SlideShare une entreprise Scribd logo
1  sur  3
Electronic Engineer (06/02/2012 – 28/02/2014)
Employer’s Name:
BAE Land System Dynamics
(Now known as Denel Vehicle Systems:Mechatronics)
My Responsibilities included:
 Maintenance of the Hoefyster sight.
 Development of the Gunner sight.
 Industrialisation of the Gunner sight.
 Integrate and test of the Gunner sight.
 Document sight assembling processes; bore sighting and functional testing procedures.
 Acceptance testing of the Gunner Sight.
 Qualification testing of the Gunner Sight.
 Document qualification results in a qualification report.
 Assist with Production planning processes and procedures.
 Training of production technicians on sighting systems.
My Tasks included:
 Hoefyster stabilised sight
o Perform minor modifications on the production units.
o Re-load software (same or updated versions) on the production units.
o Updating of build history documentation for the effected production units.
o Investigate failures reported by the clients on the production units.
o Writing of validation procedures for the registered failures.
o Testing of communication system as per validation procedure.
o Document the validation test results for configuration management purposes.
o Environmental testing.
 Gunner sight
o The development team for the new sight system consist of:
 System Engineering (Partial responsibility)
 Assisting with sight system specification.
 Software Engineering (Partial responsibility)
 Testing of sight software version released for debugging and tools
used during the assembly and test phases.
 Hardware Engineering
 In-house mechanical designed
 Sub-contracted for manufacturing
 Optical Engineering
 Sub-contracted for manufacturing
 Integration Engineering (My responsibility)
 In-house test laboratory, set-up
 Sight test bench, modification to be suitable for this platform
 Test models, assembly and step by step process
 Test looms (internal and external), manufacturing drawings
 Industrialisation Engineering (Partial responsibility)
 Environmental test looms
 Production documentation
 Assembling and testing procedure inputs for the industrial
engineering to design an optimal solution for the production line.
 Production (Partial responsibility)
 Production units
o Sensors, order placement and barcoding for store placement
and batch identification
o Internal looms, sub-contracting for assembling
o Electronic boards, sub-contracting for assembling
o Focussing and adjusting the parameter settings of the day camera assemblies.
o Assembling of experimental development sight models (XDM).
o Design interface loom for the XDM.
o Assisting the software engineers with XDM software modification.
o Demonstrate the functionality of the XDM sight to the client.
o Assisting the client with integration effort of the XDM on their system bench.
o Investigate purging methods for the sights as well as EMI rings for the different lids
and plates.
o Design and implementing of changes to the engineering design models (EDM).
o Writing instructions for bore sighting (sensor alignment) and assembling process.
o Writing component test verification instructions per sub-system.
o Perform bore sighting, assembling and component test verification to ensure that the
documentation is accurate and can be used correctly by the technicians during the
assembling an integration process.
o Design and fitment of the internal camera looms.
o Assembling of the first three EDMs to be used for qualification testing.
o Writing acceptance test procedure (ATP) for gunner sight.
o Testing the complete sight system according the ATP to ensure that the procedure is
accurate and can be used correctly by the technicians during the test and evaluation
phase.
o Update the configuration management system with the latest sight system input in
order for the planning department to make use of the correct BOM for issuing the
correct quantities to the assembly line.
o Ensure the correct BOM quantities have been issued from stores and all relevant
paperwork is requested from the configuration department before the assembling and
integration process starts.
o Writing qualification test procedure for the gunner sight.
o Perform environmental tests on the gunner sight according to the military
environmental standards specified by the client:
 Temperature
 Vibration and shock
 Altitude
 Electro Magnetic Interference (EMI)
 Rain
 Dust and Sand
o Perform qualification tests on the gunner sight according to the test procedure:
 Functional testing
 Sensor alignment testing
 Boresight retention testing (part of the vibration and shock)
 Optics testing (dead pixels analysis, part of the temperature hot and cold
cycle testing)
 Purging of sights with nitrogen and placing of desiccants for moisture control.
o Document qualification results in a qualification report.
o Assembling of more EDMs after qualification testing as part of the client requirement
before delivery of the production units.
o Use the EDMs to provide training to the technicians in preparation for the production
run as well as process flow design, workstation and holding shelves.
Training and courses:
 On the job-training was provided for land vehicle sighting systems.

Contenu connexe

Tendances

Introducing OSA 5405 - Highly Precise On-Site Synchronization
Introducing OSA 5405 - Highly Precise On-Site SynchronizationIntroducing OSA 5405 - Highly Precise On-Site Synchronization
Introducing OSA 5405 - Highly Precise On-Site SynchronizationADVA
 
Audinate avb white paper v1.2
Audinate avb white paper v1.2Audinate avb white paper v1.2
Audinate avb white paper v1.2Bob Vanden Burgt
 
Introducing One Network Edge
Introducing One Network EdgeIntroducing One Network Edge
Introducing One Network EdgeADVA
 
GNSS Optimization for Urban Canyon and Indoor Synchronization
GNSS Optimization for Urban Canyon and Indoor SynchronizationGNSS Optimization for Urban Canyon and Indoor Synchronization
GNSS Optimization for Urban Canyon and Indoor SynchronizationADVA
 
Introducing the OSA 5405-P substation grandmaster for smart grid timing
Introducing the OSA 5405-P substation grandmaster for smart grid timingIntroducing the OSA 5405-P substation grandmaster for smart grid timing
Introducing the OSA 5405-P substation grandmaster for smart grid timingADVA
 
Timing in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locationsTiming in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locationsADVA
 
Beyond January 3rd: Operationalization of Timekeeping
Beyond January 3rd: Operationalization of TimekeepingBeyond January 3rd: Operationalization of Timekeeping
Beyond January 3rd: Operationalization of TimekeepingADVA
 
Solving synchronization challenges with critical infrastructures
Solving synchronization challenges with critical infrastructuresSolving synchronization challenges with critical infrastructures
Solving synchronization challenges with critical infrastructuresADVA
 
EMC VPLEX Continuous availability and non disruptive
EMC VPLEX Continuous availability and non disruptiveEMC VPLEX Continuous availability and non disruptive
EMC VPLEX Continuous availability and non disruptivesolarisyougood
 
Case Study: Small Macro Cell Sync Solution
Case Study: Small Macro Cell Sync SolutionCase Study: Small Macro Cell Sync Solution
Case Study: Small Macro Cell Sync SolutionADVA
 
ODSA PoC Physical Design Elements
ODSA PoC Physical Design ElementsODSA PoC Physical Design Elements
ODSA PoC Physical Design Elementsjennimenni
 
Time as a service for the IoT world of tomorrow
Time as a service for the IoT world of tomorrowTime as a service for the IoT world of tomorrow
Time as a service for the IoT world of tomorrowADVA
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_TemplateAlan Simon
 
Methods for Improving NTP
Methods for Improving NTPMethods for Improving NTP
Methods for Improving NTPADVA
 
ADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber Assurance
ADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber AssuranceADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber Assurance
ADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber AssuranceADVA
 
Synchronization protection & redundancy in ng networks itsf 2015
Synchronization protection & redundancy in ng networks   itsf 2015Synchronization protection & redundancy in ng networks   itsf 2015
Synchronization protection & redundancy in ng networks itsf 2015Daniel Sproats
 
EOSS Presentation - DPF
EOSS Presentation - DPFEOSS Presentation - DPF
EOSS Presentation - DPFDavid Fagan
 

Tendances (20)

Introducing OSA 5405 - Highly Precise On-Site Synchronization
Introducing OSA 5405 - Highly Precise On-Site SynchronizationIntroducing OSA 5405 - Highly Precise On-Site Synchronization
Introducing OSA 5405 - Highly Precise On-Site Synchronization
 
Audinate avb white paper v1.2
Audinate avb white paper v1.2Audinate avb white paper v1.2
Audinate avb white paper v1.2
 
Introducing One Network Edge
Introducing One Network EdgeIntroducing One Network Edge
Introducing One Network Edge
 
Introduction to Reactive Technologies
Introduction to Reactive TechnologiesIntroduction to Reactive Technologies
Introduction to Reactive Technologies
 
GNSS Optimization for Urban Canyon and Indoor Synchronization
GNSS Optimization for Urban Canyon and Indoor SynchronizationGNSS Optimization for Urban Canyon and Indoor Synchronization
GNSS Optimization for Urban Canyon and Indoor Synchronization
 
Introducing the OSA 5405-P substation grandmaster for smart grid timing
Introducing the OSA 5405-P substation grandmaster for smart grid timingIntroducing the OSA 5405-P substation grandmaster for smart grid timing
Introducing the OSA 5405-P substation grandmaster for smart grid timing
 
CIE_overview
CIE_overviewCIE_overview
CIE_overview
 
Timing in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locationsTiming in the pits: GNSS in challenging locations
Timing in the pits: GNSS in challenging locations
 
Beyond January 3rd: Operationalization of Timekeeping
Beyond January 3rd: Operationalization of TimekeepingBeyond January 3rd: Operationalization of Timekeeping
Beyond January 3rd: Operationalization of Timekeeping
 
Solving synchronization challenges with critical infrastructures
Solving synchronization challenges with critical infrastructuresSolving synchronization challenges with critical infrastructures
Solving synchronization challenges with critical infrastructures
 
EMC VPLEX Continuous availability and non disruptive
EMC VPLEX Continuous availability and non disruptiveEMC VPLEX Continuous availability and non disruptive
EMC VPLEX Continuous availability and non disruptive
 
Case Study: Small Macro Cell Sync Solution
Case Study: Small Macro Cell Sync SolutionCase Study: Small Macro Cell Sync Solution
Case Study: Small Macro Cell Sync Solution
 
ODSA PoC Physical Design Elements
ODSA PoC Physical Design ElementsODSA PoC Physical Design Elements
ODSA PoC Physical Design Elements
 
Time as a service for the IoT world of tomorrow
Time as a service for the IoT world of tomorrowTime as a service for the IoT world of tomorrow
Time as a service for the IoT world of tomorrow
 
Company_IPP_Profile_Template
Company_IPP_Profile_TemplateCompany_IPP_Profile_Template
Company_IPP_Profile_Template
 
Methods for Improving NTP
Methods for Improving NTPMethods for Improving NTP
Methods for Improving NTP
 
ADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber Assurance
ADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber AssuranceADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber Assurance
ADVA ALM: Advanced Link Monitoring Technology for Ultimate Fiber Assurance
 
Synchronization protection & redundancy in ng networks itsf 2015
Synchronization protection & redundancy in ng networks   itsf 2015Synchronization protection & redundancy in ng networks   itsf 2015
Synchronization protection & redundancy in ng networks itsf 2015
 
Emc vplex deep dive
Emc vplex deep diveEmc vplex deep dive
Emc vplex deep dive
 
EOSS Presentation - DPF
EOSS Presentation - DPFEOSS Presentation - DPF
EOSS Presentation - DPF
 

En vedette

Mission Ready PLM
Mission Ready PLMMission Ready PLM
Mission Ready PLMAras
 
Global and china military industry report, 2009 2010
Global and china military industry report, 2009 2010Global and china military industry report, 2009 2010
Global and china military industry report, 2009 2010ResearchInChina
 
Mil Pac Solutions Overview
Mil Pac Solutions OverviewMil Pac Solutions Overview
Mil Pac Solutions Overviewbrianaldridge
 
Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce Aanchal Saxena
 
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...pzulueta
 
BAE Tactical Vehicles Overview
BAE Tactical Vehicles OverviewBAE Tactical Vehicles Overview
BAE Tactical Vehicles OverviewJerry Lee Davis
 
UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...
UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...
UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...techUK
 
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE SystemsBAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE SystemsAVEVA Group plc
 
Resume Mcgregor March 2016
Resume Mcgregor March 2016Resume Mcgregor March 2016
Resume Mcgregor March 2016Arthur McGregor
 
Macro diagrams and definitions
Macro diagrams and definitionsMacro diagrams and definitions
Macro diagrams and definitions12jostma
 
A2 Economics Exam Technique - Weesteps to Evaluation
A2 Economics Exam Technique - Weesteps to EvaluationA2 Economics Exam Technique - Weesteps to Evaluation
A2 Economics Exam Technique - Weesteps to Evaluationtutor2u
 
Agrregate Demand and Supply
Agrregate Demand and SupplyAgrregate Demand and Supply
Agrregate Demand and SupplyAleeza Baig
 
Joseph Kony and the LRA
Joseph Kony and the LRAJoseph Kony and the LRA
Joseph Kony and the LRAchristyleigh19
 
3.4 Demand And Supply Side Policies
3.4   Demand And Supply Side Policies3.4   Demand And Supply Side Policies
3.4 Demand And Supply Side PoliciesAndrew McCarthy
 
3.3 Macro Economic Models
3.3   Macro Economic Models3.3   Macro Economic Models
3.3 Macro Economic ModelsAndrew McCarthy
 
AS Macro Revision Aggregate Supply
AS Macro Revision Aggregate SupplyAS Macro Revision Aggregate Supply
AS Macro Revision Aggregate Supplytutor2u
 
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...THANDAIAH PRABU
 
Thai tech startup ecosystem report 2017
Thai tech startup ecosystem report 2017Thai tech startup ecosystem report 2017
Thai tech startup ecosystem report 2017Techsauce Media
 

En vedette (20)

Mission Ready PLM
Mission Ready PLMMission Ready PLM
Mission Ready PLM
 
Global and china military industry report, 2009 2010
Global and china military industry report, 2009 2010Global and china military industry report, 2009 2010
Global and china military industry report, 2009 2010
 
Mil Pac Solutions Overview
Mil Pac Solutions OverviewMil Pac Solutions Overview
Mil Pac Solutions Overview
 
Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce Financial Analysis of BAE Systems and Rolls Royce
Financial Analysis of BAE Systems and Rolls Royce
 
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
Counterfeit Avoidance Through Purchasing Processes and Supplier Control - Liv...
 
Optimizing the image analyst's workflow for the United States Air Force
Optimizing the image analyst's workflow for the United States Air ForceOptimizing the image analyst's workflow for the United States Air Force
Optimizing the image analyst's workflow for the United States Air Force
 
BAE Tactical Vehicles Overview
BAE Tactical Vehicles OverviewBAE Tactical Vehicles Overview
BAE Tactical Vehicles Overview
 
UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...
UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...
UK Spectrum Policy Forum - Jade McCready, BAE Systems -Defence Sector Briefin...
 
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE SystemsBAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
BAE Systems Naval Ships – MARS to ERM Transformation by Ken McCrae, BAE Systems
 
Missles flight control systems
Missles flight control systemsMissles flight control systems
Missles flight control systems
 
Resume Mcgregor March 2016
Resume Mcgregor March 2016Resume Mcgregor March 2016
Resume Mcgregor March 2016
 
Macro diagrams and definitions
Macro diagrams and definitionsMacro diagrams and definitions
Macro diagrams and definitions
 
A2 Economics Exam Technique - Weesteps to Evaluation
A2 Economics Exam Technique - Weesteps to EvaluationA2 Economics Exam Technique - Weesteps to Evaluation
A2 Economics Exam Technique - Weesteps to Evaluation
 
Agrregate Demand and Supply
Agrregate Demand and SupplyAgrregate Demand and Supply
Agrregate Demand and Supply
 
Joseph Kony and the LRA
Joseph Kony and the LRAJoseph Kony and the LRA
Joseph Kony and the LRA
 
3.4 Demand And Supply Side Policies
3.4   Demand And Supply Side Policies3.4   Demand And Supply Side Policies
3.4 Demand And Supply Side Policies
 
3.3 Macro Economic Models
3.3   Macro Economic Models3.3   Macro Economic Models
3.3 Macro Economic Models
 
AS Macro Revision Aggregate Supply
AS Macro Revision Aggregate SupplyAS Macro Revision Aggregate Supply
AS Macro Revision Aggregate Supply
 
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
 
Thai tech startup ecosystem report 2017
Thai tech startup ecosystem report 2017Thai tech startup ecosystem report 2017
Thai tech startup ecosystem report 2017
 

Similaire à BAE (20)

ATE
ATEATE
ATE
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
OMPRAKASH_Resume
OMPRAKASH_ResumeOMPRAKASH_Resume
OMPRAKASH_Resume
 
CV
CVCV
CV
 
Chris Resume 10_13_2015
Chris Resume 10_13_2015Chris Resume 10_13_2015
Chris Resume 10_13_2015
 
Chris Resume 10_13_2015
Chris Resume 10_13_2015Chris Resume 10_13_2015
Chris Resume 10_13_2015
 
Chris Resume 10_13_2015
Chris Resume 10_13_2015Chris Resume 10_13_2015
Chris Resume 10_13_2015
 
Latest_CV
Latest_CVLatest_CV
Latest_CV
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume_Santosh
Resume_SantoshResume_Santosh
Resume_Santosh
 
Resume (Oct 2012)
Resume (Oct 2012)Resume (Oct 2012)
Resume (Oct 2012)
 
Todd Watson Resume
Todd Watson ResumeTodd Watson Resume
Todd Watson Resume
 
Daniel Velazquez G
Daniel Velazquez GDaniel Velazquez G
Daniel Velazquez G
 
Resume__GARY_SHELTON
Resume__GARY_SHELTONResume__GARY_SHELTON
Resume__GARY_SHELTON
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
Resume 2.0
Resume 2.0Resume 2.0
Resume 2.0
 
EWS Resume 2016
EWS Resume 2016EWS Resume 2016
EWS Resume 2016
 
Peter Vinh Resume
Peter Vinh ResumePeter Vinh Resume
Peter Vinh Resume
 

BAE

  • 1. Electronic Engineer (06/02/2012 – 28/02/2014) Employer’s Name: BAE Land System Dynamics (Now known as Denel Vehicle Systems:Mechatronics) My Responsibilities included:  Maintenance of the Hoefyster sight.  Development of the Gunner sight.  Industrialisation of the Gunner sight.  Integrate and test of the Gunner sight.  Document sight assembling processes; bore sighting and functional testing procedures.  Acceptance testing of the Gunner Sight.  Qualification testing of the Gunner Sight.  Document qualification results in a qualification report.  Assist with Production planning processes and procedures.  Training of production technicians on sighting systems. My Tasks included:  Hoefyster stabilised sight o Perform minor modifications on the production units. o Re-load software (same or updated versions) on the production units. o Updating of build history documentation for the effected production units. o Investigate failures reported by the clients on the production units. o Writing of validation procedures for the registered failures. o Testing of communication system as per validation procedure. o Document the validation test results for configuration management purposes. o Environmental testing.  Gunner sight o The development team for the new sight system consist of:  System Engineering (Partial responsibility)  Assisting with sight system specification.  Software Engineering (Partial responsibility)  Testing of sight software version released for debugging and tools used during the assembly and test phases.
  • 2.  Hardware Engineering  In-house mechanical designed  Sub-contracted for manufacturing  Optical Engineering  Sub-contracted for manufacturing  Integration Engineering (My responsibility)  In-house test laboratory, set-up  Sight test bench, modification to be suitable for this platform  Test models, assembly and step by step process  Test looms (internal and external), manufacturing drawings  Industrialisation Engineering (Partial responsibility)  Environmental test looms  Production documentation  Assembling and testing procedure inputs for the industrial engineering to design an optimal solution for the production line.  Production (Partial responsibility)  Production units o Sensors, order placement and barcoding for store placement and batch identification o Internal looms, sub-contracting for assembling o Electronic boards, sub-contracting for assembling o Focussing and adjusting the parameter settings of the day camera assemblies. o Assembling of experimental development sight models (XDM). o Design interface loom for the XDM. o Assisting the software engineers with XDM software modification. o Demonstrate the functionality of the XDM sight to the client. o Assisting the client with integration effort of the XDM on their system bench. o Investigate purging methods for the sights as well as EMI rings for the different lids and plates. o Design and implementing of changes to the engineering design models (EDM). o Writing instructions for bore sighting (sensor alignment) and assembling process. o Writing component test verification instructions per sub-system. o Perform bore sighting, assembling and component test verification to ensure that the documentation is accurate and can be used correctly by the technicians during the assembling an integration process. o Design and fitment of the internal camera looms. o Assembling of the first three EDMs to be used for qualification testing. o Writing acceptance test procedure (ATP) for gunner sight. o Testing the complete sight system according the ATP to ensure that the procedure is accurate and can be used correctly by the technicians during the test and evaluation phase. o Update the configuration management system with the latest sight system input in order for the planning department to make use of the correct BOM for issuing the correct quantities to the assembly line. o Ensure the correct BOM quantities have been issued from stores and all relevant paperwork is requested from the configuration department before the assembling and integration process starts. o Writing qualification test procedure for the gunner sight. o Perform environmental tests on the gunner sight according to the military environmental standards specified by the client:  Temperature  Vibration and shock  Altitude  Electro Magnetic Interference (EMI)  Rain  Dust and Sand o Perform qualification tests on the gunner sight according to the test procedure:  Functional testing  Sensor alignment testing
  • 3.  Boresight retention testing (part of the vibration and shock)  Optics testing (dead pixels analysis, part of the temperature hot and cold cycle testing)  Purging of sights with nitrogen and placing of desiccants for moisture control. o Document qualification results in a qualification report. o Assembling of more EDMs after qualification testing as part of the client requirement before delivery of the production units. o Use the EDMs to provide training to the technicians in preparation for the production run as well as process flow design, workstation and holding shelves. Training and courses:  On the job-training was provided for land vehicle sighting systems.