Project Title    CENTRE POINT TOWER 
Client    TARGETFOLLOW LTD. 
M&E Consultant    Cundall Johnston 
Main Contractor    Longcross Construction Ltd  
Value M&E Works    £1,500,000 
Duration    May 2007 – November 2007 
Contract Type    JCT ‘98 
The  iconic  Centre  Point  Tower  has  been 
progressively  refurbished  as  the  New  Oxford 
Street area of London became a popular place 
to  work.  Newly  refurbished  floors  were  being 
let  quickly  which  lead  to  our  involvement  in 
several Cat B fit out works’ projects. 
 
Following successful completion of phases I and 
II  of  the  mechanical  and  electrical 
refurbishment  to  10  floors  of  Centre  Point 
Tower, Trinity were awarded a further 5 floors 
of office space to refurbish. The programme for 
the  works  took  30  weeks  from  the  initial 
instruction.  
As  with  phases  I  and  II,  we  were  subject  to  the 
same  building  and  occupancy  constraints  of  very 
confined  ceiling  void  services  space  and  the  fact 
that the majority of the other floors of the building 
were  occupied.  The  latter  required  careful 
planning  and  liaison  with  on‐site  personnel  to 
avoid disruption to ‘live’ floors.
As with the other phases, the mechanical services 
consisted  of  a  4  pipe  fan  coil  air  conditioning 
system,  fresh  air  ventilation  and  zonal  extract. 
However  this  particular  phase  also  required 
additional  mechanical works involving  major plant 
replacement.  There were alterations to the boiler 
primary  pipework,  extension/enlargement  of  the 
existing CHW & LPHW risers, supply and installation 
of  new  FCU  chilled  water  inverter  driven  pumps 
and  removal  and  replacement  of  the  existing 
induction  system  pumps.  Completion  of  this  work 
necessitated  the  removal  of  several  items  of 
redundant mechanical plant.

Contenu connexe

Tendances

CHENXIANG XU_Resume
CHENXIANG XU_ResumeCHENXIANG XU_Resume
CHENXIANG XU_ResumeChenxiang Xu
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Mastersimon smith
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison
 
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentationDario Gnoato
 
Chester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse DevelopmentsChester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse DevelopmentsPlace North West
 
Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015FBE Manchester
 
Alex CV Short Selection_email
Alex CV Short Selection_emailAlex CV Short Selection_email
Alex CV Short Selection_emailAlex Matovic
 
Interiors presentation 2013
Interiors presentation 2013Interiors presentation 2013
Interiors presentation 2013John Prendergast
 
Reference from NRA
Reference from NRAReference from NRA
Reference from NRATony O Neill
 
Curriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingCurriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingGary Cutting
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015Hassan gariesh
 

Tendances (20)

CV -AD
CV -ADCV -AD
CV -AD
 
CHENXIANG XU_Resume
CHENXIANG XU_ResumeCHENXIANG XU_Resume
CHENXIANG XU_Resume
 
Smith, Simon- Resume - Master
Smith, Simon- Resume - MasterSmith, Simon- Resume - Master
Smith, Simon- Resume - Master
 
Mahmoud CV 2015
Mahmoud CV 2015Mahmoud CV 2015
Mahmoud CV 2015
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for web
 
Ambulance Station - Beverley
Ambulance Station - BeverleyAmbulance Station - Beverley
Ambulance Station - Beverley
 
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
 
Chester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse DevelopmentsChester Development Update: Phil Mayall, Muse Developments
Chester Development Update: Phil Mayall, Muse Developments
 
Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015Fbe manchester energy event nov 2015
Fbe manchester energy event nov 2015
 
Alex CV Short Selection_email
Alex CV Short Selection_emailAlex CV Short Selection_email
Alex CV Short Selection_email
 
Interiors presentation 2013
Interiors presentation 2013Interiors presentation 2013
Interiors presentation 2013
 
Nick Kennedy cv
Nick Kennedy cvNick Kennedy cv
Nick Kennedy cv
 
Reference from NRA
Reference from NRAReference from NRA
Reference from NRA
 
Curriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen CuttingCurriculum Vitae of Gary Stephen Cutting
Curriculum Vitae of Gary Stephen Cutting
 
ashraf frieg CV
ashraf frieg CVashraf frieg CV
ashraf frieg CV
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
Linkedin Presentation
Linkedin PresentationLinkedin Presentation
Linkedin Presentation
 
Mahmoud Abou EL-Hmad
Mahmoud Abou EL-HmadMahmoud Abou EL-Hmad
Mahmoud Abou EL-Hmad
 
Omar Ash Resume - Kuwait
Omar Ash Resume - KuwaitOmar Ash Resume - Kuwait
Omar Ash Resume - Kuwait
 
MJN Resume
MJN ResumeMJN Resume
MJN Resume
 

En vedette

1. Brochure Soho Hotel
1. Brochure Soho Hotel1. Brochure Soho Hotel
1. Brochure Soho HotelMatthew Warr
 
3. Brochure Trilogy Swindon
3. Brochure Trilogy Swindon3. Brochure Trilogy Swindon
3. Brochure Trilogy SwindonMatthew Warr
 
8. Brochure Luminaire
8. Brochure Luminaire8. Brochure Luminaire
8. Brochure LuminaireMatthew Warr
 
2. Brochure Paramount Club
2. Brochure Paramount Club2. Brochure Paramount Club
2. Brochure Paramount ClubMatthew Warr
 
4. Brochure M&R Towers
4. Brochure M&R Towers4. Brochure M&R Towers
4. Brochure M&R TowersMatthew Warr
 

En vedette (8)

1. Brochure Soho Hotel
1. Brochure Soho Hotel1. Brochure Soho Hotel
1. Brochure Soho Hotel
 
Roundhouse 1
Roundhouse 1Roundhouse 1
Roundhouse 1
 
3. Brochure Trilogy Swindon
3. Brochure Trilogy Swindon3. Brochure Trilogy Swindon
3. Brochure Trilogy Swindon
 
8. Brochure Luminaire
8. Brochure Luminaire8. Brochure Luminaire
8. Brochure Luminaire
 
2. Brochure Paramount Club
2. Brochure Paramount Club2. Brochure Paramount Club
2. Brochure Paramount Club
 
Sunrise
SunriseSunrise
Sunrise
 
4. Brochure M&R Towers
4. Brochure M&R Towers4. Brochure M&R Towers
4. Brochure M&R Towers
 
5. Brochure JPMC
5. Brochure JPMC5. Brochure JPMC
5. Brochure JPMC
 

Similaire à 9. Brochure Centre Point

Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016Tim Read
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul MageePaul Magee
 
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015Terry Harvey
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311weydon23
 
Project Experience - HCE Ltd - Ben Schofield
Project Experience - HCE Ltd - Ben SchofieldProject Experience - HCE Ltd - Ben Schofield
Project Experience - HCE Ltd - Ben SchofieldBen Schofield
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docxbrian157854
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010Tonyamis
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1Eamon Hannaway
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...Mary Montoya
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv newkarl davis
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012JerramFalkus
 
What is First Fix and Second Fix Electrical Construction?
What is First Fix and Second Fix Electrical Construction?What is First Fix and Second Fix Electrical Construction?
What is First Fix and Second Fix Electrical Construction?Electric Works London
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell
 

Similaire à 9. Brochure Centre Point (20)

Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
Terry CV June 2015
Terry CV June 2015Terry CV June 2015
Terry CV June 2015
 
newestcv
newestcvnewestcv
newestcv
 
photos & job descriptions
photos & job descriptionsphotos & job descriptions
photos & job descriptions
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
Project Experience - HCE Ltd - Ben Schofield
Project Experience - HCE Ltd - Ben SchofieldProject Experience - HCE Ltd - Ben Schofield
Project Experience - HCE Ltd - Ben Schofield
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docx
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...Advanced Tunnel Form Construction Technique, Case Study of  Rohan-Abhilasha, ...
Advanced Tunnel Form Construction Technique, Case Study of Rohan-Abhilasha, ...
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
Appendices
AppendicesAppendices
Appendices
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
What is First Fix and Second Fix Electrical Construction?
What is First Fix and Second Fix Electrical Construction?What is First Fix and Second Fix Electrical Construction?
What is First Fix and Second Fix Electrical Construction?
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 

9. Brochure Centre Point

  • 1. MATTHEW WARR PROFESSIONAL PORTFOLIO PROJECT OVERVIEW No.9  RESUME/PORTFOLIO | CONFIDENTIAL                                                              Project Title    CENTRE POINT TOWER  Client    TARGETFOLLOW LTD.  M&E Consultant    Cundall Johnston  Main Contractor    Longcross Construction Ltd   Value M&E Works    £1,500,000  Duration    May 2007 – November 2007  Contract Type    JCT ‘98  The  iconic  Centre  Point  Tower  has  been  progressively  refurbished  as  the  New  Oxford  Street area of London became a popular place  to  work.  Newly  refurbished  floors  were  being  let  quickly  which  lead  to  our  involvement  in  several Cat B fit out works’ projects.    Following successful completion of phases I and  II  of  the  mechanical  and  electrical  refurbishment  to  10  floors  of  Centre  Point  Tower, Trinity were awarded a further 5 floors  of office space to refurbish. The programme for  the  works  took  30  weeks  from  the  initial  instruction.   As  with  phases  I  and  II,  we  were  subject  to  the  same  building  and  occupancy  constraints  of  very  confined  ceiling  void  services  space  and  the  fact  that the majority of the other floors of the building  were  occupied.  The  latter  required  careful  planning  and  liaison  with  on‐site  personnel  to  avoid disruption to ‘live’ floors. As with the other phases, the mechanical services  consisted  of  a  4  pipe  fan  coil  air  conditioning  system,  fresh  air  ventilation  and  zonal  extract.  However  this  particular  phase  also  required  additional  mechanical works involving  major plant  replacement.  There were alterations to the boiler  primary  pipework,  extension/enlargement  of  the  existing CHW & LPHW risers, supply and installation  of  new  FCU  chilled  water  inverter  driven  pumps  and  removal  and  replacement  of  the  existing  induction  system  pumps.  Completion  of  this  work  necessitated  the  removal  of  several  items  of  redundant mechanical plant.