Control of Hazardous EnergyControl of Hazardous Energy
LLOCKOCKOOUT/UT/TTAGAGOOUTUT
Plant Asset ProtectionPlant Asset Protection
Lockout/TagoutLockout/Tagout
If you have any questionsIf you have any questions
about the presentation,about the presentation,
please contact:please contact:
Plant Asset Protection (PAP)Plant Asset Protection (PAP)
 Local 388 - Plant Shift-in-ChargeLocal 388 - Plant Shift-in-Charge
 Local 375 - PAP ManagerLocal 375 - PAP Manager
Lockout/TagoutLockout/Tagout
 Purpose of Lockout/TagoutPurpose of Lockout/Tagout
 ScopeScope
 DefinitionsDefinitions
 Step by Step InstructionStep by Step Instruction
Lockout/Tagout – Common ExcusesLockout/Tagout – Common Excuses
 This job will only take a few minutes. I don’t need
to lock it out.
 I’ve done this work for 20 years. I know what I’m
doing. I don’t need to lock it out.
 I’m in a hurry. I’ve locked the equipment out. I’m
sure it’s okay. I don’t need to verify it.
 There are two of us working on the equipment.
There is no need for both of us to lock it out. I’ll
work under my partner’s lock.
Lockout/Tagout – Top 5 ReasonsLockout/Tagout – Top 5 Reasons
1.1. Your life is on the lineYour life is on the line
2.2. Your family and friends love and need youYour family and friends love and need you
3.3. Your co-workers depend on you being aroundYour co-workers depend on you being around
4.4. It’s a company requirementIt’s a company requirement
5.5. It’s a regulatory requirementIt’s a regulatory requirement
Lockout/Tagout – PurposeLockout/Tagout – Purpose
The Concentrate Plant has establishedThe Concentrate Plant has established
requirements for Lockout/Tagout ofrequirements for Lockout/Tagout of
equipment during servicing andequipment during servicing and
maintenance to ensure:maintenance to ensure:
 equipment is isolated & locked or taggedequipment is isolated & locked or tagged
out from all potentially hazardous energyout from all potentially hazardous energy
 where the unexpected energization orwhere the unexpected energization or
release of such energy could cause injury.release of such energy could cause injury.
Lockout/Tagout – ScopeLockout/Tagout – Scope
Lockout/Tagout covers:Lockout/Tagout covers:
SERVICING and MAINTENANCESERVICING and MAINTENANCE ofof
machines and equipment in whichmachines and equipment in which
the unexpected energization, start-the unexpected energization, start-
up or release of energy could causeup or release of energy could cause
injury to employees.injury to employees.
Lockout/Tagout – ScopeLockout/Tagout – Scope
SERVICING and MAINTENANCESERVICING and MAINTENANCE includes:includes:
•Constructing
•Installing
•Setting upSetting up
•AdjustingAdjusting
•Inspecting
•Modifying
•ServicingServicing
•MaintenanceMaintenance
Lockout/Tagout – ScopeLockout/Tagout – Scope
Lockout/Tagout is not requiredLockout/Tagout is not required
for maintenance or servicingfor maintenance or servicing
performed during normalperformed during normal
productionproduction unlessunless itit
requires:requires:
 Removal of a guardRemoval of a guard
 Bypass of a safety deviceBypass of a safety device
 Placement of any part of thePlacement of any part of the
body in point of operation orbody in point of operation or
other danger zoneother danger zone
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
LOCKOUTLOCKOUT
 Placement of a lockoutPlacement of a lockout
device on an energydevice on an energy
isolating device, inisolating device, in
accordance with anaccordance with an
established procedure.established procedure.
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
TAGOUTTAGOUT
 Placement of a tagoutPlacement of a tagout
device on an energydevice on an energy
isolating device, inisolating device, in
accordance with anaccordance with an
established procedure.established procedure.
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
AUTHORIZED PERSONAUTHORIZED PERSON
A duly trained personnelA duly trained personnel
who locks or tagswho locks or tags
machines or equipmentmachines or equipment
to perform maintenanceto perform maintenance
or servicingor servicing
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
AFFECTED PERSONAFFECTED PERSON
A person whose jobA person whose job
requires him/her torequires him/her to
operate or work in anoperate or work in an
area where servicing isarea where servicing is
being performed underbeing performed under
Lockout/Tagout.Lockout/Tagout.
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
SOURCES OF ENERGYSOURCES OF ENERGY
Energy needed to operateEnergy needed to operate
the machine or equipmentthe machine or equipment
 ElectricalElectrical
 HydraulicHydraulic
 PneumaticPneumatic
 MechanicalMechanical
 Process PipingProcess Piping
 ThermalThermal
 StoredStored
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
ENERGY ISOLATING DEVICEENERGY ISOLATING DEVICE
Mechanical device that prevents theMechanical device that prevents the
transmission or release of energytransmission or release of energy
 Electrical circuit breakerElectrical circuit breaker
 Disconnect switchDisconnect switch
 Line valveLine valve
 Slip blindSlip blind
Note: Push button, selector switches,Note: Push button, selector switches,
emergency stops and other control devicesemergency stops and other control devices
are NOT energy isolating devicesare NOT energy isolating devices
Lockout/Tagout – DefinitionsLockout/Tagout – Definitions
Lockout/Tagout Devices mustLockout/Tagout Devices must
be:be:
 DurableDurable
 StandardizedStandardized
 SubstantialSubstantial
 IdentifiableIdentifiable
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
1.1. Know the EquipmentKnow the Equipment
2.2. Notify Affected PersonsNotify Affected Persons
3.3. Shutdown equipment byShutdown equipment by
normal procedures (Ifnormal procedures (If
possible)possible)
4.4. Isolate Equipment byIsolate Equipment by
operating energy isolatingoperating energy isolating
devices.devices.
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
5.5. Apply locks to devicesApply locks to devices
6.6. Dissipate stored energyDissipate stored energy
7.7. VERIFY Lockout isVERIFY Lockout is
effectiveeffective
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
The next step after locking out theThe next step after locking out the
energy sources & dissipating theenergy sources & dissipating the
stored energy is:stored energy is:
a)a) Take a coffee breakTake a coffee break
b)b) Perform servicing/maintenancePerform servicing/maintenance
c)c) Verify the LockoutVerify the Lockout
d)d) None of the aboveNone of the above
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
VERY GOOD!VERY GOOD!
C. IS THE CORRECTC. IS THE CORRECT
ANSWER!ANSWER!
Always verify ifAlways verify if
lockout/tagoutlockout/tagout
performed isperformed is
effective.effective.
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
Verification of Lockout includes:Verification of Lockout includes:
 Push controls buttons, turn knobs,Push controls buttons, turn knobs,
etc.etc.
 Use voltage meter for electricalUse voltage meter for electrical
work (If the employee could bework (If the employee could be
exposed to live circuits)exposed to live circuits)
 (For circuits above 600 volts, check(For circuits above 600 volts, check
meter against a known source,meter against a known source,
before & after use)before & after use)
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
When performing maintenance whereWhen performing maintenance where
the employee could be exposed tothe employee could be exposed to
live electrical circuits, verification islive electrical circuits, verification is
accomplished by turning/pushingaccomplished by turning/pushing
control knobs/buttons.control knobs/buttons.
TRUETRUE
FALSEFALSE
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
VERY GOOD!VERY GOOD!
The answer isThe answer is FalseFalse
Verification isVerification is
accomplished byaccomplished by
using a voltmeter.using a voltmeter.
This must beThis must be
performed by aperformed by a
qualified person.qualified person.
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
ENERGY RESTORATIONENERGY RESTORATION
1.1. Check that tools/parts areCheck that tools/parts are
removedremoved
2.2. Check for people in hazardousCheck for people in hazardous
locationslocations
3.3. Replace guards & safety devicesReplace guards & safety devices
4.4. Notify all Affected employeesNotify all Affected employees
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
ENERGY RESTORATIONENERGY RESTORATION
5.5. Ensure all controls are in theEnsure all controls are in the
“OFF” position“OFF” position
6.6. Remove Locks & TagsRemove Locks & Tags
7.7. Restore EnergyRestore Energy
8.8. Ensure Equipment isEnsure Equipment is
operationaloperational
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
During energy restoration the authorized personDuring energy restoration the authorized person
should:should:
a.a. Check that tools and people are clearedCheck that tools and people are cleared
b.b. Guards and safety devices have been replaced and arGuards and safety devices have been replaced and ar
c.c. All controls are in the “OFF” PositionAll controls are in the “OFF” Position
d.d. All of the aboveAll of the above
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
VERY GOOD!VERY GOOD!
D is the correctD is the correct
answeranswer
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
IMPORTANT POINTS TO CONSIDERIMPORTANT POINTS TO CONSIDER
Lockout/Tagout is the requiredLockout/Tagout is the required
method of isolating machinesmethod of isolating machines
from the energy sourcefrom the energy source
Only Authorized EmployeesOnly Authorized Employees
may lock/tag out equipment.may lock/tag out equipment.
DO NOT ATTEMPT TO OPERATEDO NOT ATTEMPT TO OPERATE
ANY ENERGY ISOLATING DEVICEANY ENERGY ISOLATING DEVICE
WHERE IT IS LOCKED ANDWHERE IT IS LOCKED AND
TAGGED OUT.TAGGED OUT.
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
IMPORTANT POINTS TO CONSIDERIMPORTANT POINTS TO CONSIDER
All equipment must be lockedAll equipment must be locked
and tagged out to protectand tagged out to protect
against accidental oragainst accidental or
inadvertent operation whichinadvertent operation which
could cause injury to personnel.could cause injury to personnel.
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
CONTRACTORSCONTRACTORS
TCCEC and the contractor must inform eachTCCEC and the contractor must inform each
other of their respective lockout/tagoutother of their respective lockout/tagout
procedures.procedures.
The two parties must coordinate theThe two parties must coordinate the
implementation of the procedures.implementation of the procedures.
The contractor’s employees and TCCECThe contractor’s employees and TCCEC
engineering personnel must perform theengineering personnel must perform the
lockout/tagout and verificationlockout/tagout and verification
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
SHIFT CHANGESHIFT CHANGE
There must be a procedure or methodThere must be a procedure or method
to ensure the continuity of theto ensure the continuity of the
Lockout during shift or personnelLockout during shift or personnel
changes.changes.
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
When an outside contractor’s work requires aWhen an outside contractor’s work requires a
lockout/tagout:lockout/tagout:
a.a. TCCEC and the contractor must inform eachTCCEC and the contractor must inform each
other of their Lockout/Tagout proceduresother of their Lockout/Tagout procedures
b.b. The two parties must coordinate theThe two parties must coordinate the
implementation of the procedures.implementation of the procedures.
c.c. Both a and bBoth a and b
d.d. None of the aboveNone of the above
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
VERY GOOD!VERY GOOD!
C is the correctC is the correct
answeranswer
Lockout/Tagout – InstructionsLockout/Tagout – Instructions
ABANDONED LOCKABANDONED LOCK
In general, only the person who applied theIn general, only the person who applied the
lock should remove it.lock should remove it.
The PAP Manager may have the lockThe PAP Manager may have the lock
removed by another authorized person,removed by another authorized person,
under the following conditions:under the following conditions:
 All reasonable attempts have beenAll reasonable attempts have been
made to contact the person whomade to contact the person who
abandoned the lockabandoned the lock
 It has been determined that theIt has been determined that the
equipment is safe to operateequipment is safe to operate
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
Who should normally remove the lock of anWho should normally remove the lock of an
authorized employee?authorized employee?
a.a. The Plant Asset Protection ManagerThe Plant Asset Protection Manager
b.b. The authorized employee performingThe authorized employee performing
lockoutlockout
c.c. Another Authorized employeeAnother Authorized employee
d.d. All of the aboveAll of the above
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
Lockout/Tagout – REVIEWLockout/Tagout – REVIEW
VERY GOOD!VERY GOOD!
B is the correctB is the correct
answeranswer
Under normalUnder normal
conditions, only theconditions, only the
person who appliedperson who applied
the lock shouldthe lock should
remove it.remove it.
Lockout/TagoutLockout/Tagout
LOCK ITLOCK IT
TAG ITTAG IT
VERIFY ITVERIFY IT
Lockout/TagoutLockout/Tagout
QUESTIONS?QUESTIONS?
COMMENTS?COMMENTS?
SUGGESTIONS?SUGGESTIONS?
VIOLENT REACTIONS?VIOLENT REACTIONS?
Safety is Everyone’s Responsibility!Safety is Everyone’s Responsibility!
Safety
Safety

Contenu connexe

Tendances

Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
vtsiri
 
Supervisor Safety Training
Supervisor Safety TrainingSupervisor Safety Training
Supervisor Safety Training
Steve Wise
 

Tendances (20)

Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 
LOTO
LOTO LOTO
LOTO
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
 
Electrical hazards & safety training
Electrical hazards & safety trainingElectrical hazards & safety training
Electrical hazards & safety training
 
ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag Out
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Basic electrical safety
Basic electrical safetyBasic electrical safety
Basic electrical safety
 
Electrical safety
Electrical safetyElectrical safety
Electrical safety
 
Supervisor Safety Training
Supervisor Safety TrainingSupervisor Safety Training
Supervisor Safety Training
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 
Electrical Safety
Electrical SafetyElectrical Safety
Electrical Safety
 

En vedette

Safety as a value
Safety as a valueSafety as a value
Safety as a value
guestbbec14
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
txn4_8
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
Noel Regalado
 
mechanical components & maintenance
mechanical components & maintenancemechanical components & maintenance
mechanical components & maintenance
maizatul fazira
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
foxycrow
 

En vedette (17)

Safety as a value
Safety as a valueSafety as a value
Safety as a value
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelines
 
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)
 
Loto training
Loto trainingLoto training
Loto training
 
Operator Safety - Why are Pre Operation Forklift Inspections so Important?
Operator Safety - Why are Pre Operation Forklift Inspections so Important?Operator Safety - Why are Pre Operation Forklift Inspections so Important?
Operator Safety - Why are Pre Operation Forklift Inspections so Important?
 
mechanical components & maintenance
mechanical components & maintenancemechanical components & maintenance
mechanical components & maintenance
 
LOTO 2
LOTO 2LOTO 2
LOTO 2
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines
 
Safety in cement plant
Safety in cement plantSafety in cement plant
Safety in cement plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Manufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMICManufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMIC
 
Electrical Safety Training by ISRI
Electrical Safety Training by ISRIElectrical Safety Training by ISRI
Electrical Safety Training by ISRI
 
Introduction To Software Engineering
Introduction To Software EngineeringIntroduction To Software Engineering
Introduction To Software Engineering
 

Similaire à Control of hazardous energy

Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
Jon Hilden
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
Assem27
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
Anbr Cama
 

Similaire à Control of hazardous energy (20)

Loto verify awareness
Loto verify awarenessLoto verify awareness
Loto verify awareness
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
Hazardous Energy Control by MSHA
Hazardous Energy Control by MSHAHazardous Energy Control by MSHA
Hazardous Energy Control by MSHA
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
 
Loto.ppt
Loto.pptLoto.ppt
Loto.ppt
 
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
lockout-tagout-training.ppt
lockout-tagout-training.pptlockout-tagout-training.ppt
lockout-tagout-training.ppt
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
The complete procedure of Logout & tagout
The complete procedure of Logout & tagoutThe complete procedure of Logout & tagout
The complete procedure of Logout & tagout
 
LOTO Training.pdf
LOTO Training.pdfLOTO Training.pdf
LOTO Training.pdf
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure
 
LOTO LIVE WIRE CS
LOTO LIVE WIRE CSLOTO LIVE WIRE CS
LOTO LIVE WIRE CS
 

Dernier

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Dernier (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 

Control of hazardous energy

  • 1. Control of Hazardous EnergyControl of Hazardous Energy LLOCKOCKOOUT/UT/TTAGAGOOUTUT Plant Asset ProtectionPlant Asset Protection
  • 2. Lockout/TagoutLockout/Tagout If you have any questionsIf you have any questions about the presentation,about the presentation, please contact:please contact: Plant Asset Protection (PAP)Plant Asset Protection (PAP)  Local 388 - Plant Shift-in-ChargeLocal 388 - Plant Shift-in-Charge  Local 375 - PAP ManagerLocal 375 - PAP Manager
  • 3. Lockout/TagoutLockout/Tagout  Purpose of Lockout/TagoutPurpose of Lockout/Tagout  ScopeScope  DefinitionsDefinitions  Step by Step InstructionStep by Step Instruction
  • 4. Lockout/Tagout – Common ExcusesLockout/Tagout – Common Excuses  This job will only take a few minutes. I don’t need to lock it out.  I’ve done this work for 20 years. I know what I’m doing. I don’t need to lock it out.  I’m in a hurry. I’ve locked the equipment out. I’m sure it’s okay. I don’t need to verify it.  There are two of us working on the equipment. There is no need for both of us to lock it out. I’ll work under my partner’s lock.
  • 5. Lockout/Tagout – Top 5 ReasonsLockout/Tagout – Top 5 Reasons 1.1. Your life is on the lineYour life is on the line 2.2. Your family and friends love and need youYour family and friends love and need you 3.3. Your co-workers depend on you being aroundYour co-workers depend on you being around 4.4. It’s a company requirementIt’s a company requirement 5.5. It’s a regulatory requirementIt’s a regulatory requirement
  • 6. Lockout/Tagout – PurposeLockout/Tagout – Purpose The Concentrate Plant has establishedThe Concentrate Plant has established requirements for Lockout/Tagout ofrequirements for Lockout/Tagout of equipment during servicing andequipment during servicing and maintenance to ensure:maintenance to ensure:  equipment is isolated & locked or taggedequipment is isolated & locked or tagged out from all potentially hazardous energyout from all potentially hazardous energy  where the unexpected energization orwhere the unexpected energization or release of such energy could cause injury.release of such energy could cause injury.
  • 7. Lockout/Tagout – ScopeLockout/Tagout – Scope Lockout/Tagout covers:Lockout/Tagout covers: SERVICING and MAINTENANCESERVICING and MAINTENANCE ofof machines and equipment in whichmachines and equipment in which the unexpected energization, start-the unexpected energization, start- up or release of energy could causeup or release of energy could cause injury to employees.injury to employees.
  • 8. Lockout/Tagout – ScopeLockout/Tagout – Scope SERVICING and MAINTENANCESERVICING and MAINTENANCE includes:includes: •Constructing •Installing •Setting upSetting up •AdjustingAdjusting •Inspecting •Modifying •ServicingServicing •MaintenanceMaintenance
  • 9. Lockout/Tagout – ScopeLockout/Tagout – Scope Lockout/Tagout is not requiredLockout/Tagout is not required for maintenance or servicingfor maintenance or servicing performed during normalperformed during normal productionproduction unlessunless itit requires:requires:  Removal of a guardRemoval of a guard  Bypass of a safety deviceBypass of a safety device  Placement of any part of thePlacement of any part of the body in point of operation orbody in point of operation or other danger zoneother danger zone
  • 10. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions LOCKOUTLOCKOUT  Placement of a lockoutPlacement of a lockout device on an energydevice on an energy isolating device, inisolating device, in accordance with anaccordance with an established procedure.established procedure.
  • 11. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions TAGOUTTAGOUT  Placement of a tagoutPlacement of a tagout device on an energydevice on an energy isolating device, inisolating device, in accordance with anaccordance with an established procedure.established procedure.
  • 12. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions AUTHORIZED PERSONAUTHORIZED PERSON A duly trained personnelA duly trained personnel who locks or tagswho locks or tags machines or equipmentmachines or equipment to perform maintenanceto perform maintenance or servicingor servicing
  • 13. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions AFFECTED PERSONAFFECTED PERSON A person whose jobA person whose job requires him/her torequires him/her to operate or work in anoperate or work in an area where servicing isarea where servicing is being performed underbeing performed under Lockout/Tagout.Lockout/Tagout.
  • 14. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions SOURCES OF ENERGYSOURCES OF ENERGY Energy needed to operateEnergy needed to operate the machine or equipmentthe machine or equipment  ElectricalElectrical  HydraulicHydraulic  PneumaticPneumatic  MechanicalMechanical  Process PipingProcess Piping  ThermalThermal  StoredStored
  • 15. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions ENERGY ISOLATING DEVICEENERGY ISOLATING DEVICE Mechanical device that prevents theMechanical device that prevents the transmission or release of energytransmission or release of energy  Electrical circuit breakerElectrical circuit breaker  Disconnect switchDisconnect switch  Line valveLine valve  Slip blindSlip blind Note: Push button, selector switches,Note: Push button, selector switches, emergency stops and other control devicesemergency stops and other control devices are NOT energy isolating devicesare NOT energy isolating devices
  • 16. Lockout/Tagout – DefinitionsLockout/Tagout – Definitions Lockout/Tagout Devices mustLockout/Tagout Devices must be:be:  DurableDurable  StandardizedStandardized  SubstantialSubstantial  IdentifiableIdentifiable
  • 17. Lockout/Tagout – InstructionsLockout/Tagout – Instructions 1.1. Know the EquipmentKnow the Equipment 2.2. Notify Affected PersonsNotify Affected Persons 3.3. Shutdown equipment byShutdown equipment by normal procedures (Ifnormal procedures (If possible)possible) 4.4. Isolate Equipment byIsolate Equipment by operating energy isolatingoperating energy isolating devices.devices.
  • 18. Lockout/Tagout – InstructionsLockout/Tagout – Instructions 5.5. Apply locks to devicesApply locks to devices 6.6. Dissipate stored energyDissipate stored energy 7.7. VERIFY Lockout isVERIFY Lockout is effectiveeffective
  • 19. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW The next step after locking out theThe next step after locking out the energy sources & dissipating theenergy sources & dissipating the stored energy is:stored energy is: a)a) Take a coffee breakTake a coffee break b)b) Perform servicing/maintenancePerform servicing/maintenance c)c) Verify the LockoutVerify the Lockout d)d) None of the aboveNone of the above
  • 20. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
  • 21. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW VERY GOOD!VERY GOOD! C. IS THE CORRECTC. IS THE CORRECT ANSWER!ANSWER! Always verify ifAlways verify if lockout/tagoutlockout/tagout performed isperformed is effective.effective.
  • 22. Lockout/Tagout – InstructionsLockout/Tagout – Instructions Verification of Lockout includes:Verification of Lockout includes:  Push controls buttons, turn knobs,Push controls buttons, turn knobs, etc.etc.  Use voltage meter for electricalUse voltage meter for electrical work (If the employee could bework (If the employee could be exposed to live circuits)exposed to live circuits)  (For circuits above 600 volts, check(For circuits above 600 volts, check meter against a known source,meter against a known source, before & after use)before & after use)
  • 23. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW When performing maintenance whereWhen performing maintenance where the employee could be exposed tothe employee could be exposed to live electrical circuits, verification islive electrical circuits, verification is accomplished by turning/pushingaccomplished by turning/pushing control knobs/buttons.control knobs/buttons. TRUETRUE FALSEFALSE
  • 24. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
  • 25. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW VERY GOOD!VERY GOOD! The answer isThe answer is FalseFalse Verification isVerification is accomplished byaccomplished by using a voltmeter.using a voltmeter. This must beThis must be performed by aperformed by a qualified person.qualified person.
  • 26. Lockout/Tagout – InstructionsLockout/Tagout – Instructions ENERGY RESTORATIONENERGY RESTORATION 1.1. Check that tools/parts areCheck that tools/parts are removedremoved 2.2. Check for people in hazardousCheck for people in hazardous locationslocations 3.3. Replace guards & safety devicesReplace guards & safety devices 4.4. Notify all Affected employeesNotify all Affected employees
  • 27. Lockout/Tagout – InstructionsLockout/Tagout – Instructions ENERGY RESTORATIONENERGY RESTORATION 5.5. Ensure all controls are in theEnsure all controls are in the “OFF” position“OFF” position 6.6. Remove Locks & TagsRemove Locks & Tags 7.7. Restore EnergyRestore Energy 8.8. Ensure Equipment isEnsure Equipment is operationaloperational
  • 28. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW During energy restoration the authorized personDuring energy restoration the authorized person should:should: a.a. Check that tools and people are clearedCheck that tools and people are cleared b.b. Guards and safety devices have been replaced and arGuards and safety devices have been replaced and ar c.c. All controls are in the “OFF” PositionAll controls are in the “OFF” Position d.d. All of the aboveAll of the above
  • 29. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
  • 30. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW VERY GOOD!VERY GOOD! D is the correctD is the correct answeranswer
  • 31. Lockout/Tagout – InstructionsLockout/Tagout – Instructions IMPORTANT POINTS TO CONSIDERIMPORTANT POINTS TO CONSIDER Lockout/Tagout is the requiredLockout/Tagout is the required method of isolating machinesmethod of isolating machines from the energy sourcefrom the energy source Only Authorized EmployeesOnly Authorized Employees may lock/tag out equipment.may lock/tag out equipment.
  • 32. DO NOT ATTEMPT TO OPERATEDO NOT ATTEMPT TO OPERATE ANY ENERGY ISOLATING DEVICEANY ENERGY ISOLATING DEVICE WHERE IT IS LOCKED ANDWHERE IT IS LOCKED AND TAGGED OUT.TAGGED OUT. Lockout/Tagout – InstructionsLockout/Tagout – Instructions IMPORTANT POINTS TO CONSIDERIMPORTANT POINTS TO CONSIDER All equipment must be lockedAll equipment must be locked and tagged out to protectand tagged out to protect against accidental oragainst accidental or inadvertent operation whichinadvertent operation which could cause injury to personnel.could cause injury to personnel.
  • 33. Lockout/Tagout – InstructionsLockout/Tagout – Instructions CONTRACTORSCONTRACTORS TCCEC and the contractor must inform eachTCCEC and the contractor must inform each other of their respective lockout/tagoutother of their respective lockout/tagout procedures.procedures. The two parties must coordinate theThe two parties must coordinate the implementation of the procedures.implementation of the procedures. The contractor’s employees and TCCECThe contractor’s employees and TCCEC engineering personnel must perform theengineering personnel must perform the lockout/tagout and verificationlockout/tagout and verification
  • 34. Lockout/Tagout – InstructionsLockout/Tagout – Instructions SHIFT CHANGESHIFT CHANGE There must be a procedure or methodThere must be a procedure or method to ensure the continuity of theto ensure the continuity of the Lockout during shift or personnelLockout during shift or personnel changes.changes.
  • 35. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW When an outside contractor’s work requires aWhen an outside contractor’s work requires a lockout/tagout:lockout/tagout: a.a. TCCEC and the contractor must inform eachTCCEC and the contractor must inform each other of their Lockout/Tagout proceduresother of their Lockout/Tagout procedures b.b. The two parties must coordinate theThe two parties must coordinate the implementation of the procedures.implementation of the procedures. c.c. Both a and bBoth a and b d.d. None of the aboveNone of the above
  • 36. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
  • 37. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW VERY GOOD!VERY GOOD! C is the correctC is the correct answeranswer
  • 38. Lockout/Tagout – InstructionsLockout/Tagout – Instructions ABANDONED LOCKABANDONED LOCK In general, only the person who applied theIn general, only the person who applied the lock should remove it.lock should remove it. The PAP Manager may have the lockThe PAP Manager may have the lock removed by another authorized person,removed by another authorized person, under the following conditions:under the following conditions:  All reasonable attempts have beenAll reasonable attempts have been made to contact the person whomade to contact the person who abandoned the lockabandoned the lock  It has been determined that theIt has been determined that the equipment is safe to operateequipment is safe to operate
  • 39. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW Who should normally remove the lock of anWho should normally remove the lock of an authorized employee?authorized employee? a.a. The Plant Asset Protection ManagerThe Plant Asset Protection Manager b.b. The authorized employee performingThe authorized employee performing lockoutlockout c.c. Another Authorized employeeAnother Authorized employee d.d. All of the aboveAll of the above
  • 40. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW INCORRECT ANSWER, LET’S REVIEWINCORRECT ANSWER, LET’S REVIEW
  • 41. Lockout/Tagout – REVIEWLockout/Tagout – REVIEW VERY GOOD!VERY GOOD! B is the correctB is the correct answeranswer Under normalUnder normal conditions, only theconditions, only the person who appliedperson who applied the lock shouldthe lock should remove it.remove it.
  • 42. Lockout/TagoutLockout/Tagout LOCK ITLOCK IT TAG ITTAG IT VERIFY ITVERIFY IT
  • 44. Safety is Everyone’s Responsibility!Safety is Everyone’s Responsibility! Safety Safety