SlideShare une entreprise Scribd logo
1  sur  1
Télécharger pour lire hors ligne
Maintenance Work Order
Work Request “to be filled by Originator”
Work Type: (Breakdown BD, Corrective Maintenance CM, Projects)
Scheduling: (Planned / unplanned)
Line status: (Working / Stopped)
Shift:……… Originator:……….. Request dept:……… Date:…../…../…… Time:………
Cost Center:………… Location:………. Equipment name:……….. Equipment code:…………. Responsibility….
Problem description:……………………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………………………………………………
Problem Code:………….
SupervisorMaintenanceTo be filled by theSection
PhaseWork Order Execution
TimeCodeTechnicians
1.
2.
3.
Equipment Downtime:…………………….
Used Spare Parts:
QuantityCodeSpare Parts description
Used Tools:
QCodeNameQCodeName
Notes:______________________________________________________
__________________________________________________________________
WO Closing”Signatures”
Technician:…………… Supervisor:…………….. Originator:……………
Failure Code:Failure Description:
Cause Code:Cause:
Action Code:Remedy:
Clarification at the back of the paper!
Priority Check: Safety
High
Normal

Contenu connexe

Tendances

Sistem manajemen maintenance
Sistem manajemen maintenanceSistem manajemen maintenance
Sistem manajemen maintenanceZainal Abidin
 
Manper04 performance
Manper04 performanceManper04 performance
Manper04 performanceArif Rahman
 
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docxMAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docxDwarika Bhushan Sharma
 
Machine maintenance presentation
Machine maintenance presentationMachine maintenance presentation
Machine maintenance presentationhimu_kamrul
 
Yara-Sluiskil-presentatie-2021-ext..pdf
Yara-Sluiskil-presentatie-2021-ext..pdfYara-Sluiskil-presentatie-2021-ext..pdf
Yara-Sluiskil-presentatie-2021-ext..pdfDoesDoeselaar
 
Confine space rescue ppt
Confine space rescue pptConfine space rescue ppt
Confine space rescue pptYKN
 
Rencana kerja dan pemeliharaan peralatan
Rencana kerja dan pemeliharaan peralatan Rencana kerja dan pemeliharaan peralatan
Rencana kerja dan pemeliharaan peralatan hero1964
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docDwarika Bhushan Sharma
 
Planned Maintenance - TPM ATI.pdf
Planned Maintenance - TPM ATI.pdfPlanned Maintenance - TPM ATI.pdf
Planned Maintenance - TPM ATI.pdfRobi Cahyadi
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceYesica Adicondro
 
Tugas1 cnc kelas a_presentasi_power point
Tugas1 cnc kelas a_presentasi_power pointTugas1 cnc kelas a_presentasi_power point
Tugas1 cnc kelas a_presentasi_power pointIlham Reyzer Firmansyah
 
Sistem operasi RTG crane
Sistem operasi RTG craneSistem operasi RTG crane
Sistem operasi RTG craneAchmad Zulkifli
 
Liquid Penetrant Testing-Penetrants
Liquid Penetrant Testing-PenetrantsLiquid Penetrant Testing-Penetrants
Liquid Penetrant Testing-PenetrantsMani Vannan M
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 

Tendances (20)

Heavy equipments in construction
Heavy equipments in constructionHeavy equipments in construction
Heavy equipments in construction
 
Safety committee training
Safety committee trainingSafety committee training
Safety committee training
 
Sistem manajemen maintenance
Sistem manajemen maintenanceSistem manajemen maintenance
Sistem manajemen maintenance
 
Manper04 performance
Manper04 performanceManper04 performance
Manper04 performance
 
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docxMAST CLIMBER & CRADLE PERMIT Form # HSEQ -  Rev 2.docx
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
 
Machine maintenance presentation
Machine maintenance presentationMachine maintenance presentation
Machine maintenance presentation
 
Yara-Sluiskil-presentatie-2021-ext..pdf
Yara-Sluiskil-presentatie-2021-ext..pdfYara-Sluiskil-presentatie-2021-ext..pdf
Yara-Sluiskil-presentatie-2021-ext..pdf
 
Confine space rescue ppt
Confine space rescue pptConfine space rescue ppt
Confine space rescue ppt
 
1. Presentasi
1. Presentasi1. Presentasi
1. Presentasi
 
Height work permit
Height work permitHeight work permit
Height work permit
 
Rencana kerja dan pemeliharaan peralatan
Rencana kerja dan pemeliharaan peralatan Rencana kerja dan pemeliharaan peralatan
Rencana kerja dan pemeliharaan peralatan
 
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.docHSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
HSE WARNING LETTER-DISCIPLINARY NOTICE Form # HSEQ - HSEWL Rev 6.doc
 
Dasar k3 uts
Dasar k3 utsDasar k3 uts
Dasar k3 uts
 
Planned Maintenance - TPM ATI.pdf
Planned Maintenance - TPM ATI.pdfPlanned Maintenance - TPM ATI.pdf
Planned Maintenance - TPM ATI.pdf
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
K3 mekanik
K3 mekanikK3 mekanik
K3 mekanik
 
Tugas1 cnc kelas a_presentasi_power point
Tugas1 cnc kelas a_presentasi_power pointTugas1 cnc kelas a_presentasi_power point
Tugas1 cnc kelas a_presentasi_power point
 
Sistem operasi RTG crane
Sistem operasi RTG craneSistem operasi RTG crane
Sistem operasi RTG crane
 
Liquid Penetrant Testing-Penetrants
Liquid Penetrant Testing-PenetrantsLiquid Penetrant Testing-Penetrants
Liquid Penetrant Testing-Penetrants
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 

Similaire à Maintenance Work Order Sheet

New project information sheet
New project information sheetNew project information sheet
New project information sheetMpho Seboane
 
Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2halfmann4
 
Worksheets for ass1 2011 12
Worksheets for ass1 2011 12Worksheets for ass1 2011 12
Worksheets for ass1 2011 12samuelgreen
 
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...Rod King, Ph.D.
 
Gate pass authorization for taking personal materials
Gate pass authorization for taking personal materialsGate pass authorization for taking personal materials
Gate pass authorization for taking personal materialsPasilo Drango
 
3.daftar isi
3.daftar isi3.daftar isi
3.daftar isiMamoit
 
Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)Rushi Reddy
 
Gameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST GameGameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST GameRod King, Ph.D.
 
Pg question paper_format
Pg question paper_formatPg question paper_format
Pg question paper_formatselvakumar g
 
Aix student guide system administrations part 2 problem determination
Aix student guide system administrations part 2   problem determinationAix student guide system administrations part 2   problem determination
Aix student guide system administrations part 2 problem determinationYogesh Sharma
 

Similaire à Maintenance Work Order Sheet (20)

New project information sheet
New project information sheetNew project information sheet
New project information sheet
 
Key request form
Key request formKey request form
Key request form
 
Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2Meen 442 Journal Final Pdf V2
Meen 442 Journal Final Pdf V2
 
4 contents
4 contents4 contents
4 contents
 
Worksheets for ass1 2011 12
Worksheets for ass1 2011 12Worksheets for ass1 2011 12
Worksheets for ass1 2011 12
 
4 contents
4 contents4 contents
4 contents
 
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
FROM TRADITIONAL ACCOUNTING TO BUSINESS MODEL IMPROVEMENT & INNOVATION ACCOUN...
 
LEAVE APPLICATION.docx
LEAVE APPLICATION.docxLEAVE APPLICATION.docx
LEAVE APPLICATION.docx
 
Gate pass authorization for taking personal materials
Gate pass authorization for taking personal materialsGate pass authorization for taking personal materials
Gate pass authorization for taking personal materials
 
3.daftar isi
3.daftar isi3.daftar isi
3.daftar isi
 
Agent's Guide to Contracting
Agent's Guide to ContractingAgent's Guide to Contracting
Agent's Guide to Contracting
 
Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)Incident user-guide-700(Remidy)
Incident user-guide-700(Remidy)
 
Gameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST GameGameboards for the Kanban-LIST Game
Gameboards for the Kanban-LIST Game
 
Pg question paper_format
Pg question paper_formatPg question paper_format
Pg question paper_format
 
Pg question paper_format
Pg question paper_formatPg question paper_format
Pg question paper_format
 
Remedy
RemedyRemedy
Remedy
 
Aix student guide system administrations part 2 problem determination
Aix student guide system administrations part 2   problem determinationAix student guide system administrations part 2   problem determination
Aix student guide system administrations part 2 problem determination
 
Cs414 sheet3 f2014
Cs414 sheet3 f2014Cs414 sheet3 f2014
Cs414 sheet3 f2014
 
Sheet3
Sheet3Sheet3
Sheet3
 
IP Form Symphony
IP Form SymphonyIP Form Symphony
IP Form Symphony
 

Plus de Mohammed Hamed Ahmed Soliman

Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsMohammed Hamed Ahmed Soliman
 
Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Mohammed Hamed Ahmed Soliman
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 

Plus de Mohammed Hamed Ahmed Soliman (20)

Lean accounting VS Financial Management
Lean accounting VS Financial ManagementLean accounting VS Financial Management
Lean accounting VS Financial Management
 
Healthcare is ripe for lean
Healthcare is ripe for leanHealthcare is ripe for lean
Healthcare is ripe for lean
 
Pareto Analysis
Pareto AnalysisPareto Analysis
Pareto Analysis
 
Brainstorming Technique
Brainstorming TechniqueBrainstorming Technique
Brainstorming Technique
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
Shingo Prize for Operational Excellence
Shingo Prize for Operational ExcellenceShingo Prize for Operational Excellence
Shingo Prize for Operational Excellence
 
Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...Business Process Management - Developing High Performance Facility Management...
Business Process Management - Developing High Performance Facility Management...
 
Root Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case StudyRoot Cause Analysis RCA - Case Study
Root Cause Analysis RCA - Case Study
 
The Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business successThe Toyota Way - Toyota dramatic business success
The Toyota Way - Toyota dramatic business success
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
5S Complete Implementation Guide
5S Complete Implementation Guide 5S Complete Implementation Guide
5S Complete Implementation Guide
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
CMMS - From Theory to Execution
CMMS - From Theory to ExecutionCMMS - From Theory to Execution
CMMS - From Theory to Execution
 
Maintenance Work Order
Maintenance Work OrderMaintenance Work Order
Maintenance Work Order
 
Problems Solving Techniques
Problems Solving TechniquesProblems Solving Techniques
Problems Solving Techniques
 
Advanced Maintenance Management
Advanced Maintenance ManagementAdvanced Maintenance Management
Advanced Maintenance Management
 
Ultrasound Detection - Applications
Ultrasound Detection - ApplicationsUltrasound Detection - Applications
Ultrasound Detection - Applications
 
Machinery Oil Analysis
Machinery Oil AnalysisMachinery Oil Analysis
Machinery Oil Analysis
 

Maintenance Work Order Sheet

  • 1. Maintenance Work Order Work Request “to be filled by Originator” Work Type: (Breakdown BD, Corrective Maintenance CM, Projects) Scheduling: (Planned / unplanned) Line status: (Working / Stopped) Shift:……… Originator:……….. Request dept:……… Date:…../…../…… Time:……… Cost Center:………… Location:………. Equipment name:……….. Equipment code:…………. Responsibility…. Problem description:…………………………………………………………………………………………………………………………………………………….. ………………………………………………………………………………………………………………………………………………………………………………… Problem Code:…………. SupervisorMaintenanceTo be filled by theSection PhaseWork Order Execution TimeCodeTechnicians 1. 2. 3. Equipment Downtime:……………………. Used Spare Parts: QuantityCodeSpare Parts description Used Tools: QCodeNameQCodeName Notes:______________________________________________________ __________________________________________________________________ WO Closing”Signatures” Technician:…………… Supervisor:…………….. Originator:…………… Failure Code:Failure Description: Cause Code:Cause: Action Code:Remedy: Clarification at the back of the paper! Priority Check: Safety High Normal