What is the actual condition? (current state)
What is the Next Target Step?
Actual Date Completed:
Zone Leader: Zone:
Starting Date: Target Completion Date:
What is Your Vision:
What Problem Are You Trying To Solve and WHY? (Remember to include what issues the problem is CAUSING)
Use the 5 why methodology to better describe current state
PLAN - Implement the Change VERIFY Success, & Adjust as Needed
Who is doing what, and when might it be completed? Verify Results - What were your conclusions?
1. Why is this problem occurring? The laminate adhesion is
not being checked often enough to catch the pieces with
loose laminate.
2. Why is that? Per standard work, every 20th piece must
be checked for adhesion.
3. Why is that?
4. Why is that?
5. Why is that?
List Possible Solution(s) -
check more parts mor often
A number of laminate skins needed to be remade due to the fact the laminate did not adhere
to the core board. This is costly due to the time spent re-making skins. i.e. the work must be
done twice.
We check 1/20th of the work coming off the press
for loose laminate. 8 parts made it through the
process without being caught.
Revise Standard work to check one part in every 10
for loose laminate.
Matthew Larson will coach operators on 2nd shift
and Cinder Belcher will coach those on 1st shift and
revise standard work for the label station to include
revised laminate adhesion check procedure.
Matthew Larson/Cinder
Belcher
GRL
10/08/2013 10/10/13
Zero loose laminate issues on the BU press
Should This Be Considered For A Poka-Yoke? YES NO

Contenu connexe

Similaire à katalooselam100813

conference PPT ROI-UTM 00
conference PPT ROI-UTM 00conference PPT ROI-UTM 00
conference PPT ROI-UTM 00Richard Oles
 
14.01.01.01 corrective prevetnive action
14.01.01.01 corrective prevetnive action14.01.01.01 corrective prevetnive action
14.01.01.01 corrective prevetnive actionPhat Lu Anh
 
Unlocking slide after flattening 5-20
Unlocking slide after flattening 5-20Unlocking slide after flattening 5-20
Unlocking slide after flattening 5-20John Zill
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan WeeratungaRoshan Sujeewa Weeratunga
 
Bayonne packaging final ppt
Bayonne packaging final pptBayonne packaging final ppt
Bayonne packaging final pptpooja Khetwal
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10ppTaliya Hemanth
 
Process Mapping and Process Improvement for the Small Business Owner
Process Mapping and Process Improvement  for the Small Business OwnerProcess Mapping and Process Improvement  for the Small Business Owner
Process Mapping and Process Improvement for the Small Business OwnerMichiko Diby
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...q-Maxim
 
Simulation of production systems- final report
Simulation of production systems- final reportSimulation of production systems- final report
Simulation of production systems- final reportSatheesh Kumar Chandran
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.ASHISH MENKUDALE
 
Novel Solutions To Process Big Data
Novel Solutions To Process Big DataNovel Solutions To Process Big Data
Novel Solutions To Process Big DataSafe Software
 

Similaire à katalooselam100813 (20)

Artisan RCA1
Artisan RCA1Artisan RCA1
Artisan RCA1
 
Kaizen
KaizenKaizen
Kaizen
 
conference PPT ROI-UTM 00
conference PPT ROI-UTM 00conference PPT ROI-UTM 00
conference PPT ROI-UTM 00
 
14.01.01.01 corrective prevetnive action
14.01.01.01 corrective prevetnive action14.01.01.01 corrective prevetnive action
14.01.01.01 corrective prevetnive action
 
8d_en.pdf
8d_en.pdf8d_en.pdf
8d_en.pdf
 
Unlocking slide after flattening 5-20
Unlocking slide after flattening 5-20Unlocking slide after flattening 5-20
Unlocking slide after flattening 5-20
 
5 w1h
5 w1h5 w1h
5 w1h
 
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
Six Sigma Project Charter Attributa Data of Roshan   WeeratungaSix Sigma Project Charter Attributa Data of Roshan   Weeratunga
Six Sigma Project Charter Attributa Data of Roshan Weeratunga
 
Bayonne packaging final ppt
Bayonne packaging final pptBayonne packaging final ppt
Bayonne packaging final ppt
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10pp
 
Process Mapping and Process Improvement for the Small Business Owner
Process Mapping and Process Improvement  for the Small Business OwnerProcess Mapping and Process Improvement  for the Small Business Owner
Process Mapping and Process Improvement for the Small Business Owner
 
smalBiz
smalBizsmalBiz
smalBiz
 
Mpc sequencing
Mpc   sequencingMpc   sequencing
Mpc sequencing
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...
 
Troubleshooting.pdf
Troubleshooting.pdfTroubleshooting.pdf
Troubleshooting.pdf
 
Simulation of production systems- final report
Simulation of production systems- final reportSimulation of production systems- final report
Simulation of production systems- final report
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.
 
Focus on Growth - 7 Wastes
Focus on Growth - 7 WastesFocus on Growth - 7 Wastes
Focus on Growth - 7 Wastes
 
KAIZEN.pptx
KAIZEN.pptxKAIZEN.pptx
KAIZEN.pptx
 
Novel Solutions To Process Big Data
Novel Solutions To Process Big DataNovel Solutions To Process Big Data
Novel Solutions To Process Big Data
 

katalooselam100813

  • 1. What is the actual condition? (current state) What is the Next Target Step? Actual Date Completed: Zone Leader: Zone: Starting Date: Target Completion Date: What is Your Vision: What Problem Are You Trying To Solve and WHY? (Remember to include what issues the problem is CAUSING) Use the 5 why methodology to better describe current state PLAN - Implement the Change VERIFY Success, & Adjust as Needed Who is doing what, and when might it be completed? Verify Results - What were your conclusions? 1. Why is this problem occurring? The laminate adhesion is not being checked often enough to catch the pieces with loose laminate. 2. Why is that? Per standard work, every 20th piece must be checked for adhesion. 3. Why is that? 4. Why is that? 5. Why is that? List Possible Solution(s) - check more parts mor often A number of laminate skins needed to be remade due to the fact the laminate did not adhere to the core board. This is costly due to the time spent re-making skins. i.e. the work must be done twice. We check 1/20th of the work coming off the press for loose laminate. 8 parts made it through the process without being caught. Revise Standard work to check one part in every 10 for loose laminate. Matthew Larson will coach operators on 2nd shift and Cinder Belcher will coach those on 1st shift and revise standard work for the label station to include revised laminate adhesion check procedure. Matthew Larson/Cinder Belcher GRL 10/08/2013 10/10/13 Zero loose laminate issues on the BU press
  • 2. Should This Be Considered For A Poka-Yoke? YES NO