SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
DNUP
UP
DN
DN
DN
87654321
121110987654321
DN
65432
1413121110987
1918171615
8765432
17161514131211109
321
321
321
GROUND LEVEL
0
GROUND FLOOR PLAN
400
BASEMENT FLOOR PLAN
-3000
FIRST FLOOR PLAN
4500
SECOND FLOOR PLAN
7695
THIRD FLOOR PLAN
11500
ROOF PLAN
15000
BC
TOP OF ROOF ACCESS
17500
NAME: MARK THORNTON
CLASS: DESIGN AND DETAIL 3
DATE:
DRAWING NO.SCALE:
CHECKED BY:
ARCHITECTURAL TECHNOLOGY
YEAR 3
1 : 100
KEY SECTION
CURTAIN WALL
CURTAIN WALL CONSTRUCTED FROM
50mm X 150mm ALUMINIUM MULLIONS
@ 2000mm C/C WITH TRIPLE GLAZED
GLASS PANELS WITH ARGON GAS
IN CENTRE TO GET DESIRED U VALUE
TO COMPLY WITH TGD PART L
600mm SPANDREL PANELS FIXED AT
FLOOR INTERVALS WITH LAMATHERM
FIRE STOP 1000mm X 2000mm WINDOW
OPENINGS LOCATED AT EACH FLOOR
TO PROVIDE VENTILATION
AMBULANT DISABLES STAIRS
PRE CAST CONCRETE STAIRS
1500mm WIDE WITH 300mm
GOING AND 180mm RISERS
STAIRS FIXED TO STRUCTURAL
CONCRETE WALL WITH STEEL
AND GLASS HANDRAIL BOLTED
TO STAIRS STAIRS TO COMPLY
WITH TGD M
COLUMNS
400mm x 400mm STEEL
REINFORCED CAST -INSITU
CONCRETE COLUMNS AS PER
STRUCTURAL ENGINEERS
SPECIFICATIONS
ROOF AND PARAPET
300MM CAST IN-SITU CONCRETE
WITH DPM LAID UNDER 100 MM
TAPERED RIGID BOARD INSULATION
WITH 2 LAYERS OF TORCHED ON BITUM
2 70MM C SECTION CHANNELS WITH
400MM STEEL SHEETS FIXED EITHER SIDE
FOR PARAPET WITH 100MMRIGID BOARD
INSULATION WRAPPEDAROUND PARAPET
DPM TO BE WRAPPED INSULATION AND
OVERLAP 100MM WITH INSULATION ON
THE CONCRETE WALL PARAPET FINISHED
WITH ALUMINIUM CAPPING
SUSPENDED CEILING
SUSPENDED CEILING FIXED TO
UNDERSIDE OF 300MM REINFORCED
CAST IN SITU CONCRETE SLAB
WITH WIRES 600X600MM CEILING
TILES PLACED INTO GRID
RAISED ACCESS FLOOR
192MM PEDESTALS FIXED TO
300MM REINFORCED WITH
600X600X38MM PANELS FIXED
PEDESTALS TO ALLOW ACCESS
CLADDING
100MM RIGID BOARD INSULATION
FOR DESIRED U-VALUE TO COMPLY
WITH TGD L STEEL BRACKETS FIXED
TO CONCRETE WALL AND VERTICAL RAILS
FIXED TO BRACKETS AND HORIZONTAL
KINGSPAN BENCHMARK CARRIER
RAIL FIXED TO VERTICAL RAILS 980MM
AND 480MM LONG FIBRE CEMENT
CLADDING FIXED TO CARRIER RAIL WITH
BENCHMARK BRACKET
NTS
10/03/2014
ISO Building Corner
Section Detail

Contenu connexe

Tendances

Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3Aden Saitabau Kumary
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Aden Saitabau Kumary
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingAngeline KH
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresEdel Fox
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2XingYue0907
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)David Dinsdale
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawingsYeeQun
 
JP Slide Show
JP Slide ShowJP Slide Show
JP Slide Showscassidy
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed UseGrant Hepburn
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektMorten Lund
 

Tendances (20)

Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
Floor plans
Floor plansFloor plans
Floor plans
 
Floor plans
Floor plansFloor plans
Floor plans
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
 
Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structures
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Goldcoast housing
Goldcoast housingGoldcoast housing
Goldcoast housing
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
 
T30 HOTEL CHINA
T30 HOTEL CHINAT30 HOTEL CHINA
T30 HOTEL CHINA
 
cpy
cpycpy
cpy
 
JP Slide Show
JP Slide ShowJP Slide Show
JP Slide Show
 
Kopane Courts Mixed Use
Kopane Courts Mixed UseKopane Courts Mixed Use
Kopane Courts Mixed Use
 
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus EffektPOSHTEL SHANGHAI 09 2017 - by Sinus Effekt
POSHTEL SHANGHAI 09 2017 - by Sinus Effekt
 

Similaire à MARK THORNTON ISO CORNER SECTION DETAIL

Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurantkristienadana
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Projectdanburge
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
ALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDCALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDCJonathan Mohabir
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Projectdanburge
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlowTej Raj Upreti
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport DevelopmentTrevain Bechan
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentCraigFensham
 
Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...
Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...
Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...1puneville
 

Similaire à MARK THORNTON ISO CORNER SECTION DETAIL (20)

Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Project
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
School
SchoolSchool
School
 
ALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDCALYSSA MASON - PORTFOLIO - SCDC
ALYSSA MASON - PORTFOLIO - SCDC
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Project
 
Adva
AdvaAdva
Adva
 
House drawing
House drawing House drawing
House drawing
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
JOINERY_WORK
JOINERY_WORKJOINERY_WORK
JOINERY_WORK
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
8 months work
8 months work8 months work
8 months work
 
dan palmer
dan palmerdan palmer
dan palmer
 
Lot 280 Bogdanich way
Lot 280 Bogdanich wayLot 280 Bogdanich way
Lot 280 Bogdanich way
 
7545 103 final plans as proposed
7545 103 final plans as proposed7545 103 final plans as proposed
7545 103 final plans as proposed
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport Development
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce Development
 
Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...
Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...
Puneville - 2, 3, 4BHK Ultra luxurious flat in an elite township project in p...
 

MARK THORNTON ISO CORNER SECTION DETAIL

  • 1. DNUP UP DN DN DN 87654321 121110987654321 DN 65432 1413121110987 1918171615 8765432 17161514131211109 321 321 321 GROUND LEVEL 0 GROUND FLOOR PLAN 400 BASEMENT FLOOR PLAN -3000 FIRST FLOOR PLAN 4500 SECOND FLOOR PLAN 7695 THIRD FLOOR PLAN 11500 ROOF PLAN 15000 BC TOP OF ROOF ACCESS 17500 NAME: MARK THORNTON CLASS: DESIGN AND DETAIL 3 DATE: DRAWING NO.SCALE: CHECKED BY: ARCHITECTURAL TECHNOLOGY YEAR 3 1 : 100 KEY SECTION CURTAIN WALL CURTAIN WALL CONSTRUCTED FROM 50mm X 150mm ALUMINIUM MULLIONS @ 2000mm C/C WITH TRIPLE GLAZED GLASS PANELS WITH ARGON GAS IN CENTRE TO GET DESIRED U VALUE TO COMPLY WITH TGD PART L 600mm SPANDREL PANELS FIXED AT FLOOR INTERVALS WITH LAMATHERM FIRE STOP 1000mm X 2000mm WINDOW OPENINGS LOCATED AT EACH FLOOR TO PROVIDE VENTILATION AMBULANT DISABLES STAIRS PRE CAST CONCRETE STAIRS 1500mm WIDE WITH 300mm GOING AND 180mm RISERS STAIRS FIXED TO STRUCTURAL CONCRETE WALL WITH STEEL AND GLASS HANDRAIL BOLTED TO STAIRS STAIRS TO COMPLY WITH TGD M COLUMNS 400mm x 400mm STEEL REINFORCED CAST -INSITU CONCRETE COLUMNS AS PER STRUCTURAL ENGINEERS SPECIFICATIONS ROOF AND PARAPET 300MM CAST IN-SITU CONCRETE WITH DPM LAID UNDER 100 MM TAPERED RIGID BOARD INSULATION WITH 2 LAYERS OF TORCHED ON BITUM 2 70MM C SECTION CHANNELS WITH 400MM STEEL SHEETS FIXED EITHER SIDE FOR PARAPET WITH 100MMRIGID BOARD INSULATION WRAPPEDAROUND PARAPET DPM TO BE WRAPPED INSULATION AND OVERLAP 100MM WITH INSULATION ON THE CONCRETE WALL PARAPET FINISHED WITH ALUMINIUM CAPPING SUSPENDED CEILING SUSPENDED CEILING FIXED TO UNDERSIDE OF 300MM REINFORCED CAST IN SITU CONCRETE SLAB WITH WIRES 600X600MM CEILING TILES PLACED INTO GRID RAISED ACCESS FLOOR 192MM PEDESTALS FIXED TO 300MM REINFORCED WITH 600X600X38MM PANELS FIXED PEDESTALS TO ALLOW ACCESS CLADDING 100MM RIGID BOARD INSULATION FOR DESIRED U-VALUE TO COMPLY WITH TGD L STEEL BRACKETS FIXED TO CONCRETE WALL AND VERTICAL RAILS FIXED TO BRACKETS AND HORIZONTAL KINGSPAN BENCHMARK CARRIER RAIL FIXED TO VERTICAL RAILS 980MM AND 480MM LONG FIBRE CEMENT CLADDING FIXED TO CARRIER RAIL WITH BENCHMARK BRACKET NTS 10/03/2014 ISO Building Corner Section Detail