MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
PROJECT NAME CLIENT NAME PROJECT DESCRIPTION YEAR
Supply, Installation, Testing &
Commissioning Of LED Street
Lights
Punjab University
Employees
Housing Scheme
(Phase-II)
 Supply of LED Street Lights and Power cable
 Installation, testing & Commissioning of LED Street
Lights
2015
Supply of Substation Connectors
& Transmission Line Hardware
LESCO
 Supply of 132KV Substation Connectors &
Transmission Line Hardware
2015
Supply of Transmission Line
Hardware
MEPCO
 Supply of 132 KV transmission line hardware &
SF6 Gas
2015
Supply of Switchgear MEPCO  Supply of 11Kv Outgoing Panels 2015
Supply of Substation Connectors IESCO
 Supply of 132KV Substation Connectors &
Cartridge
2015
Supply of Substation Connectors
& Transmission Line Hardware
PESCO
 Supply of 132KV Substation Connectors,
Transmission line hardware, Cartridges & Control
Cable.
2015
Supply of Termination Kits SEPCO  Supply of 11 KV indoor & outdoor Termination kits. 2015
Page 2 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Supply of Substation Connectors
& Transmission Line Hardware
SEPCO
 Supply of 132KV Substation Connectors,
Transmission line hardware and Cartridges.
2015
Supply of Diesel Generator Sets SEPCO  Supply of 50 KVA & 5 KVA Diesel Generator Sets 2015
Supply of SF6 Gas HESCO  Supply of SF6 Gas 2015
Ibrahim Fiber Faisalabad
 Supply, Installation, Testing & Commissioning of
material regarding 5 KM 11 KV Transmission Lines
2015-To date
Construction of Water Filtration
Plants
KSB
 Excavation in foundation
 Cement Concrete plain
 Reinforced cement concrete in foundations,
columns and walls.
 Fabrication of mild steel reinforcement for cement
concrete
 Supply & filling sand under floor
 Providing, laying, cutting, jointing, testing UPVC
pipe line in trench
 Brickworks
 Supply & fixing of Steel grated Doors
 Supply & fixing of Steel grill
 Plaster of Walls & Columns
 Providing, fixing & jointing of Ceramic & Floor tiles
 Electrification of complete plant
2014- To Date
Page 3 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Construction of Lowari Tunnel
situated in the Khyber-
Pakhtunkhwa province
of Pakistan connecting Dir and Ch
itral Valley
Length: 8.75 km
Diameter: 7.1 meters
SAMBU JV
(South Korea)
 Construction of Roads.
 Supply of complete Construction Material
 Supply of different Construction Machinery
2009-To Date
Construction of Kabul-Kandahar
highway AFGHANISTAN
Rafique
Construction
Company
 Construction of Highway
 Supply of complete Construction Material
 Supply of different Construction Machinery
2011- To Date
Design, Supply, Installation,
Testing & Commissioning of Solar
System for Tube Wells in Dera
Ghazi Khan, Punjab.
Rasheed Farm
House & Yousaf
Farm House
 Supply, Installation, Testing and Commissioning of
40 HP Solar Submersible Pumps.
 Supply, Installation, Testing and Commissioning of
Solar Inverter.
 Supply, Installation, Testing and Commissioning of
Solar Modules.
2014- To Date
External Electrification of Canal
Garden Housing Society
Mohlanwal
 Installation & Commissioning of 11 KV
Transmission Line.
 Installation & Commissioning of Switchgears,
Transformers, Power Generators, Lightning system,
Earthing System, Street Lights, etc
2010-15
Page 4 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Mughal Steel Sheikhupura Road
 Supply, Laying, Installation, Testing &
Commissioning of Power Cables
 Supply, Installation, Testing & Commissioning of
Switchgears
 Supply, Installation, Testing & Commissioning of
material regarding 11 KV Transmission Lines
2009-15
Air Force Officer Housing Society
(AFOHS) (Falcon Complex) Near
Centre Point, Lahore.
PAF
 Installation and Commissioning of Transmission
Line including Installation, Testing &
Commissioning of Transformers.
2011-14
220 KV Wapda Town Grid Station
 Laying, Installation, Testing & Commissioning of
Power & Control Cables
2013-14
132 KV Okara Grid Station
 Laying, Installation, Testing & Commissioning of
Power & Control Cables
 Installation & Commissioning of Termination Kits
2014
132 KV Toba Tek Singh
 Laying, Installation, Testing & Commissioning of
Power & Control Cables
 Installation & Commissioning of Termination Kits
 Installation, Testing & Commissioning of Control &
Relay Panels
2014
MGM GT Road Faisalabad
 Supply, Installation, Testing & Commissioning of
material regarding 7 KM 11 KV Transmission Lines
2013-14
Page 5 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Construction of Mazar-Khomri
Highway AFGHANISTAN
Haji M. Noor
Construction
 Construction of Highway
 Supply of complete Construction Material
 Supply of different Construction Machinery
2010-2014
Designing, Supply, Installation,
Testing and Commissioning of
Switchgears and Electrification of
Different Halls
(Conform to IEC 60364 (Electrical
Installation of Buildings) & IEC
61024 Protection of Structures
against Lightning))
DeSOM Services
Club Lahore
(Supervised by
Military
Engineering
Services (MES))
 Supply, Installation, Testing and Commissioning of
Switchgears.
 Supply, Installation, Testing and Commissioning of
4-Ton Cabinet (FMAC).
 Supply, Installation, Testing and Commissioning of
Power Cables of different sizes.
 Supply, Installation, Testing and Commissioning
Copper Strip for Lightning protection.
 Designing of Electrification and Providing &
Installation of complete electrical fixtures.
2014
Supply & Installation of Various
Electrical and Mechanical
Equipment and Fabrication works
Hyperstar
Lahore
 Supply and Installation of Switchgears.
 Fabrication of Cabinet and Staff Lockers.
2014
Supply & Installation of 350 KVA
Generator (Conform to NFPA 110)
French Embassy
Islamabad
 Supply, Installation, Testing and Commissioning of
350 KVA Generator.
2014
Designing, Supply, Installation,
Testing and Commissioning of
Switchgears, Power Cables and
Electrification
(Conform to IEC 60364 (Electrical
Installation of Buildings) & IEC
60439-1 (Low voltage Switchgear
and controlgear assemblies)
Intelligent
Metering Systems
(Pvt) Ltd.
 Supply, Installation, Testing and Commissioning of
Switchgears.
 Supply, Installation, Testing and Commissioning of
Power Cables of different sizes.
 Electrification and Installation of complete
electrical fixtures.
2014
Page 6 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Interloop GT Road Faisalabad
 Supply, Installation, Testing & Commissioning of
material regarding 7 KM 11 KV Transmission Lines
 Supply, Laying, Installation, Testing &
Commissioning of Power Cables
 Supply, Installation, Testing & Commissioning of
Switchgears
 , Installation, Testing & Commissioning of 2 MVA
Power Transformer
2013-14
Supply & Installation of LT Panels
and 200 KVA Generator
Bar B.Q Tonight
Lahore
 Supply, Installation, Testing and Commissioning of
LT Panels.
 Supply, Installation, Testing and Commissioning of
200 KVA Generator.
2013-14
Electrification, Supply and laying
of Power Cables
(Conform to IEC 60364 (Electrical
Installation of Buildings) & IEC
60268 (Sound System
Equipment))
Quality Switchgear
Ferozpur Road,
Lahore.
 Electrification and Electrical Fixtures installation of
complete factory.
 Supply, Laying and Testing of Power Cables.
 Supply and installation of CCTV.
 Supply and installation of Public Address System.
2013-14
Preparation of Construction
Claims and Drafting of letters
Harbin Electric
International (HEI
China)
 Preparation of EOT & Cost Claims for 560 MW
Combined Cycle Power Plant, Bin Qasim, Karachi.
 Preparation of EOT & Cost Claims for 747 MW
Combined Cycle Power Plant, Guddu, Sindh.
2012-14
Page 7 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Pakistan Medical Housing Society
(PMHS), Sunder State, Raiwind
Road, Lahore.
Pakistan Medical
Association (PMA)
(Supervised by
LESCO)
 Installation & commissioning of Underground
Electrical Distribution System.
 Installation & commissioning of RMUs,
Switchgears, Transformers, Power Generators.
 Installation & commissioning of Lightning system,
Earthing System, Street Lights, etc
2011-13
Construction of Kandahar Airport
AFGHANISTAN
Jannat Gull
Company & Randi
Comapny
 Construction of Runways
 Construction of Building
 Supply of Construction Material
2010-13
Construction of Shurab Airport
AFGHANISTAN
Eid Gull
Construction
Company
 Construction of Runways
 Construction of Building
 Supply of Construction Material
 Supply of different Construction Machinery
2010-13
PEL Transformer Unit-02 PEL
 Installation & Commissioning of Substation,
Switchgears, Transformers, Power Generators.
 Installation & Commissioning of Internal & External
Electrification (Overhead & Underground Electrical
Distribution System).
 Installation & Commissioning of Electrical Wiring &
Light Fixtures, Lightning system & Earthing System.
 Installation & Commissioning of Public Address
System & Fire Alarm System.
2009-13
Page 8 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Supply of CTs LESCO  Supply of 132KV CTs (Supplier Nanfang, China) 2013
Supply of CTs FESCO  Supply of 132KV CTs (Supplier Nanfang, China) 2013
Supply of Distribution
Transformer
IESCO
 Supply of 100 & 200 KVA Distribution Transformer
(Supplier SEC China)
2013
Designing, Installation, Testing &
Commissioning of 132 KV Grid
Station.
Gharibwal Cement
Limited
 Designing of complete 132 KV Grid Station.
 Installation of 132/66KV dual input, 46MVA Power
Transformer.
 Design and develop the connections diagrams /
terminations for all Grid equipment along with
cable schedules, sizes and routing.
 Design and develop Protection and control scheme
design and diagrams.
 Design calculation / setting calculations for relays
as per WAPDA / IESCO requirement.
 Setting of the relays at site and its testing.
 Review of design and calculations and incorporate
/ address any comments received from Utility for
approval. 
2013
Page 9 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
500 KV Grid Station Yousaf Wala
Sahiwal, 132 KV Diplpur Grid
Station, 132 Sadiqqbad Grid
Station & 220 KV Daharki Grid
Station
 Installation, Testing & Commissioning of PLC
Panels
 Termination of Control Cables
2013
Pearl Continental Hotel Muzaffar
Abad A.J.K
P.S.L
 Providing & Installation of complete electrical
fixtures, Lightning protection system and earthing.
2012
Construction of Highway Logar-
Kabul AFGHANISTAN
Engr. Mahmood
Construction
Company
 Construction of Highway
 Supply of complete Construction Material
 Supply of different Construction Machinery
2009-12
Sufi City Housing Scheme (SCHS),
Mandi bahudin.
Malik Ali Amir
(Supervised by
GEPCO)
 Installation & Commissioning of 11 KV
Transmission Line.
 Installation & Commissioning of Switchgears,
Transformers, Power Generators, Lightning system,
Earthing System, Street Lights, etc
2010-11
Page 10 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Al Rehman Garden Housing
Schem (ARGHS) Near Sharqpur
Road, Sheikhupura.
Haji M. Ikhlaq
(Supervised by
LESCO)
 Installation & Commissioning of Transmission Line.
 Installation & Commissioning of Switchgears.
 Installation & Commissioning of Transformers &
Power Generators.
 Installation & Commissioning of Lightning system,
Earthing System & Street Lights, etc.
2009-11
Army Welfare Trust Housing
Scheme Raiwind Road, Lahore.
Army welfare
Trust
 Installation & Commissioning of Transmission Line.
 Installation & Commissioning of Switchgears,
Transformers, Power Generators.
 Installation & Commissioning of Lightning system,
Earthing System, Street Lights, etc in Sector # 01,
02 & 03.
2002-11
Construction of Road from Pasni
to Quetta, Balochistan, Pakistan
FWO
 Construction of Road
 Supply of complete Construction Material
 Supply of different Construction Machinery
2005-07
Construction of CRBC Canal at
Taunsa, Punjab, Pakistan
Taxcer Turkish
Compaany &
Ghulam Rasool
and Company
(Pvt.) Ltd.
 Excavation works and supply of crush etc. 2001-07
Construction of Jalalabad-
Torkham Highway AFGHANISTAN
FWO
 Construction of Highway
 Supply of complete Construction Material
 Supply of different Construction Machinery
2003-06
Construction of Moro-Nosero feroz
Road, Sindh, Pakistan
Hasnain
Construction
Company
 Construction of Road
 Supply of complete Construction Material
2005
Page 11 of 11
MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST 
                                 Projects in Hand or Completed 
Construction of Renala Khurd
Bypass, Punjab, Pakistan
Hasnain
Construction
Company
 Construction of Road
 Supply of complete Construction Material
 Supply of different Construction Machinery
2004
Construction of National Highway
from Okara to Sahiwal, Punjab,
Pakistan
LAC
 Construction of Highway
 Supply of complete Construction Material
1998
Construction of Indus Highway
from Karachi to Peshawar,
Pakistan
China Petroleum
 Supply of complete Construction Material
 Supply of different Construction Machinery
1980-88

Contenu connexe

Tendances

Tendances (19)

MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
transformer Manufactures and exporters in India
transformer Manufactures and exporters in Indiatransformer Manufactures and exporters in India
transformer Manufactures and exporters in India
 
Sameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CVSameh Youssef _Electrical Engineer_CV
Sameh Youssef _Electrical Engineer_CV
 
Raheel iqbal CV1
Raheel iqbal CV1Raheel iqbal CV1
Raheel iqbal CV1
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Dcsr.profile 2016
Dcsr.profile 2016Dcsr.profile 2016
Dcsr.profile 2016
 
DCSR ENERGY
DCSR ENERGYDCSR ENERGY
DCSR ENERGY
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
CV8thApril 2015
CV8thApril 2015CV8thApril 2015
CV8thApril 2015
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
joshi-CV_design (2)
joshi-CV_design (2)joshi-CV_design (2)
joshi-CV_design (2)
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
Jakson Power Solutions
Jakson Power SolutionsJakson Power Solutions
Jakson Power Solutions
 
CV2015
CV2015CV2015
CV2015
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foreman
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
Resume- Rahul Bhardwaj
Resume- Rahul BhardwajResume- Rahul Bhardwaj
Resume- Rahul Bhardwaj
 

En vedette

Present project
Present projectPresent project
Present projectXun Eiei
 
Dist.gen 1
Dist.gen 1Dist.gen 1
Dist.gen 1sanjivkj
 
Commissioning services for substation and power plants
Commissioning services for substation and power plantsCommissioning services for substation and power plants
Commissioning services for substation and power plantsEvaldas Paliliūnas
 
Power Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault DetectionPower Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault DetectionLiving Online
 
automatic power factor controller
automatic power factor controllerautomatic power factor controller
automatic power factor controllersingh1515
 

En vedette (10)

Present project
Present projectPresent project
Present project
 
POWER TRANSMISSION SOLUTIONS
POWER TRANSMISSION SOLUTIONSPOWER TRANSMISSION SOLUTIONS
POWER TRANSMISSION SOLUTIONS
 
Dist.gen 1
Dist.gen 1Dist.gen 1
Dist.gen 1
 
Commissioning services for substation and power plants
Commissioning services for substation and power plantsCommissioning services for substation and power plants
Commissioning services for substation and power plants
 
Loss minimisation in power system
Loss minimisation in power systemLoss minimisation in power system
Loss minimisation in power system
 
Power Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault DetectionPower Cables Operation, Maintenance, Location and Fault Detection
Power Cables Operation, Maintenance, Location and Fault Detection
 
Busbar Design
Busbar DesignBusbar Design
Busbar Design
 
automatic power factor controller
automatic power factor controllerautomatic power factor controller
automatic power factor controller
 
POWER LOSS REDUCTION IN ELECTRICAL DISTRIBUTION SYSTEMS USING CAPACITOR PLACE...
POWER LOSS REDUCTION IN ELECTRICAL DISTRIBUTION SYSTEMS USING CAPACITOR PLACE...POWER LOSS REDUCTION IN ELECTRICAL DISTRIBUTION SYSTEMS USING CAPACITOR PLACE...
POWER LOSS REDUCTION IN ELECTRICAL DISTRIBUTION SYSTEMS USING CAPACITOR PLACE...
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 

Similaire à MECP Projects _Updated on 03-April-2015_

Similaire à MECP Projects _Updated on 03-April-2015_ (20)

CV Solar
CV SolarCV Solar
CV Solar
 
BS Ltd
BS LtdBS Ltd
BS Ltd
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
Engr uzair khan
Engr uzair khanEngr uzair khan
Engr uzair khan
 
CV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical EngineerCV of Ronnel T. Domingo - Electrical Engineer
CV of Ronnel T. Domingo - Electrical Engineer
 
New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
CV
CVCV
CV
 
Ravi_ElectricalEngineer
Ravi_ElectricalEngineerRavi_ElectricalEngineer
Ravi_ElectricalEngineer
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
Resume_Sameer-1 -Simens
Resume_Sameer-1 -SimensResume_Sameer-1 -Simens
Resume_Sameer-1 -Simens
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016Encotec -Company Presentation_Apr 2016
Encotec -Company Presentation_Apr 2016
 
Supreme & co pvt ltd
Supreme & co pvt ltdSupreme & co pvt ltd
Supreme & co pvt ltd
 
sathish kannan EEE
sathish kannan EEEsathish kannan EEE
sathish kannan EEE
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 

MECP Projects _Updated on 03-April-2015_

  • 1. Page 1 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  PROJECT NAME CLIENT NAME PROJECT DESCRIPTION YEAR Supply, Installation, Testing & Commissioning Of LED Street Lights Punjab University Employees Housing Scheme (Phase-II)  Supply of LED Street Lights and Power cable  Installation, testing & Commissioning of LED Street Lights 2015 Supply of Substation Connectors & Transmission Line Hardware LESCO  Supply of 132KV Substation Connectors & Transmission Line Hardware 2015 Supply of Transmission Line Hardware MEPCO  Supply of 132 KV transmission line hardware & SF6 Gas 2015 Supply of Switchgear MEPCO  Supply of 11Kv Outgoing Panels 2015 Supply of Substation Connectors IESCO  Supply of 132KV Substation Connectors & Cartridge 2015 Supply of Substation Connectors & Transmission Line Hardware PESCO  Supply of 132KV Substation Connectors, Transmission line hardware, Cartridges & Control Cable. 2015 Supply of Termination Kits SEPCO  Supply of 11 KV indoor & outdoor Termination kits. 2015
  • 2. Page 2 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Supply of Substation Connectors & Transmission Line Hardware SEPCO  Supply of 132KV Substation Connectors, Transmission line hardware and Cartridges. 2015 Supply of Diesel Generator Sets SEPCO  Supply of 50 KVA & 5 KVA Diesel Generator Sets 2015 Supply of SF6 Gas HESCO  Supply of SF6 Gas 2015 Ibrahim Fiber Faisalabad  Supply, Installation, Testing & Commissioning of material regarding 5 KM 11 KV Transmission Lines 2015-To date Construction of Water Filtration Plants KSB  Excavation in foundation  Cement Concrete plain  Reinforced cement concrete in foundations, columns and walls.  Fabrication of mild steel reinforcement for cement concrete  Supply & filling sand under floor  Providing, laying, cutting, jointing, testing UPVC pipe line in trench  Brickworks  Supply & fixing of Steel grated Doors  Supply & fixing of Steel grill  Plaster of Walls & Columns  Providing, fixing & jointing of Ceramic & Floor tiles  Electrification of complete plant 2014- To Date
  • 3. Page 3 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Construction of Lowari Tunnel situated in the Khyber- Pakhtunkhwa province of Pakistan connecting Dir and Ch itral Valley Length: 8.75 km Diameter: 7.1 meters SAMBU JV (South Korea)  Construction of Roads.  Supply of complete Construction Material  Supply of different Construction Machinery 2009-To Date Construction of Kabul-Kandahar highway AFGHANISTAN Rafique Construction Company  Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 2011- To Date Design, Supply, Installation, Testing & Commissioning of Solar System for Tube Wells in Dera Ghazi Khan, Punjab. Rasheed Farm House & Yousaf Farm House  Supply, Installation, Testing and Commissioning of 40 HP Solar Submersible Pumps.  Supply, Installation, Testing and Commissioning of Solar Inverter.  Supply, Installation, Testing and Commissioning of Solar Modules. 2014- To Date External Electrification of Canal Garden Housing Society Mohlanwal  Installation & Commissioning of 11 KV Transmission Line.  Installation & Commissioning of Switchgears, Transformers, Power Generators, Lightning system, Earthing System, Street Lights, etc 2010-15
  • 4. Page 4 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Mughal Steel Sheikhupura Road  Supply, Laying, Installation, Testing & Commissioning of Power Cables  Supply, Installation, Testing & Commissioning of Switchgears  Supply, Installation, Testing & Commissioning of material regarding 11 KV Transmission Lines 2009-15 Air Force Officer Housing Society (AFOHS) (Falcon Complex) Near Centre Point, Lahore. PAF  Installation and Commissioning of Transmission Line including Installation, Testing & Commissioning of Transformers. 2011-14 220 KV Wapda Town Grid Station  Laying, Installation, Testing & Commissioning of Power & Control Cables 2013-14 132 KV Okara Grid Station  Laying, Installation, Testing & Commissioning of Power & Control Cables  Installation & Commissioning of Termination Kits 2014 132 KV Toba Tek Singh  Laying, Installation, Testing & Commissioning of Power & Control Cables  Installation & Commissioning of Termination Kits  Installation, Testing & Commissioning of Control & Relay Panels 2014 MGM GT Road Faisalabad  Supply, Installation, Testing & Commissioning of material regarding 7 KM 11 KV Transmission Lines 2013-14
  • 5. Page 5 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Construction of Mazar-Khomri Highway AFGHANISTAN Haji M. Noor Construction  Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 2010-2014 Designing, Supply, Installation, Testing and Commissioning of Switchgears and Electrification of Different Halls (Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 61024 Protection of Structures against Lightning)) DeSOM Services Club Lahore (Supervised by Military Engineering Services (MES))  Supply, Installation, Testing and Commissioning of Switchgears.  Supply, Installation, Testing and Commissioning of 4-Ton Cabinet (FMAC).  Supply, Installation, Testing and Commissioning of Power Cables of different sizes.  Supply, Installation, Testing and Commissioning Copper Strip for Lightning protection.  Designing of Electrification and Providing & Installation of complete electrical fixtures. 2014 Supply & Installation of Various Electrical and Mechanical Equipment and Fabrication works Hyperstar Lahore  Supply and Installation of Switchgears.  Fabrication of Cabinet and Staff Lockers. 2014 Supply & Installation of 350 KVA Generator (Conform to NFPA 110) French Embassy Islamabad  Supply, Installation, Testing and Commissioning of 350 KVA Generator. 2014 Designing, Supply, Installation, Testing and Commissioning of Switchgears, Power Cables and Electrification (Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 60439-1 (Low voltage Switchgear and controlgear assemblies) Intelligent Metering Systems (Pvt) Ltd.  Supply, Installation, Testing and Commissioning of Switchgears.  Supply, Installation, Testing and Commissioning of Power Cables of different sizes.  Electrification and Installation of complete electrical fixtures. 2014
  • 6. Page 6 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Interloop GT Road Faisalabad  Supply, Installation, Testing & Commissioning of material regarding 7 KM 11 KV Transmission Lines  Supply, Laying, Installation, Testing & Commissioning of Power Cables  Supply, Installation, Testing & Commissioning of Switchgears  , Installation, Testing & Commissioning of 2 MVA Power Transformer 2013-14 Supply & Installation of LT Panels and 200 KVA Generator Bar B.Q Tonight Lahore  Supply, Installation, Testing and Commissioning of LT Panels.  Supply, Installation, Testing and Commissioning of 200 KVA Generator. 2013-14 Electrification, Supply and laying of Power Cables (Conform to IEC 60364 (Electrical Installation of Buildings) & IEC 60268 (Sound System Equipment)) Quality Switchgear Ferozpur Road, Lahore.  Electrification and Electrical Fixtures installation of complete factory.  Supply, Laying and Testing of Power Cables.  Supply and installation of CCTV.  Supply and installation of Public Address System. 2013-14 Preparation of Construction Claims and Drafting of letters Harbin Electric International (HEI China)  Preparation of EOT & Cost Claims for 560 MW Combined Cycle Power Plant, Bin Qasim, Karachi.  Preparation of EOT & Cost Claims for 747 MW Combined Cycle Power Plant, Guddu, Sindh. 2012-14
  • 7. Page 7 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Pakistan Medical Housing Society (PMHS), Sunder State, Raiwind Road, Lahore. Pakistan Medical Association (PMA) (Supervised by LESCO)  Installation & commissioning of Underground Electrical Distribution System.  Installation & commissioning of RMUs, Switchgears, Transformers, Power Generators.  Installation & commissioning of Lightning system, Earthing System, Street Lights, etc 2011-13 Construction of Kandahar Airport AFGHANISTAN Jannat Gull Company & Randi Comapny  Construction of Runways  Construction of Building  Supply of Construction Material 2010-13 Construction of Shurab Airport AFGHANISTAN Eid Gull Construction Company  Construction of Runways  Construction of Building  Supply of Construction Material  Supply of different Construction Machinery 2010-13 PEL Transformer Unit-02 PEL  Installation & Commissioning of Substation, Switchgears, Transformers, Power Generators.  Installation & Commissioning of Internal & External Electrification (Overhead & Underground Electrical Distribution System).  Installation & Commissioning of Electrical Wiring & Light Fixtures, Lightning system & Earthing System.  Installation & Commissioning of Public Address System & Fire Alarm System. 2009-13
  • 8. Page 8 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Supply of CTs LESCO  Supply of 132KV CTs (Supplier Nanfang, China) 2013 Supply of CTs FESCO  Supply of 132KV CTs (Supplier Nanfang, China) 2013 Supply of Distribution Transformer IESCO  Supply of 100 & 200 KVA Distribution Transformer (Supplier SEC China) 2013 Designing, Installation, Testing & Commissioning of 132 KV Grid Station. Gharibwal Cement Limited  Designing of complete 132 KV Grid Station.  Installation of 132/66KV dual input, 46MVA Power Transformer.  Design and develop the connections diagrams / terminations for all Grid equipment along with cable schedules, sizes and routing.  Design and develop Protection and control scheme design and diagrams.  Design calculation / setting calculations for relays as per WAPDA / IESCO requirement.  Setting of the relays at site and its testing.  Review of design and calculations and incorporate / address any comments received from Utility for approval.  2013
  • 9. Page 9 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  500 KV Grid Station Yousaf Wala Sahiwal, 132 KV Diplpur Grid Station, 132 Sadiqqbad Grid Station & 220 KV Daharki Grid Station  Installation, Testing & Commissioning of PLC Panels  Termination of Control Cables 2013 Pearl Continental Hotel Muzaffar Abad A.J.K P.S.L  Providing & Installation of complete electrical fixtures, Lightning protection system and earthing. 2012 Construction of Highway Logar- Kabul AFGHANISTAN Engr. Mahmood Construction Company  Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 2009-12 Sufi City Housing Scheme (SCHS), Mandi bahudin. Malik Ali Amir (Supervised by GEPCO)  Installation & Commissioning of 11 KV Transmission Line.  Installation & Commissioning of Switchgears, Transformers, Power Generators, Lightning system, Earthing System, Street Lights, etc 2010-11
  • 10. Page 10 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Al Rehman Garden Housing Schem (ARGHS) Near Sharqpur Road, Sheikhupura. Haji M. Ikhlaq (Supervised by LESCO)  Installation & Commissioning of Transmission Line.  Installation & Commissioning of Switchgears.  Installation & Commissioning of Transformers & Power Generators.  Installation & Commissioning of Lightning system, Earthing System & Street Lights, etc. 2009-11 Army Welfare Trust Housing Scheme Raiwind Road, Lahore. Army welfare Trust  Installation & Commissioning of Transmission Line.  Installation & Commissioning of Switchgears, Transformers, Power Generators.  Installation & Commissioning of Lightning system, Earthing System, Street Lights, etc in Sector # 01, 02 & 03. 2002-11 Construction of Road from Pasni to Quetta, Balochistan, Pakistan FWO  Construction of Road  Supply of complete Construction Material  Supply of different Construction Machinery 2005-07 Construction of CRBC Canal at Taunsa, Punjab, Pakistan Taxcer Turkish Compaany & Ghulam Rasool and Company (Pvt.) Ltd.  Excavation works and supply of crush etc. 2001-07 Construction of Jalalabad- Torkham Highway AFGHANISTAN FWO  Construction of Highway  Supply of complete Construction Material  Supply of different Construction Machinery 2003-06 Construction of Moro-Nosero feroz Road, Sindh, Pakistan Hasnain Construction Company  Construction of Road  Supply of complete Construction Material 2005
  • 11. Page 11 of 11 MEGA ENGINEERING CO. PAKISTAN‐EXPERIENCE LIST                                   Projects in Hand or Completed  Construction of Renala Khurd Bypass, Punjab, Pakistan Hasnain Construction Company  Construction of Road  Supply of complete Construction Material  Supply of different Construction Machinery 2004 Construction of National Highway from Okara to Sahiwal, Punjab, Pakistan LAC  Construction of Highway  Supply of complete Construction Material 1998 Construction of Indus Highway from Karachi to Peshawar, Pakistan China Petroleum  Supply of complete Construction Material  Supply of different Construction Machinery 1980-88