About Mogul Ventures Corp.
                                                                          Canadian company focusing on acquisition, exploration and development of coal
                                                                          projects in Mongolia. The Company is developing its 100% owned flagship asset,
                                                                          Black Hills thermal coal project located in Middle Gobi near Choir city.
                                                                          The extensive Russian exploration history at Black Hills and the recently completed
                                                                          drill program resulted in an intial NI 43-101 compliant 89.6 million tons of Inferred
Planned Railways in Mongolia                                              Resources in Ovdog Hudag coal deposit.1


                                                                                                                                                               Goals and Objectives
          ULAANGOM                    Tsagaan tolgoi                            Altanbulag
                                                                                               RUSSIA                          Ereentsav                       •	Additional drilling and surface
Tsagaahnuur

     Tsagaan hairrhan uul         Baruunturuun                                                                                                                  exploration to maximize Black Hills’
                                Tsagaanhairhan                                       DARHAN                                                                     full potential including:
                                                                ERDENET                Shariyn gol
                               Urgamal
                                                                                                                   CHOIBALSAN                    Rashaant
                   Dorvoljin
                                      Argalant
                                                                                                                                                                •	 Infill and expansion drilling to expand
                                                                        ULAANBAATAR                Baganuur                      Toson uul    Tamsag bulag
                                      Jargalan                                                Bagahangai
                                                                                                                                                                  resources and upgrade resource
                                                                                                                                    Matad
                                                                                                                                                                  category
                            ALTAI
                        Tayangiyn
                        nuruu
                                                 MONGOLIA                                    CHOIR
                                                                                                       Bor-Ondor
                                                                                                                 BARUUN-URT                  Bichigt
                                  Tseel                                                                                                                         •	 Step-out drilling between Ovdog
                              Altai
                                                   Shinejinst
                                                                 Black Hills                                                                                      Hudag and Ikh Ulaan-Nuur to
                                                                                     SAINSHAND
                  Burgastai                                                                  Zuunbayan                                                            delineate additional resources
                                                                                                   Tsagaan suvarga
                                                                                                                      Zamiyn-Uud
                                                                Nariin suhait
                                                                                    Tavan tolgoi                                                                •	 Re-drill Ikh Ulaan-Nuur
                                                                                                                                CHINA
    Existing railway line                                  Shiveehuren
    Planned railway line in 2010
                                                                                                                                                                •	 Commence detailed development
                                                                                      Gashuunsuhait
    Planned railway line in 2011                                                                                                                                  studies including: environmental
    Planned railway line in 2015                                                                           Source: Mongolia Railroad Policy, Eurasia Capital      baseline, processing, mine design

                                                                                                                                                                •	 Evaluation of potential for other
                                                                                                                                                                  valuable commodities on the
                                                                                                                                                                  property (Fe, Cu)
 Black Hills Project Key Advantages                                                                                                                            •	Conduct an economic evaluation
 •	 trategic location close to existing rail line (parallel line planned) providing ready access
   S                                                                                                                                                           •	Develop Black Hills towards production
    to Chinese markets
 •	 he mineral concession is 34,054.69 hectares with a mining license covering its extent
   T                                                                                                                                                           •	Seek strategic partners for funding
    and includes the Ovdog Hudag and Ikh Ulaan-Nuur thermal coal deposits.                                                                                      expansion, off-take, potential
                                                                                                                                                                development of a mine-mouth
 •	Open pit accessible thermal coal resources with expected low strip ratio
                                                                                                                                                                power plant, and application of new
 •	 I 43-101 compliant Inferred Resource of 89.6 Mt from 2,370 m of drilling in 14 holes
   N                                                                                                                                                            technologies for monetizing deep-in-
    at Ovdog Hudag deposit                                                                                                                                      ground stranded coal
 •	Excellent potential to significantly expand the projects’ coal resources through:
                                                                                                                                                               •	Acquire additional coal projects
    •	 Infill and step-out drilling at Ovdog Hudag deposit where substantially larger historical                                                                focusing on coking coal and thermal
       resources were delineated by Russian work in the 1960s and 1970s                                                                                         coal in Mongolia
    •	 Testing the undrilled area between the two known deposits
 •	Ovdog Hudag coal deposit remains open to the north
 •	Drilling of the Ikh Ulaan Nuur deposit 7 km NNE of Ovdog Hudag (86.4 Mt)2
                                                                                                                                                                            MOGUL VENTURES CORP.
 •	Property has potential for presence of other commodities (Cu, Fe)
                                                                                                                                                                            Bay Adelaide Centre
                                                                                                                                                                            Suite 1200, 333 Bay St.
                                                                                                                                                                            Toronto, ON
                                                                                                                                                                            M5H 2R2, Canada  
 NOTES
                                                                                                                                                                            p +1 416.309.4326 
 1  2	Ovdog Hudag Coal Deposit, Mogul Ventures Corp. – 43-101 report by SRK Consulting (China) Ltd.,                                                                      F +1 416.364.3346
        December 31, 2011                                                                                                                                                   E information@mogulvc.com

                                                                                                                                                                            w www.mogulvc.com
MOGUL VENTURES CORP.                                                          Mogul Ventures Team
                   Bay Adelaide Centre, Suite 1200, 333 Bay St., Toronto, ON, M5H 2R2, Canada 
                                                                                                 Steven Khan, MBA, CFA
                   p +1 416.309.4326  •  F +1 416.364.3346 •  E information@mogulvc.com
                                                                                                 Executive Chairman  Director
                   w www.mogulvc.com
                                                                                                 John Carlesso
                                                                                                 CEO  Director
                                                                                                 Jamul Jadamba
Ovdog Hudag Coal Deposit                                                                         President  Director
                                                                                                 David A. Terry, Ph.D., P.Geo.
•	 n 2011, a 14 hole, ~2,370 m core drilling program on 1,000 m centers confirmed
  I                                                                                              Senior Technical Advisor
  the historical work on the deposit, forming the basis for a NI 43-101 Resource Estimate
  by SRK Consulting
•	NI 43-101 Report summary results:
  •	 Estimated Inferred Resources of 89.6 Mt3
  •	 8 coal seams recognized – 4 fully mineable,
    2 partially mineable
  •	 Classed as High Vol Bituminous A Thermal Coal
  •	 Average Gross Calorific value -
    5,636 to 6,431 kcal/kg (daf)*
  	 •	 * ,776 to 4,952 kcal/kg on a dry basis;
        3
       daf = dry ash free basis
  •	 Average Volatile Matter – 29.9 to 37.9%
  •	 Average Fixed Carbon – 32.3 to 39.5%
  •	 Average Ash – 22 to 33% - washing will reduce
  •	 Average Sulphur – 4.94%; removal of abundant
    visible pyrite by washing expected to reduce
    S levels significantly
•	 RK recommended program: infill and expansion
  S
  drilling program, process test work, mine design and
  Preliminary Economic Assessment


Ovdog Hudag                                                                                      Mongolian Coal
Ikh Ulaan-Nuur Deposits                                                 IH ULAAN
                                                                          NUUR                    •	 iewed as Saudi Arabia of coal:
                                                                                                    V
•	 vdog Hudag coal deposit historical
  O                                                                      DEPOSIT                   total Minable resources are estimated
                                                                                                   at 162Bt 7
  resources, based on Russian drilling from the
  ‘60s and ‘70s, using a Russian Classification                                                   •	 urrent coal production of about
                                                                                                    C
  system and based on 85 drill holes:                                                             16Mt per year (mostly exported to
  •	 1968: C1+C2 resources totalling
                                                                                                   China), expected to reach 60–70Mt
                                                                                   7 km            by 20158
    201.2 Mt4
                                                                                 undrilled
                                                                               area between       •	 igh quality and highly accessible:
                                                                                                    H
  •	 1970: B+C1+C2 resources totalling
                                                                                  deposits         generally near surface, ideal for low
    168.2 Mt   5
                                                                                                   cost open pit mining, dominated by
•	 kh Ulaan-Nuur coal deposit is located
  I                                                                                                high-quality low ash, low sulfur and
  7km NNE of Ovdog Hudag                           OVDOG                                           low phosphorous coals
  •	 1970: A+B+C1+C2 resources totalling           HUDAG
                                                                                                  •	 nown Geology: 12 coal basins,
                                                                                                    K
                                                   DEPOSIT
    86.4 Mt6                                                                                       3 regions with over 200 deposits of
•	 xcellent potential for additional
  E                                                                                                thermal and metallurgical grade coal
  coal resources to be delineated in the
  undrilled area between Ovdog Hudag                                                              NOTES:
  and Ikh Ulaan-Nuur                                                                              3–6	Ovdog Hudag Coal Deposit, Mogul Ventures
                                                                                                       Corp. – 43-101 report by SRK Consulting
•	 e-drilling of Ikh Ulaan-Nuur will add
  R                                                                                                    (China) Ltd., December 31, 2011
  to NI 43-101 resources
                                                                                                  7–8	Renaissance Capital, “Moncoalia” report,
•	 pen pit accessible coal resources with
  O                                                                                                    June 15, 2011
                                                       2011 drill holes
  expected low strip ratio                                                         2 KM
                                                       Historical drillholes


                                                   ILLUSTRATION: Drill Rig, 2011

Contenu connexe

Plus de Mogul_ventures

Corporate Presentation Q4 2013
Corporate Presentation Q4 2013Corporate Presentation Q4 2013
Corporate Presentation Q4 2013Mogul_ventures
 
Mogul presentation tin q1 2013
Mogul presentation tin q1 2013Mogul presentation tin q1 2013
Mogul presentation tin q1 2013Mogul_ventures
 
Mogul presentation feb 2013 final
Mogul presentation feb 2013 finalMogul presentation feb 2013 final
Mogul presentation feb 2013 finalMogul_ventures
 
Mogul fs113 jan3013_v3final_lo
Mogul fs113 jan3013_v3final_loMogul fs113 jan3013_v3final_lo
Mogul fs113 jan3013_v3final_loMogul_ventures
 
Mogul presentation jan 2013 final
Mogul presentation jan 2013 finalMogul presentation jan 2013 final
Mogul presentation jan 2013 finalMogul_ventures
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012Mogul_ventures
 
Corporate Presentation October 2012
Corporate Presentation October 2012Corporate Presentation October 2012
Corporate Presentation October 2012Mogul_ventures
 
Mogul Ventures Corporate Presentation
Mogul Ventures Corporate PresentationMogul Ventures Corporate Presentation
Mogul Ventures Corporate PresentationMogul_ventures
 
Mogul presentation june2712
Mogul presentation june2712Mogul presentation june2712
Mogul presentation june2712Mogul_ventures
 
Mogul presentation june.06.12
Mogul presentation june.06.12Mogul presentation june.06.12
Mogul presentation june.06.12Mogul_ventures
 
Mogul fact sheet may29 12 v1
Mogul fact sheet may29 12 v1Mogul fact sheet may29 12 v1
Mogul fact sheet may29 12 v1Mogul_ventures
 
Mogul presentation may.25.12
Mogul presentation may.25.12Mogul presentation may.25.12
Mogul presentation may.25.12Mogul_ventures
 
Mogul Ventures Corp. Presentation
Mogul Ventures Corp. PresentationMogul Ventures Corp. Presentation
Mogul Ventures Corp. PresentationMogul_ventures
 
Mogul presentation feb.22.12
Mogul presentation feb.22.12Mogul presentation feb.22.12
Mogul presentation feb.22.12Mogul_ventures
 
Mogul Fact Sheet February 06, 2012
Mogul Fact Sheet February 06, 2012Mogul Fact Sheet February 06, 2012
Mogul Fact Sheet February 06, 2012Mogul_ventures
 
Mogul Presentation February 06, 2012
Mogul Presentation February 06, 2012Mogul Presentation February 06, 2012
Mogul Presentation February 06, 2012Mogul_ventures
 
Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012Mogul_ventures
 

Plus de Mogul_ventures (17)

Corporate Presentation Q4 2013
Corporate Presentation Q4 2013Corporate Presentation Q4 2013
Corporate Presentation Q4 2013
 
Mogul presentation tin q1 2013
Mogul presentation tin q1 2013Mogul presentation tin q1 2013
Mogul presentation tin q1 2013
 
Mogul presentation feb 2013 final
Mogul presentation feb 2013 finalMogul presentation feb 2013 final
Mogul presentation feb 2013 final
 
Mogul fs113 jan3013_v3final_lo
Mogul fs113 jan3013_v3final_loMogul fs113 jan3013_v3final_lo
Mogul fs113 jan3013_v3final_lo
 
Mogul presentation jan 2013 final
Mogul presentation jan 2013 finalMogul presentation jan 2013 final
Mogul presentation jan 2013 final
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
Corporate Presentation October 2012
Corporate Presentation October 2012Corporate Presentation October 2012
Corporate Presentation October 2012
 
Mogul Ventures Corporate Presentation
Mogul Ventures Corporate PresentationMogul Ventures Corporate Presentation
Mogul Ventures Corporate Presentation
 
Mogul presentation june2712
Mogul presentation june2712Mogul presentation june2712
Mogul presentation june2712
 
Mogul presentation june.06.12
Mogul presentation june.06.12Mogul presentation june.06.12
Mogul presentation june.06.12
 
Mogul fact sheet may29 12 v1
Mogul fact sheet may29 12 v1Mogul fact sheet may29 12 v1
Mogul fact sheet may29 12 v1
 
Mogul presentation may.25.12
Mogul presentation may.25.12Mogul presentation may.25.12
Mogul presentation may.25.12
 
Mogul Ventures Corp. Presentation
Mogul Ventures Corp. PresentationMogul Ventures Corp. Presentation
Mogul Ventures Corp. Presentation
 
Mogul presentation feb.22.12
Mogul presentation feb.22.12Mogul presentation feb.22.12
Mogul presentation feb.22.12
 
Mogul Fact Sheet February 06, 2012
Mogul Fact Sheet February 06, 2012Mogul Fact Sheet February 06, 2012
Mogul Fact Sheet February 06, 2012
 
Mogul Presentation February 06, 2012
Mogul Presentation February 06, 2012Mogul Presentation February 06, 2012
Mogul Presentation February 06, 2012
 
Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012Corporate Presentation January 04, 2012
Corporate Presentation January 04, 2012
 

Dernier

Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop AG
 
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFWWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFMichael Claudio
 
Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna SpA
 
Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop AG
 
Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024nicola_mining
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potentialnicola_mining
 
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd
 

Dernier (7)

Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24
 
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFWWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
 
Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 Presentation
 
Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023
 
Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
 
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
 

Mogul Corporate Fact Sheet

  • 1. About Mogul Ventures Corp. Canadian company focusing on acquisition, exploration and development of coal projects in Mongolia. The Company is developing its 100% owned flagship asset, Black Hills thermal coal project located in Middle Gobi near Choir city. The extensive Russian exploration history at Black Hills and the recently completed drill program resulted in an intial NI 43-101 compliant 89.6 million tons of Inferred Planned Railways in Mongolia Resources in Ovdog Hudag coal deposit.1 Goals and Objectives ULAANGOM Tsagaan tolgoi Altanbulag RUSSIA Ereentsav • Additional drilling and surface Tsagaahnuur Tsagaan hairrhan uul Baruunturuun exploration to maximize Black Hills’ Tsagaanhairhan DARHAN full potential including: ERDENET Shariyn gol Urgamal CHOIBALSAN Rashaant Dorvoljin Argalant • Infill and expansion drilling to expand ULAANBAATAR Baganuur Toson uul Tamsag bulag Jargalan Bagahangai resources and upgrade resource Matad category ALTAI Tayangiyn nuruu MONGOLIA CHOIR Bor-Ondor BARUUN-URT Bichigt Tseel • Step-out drilling between Ovdog Altai Shinejinst Black Hills Hudag and Ikh Ulaan-Nuur to SAINSHAND Burgastai Zuunbayan delineate additional resources Tsagaan suvarga Zamiyn-Uud Nariin suhait Tavan tolgoi • Re-drill Ikh Ulaan-Nuur CHINA Existing railway line Shiveehuren Planned railway line in 2010 • Commence detailed development Gashuunsuhait Planned railway line in 2011 studies including: environmental Planned railway line in 2015 Source: Mongolia Railroad Policy, Eurasia Capital baseline, processing, mine design • Evaluation of potential for other valuable commodities on the property (Fe, Cu) Black Hills Project Key Advantages • Conduct an economic evaluation • trategic location close to existing rail line (parallel line planned) providing ready access S • Develop Black Hills towards production to Chinese markets • he mineral concession is 34,054.69 hectares with a mining license covering its extent T • Seek strategic partners for funding and includes the Ovdog Hudag and Ikh Ulaan-Nuur thermal coal deposits. expansion, off-take, potential development of a mine-mouth • Open pit accessible thermal coal resources with expected low strip ratio power plant, and application of new • I 43-101 compliant Inferred Resource of 89.6 Mt from 2,370 m of drilling in 14 holes N technologies for monetizing deep-in- at Ovdog Hudag deposit ground stranded coal • Excellent potential to significantly expand the projects’ coal resources through: • Acquire additional coal projects • Infill and step-out drilling at Ovdog Hudag deposit where substantially larger historical focusing on coking coal and thermal resources were delineated by Russian work in the 1960s and 1970s coal in Mongolia • Testing the undrilled area between the two known deposits • Ovdog Hudag coal deposit remains open to the north • Drilling of the Ikh Ulaan Nuur deposit 7 km NNE of Ovdog Hudag (86.4 Mt)2 MOGUL VENTURES CORP. • Property has potential for presence of other commodities (Cu, Fe) Bay Adelaide Centre Suite 1200, 333 Bay St. Toronto, ON M5H 2R2, Canada   NOTES p +1 416.309.4326  1 2 Ovdog Hudag Coal Deposit, Mogul Ventures Corp. – 43-101 report by SRK Consulting (China) Ltd., F +1 416.364.3346 December 31, 2011 E information@mogulvc.com w www.mogulvc.com
  • 2. MOGUL VENTURES CORP. Mogul Ventures Team Bay Adelaide Centre, Suite 1200, 333 Bay St., Toronto, ON, M5H 2R2, Canada  Steven Khan, MBA, CFA p +1 416.309.4326  •  F +1 416.364.3346 •  E information@mogulvc.com Executive Chairman Director w www.mogulvc.com John Carlesso CEO Director Jamul Jadamba Ovdog Hudag Coal Deposit President Director David A. Terry, Ph.D., P.Geo. • n 2011, a 14 hole, ~2,370 m core drilling program on 1,000 m centers confirmed I Senior Technical Advisor the historical work on the deposit, forming the basis for a NI 43-101 Resource Estimate by SRK Consulting • NI 43-101 Report summary results: • Estimated Inferred Resources of 89.6 Mt3 • 8 coal seams recognized – 4 fully mineable, 2 partially mineable • Classed as High Vol Bituminous A Thermal Coal • Average Gross Calorific value - 5,636 to 6,431 kcal/kg (daf)* • * ,776 to 4,952 kcal/kg on a dry basis; 3 daf = dry ash free basis • Average Volatile Matter – 29.9 to 37.9% • Average Fixed Carbon – 32.3 to 39.5% • Average Ash – 22 to 33% - washing will reduce • Average Sulphur – 4.94%; removal of abundant visible pyrite by washing expected to reduce S levels significantly • RK recommended program: infill and expansion S drilling program, process test work, mine design and Preliminary Economic Assessment Ovdog Hudag Mongolian Coal Ikh Ulaan-Nuur Deposits IH ULAAN NUUR • iewed as Saudi Arabia of coal: V • vdog Hudag coal deposit historical O DEPOSIT total Minable resources are estimated at 162Bt 7 resources, based on Russian drilling from the ‘60s and ‘70s, using a Russian Classification • urrent coal production of about C system and based on 85 drill holes: 16Mt per year (mostly exported to • 1968: C1+C2 resources totalling China), expected to reach 60–70Mt 7 km by 20158 201.2 Mt4 undrilled area between • igh quality and highly accessible: H • 1970: B+C1+C2 resources totalling deposits generally near surface, ideal for low 168.2 Mt 5 cost open pit mining, dominated by • kh Ulaan-Nuur coal deposit is located I high-quality low ash, low sulfur and 7km NNE of Ovdog Hudag OVDOG low phosphorous coals • 1970: A+B+C1+C2 resources totalling HUDAG • nown Geology: 12 coal basins, K DEPOSIT 86.4 Mt6 3 regions with over 200 deposits of • xcellent potential for additional E thermal and metallurgical grade coal coal resources to be delineated in the undrilled area between Ovdog Hudag NOTES: and Ikh Ulaan-Nuur 3–6 Ovdog Hudag Coal Deposit, Mogul Ventures Corp. – 43-101 report by SRK Consulting • e-drilling of Ikh Ulaan-Nuur will add R (China) Ltd., December 31, 2011 to NI 43-101 resources 7–8 Renaissance Capital, “Moncoalia” report, • pen pit accessible coal resources with O June 15, 2011 2011 drill holes expected low strip ratio 2 KM Historical drillholes ILLUSTRATION: Drill Rig, 2011