INTRODUCTION

 Pre-Engineered Buildings can be adapted to suit a wide
  variety of structural applications, the greatest economy will
  be realized when utilizing standard details. An efficiently
  designed Pre-Engineered Building can be lighter that the
  conventional steel buildings by up to 30%.
 Tailor made building based on client’s requirement &
  actual design calculations using tapered sections.
 Designing and casting is done in factory, building
  components are brought to site then fixed/jointed at
  the site. All connections are bolted.
 These are the structures basically produced at the factory
  with high tensile steel material by collecting complete
  information of the shed/building (viz; Length, Width,
  Height etc,).
 The entire design of column, rafters and other accessories
  is based on International structural standards and involve
  high technical welding and quality production.
 Video- How drawing is drawn using STRUCAD?
Insulation (PEBI)
 Uniformly textured inorganic glass fibers bonded together
  by a non-water soluble and fire-retardant thermosetting
  resin. It is free from coarse fibers and shot due to its
  mineral composition.
 PEBI is non-toxic and not hazardous to health.
Design Criteria
 DESIGN METHOD: Allowable stress design method is
  used as per the AISC specifications.

 DEFLECTIONS: Unless otherwise specified, the
  deflections will go to MBMA, AISC criteria and standard
  industry practices.

 PRIMARY FRAMING: Moment resisting frames with
  pinned or fixed bases.
 SECONDARY FRAMING: Cold formed Z sections or C
  sections for purlins or girts designed as continuous beams
  spanning over rafters and columns with laps.

 LONGITUDANAL STABILITY: Wind load on building
  end walls is transferred through roof purlins to braced bays
  and carried to the foundations through diagonal bracing.

 DESIGN SOFTWARE

   The latest software that is used for design is STAAD 2007.
ERECTION SYSTEM

     Preparation for Erection
2.    Pre Erection checks
3.    Receiving Materials at site
4.    Unloading Containers

     Erection of the Framing
7.    Preparation of the First Bay
8.    Main frames
9.    Mezzanine floors
10.   Crane Beams
Sheeting & Trimming


 Sheeting preparation

 Sheeting the walls

 Sheeting the roofs

 Miscellaneous trimmings

 Fascia
 Self weight                Self weight
  30% lighter                 More heavy
 Primary Member is          Primary members are
  tapered section             Hot rolled “I” section
 Secondary members          Secondary members are
  are light weight rolled     “I” or “C” section
  framed “Z” and “C”          which are heavy in
  section                     weight.
 Delivery – average 6 to 8    Delivery- average 20 to
  weeks                         26 weeks
 Foundation-simple design,    Foundation- expensive,
  easy to construct & light     heavy foundation
  wt.                           required.
 Erection cost and time-      Erection cost and time-
  accurately known              20% more than PEB
 Overall price - Higher
 Overall price -30%lower
                                price per square meter.
 Architecture-achieved at
                               Architecture- achieved at
  low cost
                                higher cost
 Erection process is easy,
                               Erection process is slow
  fast, step by step
                                and extensive field labor
                                is required.
PRE ENGINEERED BUILDING vs
CONCRETE BUILDINGS
APPLICATIONS
   Industrial Buildings
   Warehouses
   Commercial Complexes
   Showrooms
   Offices
   Schools
   Indoor Stadiums
   Outdoor Stadiums with canopies
   Gas Stations
   Metro Stations, Bus Terminals, Parking Lots
   Primary Health Centers, Angan wadi’s
   And many more…
Industrial      Indoor Stadiums
   Building




Parking lots   Railway Station
Aircraft Hangars   Metro Station




 Wear house        High rise Building
ADVANTAGES
   Aesthetic Appeal
   Faster Completion
   Economical
   Seismic Resistance
   Ease of Expansion
   Maintenance Free
   Large Clear Spans
   Controlled Quality
CONCLUSION

 PEB concept has been very successful and well established
  in North America, Australia and is presently expanding in
  U.K and European countries. PEB construction is 30 to
  40% faster than masonary construction. PEB buildings
  provide good insulation effect and would be highly suitable
  for a tropical country like India.

 The pre-engineered building calls for very fast construction
  of buildings and with good aesthetic looks and quality
  construction. Pre-engineered Buildings can be used
  extensively for construction of industrial and residential
  buildings.
REFERENCES
 Various websites from internet
 PEB project Vigyan Ashram, Pabal
Thank You!

Contenu connexe

Tendances

Steel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersSteel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersPrem Chand Sharma
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.Suhailkhan204
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-buildinghlksd
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
Introduction to steel concrete composite structure
Introduction to steel concrete composite structureIntroduction to steel concrete composite structure
Introduction to steel concrete composite structureElias Ahmed Nirob
 
A Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction TechniqueA Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction TechniqueIJERA Editor
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of buildingKrishnagnr
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)Waseem Akbar
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project reportShubham Parab
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor SystemAditya Shah
 
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...
Comparative Study of an Industrial Pre Engineered Building with Conventiona...Yogita Kadam
 
Pre engineered buildings vs conventional steel buildings
Pre engineered buildings vs conventional steel buildingsPre engineered buildings vs conventional steel buildings
Pre engineered buildings vs conventional steel buildingsRavikiran Kattoli
 

Tendances (20)

Steel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersSteel Structural Design Manual for Engineers
Steel Structural Design Manual for Engineers
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Bracing connections
Bracing connectionsBracing connections
Bracing connections
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Introduction to steel concrete composite structure
Introduction to steel concrete composite structureIntroduction to steel concrete composite structure
Introduction to steel concrete composite structure
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
Steel structures
Steel structuresSteel structures
Steel structures
 
Multi Storey Steel Structures
Multi Storey Steel StructuresMulti Storey Steel Structures
Multi Storey Steel Structures
 
Peb ss
Peb ssPeb ss
Peb ss
 
A Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction TechniqueA Study On Pre-Engineered Building – A Construction Technique
A Study On Pre-Engineered Building – A Construction Technique
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Analysis and design of building
Analysis and design of buildingAnalysis and design of building
Analysis and design of building
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
Post tension Floor System
Post tension Floor SystemPost tension Floor System
Post tension Floor System
 
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...Comparative Study of  an Industrial Pre Engineered Building  with Conventiona...
Comparative Study of an Industrial Pre Engineered Building with Conventiona...
 
Pre engineered buildings vs conventional steel buildings
Pre engineered buildings vs conventional steel buildingsPre engineered buildings vs conventional steel buildings
Pre engineered buildings vs conventional steel buildings
 

Similaire à PEB construction-Mukesh Bhavsar

Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering buildingRathin Rakshit
 
96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildingshlksd
 
Presentation on PEB Metal
Presentation on PEB MetalPresentation on PEB Metal
Presentation on PEB MetalPEB Metal
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final WebFaris Alwan
 
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...IRJET Journal
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structureArpan Dixit
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptxra1508
 
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET Journal
 
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildingshlksd
 
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET Journal
 
Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering buildingnarayanababu7
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Habibie Razak
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for constPradeepPandya1
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Pre Engineered Building Catalogue
Pre Engineered Building CataloguePre Engineered Building Catalogue
Pre Engineered Building CatalogueEPACK PEB
 

Similaire à PEB construction-Mukesh Bhavsar (20)

Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering building
 
96382022 pre-engineered-buildings
96382022 pre-engineered-buildings96382022 pre-engineered-buildings
96382022 pre-engineered-buildings
 
Pre-engineered bldg.pptx
Pre-engineered bldg.pptxPre-engineered bldg.pptx
Pre-engineered bldg.pptx
 
Presentation on PEB Metal
Presentation on PEB MetalPresentation on PEB Metal
Presentation on PEB Metal
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final Web
 
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
IRJET- Review Paper on Comparative Study of an Industrial Pre – Engineered Bu...
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structure
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
 
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCCIRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
IRJET- Relative Investigation of Multi-Storey Structure into PEB and RCC
 
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
A Study of Performance of Pre-Engineered Building of an Industrial Warehouse ...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
IRJET- Comparative Study of an Industrial Pre – Engineered Building with Conv...
 
Pre engineering building
Pre engineering buildingPre engineering building
Pre engineering building
 
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
Micce 2010 Peb Presentation (2) By Habibie Razak Cm4 2
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for const
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Pre Engineered Building Catalogue
Pre Engineered Building CataloguePre Engineered Building Catalogue
Pre Engineered Building Catalogue
 

Plus de Mukesh Bhavsar

Plus de Mukesh Bhavsar (7)

Blake mycoskie
Blake mycoskieBlake mycoskie
Blake mycoskie
 
Nick Vujicic-No arms, No legs, No worries...
Nick Vujicic-No arms, No legs, No worries...Nick Vujicic-No arms, No legs, No worries...
Nick Vujicic-No arms, No legs, No worries...
 
Sasa kasav
Sasa kasavSasa kasav
Sasa kasav
 
Richard Branson/Virgin
Richard Branson/VirginRichard Branson/Virgin
Richard Branson/Virgin
 
Oscar pistorius
Oscar pistoriusOscar pistorius
Oscar pistorius
 
Infosys
InfosysInfosys
Infosys
 
Tata Jagriti Yatra 2010-Mukesh Bhavsar
Tata Jagriti Yatra 2010-Mukesh BhavsarTata Jagriti Yatra 2010-Mukesh Bhavsar
Tata Jagriti Yatra 2010-Mukesh Bhavsar
 

Dernier

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 

Dernier (20)

Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

PEB construction-Mukesh Bhavsar

  • 1. SEMINAR ON “PRE ENGINEERED BUILDINGS” Concept , Design & Construction BY- Bahadur Guide- Mukesh Bhavsar
  • 2. INTRODUCTION  Pre-Engineered Buildings can be adapted to suit a wide variety of structural applications, the greatest economy will be realized when utilizing standard details. An efficiently designed Pre-Engineered Building can be lighter that the conventional steel buildings by up to 30%.  Tailor made building based on client’s requirement & actual design calculations using tapered sections.  Designing and casting is done in factory, building components are brought to site then fixed/jointed at the site. All connections are bolted.
  • 3.  These are the structures basically produced at the factory with high tensile steel material by collecting complete information of the shed/building (viz; Length, Width, Height etc,).  The entire design of column, rafters and other accessories is based on International structural standards and involve high technical welding and quality production.  Video- How drawing is drawn using STRUCAD?
  • 4. Insulation (PEBI)  Uniformly textured inorganic glass fibers bonded together by a non-water soluble and fire-retardant thermosetting resin. It is free from coarse fibers and shot due to its mineral composition.  PEBI is non-toxic and not hazardous to health.
  • 5.
  • 6. Design Criteria  DESIGN METHOD: Allowable stress design method is used as per the AISC specifications.  DEFLECTIONS: Unless otherwise specified, the deflections will go to MBMA, AISC criteria and standard industry practices.  PRIMARY FRAMING: Moment resisting frames with pinned or fixed bases.
  • 7.  SECONDARY FRAMING: Cold formed Z sections or C sections for purlins or girts designed as continuous beams spanning over rafters and columns with laps.  LONGITUDANAL STABILITY: Wind load on building end walls is transferred through roof purlins to braced bays and carried to the foundations through diagonal bracing.  DESIGN SOFTWARE The latest software that is used for design is STAAD 2007.
  • 8. ERECTION SYSTEM  Preparation for Erection 2. Pre Erection checks 3. Receiving Materials at site 4. Unloading Containers  Erection of the Framing 7. Preparation of the First Bay 8. Main frames 9. Mezzanine floors 10. Crane Beams
  • 9. Sheeting & Trimming  Sheeting preparation  Sheeting the walls  Sheeting the roofs  Miscellaneous trimmings  Fascia
  • 10.  Self weight  Self weight 30% lighter More heavy  Primary Member is  Primary members are tapered section Hot rolled “I” section  Secondary members  Secondary members are are light weight rolled “I” or “C” section framed “Z” and “C” which are heavy in section weight.
  • 11.  Delivery – average 6 to 8  Delivery- average 20 to weeks 26 weeks  Foundation-simple design,  Foundation- expensive, easy to construct & light heavy foundation wt. required.  Erection cost and time-  Erection cost and time- accurately known 20% more than PEB
  • 12.  Overall price - Higher  Overall price -30%lower price per square meter.  Architecture-achieved at  Architecture- achieved at low cost higher cost  Erection process is easy,  Erection process is slow fast, step by step and extensive field labor is required.
  • 13. PRE ENGINEERED BUILDING vs CONCRETE BUILDINGS
  • 14. APPLICATIONS  Industrial Buildings  Warehouses  Commercial Complexes  Showrooms  Offices  Schools  Indoor Stadiums  Outdoor Stadiums with canopies  Gas Stations  Metro Stations, Bus Terminals, Parking Lots  Primary Health Centers, Angan wadi’s  And many more…
  • 15. Industrial Indoor Stadiums Building Parking lots Railway Station
  • 16. Aircraft Hangars Metro Station Wear house High rise Building
  • 17. ADVANTAGES  Aesthetic Appeal  Faster Completion  Economical  Seismic Resistance  Ease of Expansion  Maintenance Free  Large Clear Spans  Controlled Quality
  • 18. CONCLUSION  PEB concept has been very successful and well established in North America, Australia and is presently expanding in U.K and European countries. PEB construction is 30 to 40% faster than masonary construction. PEB buildings provide good insulation effect and would be highly suitable for a tropical country like India.  The pre-engineered building calls for very fast construction of buildings and with good aesthetic looks and quality construction. Pre-engineered Buildings can be used extensively for construction of industrial and residential buildings.