The Economic Impact of
Dominion
Capital Expenditure
Projects
Prepared for Dominion Virginia Power
October 22, 2015
2
Table of Contents
BACKGROUND ....................................................................................................................................................................3
ECONOMIC IMPACT OF DOMINION CAPITAL EXPENDITURE IN VIRGINIA..................................................................................4
ECONOMIC IMPACT OF DVP CAPITAL EXPENDITURE IN VIRGINIA...........................................................................................6
ECONOMIC IMPACT OF DTI CAPITAL EXPENDITURE IN VIRGINIA .............................................................................................7
APPENDIX 1: DESCRIPTION OF DOMINION PROJECTS IN VIRGINIA...........................................................................................9
Dominion Virginia Power (DVP) .........................................................................................................................9
Dominion Transmission, Inc. (DTI) .....................................................................................................................11
APPENDIX 2: IMPACT ANALYSIS GLOSSARY .........................................................................................................................12
3
Background
Dominion Resources, Inc. (Dominion) has planned many significant capital expenditure projects in
Virginia in the next six years, from 2015 through 2020. Those projects (Table 1) are developed by two
business units—Dominion Virginia Power (DVP) and Dominion Transmission, Inc. (DTI).
For Dominion Virginia Power, its projects include electric generation, electric transmission, and distribution,
as well as environmental projects. As Table 1 shows, DVP’s electric generation projects now underway or
planned include those utilizing both fossil fuel and renewable sources such as solar and offshore wind. Its
electric transmission and distribution projects are related to new transmission lines and the planned
undergrounding of a significant part of its distribution networks. The environmental projects involve
significant investment such as coal ash pond closures and other initiatives to comply with various EPA
regulations. For Dominion Transmission, Inc., major projects include the Atlantic Coast Pipeline (ACP), as
well as other non-ACP natural gas projects. Those Dominion projects represent total capital expenditure
of $11.7 billion from 2015 through 2020.1
Table 1: Dominion Capital Expenditure (Total 2015-2020)
Project Amount ($Million)
Dominion Virginia Power (DVP)
Electric Generation Brunswick Power Station $341.6
Greensville Power Station $1,324.8
Offshore Wind (VOWTAP) $378.7
Nuclear (North Anna 3 Development Cost) $808.0
Utility-Scale Solar $700.0
Solar Partnership $43.0
Electric Transmission & Distribution DVP Transmission $3,778.5
DVP Undergrounding $1,000.0
Environmental Projects $727.1
Total DVP $9,101.7
Dominion Transmission, Inc. (DTI)
Atlantic Coast Pipeline (ACP) $2,378.4
Non-ACP Projects $208.7
Total DTI $2,587.1
Total Dominion $11,688.8
Source: Dominion
Dominion contracted Chmura Economics & Analytics (Chmura) to conduct a study analyzing the
economic impact of the above capital expenditure projects in Virginia from 2015 through 2020. Chmura
1 Please see Appendix 1 for descriptions of those projects.
4
used the IMPLAN Pro® model to simulate the economic impact of these projects, for both the
construction and ongoing operation phases. The direct, indirect, and induced impacts in spending and
job creation were estimated. 2
This report summarizes the economic impact of all Dominion capital expenditure projects, as well as the
economic impact of projects for Dominion Virginia Power and Dominion Transmission, Inc.
Economic Impact of Dominion Capital Expenditure in Virginia
From 2015 through 2020, the total Dominion capital expenditure for the above projects was estimated to
be $11.7 billion in Virginia. This amount will be spent on a wide variety of products and services, including:
land acquisition; construction of power stations, transmission lines, and natural gas pipelines; and
installation of power generation and transmission equipment. There will also be soft costs—such as
architecture, engineering, and other professional services.
Not every product and service necessary for the above projects is available in Virginia. Consequently,
some of the capital expenditure for these projects will occur outside the state. Based on data from
Dominion, it was estimated that $5.7 billion of the total $11.7 billion will be spent in Virginia.3
Table 2 details the estimated economic impact of Dominion’s capital expenditure in the Commonwealth
of Virginia. From 2015 to 2020, it was estimated that the construction activities of those projects will
generate a total economic impact (including direct, indirect, and induced effects) of $10.1 billion in
Virginia, which can support 71,554 cumulative jobs.4 Of the total economic impact, $5.7 billion will be
direct spending by Dominion within the state, with cumulative direct jobs amounting to 38,367 from 2015
to 2020. The indirect impact in Virginia will total $2.0 billion and support 14,138 cumulative jobs during the
construction phase in industries serving construction. The induced impact in the state during the
construction period is expected to be $2.4 billion with 19,048 cumulative jobs concentrated in consumer
service-related industries. On an annual average basis from 2015 to 2020, the total investment impact of
Dominion’s capital expenditure will be $1.7 billion that can support 11,926 Virginia jobs.
2 Direct impact is defined as the economic activity generated by the project under consideration. Indirect impact is
secondary economic activity generated by the project due to suppliers to the development, construction, or
ongoing operations. For a power generation plant, the induced impact is economic activity generated when the
workers at the power station and their suppliers spend their income at retail stores, restaurants, and professional
offices. Please see Appendix 1 for a glossary.
3 The $5.7 billion does not include land cost.
4 Each cumulative job is defined as one job that lasts for one year. As a result, if one construction worker works on a
project for 6 years, the number of cumulative jobs is 6, while the annual average number of job is 1.
5
Table 2: Economic Impact of Dominion Capital Expenditure in Virginia
Direct Indirect Induced Total
One-time Construction
2015 Spending ($Million) $777.1 $266.9 $311.8 $1,355.8
Employment 5,318 1,948 2,583 9,849
2016 Spending ($Million) $1,309.2 $454.3 $537.6 $2,301.1
Employment 8,062 3,039 4,031 15,132
2017 Spending ($Million) $1,400.4 $490.6 $590.8 $2,481.9
Employment 9,142 3,453 4,635 17,230
2018 Spending ($Million) $1,015.8 $349.6 $429.2 $1,794.6
Employment 7,077 2,604 3,554 13,235
2019 Spending ($Million) $619.9 $208.3 $254.1 $1,082.4
Employment 4,421 1,565 2,145 8,131
2020 Spending ($Million) $616.6 $207.1 $252.1 $1,075.8
Employment 4,346 1,530 2,100 7,976
Total (2015-2020) Spending ($Million) $5,739.0 $1,976.9 $2,375.7 $10,091.6
Employment 38,367 14,138 19,048 71,554
Annual Average (2015-2020) Spending ($Million) $956.51 $329.5 $395.9 $1,681.9
Employment 6,395 2,356 3,175 11,926
Ongoing Operation
Annual, 2021 Onward Spending ($Million) $146.0 $40.1 $26.0 $212.1
Employment -388 262 208 82
Note: Impacts are measured in the year when they occur. Numbers may not sum due to rounding
Source: IMPLAN Pro 2013, Dominion, and Chmura
The ongoing economic impact of Dominion’s capital expenditure was measured beginning the year
2021, when many of the projects listed in Table 1 will be in operation.5 For all Dominion projects’ ongoing
operations, the total annual economic impact (direct, indirect, and induced) was estimated to be $212.1
million (measured in 2021 dollars), which can support 82 jobs in Virginia. This economic impact from the
above projects is incremental to the impact generated by existing Dominion operations.6 The direct
impact of the ongoing operations of all Dominion projects was estimated to have annual gross revenue
of $146.0 million. Permanent employment will be reduced by 388. The reason for the reduction is that for
DVP’s transmission projects, despite billions in capital expenditure, permanent employment of the
department will be reduced by 551 in 2021(compared to its 2014 level), which is more than the job
increase resulting from DVP electricity generation and DTI projects. However, despite the net reduction in
5 Some of the projects will start operation before 2021. The ongoing operational impact of those projects was
measured in 2021 dollars. The ongoing operations of projects that will not be in service in 2021 were not included in
this study.
6 For many projects, such as environmental and distribution projects, the ongoing operation will be managed by
existing employees. As a result, the incremental employment will be zero.
6
employment, overall operation expenses and revenue of the transmission department will rise, so the
direct spending impact is positive.7 Similarly, the indirect and induced spending and employment impact
is positive due to the fact that total revenue and payroll of the transmission department will expand in
2021, despite the reduction in direct employment.8 As a result, the indirect operational impact of all of
Dominion’s projects was estimated to be $40.1 million and 262 jobs per year. The induced impact was
estimated to be $26.0 million, with associated jobs of 208 per year from 2021 onward.
Economic Impact of DVP Capital Expenditure in Virginia
From 2015 through 2020, total capital expenditure by Dominion Virginia Power was estimated to be $9.1
billion. Based on data from Dominion, it was estimated that $4.7 billion of total capital expenditure will be
spent in Virginia.
Table 3 details the estimated economic impact of DVP capital expenditure in the Commonwealth of
Virginia. From 2015 to 2020, it was estimated that construction activities of the DVP projects will generate
a total economic impact (including direct, indirect, and induced effects) of $8.2 billion in Virginia, which
can support 59,555 cumulative jobs. Of the total economic impact, $4.7 billion will be direct spending by
DVP within the state, with cumulative direct jobs amounting to 32,244 from 2015 to 2020. The indirect
impact in Virginia will total $1.6 billion and support 11,613 cumulative jobs during the construction phase
in industries supporting construction. The induced impact in the state during the construction period is
expected to be $1.9 billion with 15,698 cumulative jobs concentrated in consumer service-related
industries. On an annual average basis from 2015 to 2020, the total investment impact of DVP’s capital
expenditure will be $1.4 billion that can support 9,926 Virginia jobs.
The economic impact of ongoing operations of the DVP projects was measured beginning the year 2021,
when many of the projects listed in Table 1 will be in operation. The total annual economic impact
(direct, indirect, and induced) of all ongoing operations of DVP’s projects was estimated to be $169.5
million (measured in 2021 dollars). The direct impact was estimated to have annual gross revenue of
$120.7 million. Permanent employment will be reduced by 431 due to job reductions at DVP’s transmission
department. The indirect impact was estimated to be $32.4 million and 238 jobs per year, while the
induced impact was estimated to be $16.4 million, with associated jobs of 172 per year from 2021
onward.
7 This can be achieved by the increase in employee productivity. The business can reach increased sales (revenue)
with fewer employees.
8 Source: Dominion.
7
Table 3: Economic Impact of DVP Capital Expenditure in Virginia (2015-2020)
Direct Indirect Induced Total
One-time Construction
2015 Spending ($Million) $741.0 $253.8 $295.9 $1,290.7
Employment 5,102 1,858 2,465 9,426
2016 Spending ($Million) $1,053.1 $360.5 $422.4 $1,835.9
Employment 6,522 2,403 3,188 12,114
2017 Spending ($Million) $916.5 $312.6 $371.5 $1,600.5
Employment 6,268 2,268 3,063 11,599
2018 Spending ($Million) $769.5 $258.9 $317.5 $1,345.9
Employment 5,640 2,011 2,768 10,419
2019 Spending ($Million) $610.1 $204.7 $249.6 $1,064.5
Employment 4,365 1,542 2,114 8,021
2020 Spending ($Million) $616.6 $207.1 $252.1 $1,075.8
Employment 4,346 1,530 2,100 7,976
Total (2015-2020) Spending ($Million) $4,706.8 $1,597.6 $1,909.0 $8,213.4
Employment 32,244 11,613 15,698 59,555
Annual Average (2015-2020) Spending ($Million) $784.46 $266.3 $318.2 $1,368.9
Employment 5,374 1,935 2,616 9,926
Ongoing Operation
Annual, 2021 Onward Spending ($Million) $120.7 $32.4 $16.4 $169.5
Employment -431 238 172 -21
Note: Impacts are measured in the year when they occur. Numbers may not sum due to rounding
Source: IMPLAN Pro 2013, Dominion, and Chmura
Economic Impact of DTI Capital Expenditure in Virginia
From 2015 through 2020, total capital expenditure for Dominion Transmission, Inc. projects in Virginia was
estimated to be $2.6 billion.9 Based on data from Dominion, it was estimated that $1.0 billion of the total
$2.6 billion in capital expenditure will be spent in Virginia.
Table 4 presents the estimated economic impact of DTI capital expenditure in the Commonwealth of
Virginia. From 2015 to 2020, it was estimated that construction activities of the DTI projects will generate a
total economic impact (including direct, indirect, and induced effects) of $1.9 billion in Virginia, which
can support 11,999 cumulative jobs. Of the total economic impact, $1.0 billion will be direct spending by
DTI within the state, with cumulative direct jobs amounting to 6,124 from 2015 to 2020. The indirect impact
in Virginia will total $379.3 million and support 2,525 cumulative jobs during the construction phase in
9 For example, the Atlantic Coast Pipeline project’s capital expenditure amounts in West Virginia and North Carolina
are not included in this figure.
8
industries serving construction. The induced impact in the state during the construction period is
expected to be $466.7 million with 3,350 cumulative jobs concentrated in consumer service-related
industries. On an annual average basis from 2015 to 2020, the total investment impact of Dominion
capital expenditure will be $313.0 million that can support 2,000 Virginia jobs.
Table 4: Economic Impact of DTI Capital Expenditure in Virginia (2015-2020)
Direct Indirect Induced Total
One-time Construction
2015 Spending ($Million) $36.2 $13.1 $15.9 $65.1
Employment 216 90 118 424
2016 Spending ($Million) $256.1 $93.9 $115.3 $465.2
Employment 1,540 636 843 3,018
2017 Spending ($Million) $484.0 $178.0 $219.3 $881.3
Employment 2,874 1,185 1,572 5,631
2018 Spending ($Million) $246.2 $90.6 $111.7 $448.6
Employment 1,438 592 786 2,817
2019 Spending ($Million) $9.8 $3.6 $4.4 $17.9
Employment 56 23 31 110
2020 Spending ($Million) $0.0 $0.0 $0.0 $0.0
Employment 0 0 0 0
Total (2015-2020) Spending ($Million) $1,032.3 $379.3 $466.7 $1,878.2
Employment 6,124 2,525 3,350 11,999
Annual Average (2015-2020) Spending ($Million) $172.0 $63.2 $77.8 $313.0
Employment 1,021 421 558 2,000
Ongoing Operation
Annual, 2021 Onward Spending ($Million) $25.3 $7.7 $9.6 $42.6
Employment 43 23 36 103
Note: Impacts are measured in the year when they occur. Numbers may not sum due to rounding
Source: IMPLAN Pro 2013, Dominion, and Chmura
The ongoing economic impact of DTI capital expenditure was measured beginning the year 2021, when
the Atlantic Coast Pipeline and other non-ACP projects will be in operation. The total annual economic
impact (direct, indirect, and induced) of the ongoing operation of DTI’s projects was estimated to be
$42.6 million (measured in 2021 dollars) which can support 103 total jobs in Virginia. In terms of direct
impact, the DTI projects were estimated to have annual gross revenue of $25.3 million and employ 43
new permanent workers. The indirect impact was estimated to be $7.7 million and 23 jobs per year. The
induced impact was estimated to be $9.6 million, with associated jobs of 36 per year from 2021 onward.
9
Appendix 1: Description of Dominion Projects in Virginia
Dominion Virginia Power (DVP)
Electric Generation
Brunswick Power Station
Brunswick Power Station is a natural gas-powered electric generating facility now under construction
near Lawrenceville in Brunswick County. When operational, it will have a generating capacity of
approximately 1,358 megawatts using combined-cycle technology and be capable of meeting the
peak electrical needs of approximately 340,000 typical homes. The State Corporation Commission (SCC)
approved construction of the project in an order issued in August 2013. The station is expected to begin
commercial operation in the summer of 2016.
Greensville Power Station
Dominion Virginia Power has proposed constructing the Greensville Power Station, a natural-gas fired
facility with a generating capacity of approximately 1,600 megawatts. To be built on a site in Greensville
County, the station would use energy-efficient combined-cycle technology, consisting of three gas-fired
combustion turbines and a steam turbine, and would produce enough power to meet the peak
electrical demands of approximately 400,000 typical homes. The company submitted its application to
build the project to the State Corporation Commission (SCC) in July 2015. Subject to SCC and
environmental approvals, construction is scheduled to begin in mid-2016.
Offshore Wind (VOWTAP)
Dominion Virginia Power leads a consortium of private companies and government agencies that will
develop the Virginia Offshore Wind Technology Advancement Project (VOWTAP) to test offshore wind
generation. The project will be located approximately 27 miles off the coast of Virginia Beach. Dominion
has received $51 million in grants from the U.S. Department of Energy to support VOWTAP, which would
consist of two 6-megawatt wind turbines connected to the onshore grid by underwater cable. Other
members of the consortium include Alstom Power, Inc.; KBR; Virginia Department of Mines, Minerals and
Energy; National Renewable Energy Laboratory; Virginia Tech Advanced Research Institute; Newport
News Shipbuilding; and Tetra Tech. The company’s 2015 Integrated Resource Plan projects an in-service
date of 2019 for VOWTAP. Dominion Virginia Power is currently working with stakeholders to explore ways
to support the continued development of the project.
Nuclear (North Anna 3 Development Cost)
Dominion Virginia Power is evaluating development of a third nuclear reactor at North Anna Power
Station (North Anna 3) in Louisa County. The technology selected for North Anna 3 is the General Electric-
Hitachi Economic Simplified Boiling Water Reactor (ESBWR). The company expects to receive a
Combined Operating License (COL) for the facility from the U.S. Nuclear Regulatory Commission in 2017.
Dominion Virginia Power emphasizes that it has not committed to building North Anna 3 and will make no
final decision until after the issuance of the COL. However, the company recognizes for planning
10
purposes that the emissions-free characteristics of nuclear generation will be important considerations as
the carbon-dioxide emissions reduction mandates of the U.S. Environmental Agency’s Clean Power Plan
are implemented. According to the company’s 2015 Integrated Resource Plan, the earliest possible in-
service date for the 1,453-megawatt reactor would be September 2027.
Utility-Scale Solar
Dominion Virginia Power announced plans in February 2015 to develop multiple large-scale solar projects
totaling 400 megawatts of electricity in Virginia by 2020. Together, these solar facilities are anticipated to
be capable of generating enough electricity at peak capacity to power 100,000 homes.
Solar Partnership Program
Under the Solar Partnership Program, Dominion Virginia Power constructs and operates small-scale solar
facilities on leased rooftops or grounds of commercial businesses or public properties. Individual
installations can generate up to 2 megawatts of electricity. The program is designed to study the benefits
and impacts of solar distributed generation targeted electric distribution circuits.
Electric Transmission and Distribution
DVP Transmission
Dominion Virginia Power operates more than 6,400 miles of high-voltage electric transmission lines
operating at voltages ranging from 69 kilovolts to 500 kilovolts. The company is engaged in a significant,
long-term program to strengthen its transmission system, interconnect new electric generating units,
expand the system to meet the needs of a growing customer base, and replace aging infrastructure. In
addition to new construction, the company is undertaking projects to improve both the physical and
cyber-security of its transmission assets. Capital investment in the transmission system is expected to
approach $3.8 billion in Virginia during the 2015-2020 period.
DVP Undergrounding
Dominion Virginia Power’s Strategic Underground Program is the company’s initiative aimed at improving
service reliability by converting a significant part of its overhead electric distribution system to
underground service. Using a data-driven process, the company is analyzing the 10-year outage history
of tap lines that carry electricity to homes and neighborhoods to determine the segments most
vulnerable to damage from wind, limbs, trees, and other hazards, particularly during severe weather
events. Over more than a decade, the company plans to place as many as 4,000 miles of these
vulnerable tap lines underground, improving local circuit reliability and significantly reducing the time
needed to restore power to all customers after major events such as storms and hurricanes. To-date, the
company has converted to underground service approximately 200 miles of overhead tap lines.
Environmental Projects
Dominion Virginia Power is planning a variety of environmental improvements at its power stations to
meet new federal regulations, including those for the storage of coal combustion residuals; control of
effluents that could impact surface and groundwater; and regulation of station cooling water intakes.
11
The company also faces increasingly strict federal air quality regulations and is responding through
improvements such as the scheduled installation of equipment to reduce nitrogen oxide emissions from its
Possum Point Power Station in Prince William County.
Dominion Transmission, Inc. (DTI)
Atlantic Coast Pipeline
Dominion Transmission, Inc. will construct and operate a major interstate natural gas transportation
facility, the Atlantic Coast Pipeline, for a group of four regional energy companies (Atlantic Coast
Pipeline, LLC) consisting of Dominion, Duke Energy, AGL Resources (parent of Virginia Natural Gas) and
Piedmont Natural Gas. The 564-mile project will provide greatly improved access for Virginia and North
Carolina to the expanding natural gas production in the Appalachian basin. In addition to serving
commercial and residential natural gas customers, much of the fuel transported through the project will
be used for electric generation. About 280 miles of the pipeline will run through western, central and
southern Virginia, including a 79-mile extension carrying natural gas east to the Hampton Roads area.
Atlantic Coast Pipeline, LLC, filed its application for approval of the project with the Federal Energy
Regulatory Commission (FERC) on September 18, 2015. Pending needed regulatory and environmental
approvals, construction is expected to begin in the second half of 2016 with the pipeline in service during
the fourth quarter of 2018.
Non-ACP Projects
Dominion Transmission, Inc. also owns and operates other interstate natural gas transmission assets in
Virginia. Planned improvements in this system are scheduled during the 2015-2020 period, primarily
compressor station upgrades.
12
Appendix 2: Impact Analysis Glossary
IMPLAN Professional—an economic impact assessment modeling system. It allows the user to build
economic models to estimate the impacts of economic changes in states, counties, or communities. It
was created in the 1970s by the Forestry Service and is widely used by economists to estimate the impact
of specific events on the overall economy.
Input-Output Analysis—an examination of business-business and business-consumer economic
relationships capturing all monetary transactions in a given period, allowing one to calculate the effects
of a change in an economic activity on the entire economy (impact analysis).
Direct Impact—economic activity generated by a project or operation. For construction, this represents
activity of the contractor; for operations, this represents activity by tenants of the property.
Overhead—construction inputs not provided by the contractor.
Indirect Impact—secondary economic activity that is generated by a project or operation. An example
might be a new office building generating demand for parking garages.
Induced (Household) Impact—economic activity generated by household income resulting from direct
and indirect impacts.
Ripple Effect—the sum of induced and indirect impacts. In some projects, it is more appropriate to report
ripple effects than indirect and induced impacts separately.
Multiplier—the cumulative impacts of a unit change in economic activity on the entire economy.

Contenu connexe

Tendances

CBO’s Updated Budget and Economic Projections
CBO’s Updated Budget and Economic Projections CBO’s Updated Budget and Economic Projections
CBO’s Updated Budget and Economic Projections Congressional Budget Office
 
Deltek - Federal IT spending in 2012
Deltek - Federal IT spending in 2012Deltek - Federal IT spending in 2012
Deltek - Federal IT spending in 2012jlee1212
 
CBO’s Budget and Economic Analysis During the Pandemic
CBO’s Budget and Economic Analysis During the PandemicCBO’s Budget and Economic Analysis During the Pandemic
CBO’s Budget and Economic Analysis During the PandemicCongressional Budget Office
 
Dan Borst Power Point Presentation 2015 Tax Symposium
Dan Borst Power Point Presentation 2015 Tax SymposiumDan Borst Power Point Presentation 2015 Tax Symposium
Dan Borst Power Point Presentation 2015 Tax SymposiumDaniel Borst
 
-Future Of US Budget-Expected Future
-Future Of US Budget-Expected Future-Future Of US Budget-Expected Future
-Future Of US Budget-Expected FutureKay E. Strong
 
Shadac mnsure outreach
Shadac mnsure outreachShadac mnsure outreach
Shadac mnsure outreachsoder145
 
An Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget OutlookAn Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget OutlookCongressional Budget Office
 
Estimating the Federal Budgetary Effects of Pandemic-Related Legislation
Estimating the Federal Budgetary Effects of Pandemic-Related LegislationEstimating the Federal Budgetary Effects of Pandemic-Related Legislation
Estimating the Federal Budgetary Effects of Pandemic-Related LegislationCongressional Budget Office
 
Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)
Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)
Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)Brad Keithley
 
20211022 nzks presentation read-only
20211022 nzks presentation     read-only20211022 nzks presentation     read-only
20211022 nzks presentation read-onlyMcGuinness Institute
 
An Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget OutlookAn Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget OutlookCongressional Budget Office
 
Elmhurst college thomasjohnson-taxpresentation 1 26 11 updated
Elmhurst college thomasjohnson-taxpresentation 1 26 11 updatedElmhurst college thomasjohnson-taxpresentation 1 26 11 updated
Elmhurst college thomasjohnson-taxpresentation 1 26 11 updatedStorer Rowley
 

Tendances (19)

Hawaii Governor David Ige - Caught In The Spider's Web
Hawaii Governor David Ige - Caught In The Spider's WebHawaii Governor David Ige - Caught In The Spider's Web
Hawaii Governor David Ige - Caught In The Spider's Web
 
CBO’s Updated Budget and Economic Projections
CBO’s Updated Budget and Economic Projections CBO’s Updated Budget and Economic Projections
CBO’s Updated Budget and Economic Projections
 
RELEASE: Gov. Beshear Announces Green Boiler to Expand Operations in Danvill...
RELEASE:  Gov. Beshear Announces Green Boiler to Expand Operations in Danvill...RELEASE:  Gov. Beshear Announces Green Boiler to Expand Operations in Danvill...
RELEASE: Gov. Beshear Announces Green Boiler to Expand Operations in Danvill...
 
Deltek - Federal IT spending in 2012
Deltek - Federal IT spending in 2012Deltek - Federal IT spending in 2012
Deltek - Federal IT spending in 2012
 
CBO’s Budget and Economic Analysis During the Pandemic
CBO’s Budget and Economic Analysis During the PandemicCBO’s Budget and Economic Analysis During the Pandemic
CBO’s Budget and Economic Analysis During the Pandemic
 
An Overview of CBO’s Work on Climate Change
An Overview of CBO’s Work on Climate ChangeAn Overview of CBO’s Work on Climate Change
An Overview of CBO’s Work on Climate Change
 
Dan Borst Power Point Presentation 2015 Tax Symposium
Dan Borst Power Point Presentation 2015 Tax SymposiumDan Borst Power Point Presentation 2015 Tax Symposium
Dan Borst Power Point Presentation 2015 Tax Symposium
 
-Future Of US Budget-Expected Future
-Future Of US Budget-Expected Future-Future Of US Budget-Expected Future
-Future Of US Budget-Expected Future
 
Shadac mnsure outreach
Shadac mnsure outreachShadac mnsure outreach
Shadac mnsure outreach
 
CBO’s Updated Budget Projections
CBO’s Updated Budget ProjectionsCBO’s Updated Budget Projections
CBO’s Updated Budget Projections
 
An Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget OutlookAn Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget Outlook
 
Estimating the Federal Budgetary Effects of Pandemic-Related Legislation
Estimating the Federal Budgetary Effects of Pandemic-Related LegislationEstimating the Federal Budgetary Effects of Pandemic-Related Legislation
Estimating the Federal Budgetary Effects of Pandemic-Related Legislation
 
Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)
Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)
Alaska's Fiscal Situation: Where We've Been, Where We're Headed (10.26.2019)
 
CBO’s Policy Growth Model
CBO’s Policy Growth ModelCBO’s Policy Growth Model
CBO’s Policy Growth Model
 
20211022 nzks presentation read-only
20211022 nzks presentation     read-only20211022 nzks presentation     read-only
20211022 nzks presentation read-only
 
The Budget and Economic Outlook
The Budget and Economic OutlookThe Budget and Economic Outlook
The Budget and Economic Outlook
 
CBO’s Updated Budget and Economic Projections
CBO’s Updated Budget and Economic ProjectionsCBO’s Updated Budget and Economic Projections
CBO’s Updated Budget and Economic Projections
 
An Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget OutlookAn Overview of the 2021 Long-Term Budget Outlook
An Overview of the 2021 Long-Term Budget Outlook
 
Elmhurst college thomasjohnson-taxpresentation 1 26 11 updated
Elmhurst college thomasjohnson-taxpresentation 1 26 11 updatedElmhurst college thomasjohnson-taxpresentation 1 26 11 updated
Elmhurst college thomasjohnson-taxpresentation 1 26 11 updated
 

Similaire à The Economic Impact of Dominion Capital Expenditure Projects in Virginia 2015-2020

Report: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NC
Report: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NCReport: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NC
Report: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NCMarcellus Drilling News
 
Review of the Financial Plan of the City of New York
Review of the Financial Plan of the City of New York Review of the Financial Plan of the City of New York
Review of the Financial Plan of the City of New York Luis Taveras EMBA, MS
 
Ghana Priorities: Industrialization
Ghana Priorities: IndustrializationGhana Priorities: Industrialization
Ghana Priorities: IndustrializationCopenhagen_Consensus
 
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...UNDP Climate
 
Item # 1a - July 14, 2021 Budget Work Session Minutes
Item # 1a - July 14, 2021 Budget Work Session MinutesItem # 1a - July 14, 2021 Budget Work Session Minutes
Item # 1a - July 14, 2021 Budget Work Session Minutesahcitycouncil
 
04 03-17 april investor presentation final
04 03-17 april investor presentation final04 03-17 april investor presentation final
04 03-17 april investor presentation finalAES_BigSky
 
Item # 15 4th Quarter Financial Report
Item # 15  4th Quarter Financial ReportItem # 15  4th Quarter Financial Report
Item # 15 4th Quarter Financial Reportahcitycouncil
 
Item # 10 - 3rd Quarter Financial Report
Item # 10 - 3rd Quarter Financial ReportItem # 10 - 3rd Quarter Financial Report
Item # 10 - 3rd Quarter Financial Reportahcitycouncil
 
Callan NDT Study 2016
Callan NDT Study 2016Callan NDT Study 2016
Callan NDT Study 2016Callan
 
Agencies thru 2024-Warren Global
Agencies thru 2024-Warren GlobalAgencies thru 2024-Warren Global
Agencies thru 2024-Warren GlobalWarren Global Corp
 
Sample paper term 2 (Economics Answer).pdf
Sample paper term 2 (Economics Answer).pdfSample paper term 2 (Economics Answer).pdf
Sample paper term 2 (Economics Answer).pdfchiraggoswami18
 
Jpl 2010 Lic Combined Presentation Monroe Lic
Jpl 2010 Lic Combined Presentation Monroe LicJpl 2010 Lic Combined Presentation Monroe Lic
Jpl 2010 Lic Combined Presentation Monroe LicTana Trichel
 
Item # 14 - Refunding Bond 2020
Item # 14 - Refunding Bond 2020Item # 14 - Refunding Bond 2020
Item # 14 - Refunding Bond 2020ahcitycouncil
 
Item # 7 - 4Q Financial Report FY22
Item # 7 - 4Q Financial Report FY22Item # 7 - 4Q Financial Report FY22
Item # 7 - 4Q Financial Report FY22ahcitycouncil
 
Relatório da indústria de energia no estado de Nova Iorque
Relatório da indústria de energia no estado de Nova IorqueRelatório da indústria de energia no estado de Nova Iorque
Relatório da indústria de energia no estado de Nova IorqueMauricioBemfica1
 
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...San Diego County Water Authority
 
Police station presentation for council 10 21-10
Police station presentation for council 10 21-10Police station presentation for council 10 21-10
Police station presentation for council 10 21-10logictrail
 

Similaire à The Economic Impact of Dominion Capital Expenditure Projects in Virginia 2015-2020 (20)

Report: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NC
Report: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NCReport: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NC
Report: The Economic Impact of the Atlantic Coast Pipeline in WV, VA, NC
 
Review of the Financial Plan of the City of New York
Review of the Financial Plan of the City of New York Review of the Financial Plan of the City of New York
Review of the Financial Plan of the City of New York
 
Ghana Priorities: Industrialization
Ghana Priorities: IndustrializationGhana Priorities: Industrialization
Ghana Priorities: Industrialization
 
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
Thailand UNDP-GIZ workshop on CBA - Enhancing resilience in Thailand through ...
 
2020 Budget Education Session
2020 Budget Education Session2020 Budget Education Session
2020 Budget Education Session
 
Item # 1a - July 14, 2021 Budget Work Session Minutes
Item # 1a - July 14, 2021 Budget Work Session MinutesItem # 1a - July 14, 2021 Budget Work Session Minutes
Item # 1a - July 14, 2021 Budget Work Session Minutes
 
04 03-17 april investor presentation final
04 03-17 april investor presentation final04 03-17 april investor presentation final
04 03-17 april investor presentation final
 
Item # 15 4th Quarter Financial Report
Item # 15  4th Quarter Financial ReportItem # 15  4th Quarter Financial Report
Item # 15 4th Quarter Financial Report
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Item # 10 - 3rd Quarter Financial Report
Item # 10 - 3rd Quarter Financial ReportItem # 10 - 3rd Quarter Financial Report
Item # 10 - 3rd Quarter Financial Report
 
Callan NDT Study 2016
Callan NDT Study 2016Callan NDT Study 2016
Callan NDT Study 2016
 
Agencies thru 2024-Warren Global
Agencies thru 2024-Warren GlobalAgencies thru 2024-Warren Global
Agencies thru 2024-Warren Global
 
Sample paper term 2 (Economics Answer).pdf
Sample paper term 2 (Economics Answer).pdfSample paper term 2 (Economics Answer).pdf
Sample paper term 2 (Economics Answer).pdf
 
Jpl 2010 Lic Combined Presentation Monroe Lic
Jpl 2010 Lic Combined Presentation Monroe LicJpl 2010 Lic Combined Presentation Monroe Lic
Jpl 2010 Lic Combined Presentation Monroe Lic
 
Macro-economic Implications of Electricity Subsidies by Paul Dorosh, IFPRI
Macro-economic Implications of Electricity Subsidies by Paul Dorosh, IFPRIMacro-economic Implications of Electricity Subsidies by Paul Dorosh, IFPRI
Macro-economic Implications of Electricity Subsidies by Paul Dorosh, IFPRI
 
Item # 14 - Refunding Bond 2020
Item # 14 - Refunding Bond 2020Item # 14 - Refunding Bond 2020
Item # 14 - Refunding Bond 2020
 
Item # 7 - 4Q Financial Report FY22
Item # 7 - 4Q Financial Report FY22Item # 7 - 4Q Financial Report FY22
Item # 7 - 4Q Financial Report FY22
 
Relatório da indústria de energia no estado de Nova Iorque
Relatório da indústria de energia no estado de Nova IorqueRelatório da indústria de energia no estado de Nova Iorque
Relatório da indústria de energia no estado de Nova Iorque
 
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
Bay-Delta Conservation Plan: Preliminary Assessment of Financing Risk Paramet...
 
Police station presentation for council 10 21-10
Police station presentation for council 10 21-10Police station presentation for council 10 21-10
Police station presentation for council 10 21-10
 

Plus de Marcellus Drilling News

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongMarcellus Drilling News
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Marcellus Drilling News
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateMarcellus Drilling News
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateMarcellus Drilling News
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesMarcellus Drilling News
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingMarcellus Drilling News
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Marcellus Drilling News
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesMarcellus Drilling News
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015Marcellus Drilling News
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015Marcellus Drilling News
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsMarcellus Drilling News
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...Marcellus Drilling News
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...Marcellus Drilling News
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsMarcellus Drilling News
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookMarcellus Drilling News
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideMarcellus Drilling News
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditMarcellus Drilling News
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Marcellus Drilling News
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportMarcellus Drilling News
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectMarcellus Drilling News
 

Plus de Marcellus Drilling News (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
 
Rover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final CertificateRover Pipeline Letter to FERC Requesting Final Certificate
Rover Pipeline Letter to FERC Requesting Final Certificate
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 

Dernier

Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Tableget joys
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreiebhavenpr
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPsychicRuben LoveSpells
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Dernier (20)

Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf28042024_First India Newspaper Jaipur.pdf
28042024_First India Newspaper Jaipur.pdf
 

The Economic Impact of Dominion Capital Expenditure Projects in Virginia 2015-2020

  • 1. 1309 E Cary Street, Richmond, VA 23219 1025 Huron Road East, Cleveland, OH 44115 chmuraecon.com The Economic Impact of Dominion Capital Expenditure Projects Prepared for Dominion Virginia Power October 22, 2015
  • 2. 2 Table of Contents BACKGROUND ....................................................................................................................................................................3 ECONOMIC IMPACT OF DOMINION CAPITAL EXPENDITURE IN VIRGINIA..................................................................................4 ECONOMIC IMPACT OF DVP CAPITAL EXPENDITURE IN VIRGINIA...........................................................................................6 ECONOMIC IMPACT OF DTI CAPITAL EXPENDITURE IN VIRGINIA .............................................................................................7 APPENDIX 1: DESCRIPTION OF DOMINION PROJECTS IN VIRGINIA...........................................................................................9 Dominion Virginia Power (DVP) .........................................................................................................................9 Dominion Transmission, Inc. (DTI) .....................................................................................................................11 APPENDIX 2: IMPACT ANALYSIS GLOSSARY .........................................................................................................................12
  • 3. 3 Background Dominion Resources, Inc. (Dominion) has planned many significant capital expenditure projects in Virginia in the next six years, from 2015 through 2020. Those projects (Table 1) are developed by two business units—Dominion Virginia Power (DVP) and Dominion Transmission, Inc. (DTI). For Dominion Virginia Power, its projects include electric generation, electric transmission, and distribution, as well as environmental projects. As Table 1 shows, DVP’s electric generation projects now underway or planned include those utilizing both fossil fuel and renewable sources such as solar and offshore wind. Its electric transmission and distribution projects are related to new transmission lines and the planned undergrounding of a significant part of its distribution networks. The environmental projects involve significant investment such as coal ash pond closures and other initiatives to comply with various EPA regulations. For Dominion Transmission, Inc., major projects include the Atlantic Coast Pipeline (ACP), as well as other non-ACP natural gas projects. Those Dominion projects represent total capital expenditure of $11.7 billion from 2015 through 2020.1 Table 1: Dominion Capital Expenditure (Total 2015-2020) Project Amount ($Million) Dominion Virginia Power (DVP) Electric Generation Brunswick Power Station $341.6 Greensville Power Station $1,324.8 Offshore Wind (VOWTAP) $378.7 Nuclear (North Anna 3 Development Cost) $808.0 Utility-Scale Solar $700.0 Solar Partnership $43.0 Electric Transmission & Distribution DVP Transmission $3,778.5 DVP Undergrounding $1,000.0 Environmental Projects $727.1 Total DVP $9,101.7 Dominion Transmission, Inc. (DTI) Atlantic Coast Pipeline (ACP) $2,378.4 Non-ACP Projects $208.7 Total DTI $2,587.1 Total Dominion $11,688.8 Source: Dominion Dominion contracted Chmura Economics & Analytics (Chmura) to conduct a study analyzing the economic impact of the above capital expenditure projects in Virginia from 2015 through 2020. Chmura 1 Please see Appendix 1 for descriptions of those projects.
  • 4. 4 used the IMPLAN Pro® model to simulate the economic impact of these projects, for both the construction and ongoing operation phases. The direct, indirect, and induced impacts in spending and job creation were estimated. 2 This report summarizes the economic impact of all Dominion capital expenditure projects, as well as the economic impact of projects for Dominion Virginia Power and Dominion Transmission, Inc. Economic Impact of Dominion Capital Expenditure in Virginia From 2015 through 2020, the total Dominion capital expenditure for the above projects was estimated to be $11.7 billion in Virginia. This amount will be spent on a wide variety of products and services, including: land acquisition; construction of power stations, transmission lines, and natural gas pipelines; and installation of power generation and transmission equipment. There will also be soft costs—such as architecture, engineering, and other professional services. Not every product and service necessary for the above projects is available in Virginia. Consequently, some of the capital expenditure for these projects will occur outside the state. Based on data from Dominion, it was estimated that $5.7 billion of the total $11.7 billion will be spent in Virginia.3 Table 2 details the estimated economic impact of Dominion’s capital expenditure in the Commonwealth of Virginia. From 2015 to 2020, it was estimated that the construction activities of those projects will generate a total economic impact (including direct, indirect, and induced effects) of $10.1 billion in Virginia, which can support 71,554 cumulative jobs.4 Of the total economic impact, $5.7 billion will be direct spending by Dominion within the state, with cumulative direct jobs amounting to 38,367 from 2015 to 2020. The indirect impact in Virginia will total $2.0 billion and support 14,138 cumulative jobs during the construction phase in industries serving construction. The induced impact in the state during the construction period is expected to be $2.4 billion with 19,048 cumulative jobs concentrated in consumer service-related industries. On an annual average basis from 2015 to 2020, the total investment impact of Dominion’s capital expenditure will be $1.7 billion that can support 11,926 Virginia jobs. 2 Direct impact is defined as the economic activity generated by the project under consideration. Indirect impact is secondary economic activity generated by the project due to suppliers to the development, construction, or ongoing operations. For a power generation plant, the induced impact is economic activity generated when the workers at the power station and their suppliers spend their income at retail stores, restaurants, and professional offices. Please see Appendix 1 for a glossary. 3 The $5.7 billion does not include land cost. 4 Each cumulative job is defined as one job that lasts for one year. As a result, if one construction worker works on a project for 6 years, the number of cumulative jobs is 6, while the annual average number of job is 1.
  • 5. 5 Table 2: Economic Impact of Dominion Capital Expenditure in Virginia Direct Indirect Induced Total One-time Construction 2015 Spending ($Million) $777.1 $266.9 $311.8 $1,355.8 Employment 5,318 1,948 2,583 9,849 2016 Spending ($Million) $1,309.2 $454.3 $537.6 $2,301.1 Employment 8,062 3,039 4,031 15,132 2017 Spending ($Million) $1,400.4 $490.6 $590.8 $2,481.9 Employment 9,142 3,453 4,635 17,230 2018 Spending ($Million) $1,015.8 $349.6 $429.2 $1,794.6 Employment 7,077 2,604 3,554 13,235 2019 Spending ($Million) $619.9 $208.3 $254.1 $1,082.4 Employment 4,421 1,565 2,145 8,131 2020 Spending ($Million) $616.6 $207.1 $252.1 $1,075.8 Employment 4,346 1,530 2,100 7,976 Total (2015-2020) Spending ($Million) $5,739.0 $1,976.9 $2,375.7 $10,091.6 Employment 38,367 14,138 19,048 71,554 Annual Average (2015-2020) Spending ($Million) $956.51 $329.5 $395.9 $1,681.9 Employment 6,395 2,356 3,175 11,926 Ongoing Operation Annual, 2021 Onward Spending ($Million) $146.0 $40.1 $26.0 $212.1 Employment -388 262 208 82 Note: Impacts are measured in the year when they occur. Numbers may not sum due to rounding Source: IMPLAN Pro 2013, Dominion, and Chmura The ongoing economic impact of Dominion’s capital expenditure was measured beginning the year 2021, when many of the projects listed in Table 1 will be in operation.5 For all Dominion projects’ ongoing operations, the total annual economic impact (direct, indirect, and induced) was estimated to be $212.1 million (measured in 2021 dollars), which can support 82 jobs in Virginia. This economic impact from the above projects is incremental to the impact generated by existing Dominion operations.6 The direct impact of the ongoing operations of all Dominion projects was estimated to have annual gross revenue of $146.0 million. Permanent employment will be reduced by 388. The reason for the reduction is that for DVP’s transmission projects, despite billions in capital expenditure, permanent employment of the department will be reduced by 551 in 2021(compared to its 2014 level), which is more than the job increase resulting from DVP electricity generation and DTI projects. However, despite the net reduction in 5 Some of the projects will start operation before 2021. The ongoing operational impact of those projects was measured in 2021 dollars. The ongoing operations of projects that will not be in service in 2021 were not included in this study. 6 For many projects, such as environmental and distribution projects, the ongoing operation will be managed by existing employees. As a result, the incremental employment will be zero.
  • 6. 6 employment, overall operation expenses and revenue of the transmission department will rise, so the direct spending impact is positive.7 Similarly, the indirect and induced spending and employment impact is positive due to the fact that total revenue and payroll of the transmission department will expand in 2021, despite the reduction in direct employment.8 As a result, the indirect operational impact of all of Dominion’s projects was estimated to be $40.1 million and 262 jobs per year. The induced impact was estimated to be $26.0 million, with associated jobs of 208 per year from 2021 onward. Economic Impact of DVP Capital Expenditure in Virginia From 2015 through 2020, total capital expenditure by Dominion Virginia Power was estimated to be $9.1 billion. Based on data from Dominion, it was estimated that $4.7 billion of total capital expenditure will be spent in Virginia. Table 3 details the estimated economic impact of DVP capital expenditure in the Commonwealth of Virginia. From 2015 to 2020, it was estimated that construction activities of the DVP projects will generate a total economic impact (including direct, indirect, and induced effects) of $8.2 billion in Virginia, which can support 59,555 cumulative jobs. Of the total economic impact, $4.7 billion will be direct spending by DVP within the state, with cumulative direct jobs amounting to 32,244 from 2015 to 2020. The indirect impact in Virginia will total $1.6 billion and support 11,613 cumulative jobs during the construction phase in industries supporting construction. The induced impact in the state during the construction period is expected to be $1.9 billion with 15,698 cumulative jobs concentrated in consumer service-related industries. On an annual average basis from 2015 to 2020, the total investment impact of DVP’s capital expenditure will be $1.4 billion that can support 9,926 Virginia jobs. The economic impact of ongoing operations of the DVP projects was measured beginning the year 2021, when many of the projects listed in Table 1 will be in operation. The total annual economic impact (direct, indirect, and induced) of all ongoing operations of DVP’s projects was estimated to be $169.5 million (measured in 2021 dollars). The direct impact was estimated to have annual gross revenue of $120.7 million. Permanent employment will be reduced by 431 due to job reductions at DVP’s transmission department. The indirect impact was estimated to be $32.4 million and 238 jobs per year, while the induced impact was estimated to be $16.4 million, with associated jobs of 172 per year from 2021 onward. 7 This can be achieved by the increase in employee productivity. The business can reach increased sales (revenue) with fewer employees. 8 Source: Dominion.
  • 7. 7 Table 3: Economic Impact of DVP Capital Expenditure in Virginia (2015-2020) Direct Indirect Induced Total One-time Construction 2015 Spending ($Million) $741.0 $253.8 $295.9 $1,290.7 Employment 5,102 1,858 2,465 9,426 2016 Spending ($Million) $1,053.1 $360.5 $422.4 $1,835.9 Employment 6,522 2,403 3,188 12,114 2017 Spending ($Million) $916.5 $312.6 $371.5 $1,600.5 Employment 6,268 2,268 3,063 11,599 2018 Spending ($Million) $769.5 $258.9 $317.5 $1,345.9 Employment 5,640 2,011 2,768 10,419 2019 Spending ($Million) $610.1 $204.7 $249.6 $1,064.5 Employment 4,365 1,542 2,114 8,021 2020 Spending ($Million) $616.6 $207.1 $252.1 $1,075.8 Employment 4,346 1,530 2,100 7,976 Total (2015-2020) Spending ($Million) $4,706.8 $1,597.6 $1,909.0 $8,213.4 Employment 32,244 11,613 15,698 59,555 Annual Average (2015-2020) Spending ($Million) $784.46 $266.3 $318.2 $1,368.9 Employment 5,374 1,935 2,616 9,926 Ongoing Operation Annual, 2021 Onward Spending ($Million) $120.7 $32.4 $16.4 $169.5 Employment -431 238 172 -21 Note: Impacts are measured in the year when they occur. Numbers may not sum due to rounding Source: IMPLAN Pro 2013, Dominion, and Chmura Economic Impact of DTI Capital Expenditure in Virginia From 2015 through 2020, total capital expenditure for Dominion Transmission, Inc. projects in Virginia was estimated to be $2.6 billion.9 Based on data from Dominion, it was estimated that $1.0 billion of the total $2.6 billion in capital expenditure will be spent in Virginia. Table 4 presents the estimated economic impact of DTI capital expenditure in the Commonwealth of Virginia. From 2015 to 2020, it was estimated that construction activities of the DTI projects will generate a total economic impact (including direct, indirect, and induced effects) of $1.9 billion in Virginia, which can support 11,999 cumulative jobs. Of the total economic impact, $1.0 billion will be direct spending by DTI within the state, with cumulative direct jobs amounting to 6,124 from 2015 to 2020. The indirect impact in Virginia will total $379.3 million and support 2,525 cumulative jobs during the construction phase in 9 For example, the Atlantic Coast Pipeline project’s capital expenditure amounts in West Virginia and North Carolina are not included in this figure.
  • 8. 8 industries serving construction. The induced impact in the state during the construction period is expected to be $466.7 million with 3,350 cumulative jobs concentrated in consumer service-related industries. On an annual average basis from 2015 to 2020, the total investment impact of Dominion capital expenditure will be $313.0 million that can support 2,000 Virginia jobs. Table 4: Economic Impact of DTI Capital Expenditure in Virginia (2015-2020) Direct Indirect Induced Total One-time Construction 2015 Spending ($Million) $36.2 $13.1 $15.9 $65.1 Employment 216 90 118 424 2016 Spending ($Million) $256.1 $93.9 $115.3 $465.2 Employment 1,540 636 843 3,018 2017 Spending ($Million) $484.0 $178.0 $219.3 $881.3 Employment 2,874 1,185 1,572 5,631 2018 Spending ($Million) $246.2 $90.6 $111.7 $448.6 Employment 1,438 592 786 2,817 2019 Spending ($Million) $9.8 $3.6 $4.4 $17.9 Employment 56 23 31 110 2020 Spending ($Million) $0.0 $0.0 $0.0 $0.0 Employment 0 0 0 0 Total (2015-2020) Spending ($Million) $1,032.3 $379.3 $466.7 $1,878.2 Employment 6,124 2,525 3,350 11,999 Annual Average (2015-2020) Spending ($Million) $172.0 $63.2 $77.8 $313.0 Employment 1,021 421 558 2,000 Ongoing Operation Annual, 2021 Onward Spending ($Million) $25.3 $7.7 $9.6 $42.6 Employment 43 23 36 103 Note: Impacts are measured in the year when they occur. Numbers may not sum due to rounding Source: IMPLAN Pro 2013, Dominion, and Chmura The ongoing economic impact of DTI capital expenditure was measured beginning the year 2021, when the Atlantic Coast Pipeline and other non-ACP projects will be in operation. The total annual economic impact (direct, indirect, and induced) of the ongoing operation of DTI’s projects was estimated to be $42.6 million (measured in 2021 dollars) which can support 103 total jobs in Virginia. In terms of direct impact, the DTI projects were estimated to have annual gross revenue of $25.3 million and employ 43 new permanent workers. The indirect impact was estimated to be $7.7 million and 23 jobs per year. The induced impact was estimated to be $9.6 million, with associated jobs of 36 per year from 2021 onward.
  • 9. 9 Appendix 1: Description of Dominion Projects in Virginia Dominion Virginia Power (DVP) Electric Generation Brunswick Power Station Brunswick Power Station is a natural gas-powered electric generating facility now under construction near Lawrenceville in Brunswick County. When operational, it will have a generating capacity of approximately 1,358 megawatts using combined-cycle technology and be capable of meeting the peak electrical needs of approximately 340,000 typical homes. The State Corporation Commission (SCC) approved construction of the project in an order issued in August 2013. The station is expected to begin commercial operation in the summer of 2016. Greensville Power Station Dominion Virginia Power has proposed constructing the Greensville Power Station, a natural-gas fired facility with a generating capacity of approximately 1,600 megawatts. To be built on a site in Greensville County, the station would use energy-efficient combined-cycle technology, consisting of three gas-fired combustion turbines and a steam turbine, and would produce enough power to meet the peak electrical demands of approximately 400,000 typical homes. The company submitted its application to build the project to the State Corporation Commission (SCC) in July 2015. Subject to SCC and environmental approvals, construction is scheduled to begin in mid-2016. Offshore Wind (VOWTAP) Dominion Virginia Power leads a consortium of private companies and government agencies that will develop the Virginia Offshore Wind Technology Advancement Project (VOWTAP) to test offshore wind generation. The project will be located approximately 27 miles off the coast of Virginia Beach. Dominion has received $51 million in grants from the U.S. Department of Energy to support VOWTAP, which would consist of two 6-megawatt wind turbines connected to the onshore grid by underwater cable. Other members of the consortium include Alstom Power, Inc.; KBR; Virginia Department of Mines, Minerals and Energy; National Renewable Energy Laboratory; Virginia Tech Advanced Research Institute; Newport News Shipbuilding; and Tetra Tech. The company’s 2015 Integrated Resource Plan projects an in-service date of 2019 for VOWTAP. Dominion Virginia Power is currently working with stakeholders to explore ways to support the continued development of the project. Nuclear (North Anna 3 Development Cost) Dominion Virginia Power is evaluating development of a third nuclear reactor at North Anna Power Station (North Anna 3) in Louisa County. The technology selected for North Anna 3 is the General Electric- Hitachi Economic Simplified Boiling Water Reactor (ESBWR). The company expects to receive a Combined Operating License (COL) for the facility from the U.S. Nuclear Regulatory Commission in 2017. Dominion Virginia Power emphasizes that it has not committed to building North Anna 3 and will make no final decision until after the issuance of the COL. However, the company recognizes for planning
  • 10. 10 purposes that the emissions-free characteristics of nuclear generation will be important considerations as the carbon-dioxide emissions reduction mandates of the U.S. Environmental Agency’s Clean Power Plan are implemented. According to the company’s 2015 Integrated Resource Plan, the earliest possible in- service date for the 1,453-megawatt reactor would be September 2027. Utility-Scale Solar Dominion Virginia Power announced plans in February 2015 to develop multiple large-scale solar projects totaling 400 megawatts of electricity in Virginia by 2020. Together, these solar facilities are anticipated to be capable of generating enough electricity at peak capacity to power 100,000 homes. Solar Partnership Program Under the Solar Partnership Program, Dominion Virginia Power constructs and operates small-scale solar facilities on leased rooftops or grounds of commercial businesses or public properties. Individual installations can generate up to 2 megawatts of electricity. The program is designed to study the benefits and impacts of solar distributed generation targeted electric distribution circuits. Electric Transmission and Distribution DVP Transmission Dominion Virginia Power operates more than 6,400 miles of high-voltage electric transmission lines operating at voltages ranging from 69 kilovolts to 500 kilovolts. The company is engaged in a significant, long-term program to strengthen its transmission system, interconnect new electric generating units, expand the system to meet the needs of a growing customer base, and replace aging infrastructure. In addition to new construction, the company is undertaking projects to improve both the physical and cyber-security of its transmission assets. Capital investment in the transmission system is expected to approach $3.8 billion in Virginia during the 2015-2020 period. DVP Undergrounding Dominion Virginia Power’s Strategic Underground Program is the company’s initiative aimed at improving service reliability by converting a significant part of its overhead electric distribution system to underground service. Using a data-driven process, the company is analyzing the 10-year outage history of tap lines that carry electricity to homes and neighborhoods to determine the segments most vulnerable to damage from wind, limbs, trees, and other hazards, particularly during severe weather events. Over more than a decade, the company plans to place as many as 4,000 miles of these vulnerable tap lines underground, improving local circuit reliability and significantly reducing the time needed to restore power to all customers after major events such as storms and hurricanes. To-date, the company has converted to underground service approximately 200 miles of overhead tap lines. Environmental Projects Dominion Virginia Power is planning a variety of environmental improvements at its power stations to meet new federal regulations, including those for the storage of coal combustion residuals; control of effluents that could impact surface and groundwater; and regulation of station cooling water intakes.
  • 11. 11 The company also faces increasingly strict federal air quality regulations and is responding through improvements such as the scheduled installation of equipment to reduce nitrogen oxide emissions from its Possum Point Power Station in Prince William County. Dominion Transmission, Inc. (DTI) Atlantic Coast Pipeline Dominion Transmission, Inc. will construct and operate a major interstate natural gas transportation facility, the Atlantic Coast Pipeline, for a group of four regional energy companies (Atlantic Coast Pipeline, LLC) consisting of Dominion, Duke Energy, AGL Resources (parent of Virginia Natural Gas) and Piedmont Natural Gas. The 564-mile project will provide greatly improved access for Virginia and North Carolina to the expanding natural gas production in the Appalachian basin. In addition to serving commercial and residential natural gas customers, much of the fuel transported through the project will be used for electric generation. About 280 miles of the pipeline will run through western, central and southern Virginia, including a 79-mile extension carrying natural gas east to the Hampton Roads area. Atlantic Coast Pipeline, LLC, filed its application for approval of the project with the Federal Energy Regulatory Commission (FERC) on September 18, 2015. Pending needed regulatory and environmental approvals, construction is expected to begin in the second half of 2016 with the pipeline in service during the fourth quarter of 2018. Non-ACP Projects Dominion Transmission, Inc. also owns and operates other interstate natural gas transmission assets in Virginia. Planned improvements in this system are scheduled during the 2015-2020 period, primarily compressor station upgrades.
  • 12. 12 Appendix 2: Impact Analysis Glossary IMPLAN Professional—an economic impact assessment modeling system. It allows the user to build economic models to estimate the impacts of economic changes in states, counties, or communities. It was created in the 1970s by the Forestry Service and is widely used by economists to estimate the impact of specific events on the overall economy. Input-Output Analysis—an examination of business-business and business-consumer economic relationships capturing all monetary transactions in a given period, allowing one to calculate the effects of a change in an economic activity on the entire economy (impact analysis). Direct Impact—economic activity generated by a project or operation. For construction, this represents activity of the contractor; for operations, this represents activity by tenants of the property. Overhead—construction inputs not provided by the contractor. Indirect Impact—secondary economic activity that is generated by a project or operation. An example might be a new office building generating demand for parking garages. Induced (Household) Impact—economic activity generated by household income resulting from direct and indirect impacts. Ripple Effect—the sum of induced and indirect impacts. In some projects, it is more appropriate to report ripple effects than indirect and induced impacts separately. Multiplier—the cumulative impacts of a unit change in economic activity on the entire economy.