A leaked internal New York State Department of Transportation document forecasting the cost of increased heavy truck traffic that may result from Marcellus Shale drilling in the state. It forecasts repair and reconstruction costs from $211 - $378 million annually. However, the document is based on the 2009 draft drilling rules (dSGEIS) and not on the more recent 2011 SGEIS.