SlideShare une entreprise Scribd logo
1  sur  4
Page 1
CURRICULUM VITAE
Post applied for: Rope Access supervisor / NDT Inspector
Name : Mohamed Anvar. A
Date of Birth : 05-02-1989
Nationality : Indian
Languages known : English, Malayalam, Tamil
Addressfor communication Passportdetails
Usmiya Manzil Passport Number : G5517033
Pallippuram P.O Place of issue : Trivandrum
Trivandrum 695316 Date of issue : 02/11/2007
Kerala, India Date of expiry : 01/11/2017
Mob: 0091 -8129373137
E-mail : mohamedanvar44@yahoo.com
Qualifications
 IRATA LEVEL-III(Cert No-3/44864)
 ASNT Level- II (UT, RT, MPI & PT. (SNT-TC-1A).
 PCN UT - 3.1 & 3.2 (Cert No -328062)
 Higher Secondary school leaving certificate
 Electrician ( I T I-NCVT Certificate )
Trainingsattended.
 Helicopter under water escape techniques.
 Fire prevention & fire fighting.
 Proficiency in survival techniques.
 Elementaryfirstaid.
 Proficiency in personal safety and social responsibilities.
 Safety Task Analysis/risk assessment.
 Safe Work Permit System (Hot and Cold).
 Incident & Injury Free Working Atmosphere.
 Confined Space Entry PermitSystem.
 Attended the RBIProgram ( Risk Based Inspection )
Page 2
Computer proficiency.
 Operating System : Windows xp, Vista, 7 & 8
 Internet : Browsing & email.
 AUTO CAD
 MS Office
Scan star NDT services Chennai, India (March 2009 to September
2010)
Joined as NDT Inspector and gained experience in Ultrasonic
Thickness Gauging,Magnetic Particle Testing and Penetrant Testing.
Interpretation of various materials at different sites.
GIPCL power plant Gujarat For Scan star NDT service shutdown
project (October 2010 to November 2011)
 Ultrasonicthickness gauging.
 MagneticPenetranttesting.
 Magneticparticle testing.
(Working as a Multi NDT technician at various sites in India.)
Emirates Industrial Laboratory, Dubai:(December 2011to
December 2012)
Mainly worked on marine going vessels in Dubai Dry Docks & Jebel
Ali Port, MinaZayed port in Abudhabi, Hamariya port in Ajman
involved in various NDT methods, blasting, painting, pressure
washing & equipment replacing for various ship, rig, hulls, boilers
and other components. . Successfully completed training and obtained
certification in Rope Access also.
Page 3
Projects:
 EPPCO & ENOC Storage Tanks in Jebel Ali Free zone.
 LIVORNO, FRONTCHAMPION&ATHENA-during conversion to FPSO, FSO,
FPO&FSRU in Dry docks world Dubai, UAE.
 RIG –ORIENTAL,NDC BEYNONA,HI ISLAND,SAGAR DRILL, NOBLE GUS
ANDRWS,NOBLECHUKSYRING, NOBLE HARVEY DUHANI &NDC DELLMA.
Seatek India (2013 January to march 2013(offshore projects)
 Rope access work and NDT inspection on Transocean rig.
 Rope rigging at Jack up legs.
 UT thickness gauging in rig legs.
 Magneticparticle inspection in legs code joints.
RIG Name– F.G. McClintock (Transocean)
JC International , Nigeria (2013 March to November 2013(offshore
projects)
 Rope access work and NDT inspection on various oil rigs, drilling
ships, fpso & platforms.
 Ultrasonicthickness gauging,magneticparticle inspection.
 cctv camera cable pulling attelicomast.
 Rope rigging.
Projects:
 Total , Akpo.
Rig, Ship & Fpso:
 pacific scirocco, west capella.
 usan, akpo.(fpso)
 Transocean rigs.
Page 4
Global Remote, Chennai. ( For Ras Gas, Qatar ) 2014 February to
April 2014.
 Rope access work and NDT inspection in flare tower.
 Dye Penetrant testing in flare tip & all welds.
 Pilot pipe replacing and lifting by rope access technique.
Duties and Responsibilities:
 Ultrasonic thickness survey of hull, piping and boiler tubes.
 Magnetic particle testing on crank shafts, structural welds and
piping for crack detection.
 Penetrant testing on welds, crank shafts, turbine rotor blades etc
 Visual inspection of hull structures, bulkheads, frames etc..
 Blasting, painting, pressure washing & equipment replacing for
various ship, rig, hulls, boilers and other components.
Emirates Industrial Laboratory, Abu Dhabi: (September 2014 to
going on… )Client: ADMA-OPCO Das island.
 Ultrasonic scanning on process piping, columns and equipments.
 Magnetic particle testing on structural welds and piping for crack
detection.
 Penetrating Test on welds.
 Long range ultrasonic testing follow up with manual UT.
 Visual pit survey in various projects.
DECLARATION
I hereby declare thatthe above mentioned information is
true to the best of my knowledge.
Yoursfaithfully,
Mohamed Anvar

Contenu connexe

En vedette

Vibration and damping
Vibration and dampingVibration and damping
Vibration and damping
Divya Lattoo
 

En vedette (16)

Camargo emerson zíngaro - tradição e assimilação na música sertaneja
Camargo emerson zíngaro  - tradição e assimilação na música sertanejaCamargo emerson zíngaro  - tradição e assimilação na música sertaneja
Camargo emerson zíngaro - tradição e assimilação na música sertaneja
 
Masonic regalia Blue House chain collar
Masonic regalia Blue House chain collar Masonic regalia Blue House chain collar
Masonic regalia Blue House chain collar
 
Ppt9
Ppt9Ppt9
Ppt9
 
Masonic past master chain collar Silver & Gold
Masonic past master chain collar Silver & Gold Masonic past master chain collar Silver & Gold
Masonic past master chain collar Silver & Gold
 
10 led-20 w-shop lamp
10 led-20 w-shop lamp10 led-20 w-shop lamp
10 led-20 w-shop lamp
 
Facilitation graphique, retours d'expériences d'un chef de projet
Facilitation graphique, retours d'expériences d'un chef de projetFacilitation graphique, retours d'expériences d'un chef de projet
Facilitation graphique, retours d'expériences d'un chef de projet
 
металлургический комплекс
металлургический комплексметаллургический комплекс
металлургический комплекс
 
Membranes and thin plates
Membranes and thin platesMembranes and thin plates
Membranes and thin plates
 
арабские страны северной африки
арабские страны северной африкиарабские страны северной африки
арабские страны северной африки
 
Ibm c suite survey
Ibm c suite surveyIbm c suite survey
Ibm c suite survey
 
Heat Exchangers by Hanif Dewan
Heat Exchangers by Hanif DewanHeat Exchangers by Hanif Dewan
Heat Exchangers by Hanif Dewan
 
Vibration and damping
Vibration and dampingVibration and damping
Vibration and damping
 
Report_Mietpreise.pdf
Report_Mietpreise.pdfReport_Mietpreise.pdf
Report_Mietpreise.pdf
 
Finite Element for Trusses in 2-D
Finite Element for Trusses in 2-DFinite Element for Trusses in 2-D
Finite Element for Trusses in 2-D
 
Etude : Processus / Méthode pour l’Élaboration du Schéma Directeur des Systè...
Etude : Processus / Méthode pour l’Élaboration  du Schéma Directeur des Systè...Etude : Processus / Méthode pour l’Élaboration  du Schéma Directeur des Systè...
Etude : Processus / Méthode pour l’Élaboration du Schéma Directeur des Systè...
 
Alcoletge2
Alcoletge2Alcoletge2
Alcoletge2
 

Similaire à Updated CV 2015 Mohamed Anvar

santosh-ANDT Inspector
santosh-ANDT Inspectorsantosh-ANDT Inspector
santosh-ANDT Inspector
santosh kumar
 
SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15
Samuel Alabi
 
Ian_Atkinson_CV_201415a
Ian_Atkinson_CV_201415aIan_Atkinson_CV_201415a
Ian_Atkinson_CV_201415a
Ian Atkinson
 
CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)
Zulkifli Omar
 
ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016
ASHISH GULERIA
 
Company profile updated1 (2)
Company profile updated1 (2)Company profile updated1 (2)
Company profile updated1 (2)
WELDTECH
 

Similaire à Updated CV 2015 Mohamed Anvar (20)

Saroj CVV
Saroj CVVSaroj CVV
Saroj CVV
 
santosh-ANDT Inspector
santosh-ANDT Inspectorsantosh-ANDT Inspector
santosh-ANDT Inspector
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
vetrivel cv(1)
vetrivel cv(1)vetrivel cv(1)
vetrivel cv(1)
 
SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15SAM_ALABI_CV_7Apr15
SAM_ALABI_CV_7Apr15
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
vijayanandselnaraj_cv new
vijayanandselnaraj_cv newvijayanandselnaraj_cv new
vijayanandselnaraj_cv new
 
Bishal Tamang
Bishal TamangBishal Tamang
Bishal Tamang
 
Ian_Atkinson_CV_201415a
Ian_Atkinson_CV_201415aIan_Atkinson_CV_201415a
Ian_Atkinson_CV_201415a
 
CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)
 
VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1
 
ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016ashish updated cv.doc 12-12-2016
ashish updated cv.doc 12-12-2016
 
PT. Nadi Marin Subsea - Company Profile 2018
PT. Nadi Marin Subsea -  Company Profile 2018PT. Nadi Marin Subsea -  Company Profile 2018
PT. Nadi Marin Subsea - Company Profile 2018
 
RESUME
RESUMERESUME
RESUME
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza
 
Muhammad Sajid (CV)
Muhammad Sajid (CV)Muhammad Sajid (CV)
Muhammad Sajid (CV)
 
othellocv
othellocvothellocv
othellocv
 
Company profile updated1 (2)
Company profile updated1 (2)Company profile updated1 (2)
Company profile updated1 (2)
 
NDT Resume
NDT ResumeNDT Resume
NDT Resume
 

Updated CV 2015 Mohamed Anvar

  • 1. Page 1 CURRICULUM VITAE Post applied for: Rope Access supervisor / NDT Inspector Name : Mohamed Anvar. A Date of Birth : 05-02-1989 Nationality : Indian Languages known : English, Malayalam, Tamil Addressfor communication Passportdetails Usmiya Manzil Passport Number : G5517033 Pallippuram P.O Place of issue : Trivandrum Trivandrum 695316 Date of issue : 02/11/2007 Kerala, India Date of expiry : 01/11/2017 Mob: 0091 -8129373137 E-mail : mohamedanvar44@yahoo.com Qualifications  IRATA LEVEL-III(Cert No-3/44864)  ASNT Level- II (UT, RT, MPI & PT. (SNT-TC-1A).  PCN UT - 3.1 & 3.2 (Cert No -328062)  Higher Secondary school leaving certificate  Electrician ( I T I-NCVT Certificate ) Trainingsattended.  Helicopter under water escape techniques.  Fire prevention & fire fighting.  Proficiency in survival techniques.  Elementaryfirstaid.  Proficiency in personal safety and social responsibilities.  Safety Task Analysis/risk assessment.  Safe Work Permit System (Hot and Cold).  Incident & Injury Free Working Atmosphere.  Confined Space Entry PermitSystem.  Attended the RBIProgram ( Risk Based Inspection )
  • 2. Page 2 Computer proficiency.  Operating System : Windows xp, Vista, 7 & 8  Internet : Browsing & email.  AUTO CAD  MS Office Scan star NDT services Chennai, India (March 2009 to September 2010) Joined as NDT Inspector and gained experience in Ultrasonic Thickness Gauging,Magnetic Particle Testing and Penetrant Testing. Interpretation of various materials at different sites. GIPCL power plant Gujarat For Scan star NDT service shutdown project (October 2010 to November 2011)  Ultrasonicthickness gauging.  MagneticPenetranttesting.  Magneticparticle testing. (Working as a Multi NDT technician at various sites in India.) Emirates Industrial Laboratory, Dubai:(December 2011to December 2012) Mainly worked on marine going vessels in Dubai Dry Docks & Jebel Ali Port, MinaZayed port in Abudhabi, Hamariya port in Ajman involved in various NDT methods, blasting, painting, pressure washing & equipment replacing for various ship, rig, hulls, boilers and other components. . Successfully completed training and obtained certification in Rope Access also.
  • 3. Page 3 Projects:  EPPCO & ENOC Storage Tanks in Jebel Ali Free zone.  LIVORNO, FRONTCHAMPION&ATHENA-during conversion to FPSO, FSO, FPO&FSRU in Dry docks world Dubai, UAE.  RIG –ORIENTAL,NDC BEYNONA,HI ISLAND,SAGAR DRILL, NOBLE GUS ANDRWS,NOBLECHUKSYRING, NOBLE HARVEY DUHANI &NDC DELLMA. Seatek India (2013 January to march 2013(offshore projects)  Rope access work and NDT inspection on Transocean rig.  Rope rigging at Jack up legs.  UT thickness gauging in rig legs.  Magneticparticle inspection in legs code joints. RIG Name– F.G. McClintock (Transocean) JC International , Nigeria (2013 March to November 2013(offshore projects)  Rope access work and NDT inspection on various oil rigs, drilling ships, fpso & platforms.  Ultrasonicthickness gauging,magneticparticle inspection.  cctv camera cable pulling attelicomast.  Rope rigging. Projects:  Total , Akpo. Rig, Ship & Fpso:  pacific scirocco, west capella.  usan, akpo.(fpso)  Transocean rigs.
  • 4. Page 4 Global Remote, Chennai. ( For Ras Gas, Qatar ) 2014 February to April 2014.  Rope access work and NDT inspection in flare tower.  Dye Penetrant testing in flare tip & all welds.  Pilot pipe replacing and lifting by rope access technique. Duties and Responsibilities:  Ultrasonic thickness survey of hull, piping and boiler tubes.  Magnetic particle testing on crank shafts, structural welds and piping for crack detection.  Penetrant testing on welds, crank shafts, turbine rotor blades etc  Visual inspection of hull structures, bulkheads, frames etc..  Blasting, painting, pressure washing & equipment replacing for various ship, rig, hulls, boilers and other components. Emirates Industrial Laboratory, Abu Dhabi: (September 2014 to going on… )Client: ADMA-OPCO Das island.  Ultrasonic scanning on process piping, columns and equipments.  Magnetic particle testing on structural welds and piping for crack detection.  Penetrating Test on welds.  Long range ultrasonic testing follow up with manual UT.  Visual pit survey in various projects. DECLARATION I hereby declare thatthe above mentioned information is true to the best of my knowledge. Yoursfaithfully, Mohamed Anvar