and Fence
works for variable work progressed Villas.
Roles & Responsibilities :
 Implement the QA/QC management system at site.
 Coordinate with quality inspections with all the site sub contractors and vendors
 Coordinate all non destructive testing on site.
 Coordinate with the customer representative on all quality matters.
 Coordinate all receipt inspections.
 Distribute relevant QA/QC documentation to site subcontractors
 Verify that the quality related site activities are in accordance with the applicable
codes and standards
 Participate in the site internal and external site audits
 Coordinate all the quality site inspections through the site QC inspectors
 Ensure all quality control documentation is complied and competed for as-built hand
over through the QC turnover engineer
 Control all nonconformance reports and undertake remedial action
 Compete site quality control instructions and action remedial responses
 Review the customers specification and undertake relevant training to the site QC
inspector
 Monitor the implementation of the approved site QC Plan
 Complete and coordinate the approval of the sites QC technical submittals to the
customer
 Coordinate with the site construction manager on all quality issues Coordinate and
share the QA/QC site weekly meetings with the projects subcontractors QC personnel
 Elaborating inspection and test programs
 Assure all technical documents relative to site quality control are current status
Feb. 2012 to Nov. 2014
Position : QA/QC Manager
Project Description : Inter Refinery Pipe Line (IRP II) Project -Mussafah
Civil and Building Works (Area B1 & B2)
June 2011 to Jan. 2012
Position : QA/QC Manager
Project Description : Ruwais Refinery Expansion Project EPC # 4
Civil works (Area 4-2, 4-3-1, 4-5-2, 4-6)
October 2007 to May 2011
Position : QA/QC Manager
Project Description : Jebel Ali Power & Desalination Station ‘M’
Package “P” - Dubai
June. 2006 to Sept.07
Position : QA/QC Engineer
Project Description : Abu Dhabi Steel Pipe Factory at Mussafah ICAD2
Jan. 2005 to May 2006
Position : QA/QC Engineer
Project Description : Tabreed Cooling Plant at Marina Mall.
Dec.2003 to Dec.2004
Position : QA/QC Engineer
Project Description : 132/11 kV Subsation and W16, Abu Dhabi
Consisting of control building, GIS building,
Transformer enclosure, A/C Building, Fire Pump house,
Water tank and external works such as Road, Cable
trenches, Cable duct and Boundary wall.
July 2002 to Oct.2003
Position : QA/QC Engineer
Project Description : SVC Plant at Mussafah
Consisting of piling works, transformer bays, SVC
building consisting of central 2 storey control building
area, SVC equipment Halls and Busbar Halls, all
drainage works, all external works including cable
trenches, asphalt roads, kerbs and footpaths etc.
Jan.2001 to June 2002
Position : QA/QC Engineer
Project Description : 400 kV Interconnection Taweelah – Mussafah
Extension of Existing 400 kV Substation at Taweelah,
Consisting of piling works, control building, GIS
building, transformer compounds including steel rails,
steel grating, corner protection etc., fire protection plant
room and tanks, water supply and storage system, all
drainage works and external roads.
Oct. 97 to Dec. 2000
Position : Project Engineer
Project Description : Relocation of Abu Dhabi Aviation Facilities to Abu
Dhabi International Airport, consisting of New
Terminal Building, Modification of existing Terminal
building, Mechanical plant, Fire water tank and Pump
house, Maintenance complex and Aircraft Hangers,
Workshop building and others.
Feb 95 to Sept.97 : Al Rawa contracting Co.- Jordan as a site Engineer.
Aug.92 to Dec.94 : Al Jassi Contracting Est. – Jordan as a site Engineer.
Mar. 91 to May 92 : Serving as a conscript supervision engineer.
CV-MAMOON template Jan 2016 & Roles final

Contenu connexe

Tendances (20)

ADAMRIDZUANRESUME
ADAMRIDZUANRESUMEADAMRIDZUANRESUME
ADAMRIDZUANRESUME
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
C.V,,,,,,
C.V,,,,,,C.V,,,,,,
C.V,,,,,,
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Cv 2015
Cv 2015Cv 2015
Cv 2015
 
bmc cv (2)
bmc cv (2)bmc cv (2)
bmc cv (2)
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
cv abdul jaleel
cv abdul jaleelcv abdul jaleel
cv abdul jaleel
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 

En vedette (20)

Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Power point
Power pointPower point
Power point
 
Khalifa_Taiseer_CV_2016
Khalifa_Taiseer_CV_2016Khalifa_Taiseer_CV_2016
Khalifa_Taiseer_CV_2016
 
0_9.8.16_Harry Joo_CV
0_9.8.16_Harry Joo_CV0_9.8.16_Harry Joo_CV
0_9.8.16_Harry Joo_CV
 
BLUFFcasreg170815
BLUFFcasreg170815BLUFFcasreg170815
BLUFFcasreg170815
 
cumulative lesson plan MHufstetler
cumulative lesson plan MHufstetlercumulative lesson plan MHufstetler
cumulative lesson plan MHufstetler
 
Career Summary
Career SummaryCareer Summary
Career Summary
 
CV Rishabh Nayyar
CV Rishabh NayyarCV Rishabh Nayyar
CV Rishabh Nayyar
 
Curriculum Vitae 1
Curriculum Vitae 1Curriculum Vitae 1
Curriculum Vitae 1
 
Rafael Diaz Resume
Rafael Diaz ResumeRafael Diaz Resume
Rafael Diaz Resume
 
daphnebayudang RESUME
daphnebayudang RESUMEdaphnebayudang RESUME
daphnebayudang RESUME
 
FosterCare(FOP)
FosterCare(FOP)FosterCare(FOP)
FosterCare(FOP)
 
Evaluation of MEART Report V1.0 Final
Evaluation of MEART Report V1.0 FinalEvaluation of MEART Report V1.0 Final
Evaluation of MEART Report V1.0 Final
 
CV NB
CV NBCV NB
CV NB
 
Andrew Gando Resume
Andrew Gando ResumeAndrew Gando Resume
Andrew Gando Resume
 
Joe resume update72616
Joe resume update72616 Joe resume update72616
Joe resume update72616
 
KN
KNKN
KN
 
CV Phill O'Reilly 2016 08 04
CV Phill O'Reilly 2016 08 04CV Phill O'Reilly 2016 08 04
CV Phill O'Reilly 2016 08 04
 
SOHAIL CV.doc1
SOHAIL CV.doc1SOHAIL CV.doc1
SOHAIL CV.doc1
 
Ehab Sarhan-Snr Cost Engineer-QS 032016
Ehab Sarhan-Snr Cost Engineer-QS 032016Ehab Sarhan-Snr Cost Engineer-QS 032016
Ehab Sarhan-Snr Cost Engineer-QS 032016
 

Similaire à CV-MAMOON template Jan 2016 & Roles final

Similaire à CV-MAMOON template Jan 2016 & Roles final (20)

CV Updated
CV UpdatedCV Updated
CV Updated
 
MCV
MCVMCV
MCV
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
SENIOR LAND SURVEYOR
SENIOR LAND SURVEYORSENIOR LAND SURVEYOR
SENIOR LAND SURVEYOR
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Cv 01
Cv 01Cv 01
Cv 01
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
cv nour
cv nourcv nour
cv nour
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
S. Bould CV
S. Bould CV S. Bould CV
S. Bould CV
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 

CV-MAMOON template Jan 2016 & Roles final

  • 1. CURRICULUM VITAE NAME : MAMOON JAMIL HAWASH NATIONALITY : JORDANIAN DATE OF BIRTH : 07 - 02 - 1966 LANGUAGES : ENGLISH, ARABIC MARITAL STATUS : MARRIED EDUCATIONAL : B.Sc. CIVIL ENGINEERING QUALIFICATION ADAMSON UNIVERSITY, PHILIPPINES. : Engineers Orientation course for Building Projects : AutoCAD - Release 12 STAAD III – Release 18 Microsoft Office 97 PROFESSIONAL EXPERIENCE Oct. 1997 to present : ACTCO General Contracting Co. December 2014 to till date Position : QA/QC Manager Project Description : Jumeirah Park Villas package (P-7A-226 Villas & P-7B & C-190 Villas total of 416 Villas 4 Bed room legacy type) comprises the Execution and completion of Earth, Architectural, Structural, MEP and Fence works for variable work progressed Villas. Roles & Responsibilities :  Implement the QA/QC management system at site.  Coordinate with quality inspections with all the site sub contractors and vendors  Coordinate all non destructive testing on site.  Coordinate with the customer representative on all quality matters.  Coordinate all receipt inspections.  Distribute relevant QA/QC documentation to site subcontractors
  • 2.  Verify that the quality related site activities are in accordance with the applicable codes and standards  Participate in the site internal and external site audits  Coordinate all the quality site inspections through the site QC inspectors  Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer  Control all nonconformance reports and undertake remedial action  Compete site quality control instructions and action remedial responses  Review the customers specification and undertake relevant training to the site QC inspector  Monitor the implementation of the approved site QC Plan  Complete and coordinate the approval of the sites QC technical submittals to the customer  Coordinate with the site construction manager on all quality issues Coordinate and share the QA/QC site weekly meetings with the projects subcontractors QC personnel  Elaborating inspection and test programs  Assure all technical documents relative to site quality control are current status Feb. 2012 to Nov. 2014 Position : QA/QC Manager Project Description : Inter Refinery Pipe Line (IRP II) Project -Mussafah Civil and Building Works (Area B1 & B2) June 2011 to Jan. 2012 Position : QA/QC Manager Project Description : Ruwais Refinery Expansion Project EPC # 4 Civil works (Area 4-2, 4-3-1, 4-5-2, 4-6)
  • 3. October 2007 to May 2011 Position : QA/QC Manager Project Description : Jebel Ali Power & Desalination Station ‘M’ Package “P” - Dubai June. 2006 to Sept.07 Position : QA/QC Engineer Project Description : Abu Dhabi Steel Pipe Factory at Mussafah ICAD2 Jan. 2005 to May 2006 Position : QA/QC Engineer Project Description : Tabreed Cooling Plant at Marina Mall. Dec.2003 to Dec.2004 Position : QA/QC Engineer Project Description : 132/11 kV Subsation and W16, Abu Dhabi Consisting of control building, GIS building, Transformer enclosure, A/C Building, Fire Pump house, Water tank and external works such as Road, Cable trenches, Cable duct and Boundary wall. July 2002 to Oct.2003
  • 4. Position : QA/QC Engineer Project Description : SVC Plant at Mussafah Consisting of piling works, transformer bays, SVC building consisting of central 2 storey control building area, SVC equipment Halls and Busbar Halls, all drainage works, all external works including cable trenches, asphalt roads, kerbs and footpaths etc. Jan.2001 to June 2002 Position : QA/QC Engineer Project Description : 400 kV Interconnection Taweelah – Mussafah Extension of Existing 400 kV Substation at Taweelah, Consisting of piling works, control building, GIS building, transformer compounds including steel rails, steel grating, corner protection etc., fire protection plant room and tanks, water supply and storage system, all drainage works and external roads. Oct. 97 to Dec. 2000 Position : Project Engineer Project Description : Relocation of Abu Dhabi Aviation Facilities to Abu Dhabi International Airport, consisting of New Terminal Building, Modification of existing Terminal building, Mechanical plant, Fire water tank and Pump house, Maintenance complex and Aircraft Hangers, Workshop building and others. Feb 95 to Sept.97 : Al Rawa contracting Co.- Jordan as a site Engineer. Aug.92 to Dec.94 : Al Jassi Contracting Est. – Jordan as a site Engineer. Mar. 91 to May 92 : Serving as a conscript supervision engineer.