McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
TurnKey Design/Build Services
1.
2. Project Name
Government Facility
Project Location
Charleston, South Carolina
Project Team
Owner: Federal Government
Performance Contractor: Noresco
Government
Central Plants
Performance Contractor
Markets
Specializations
Pipe Shop Prefab
Design/Build
Engineer: McKenney’s, Inc.
Building Information Modeling
Energy Management
3. McKenney’s provided a turnkey design/build solution to replace
an outdated chiller plant in the operating classroom complex of a
government training center.
4. The Challenge
The specified chillers were much larger than the training center’s existing
units, would not fit in the existing central plant’s configuration, and
jeopardized the project’s timing and budget. Since training was in
session, chilled water service could not be interrupted, and temporary
chillers were beyond the budget scope.
The Solution
McKenney’s implemented the turnkey design solution in phases and used
existing central plant equipment during new central plant construction to
minimize shutdowns and stay within budget. A redesign of the central
plant was necessary to accommodate the new equipment, and
installation took place during four complicated, prolonged shutdowns on
weekends.
The content of this document is not intended as an endorsement.
5. The Results
Although the scope of work dramatically changed, McKenney’s executed
and completed this complicated turnkey energy project on time and
within budget without interrupting chilled water service. The energy
savings now achieved will pay for the project costs.
6. 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
sales@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214
P: 704-357-1200
Atlanta Office:
Charlotte Office:
www.mckenneys.com