Induced AC Mitigation for Safety
and Corrosion Control
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
Good morning…
Rob Shoaf
Point Integrity Solutions
137 Eayrestown Road, Unit C
Southampton, NJ 08055
p. 609.859.4323
c. 609.534.3973
rob@pointintegrity.com
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Two Reasons to be aware of Induced AC on
a pipeline
– Personnel Safety
– Integrity of pipeline
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Personnel Safety
– NACE RP0177-2000 and OSHA Standard 2207,
Part 1926
• AC voltage potentials shall remain below 15 Volts (rms)
open circuit
• Source current less than 5mA
• This equates to a resistance in the body of 3000 Ohm
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Induced AC – Electromagnetic interference
similar to the operation of a transformer.
– Proportional to power line current
– Proportional to length of parallelism
– Inversely proportional to separation distance
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• How to Protect People
– Bring down voltages
• Locally with grounding mats
– Zinc tied directly to pipe at above ground sites like block valves, blow
down pipes
• Existing grounding facilities at valve sites, trap sites, meter stations,
compressor/pump stations
– Must use decoupling device if tying to non CP protected structures
• Globally with long grounding cable along pipeline
– Zinc ribbon
» Be careful of life, galvanic ribbon is consumable
– Bare copper with decoupling device
» Can install in coke breeze to lower cable to ground resistance
» Deeper may be more moist and less susceptible to seasonal
resistivity changes. Check layer resistivity in design phase
– Electrically isolate short sections of pipeline from each other. IF’s at
1000 foot intervals. Not very practical for impressed CP system
– Have poor coating ;)
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Consideration should be given not only to
steady state AC voltages but also spikes from
fault currents and lightning - Conductive
Coupling
– Design should consider max fault current possible
by consultation with local power company
– Size connecting wires and decoupling device
accordingly.
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Example of damage from medium voltage
fault current on line
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Personnel Safety During Construction
– Sections of welded pipe on or in the ditch during construction can
generate substantial open circuit voltages and even high currents if long
enough
– Working on existing lines in the ground in AC corridors can be very
dangerous
• Ways to address
– Temporary ground rods at each end of joint or continuous section of joints. 1 in. x
6 ft. with #2 or greater connecting wire
» Connect with metallic circumferential clamp, pipe end clamp, 50 lb pull
magnets
» 1 rod for less than 200 feet of pipe, 2 for 200 feet or more
– Temporary grounding mats of zinc or even galvanized fencing bonded to valves,
risers, etc.
– Rubber tired equipment to have 10 foot or longer chain attached to frame and
drug when on ROW
– Grounded fuel trucks bonded to equipment being fueled
– Like working with half cell, be sure to make your ground connection first and
disconnect it last.
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• AC Corrosion
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Factors that influence AC corrosion potential.
– Open circuit AC voltage on pipe
• Entry or exodus of power line ROW
• Discontinuity in power lines
– Localized Soil resistivity
– Holiday size
– Condition of pipeline coating
• FBE lines – high coating resistance – low attenuation
• Coal tar and asphalt lines – lossy
• Equation to determine the AC current density at a pipeline coating holiday:
iac – AC current density (amp/m^2)
d – diameter of holiday (meters)
VAC – AC voltage of the pipeline
p – soil resistivity (ohm-m)
d
V
i AC
AC
ρπ
8
=
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
– Does not occur or is negligible at AC current
densities of less than 20 A/m^2
– Is possible at AC current densities of 20 – 100
A/m^2
– Is anticipated at AC current densities of greater
than 100 A/m^2 even with high levels of cathodic
polarization
– Coating holidays having an area of 1 cm^2
represent a worst-case risk.
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Recently found corrosion example
– New pipeline, installed 2002, 42” FBE Coated
– Pigged 2006
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• 4 years created 30% metal loss.
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Actual conditions:
– 8 Vac on pipeline
– 1200 ohm-cm soil conditions
– Assume 1 cm^2 holiday
– Calculates to 169 A/m^2
• Not always high voltage areas.
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Our Approach to AC Mitigation
– Found that modeling of AC corridor is difficult and is
only as good as the data input
• Can be expensive for sometimes questionable benefit.
– Power company may charge for detailed data
– Must capture sometimes rapidly changing soil res data
– Need very accurate pipe to power line geometry
– Walking / riding route has worked
• Can get a handle on particulars such as:
– Low resistance areas
– Changes in power line or pipeline geometry
– Allows for collection of soil resistivity data at many points based
on judgment
– AC voltages at test stations
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• AC CIS
• Jury Out
– Twisted pair w/ shield
• Grounded
– Looking Promising
– Have to interpolate for
AC accumulated test on wire.
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Mitigation Measures
– Install decoupling device (PCR) approximately every
1000 to 2000 feet along line focusing on low
resistance areas for making connections to the
pipeline.
• Allow AC off pipeline while preventing DC from entering
pipeline from grounding anode
– Grounding Anodes
• 1/0 bare stranded copper cable with and without coke breeze
• Matcor Mitigator #2 bare copper in coke breeze sleeve
• Galvanic Anodes. Prepackaged magnesium bags
• Road Casings – be careful to ensure vent is under 15 Vac
step and touch limit after hooking to pipeline
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Matcor’s Mitigator
– Similar to linear anode. Speeds up installation in
ditch when coke breeze is required
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Typical PCR installation.
• Bare copper as grounding
anode
• Coated 1/0 to Pipeline
• Yellow to stationary
reference cell to beside
pipeline for near IR free
reading
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Car vs. PCR
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Installation Considerations
– Install grounding anode on side of pipeline facing
power corridor
– Typical offset of grounding anode is 5 to 10 feet off
side of pipeline. Distance may depend on land rights.
– Connect to both ends of casing if possible
• Check casing for electrical isolation from pipeline.
• If shorted, can still use for AC mitigation but will need to keep
separate from other grounding structure.
– Ensure that decoupling devices are located at bounds
of shared power corridor and at discontinuities within
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Time to see how well the system is working.
– Chart before AC and DC reads along with current
being discharged
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Check expected current density with local soil resistivity
(12,000 ohm-cm) and assumed holiday of 1 cm^2
• Vac before = 15.51
• Vac after = 3.21
• Iac before = 32.9 a/m^2 – possible AC corrosion (in 20 to
100 A/m^2 range)
• Iac after = 6.81 A/m^2 – unlikely or negligible AC
corrosion
• Also brought step and touch potential to below 15 Vac
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• From results slide, DC potential rose on the
pipeline. This is common when AC potential is
removed.
• Went from -1.35 to -1.39 CSE
– Very common to see 50 to 500 mV increase to on
CP reads
2011 Gas/Electric Partnership Conference XIX
Cypress, Texas
February 9th, 2011
• Not a perfect science.
• Common to perform follow up work with
additional grounding cable in some areas
based on in-service testing.
• Thanks! Questions?
Thank You

More Related Content

What's hot

underground cable in transmission grid
underground cable in transmission gridunderground cable in transmission grid
underground cable in transmission grid
Engr. naeem
 
E2 earthing manual earth guidance notes
E2 earthing manual earth guidance notesE2 earthing manual earth guidance notes
E2 earthing manual earth guidance notes
bsganwal
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
Shahab Khan
 
EE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesEE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of Cables
Rajesh Ramesh
 

What's hot (20)

underground cable in transmission grid
underground cable in transmission gridunderground cable in transmission grid
underground cable in transmission grid
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 
Cable installation book
Cable installation bookCable installation book
Cable installation book
 
Your electrical safety specilist for all equipments Powered AC and DC
Your electrical safety specilist for all equipments   Powered AC and DCYour electrical safety specilist for all equipments   Powered AC and DC
Your electrical safety specilist for all equipments Powered AC and DC
 
Gas insulated substation.
Gas insulated substation.Gas insulated substation.
Gas insulated substation.
 
Seminar on Gas Insulated Substation
Seminar on Gas Insulated SubstationSeminar on Gas Insulated Substation
Seminar on Gas Insulated Substation
 
E2 earthing manual earth guidance notes
E2 earthing manual earth guidance notesE2 earthing manual earth guidance notes
E2 earthing manual earth guidance notes
 
Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design Factors considered for High Voltage Cable Joint design
Factors considered for High Voltage Cable Joint design
 
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
 
Starting First
Starting FirstStarting First
Starting First
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
underground presentation
underground presentation underground presentation
underground presentation
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
Copper and aluminum compared in a life-cycle cost perspective
Copper and aluminum compared in a life-cycle cost perspectiveCopper and aluminum compared in a life-cycle cost perspective
Copper and aluminum compared in a life-cycle cost perspective
 
1.8 overhead vs underground system
1.8 overhead vs underground system1.8 overhead vs underground system
1.8 overhead vs underground system
 
EE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of CablesEE2353 / High Voltage Engineering - Testing of Cables
EE2353 / High Voltage Engineering - Testing of Cables
 
Comparison of overhead and underground transmission lines
Comparison of overhead and underground transmission linesComparison of overhead and underground transmission lines
Comparison of overhead and underground transmission lines
 
GIS-NESCL-6
GIS-NESCL-6GIS-NESCL-6
GIS-NESCL-6
 
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...End of-life factors in high voltage gas insulated switchgear with sf6 or with...
End of-life factors in high voltage gas insulated switchgear with sf6 or with...
 

Viewers also liked

Basic principles of electrical safety
Basic principles of electrical safetyBasic principles of electrical safety
Basic principles of electrical safety
Muthurv Venkatachalam
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
mrmackenzie
 

Viewers also liked (11)

Presentation: Induced AC Interference, Corrosion & Mitigation
Presentation: Induced AC Interference, Corrosion & MitigationPresentation: Induced AC Interference, Corrosion & Mitigation
Presentation: Induced AC Interference, Corrosion & Mitigation
 
Ac corrosion-booklet-44-pagg
Ac corrosion-booklet-44-paggAc corrosion-booklet-44-pagg
Ac corrosion-booklet-44-pagg
 
Rail safety listening activity
Rail safety listening activityRail safety listening activity
Rail safety listening activity
 
Basic principles of electrical safety
Basic principles of electrical safetyBasic principles of electrical safety
Basic principles of electrical safety
 
Safety Precautions While Working on Electric Installations
Safety Precautions While Working on Electric InstallationsSafety Precautions While Working on Electric Installations
Safety Precautions While Working on Electric Installations
 
Electrical Hazards and their safety
Electrical Hazards and their safetyElectrical Hazards and their safety
Electrical Hazards and their safety
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 
Electrical hazards and safety measures
Electrical hazards and safety measuresElectrical hazards and safety measures
Electrical hazards and safety measures
 
Top 10 rules for electric safety
Top 10 rules for electric safetyTop 10 rules for electric safety
Top 10 rules for electric safety
 
Technical Marketing is the Price of Admission
Technical Marketing is the Price of AdmissionTechnical Marketing is the Price of Admission
Technical Marketing is the Price of Admission
 
Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment Water Quality Control and Treatment Water Treatment
Water Quality Control and Treatment Water Treatment
 

Similar to Presentation: Induced AC Mitigation for Safety and Corrosion Control

Impressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPImpressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCP
Tauseef bin Abdul Rashid
 

Similar to Presentation: Induced AC Mitigation for Safety and Corrosion Control (20)

Stray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom MollicaStray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom Mollica
 
Stray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom MollicaStray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom Mollica
 
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
 
NEI Underground Presentation 06-09-09 (1).pdf
NEI Underground Presentation 06-09-09 (1).pdfNEI Underground Presentation 06-09-09 (1).pdf
NEI Underground Presentation 06-09-09 (1).pdf
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
AC Interference Analysis and Mitigation
AC Interference Analysis and MitigationAC Interference Analysis and Mitigation
AC Interference Analysis and Mitigation
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
 
Corrosion in pipeline
Corrosion in pipelineCorrosion in pipeline
Corrosion in pipeline
 
Impressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPImpressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCP
 
Underground electric-transmission-lines
Underground electric-transmission-linesUnderground electric-transmission-lines
Underground electric-transmission-lines
 
Ccs for solar power pv plant
Ccs for solar power pv plantCcs for solar power pv plant
Ccs for solar power pv plant
 
Ccs for solar power pv plant
Ccs for solar power pv plantCcs for solar power pv plant
Ccs for solar power pv plant
 
Effect of grounding
Effect of groundingEffect of grounding
Effect of grounding
 
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Power System I Chapt 3.pdf
Power System I Chapt 3.pdfPower System I Chapt 3.pdf
Power System I Chapt 3.pdf
 
Cable Sizing Calculations
Cable Sizing CalculationsCable Sizing Calculations
Cable Sizing Calculations
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 

More from Marcellus Drilling News

More from Marcellus Drilling News (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final Certificate
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 

Recently uploaded

{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
Diya Sharma
 

Recently uploaded (20)

Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 

Presentation: Induced AC Mitigation for Safety and Corrosion Control

  • 1. Induced AC Mitigation for Safety and Corrosion Control
  • 2. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 Good morning… Rob Shoaf Point Integrity Solutions 137 Eayrestown Road, Unit C Southampton, NJ 08055 p. 609.859.4323 c. 609.534.3973 rob@pointintegrity.com
  • 3. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Two Reasons to be aware of Induced AC on a pipeline – Personnel Safety – Integrity of pipeline
  • 4. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Personnel Safety – NACE RP0177-2000 and OSHA Standard 2207, Part 1926 • AC voltage potentials shall remain below 15 Volts (rms) open circuit • Source current less than 5mA • This equates to a resistance in the body of 3000 Ohm
  • 5. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 6. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Induced AC – Electromagnetic interference similar to the operation of a transformer. – Proportional to power line current – Proportional to length of parallelism – Inversely proportional to separation distance
  • 7. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • How to Protect People – Bring down voltages • Locally with grounding mats – Zinc tied directly to pipe at above ground sites like block valves, blow down pipes • Existing grounding facilities at valve sites, trap sites, meter stations, compressor/pump stations – Must use decoupling device if tying to non CP protected structures • Globally with long grounding cable along pipeline – Zinc ribbon » Be careful of life, galvanic ribbon is consumable – Bare copper with decoupling device » Can install in coke breeze to lower cable to ground resistance » Deeper may be more moist and less susceptible to seasonal resistivity changes. Check layer resistivity in design phase – Electrically isolate short sections of pipeline from each other. IF’s at 1000 foot intervals. Not very practical for impressed CP system – Have poor coating ;)
  • 8. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Consideration should be given not only to steady state AC voltages but also spikes from fault currents and lightning - Conductive Coupling – Design should consider max fault current possible by consultation with local power company – Size connecting wires and decoupling device accordingly.
  • 9. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Example of damage from medium voltage fault current on line
  • 10. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 11. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Personnel Safety During Construction – Sections of welded pipe on or in the ditch during construction can generate substantial open circuit voltages and even high currents if long enough – Working on existing lines in the ground in AC corridors can be very dangerous • Ways to address – Temporary ground rods at each end of joint or continuous section of joints. 1 in. x 6 ft. with #2 or greater connecting wire » Connect with metallic circumferential clamp, pipe end clamp, 50 lb pull magnets » 1 rod for less than 200 feet of pipe, 2 for 200 feet or more – Temporary grounding mats of zinc or even galvanized fencing bonded to valves, risers, etc. – Rubber tired equipment to have 10 foot or longer chain attached to frame and drug when on ROW – Grounded fuel trucks bonded to equipment being fueled – Like working with half cell, be sure to make your ground connection first and disconnect it last.
  • 12. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 13. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 14. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 15. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 16. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • AC Corrosion
  • 17. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 18. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Factors that influence AC corrosion potential. – Open circuit AC voltage on pipe • Entry or exodus of power line ROW • Discontinuity in power lines – Localized Soil resistivity – Holiday size – Condition of pipeline coating • FBE lines – high coating resistance – low attenuation • Coal tar and asphalt lines – lossy • Equation to determine the AC current density at a pipeline coating holiday: iac – AC current density (amp/m^2) d – diameter of holiday (meters) VAC – AC voltage of the pipeline p – soil resistivity (ohm-m) d V i AC AC ρπ 8 =
  • 19. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 – Does not occur or is negligible at AC current densities of less than 20 A/m^2 – Is possible at AC current densities of 20 – 100 A/m^2 – Is anticipated at AC current densities of greater than 100 A/m^2 even with high levels of cathodic polarization – Coating holidays having an area of 1 cm^2 represent a worst-case risk.
  • 20. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Recently found corrosion example – New pipeline, installed 2002, 42” FBE Coated – Pigged 2006
  • 21. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • 4 years created 30% metal loss.
  • 22. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Actual conditions: – 8 Vac on pipeline – 1200 ohm-cm soil conditions – Assume 1 cm^2 holiday – Calculates to 169 A/m^2 • Not always high voltage areas.
  • 23. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011
  • 24. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Our Approach to AC Mitigation – Found that modeling of AC corridor is difficult and is only as good as the data input • Can be expensive for sometimes questionable benefit. – Power company may charge for detailed data – Must capture sometimes rapidly changing soil res data – Need very accurate pipe to power line geometry – Walking / riding route has worked • Can get a handle on particulars such as: – Low resistance areas – Changes in power line or pipeline geometry – Allows for collection of soil resistivity data at many points based on judgment – AC voltages at test stations
  • 25. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • AC CIS • Jury Out – Twisted pair w/ shield • Grounded – Looking Promising – Have to interpolate for AC accumulated test on wire.
  • 26. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Mitigation Measures – Install decoupling device (PCR) approximately every 1000 to 2000 feet along line focusing on low resistance areas for making connections to the pipeline. • Allow AC off pipeline while preventing DC from entering pipeline from grounding anode – Grounding Anodes • 1/0 bare stranded copper cable with and without coke breeze • Matcor Mitigator #2 bare copper in coke breeze sleeve • Galvanic Anodes. Prepackaged magnesium bags • Road Casings – be careful to ensure vent is under 15 Vac step and touch limit after hooking to pipeline
  • 27. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Matcor’s Mitigator – Similar to linear anode. Speeds up installation in ditch when coke breeze is required
  • 28. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Typical PCR installation. • Bare copper as grounding anode • Coated 1/0 to Pipeline • Yellow to stationary reference cell to beside pipeline for near IR free reading
  • 29. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Car vs. PCR
  • 30. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Installation Considerations – Install grounding anode on side of pipeline facing power corridor – Typical offset of grounding anode is 5 to 10 feet off side of pipeline. Distance may depend on land rights. – Connect to both ends of casing if possible • Check casing for electrical isolation from pipeline. • If shorted, can still use for AC mitigation but will need to keep separate from other grounding structure. – Ensure that decoupling devices are located at bounds of shared power corridor and at discontinuities within
  • 31. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Time to see how well the system is working. – Chart before AC and DC reads along with current being discharged
  • 32. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • Check expected current density with local soil resistivity (12,000 ohm-cm) and assumed holiday of 1 cm^2 • Vac before = 15.51 • Vac after = 3.21 • Iac before = 32.9 a/m^2 – possible AC corrosion (in 20 to 100 A/m^2 range) • Iac after = 6.81 A/m^2 – unlikely or negligible AC corrosion • Also brought step and touch potential to below 15 Vac
  • 33. 2011 Gas/Electric Partnership Conference XIX Cypress, Texas February 9th, 2011 • From results slide, DC potential rose on the pipeline. This is common when AC potential is removed. • Went from -1.35 to -1.39 CSE – Very common to see 50 to 500 mV increase to on CP reads