Chronology of Operational Challenges
Item                Challenges                                 Root Cause                                  Reference

   1 Furnace no draft                            Low ash melting point of EFB fibers     1. Faxes from Hartalega to Vyncke,
     • Combustion chamber is kept                • The inherent property of low ash         reference
        constantly underpressure to avoid           melting point of EFB fibers resulted        a. H.A.-Vync-KML-43
        explosion or leakage of flame to            in formation of ‘soft’ and ‘sticky’         b. H.A.-Vync-KML-44
        outside of the chamber.                     ashes.                                      c. H.A.-Vync-KML-46
     • This underpressure is created by a        • These soft and sticky ashes formed           d. H.A.-Vync-KML-51
        large suction fan mounted. before           adhere to the thermal oil coils, hot
        the chimney. Between the                    water economisors and dust collector 2. Faxes from Vyncke to Hartalega,
        combustion chamber and suction fan          blocking the travel path hot gases.     reference
        are thermal oil coils and dust           • Therefore pressure of the                    a. 1.2549 dated 20.08.2003
        collectors where the hot gases              combustion chamber increases.               b. 1.2549 dated 02.09.2003
        produced from the combustion
        chamber would to pass through.                                                      3. Figures 1, 2, 3, and 4
     • The combustion chamber draft is
        monitored real time by a pressure
        sensor. The plant stops whenever
        combustion chamber’s pressure goes
        to positive (no vacuum).
     • We experienced frequently furnace
        no draft situation that resulted in
        stoppage of the plant.

   2 Excessive clinker formation                 Low ash melting point of EFB fibers        1. Faxes from Hartalega to Vyncke,
     • Excessive clinkers were formed on         • A softened / melted ash due to the          reference
        the furnace (combustion chamber             low melting point property of empty            a. H.A.-Vync-KML-43
        side wall), furnace floor (step grate)      fruit bunches and its high potassium           b. H.A.-Vync-KML-44
        and at the furnace ceiling.                 content resulted in formation of hard          c. H.A.-Vync-KML-46
                                                    silica like clinker on the mentioned           d. H.A.-Vync-KML-49
       Damaged furnace refractory wall              surfaces.                                      e. H.A.-Vync-KML-51
       • Accumulation of clinker resulted in
collapse of refractory lining of                                                  2. Fax from Vyncke to Hartalega,
      furnace side wall and furnace                                                        reference 1.2549 dated 02.09.2003
      ceiling.
                                                                                        3. Purchase order no. to replace
                                                                                           (overhaul) old refractory with new
                                                                                              a. 041999
                                                                                              b. 040225
                                                                                              c. 042141
                                                                                              d. 042127
                                                                                              e. 042129
                                                                                              f. 042473
                                                                                              g. 042309

                                                                                        4. Figures 5, 6, 7 and 8

3 High furnace temperature                   Low calorific value of EFB fibers          1. Fax from Hartalega to Vyncke,
  • Frequent occurrence of high furnace      • Owing to this characteristic,               reference H.A.-Vync-KML-51
     temperature.                               equipment in the plant such as
  • A temperature sensor senses the             thermal oil coil and combustion
     furnace temperature continually.           chamber are undersized
     Once temperature reaches the limit,     • To compensate for the reduced
     the system will cut off to prevent         surface area of these equipment (due
     over-temperature situation.                to undersizing), the operating
  • Over temperature may results in             temperature has to be higher in order
     melt down of the furnace and greatly       to attain the required capacity
     shortens the lifespan of the plant.     • Operating in higher temperature also
     Hence the necessity of the safety cut      resulted in other problems
     off to prevent over-temperature.           mentioned earlier such as clinker
                                                formation due to melting ashes and
                                                blockage of pathway of hot gases.

4 Over estimation of fuel density         Low density of EFB fibers                     1. Faxes from Hartalega to Vyncke,
  • Owing to the fact that EFB fibers are • EFB fibers were assumed to have                reference
a relatively new biomass fuel,              density of 250 kg/m3                             a. H.A.-Vync-KML-46
       therefore its properties are not well   •   Actual density was found to be                   b. H.A.-Vync-KML-49
       established.                                around 105 kg/m3
   •   The density of EFB fibers were                                                    2. Faxes from Vyncke to Hartalega,
       wrongly estimated by Vyncke,                                                         reference
       resulting in undersizing of the                                                             a. 1.2549 dated 20.08.2003
       feeding systems                                                                             b. 1.2549 dated 02.09.2003
   •   Therefore feeding conveyors speeds                                                          c. 1.2549 dated 09.09.2003
       were increased to accommodate the
       undersize condition, resulting in                                                 3. Figures 9, 10, 11, and 12
       much higher wear and tear.

5 Damaged moving floor (ESB)                   Abrasive property of EFB fibers           1. Faxes from Hartalega to Vyncke,
  • Moving floor is a fuel feeding             • Owing to the highly abrasive               referece
     system that installed at floor level.        property of the EFB fibers, the               a. H.A.-Vync-KML-49
  • This system consists of 3 to 4                welding joints of the moving floor            b. H.A.-Vync-KML-51
     ladders, each ladder moving back             that were in direct contact with the
     and forth in a horizontal direction          EFB fibers were ‘grinded’ of,          2. Faxes from Vyncke to Hartalega,
     parallel to the floor                        resulting in breakages.                   referece
  • Its function is to discharge biomass                                                        a. 1.2549 dated 09.09.2003
     materials into feeding screws to          Entanglement of EFB fibers                       b. 1.2549 dated 13.10.2003
     convey fuel to the combustion             • EFB fibers tend to entangle, making
     chamber.                                     this material difficult to convey by   3. Figures 11 and 12
  • Moving floor (ESB) for EFB fibers             the moving floor.
     encountered extremely high wear           • Some modifications were carried out     4. Purchase order no. 037770 to
     and tear and was also unable to              but were unsuccessful, instead lead       purchase new moving floor
     function well                                to further damages to the moving
  • A new moving floor was purchased              floor.
     after only running the plant for 18
     months
6 Over current of screw conveyors              Abrasive property of EFB fibers           1. Faxes from Hartalega to Vyncke,
  • Motors of screw conveyors                  • Owing to the highly abrasive               referece
     conveying EFB fibers frequently              property of the EFB fibers, screw             a. H.A.-Vync-KML-57
experienced over current.                  conveyors experience high wear and              b. H.A.-Vync-KML-58
                                                 tear
   Breakage of screw conveyors                                                            2. Figures 9 and 10
   • Screw conveyors broke not long           Entanglement of EFB fibers
      after plant started operation           • EFB fibers tend to entangle, making       3. Purchase order no. for repair of
                                                 this material difficult to convey by        screw conveyor
   Breakage of silo mixer                        the screw conveyors.                            a. 030048
   • Mixer is installed at the intermediate   • When EFB fibers are entangled,                   b. 041288
      silo                                       forces resisting the screw conveyors            c. 041499
                                                 are much increased resulting in over            d. 040998
                                                 current and breakages.
                                              • Due also to entanglement, silo mixer      4. Purchase order no.030076 to replace
                                                 experience high forces that results in      silo mixer
                                                 high wear and tear and short fatigue
                                                 cycle

7 Damaged impeller of flue gas fan            Impermeability of EFB fibers                1. Fax from Hartalega to Vyncke,
  • Flue gas fan impeller welding joints      • Due to impermeability of the EFB             referece H.A.-Vync-KML-60
    cracked                                      fibers, primary and secondary air
  • Flue gas fan impellers were                  flows were increased to provide          2. Figures 13 and 14
    noticeably thinner within less than          more air for combustion.
    12 months in operations                   • Increase in primary and secondary         3. Purchase order no. for purchase of
                                                 air flows have to be compensated by         new flue gas fan impeller
                                                 increasing the speed of the flue gas           a. 031117
                                                 fan (suction fan installed before the          b. 040699
                                                 chimney) to maintain a negative                c. 041781
                                                 pressure inside the combustion
                                                 chamber.

                                              Highly abrasive property of EFB fibers
                                              • Due to high ash and potassium
                                                 content of EFB fibers, the flue gas
                                                 fan impeller where the air flow
speed is the highest experienced
                                                high wear and tear

                                            High operating temperature
                                            • Due to the plant being undersized
                                               because of unanticipated problems
                                               associated with EFB fibers as
                                               biomass fuel, the thermal oil heaters
                                               were forced to run at higher
                                               temperature in order to achieve its
                                               design capacity.
                                            • This has resulted in accelerated
                                               deterioration of parts

8 Biomass boilers 1&2 unable to deliver      Furnace no draft                          1. Faxes from Hartalega to Vyncke,
  up to the design capacity                  • Flue gas fan impeller speed has to be      reference
  • All the above has resulted in the           increased to increase the furnace             a. H.A.-Vync-KML-51
      boilers 1 and 2 unable to deliver heat    underpressure to compensate for the           b. H.A.-Vync-KML-54
      energy up to the design capacity          increase in primary and secondary
  • Designed capacity 15Gcal/hr                 air flows due to impermeability of     2. Email from Vyncke to Hartalega
                                                the EFB fibers.                           From Jef Mestdagh to Kuan Mun
                                             • This has resulted in reduced               Leong dated 24.12.2003
                                                retention time of hot gases within the
                                                system, therefore reducing the time    3. Contract signed between Vyncke
                                                of heat transfer to the thermal oil       and Hartalega

                                            Excessive clinker formation
                                            • Excessive clinkers were formed due
                                               to the low ash softening point of
                                               EFB fibers.
                                            • Its furnace design temperature of
                                               1,000ºC is not sustainable as
                                               excessive clinker will form
High furnace temperature
                                         • To deliver the designed capacity, the
                                            boilers need to be forced to run at
                                            extremely high temperature (furnace
                                            temperature above 1,100ºC.
                                         • At such high temperature, the risk of
                                            the system cutting off is high as the
                                            cut off limit is 1,200ºC.

                                         Over-estimation of fuel density
                                         • Due to over estimation of density of
                                            EFB fibers, all feeding systems are
                                            under-sized.
                                         • Tuning up their operating speed will
                                            increase wear and tear, not a good
                                            engineering practice.

                                         Sticky ashes
                                         • Build up of soot and sticky ashes
                                             around thermal oil coils, creating an
                                             insulating layer and therefore
                                             reducing heat exchanging surface.
                                         • Plant has to be stopped frequently to
                                             clean of the soot

9 Damaged Soot Blowers                  Abrasive nature of EFB fibers                1. Figures 15 and 16
  • Soot blowers are installed to use   • Owing to the abrasive nature of EFB
    compress air to blow away soot         fiber and its high ash content, the
    formed on the outer surface of the     soot blowers have higher wear and
    thermal oil coils.                     tear rate.
  • These soot blowers experienced high
    wear and tear
10 Damaged multicyclones                          Abrasive nature of EFB fibers            1. Purchase order no. 039586 for
     • A dust collector installed between           Owing to the abrasive nature of EFB         replacement of cyclones
       the thermal oil coil and flue gas fan        fiber and its high ash content, the
       to collect dust / soot before                dedustor and cyclones have higher wear   2. Purchase order no. 040792 to repair
       discharging out through the chimney          and tear rate.                              dedustor
     • Within the dust collector, there are
       multi-cyclones, these cyclones
       experienced high wear and tear



PHOTOGRAPHS




                                                                                                Blocked cyclone

                                                                                    Cyclone not
             Soot formation
                                                                                    blocked

Figure 1: Softened ashes sticking to the thermal oil coils          Figure 2: Blocked cyclones in dust collector
Heat exchanger
                                                                                              coils

                                                                          Thick soot


                                                               Figure 4: Blocked economisor heat exchanger coils
Figure 3: Cyclones cleaned - unblocked


    Clinker

                                                                     Steps clearly visible




Figure 5: Excessive clinker formation on furnace floor (step   Figure 6: Without clinker, steps of the furnace floor is clearly
grate)                                                           visible


                          Exposed cooling tube

                                                                              Cooling tubes




Figure 7: Damaged refractory at furnace ceiling, exposing cooling Figure 8: Repair underway for damaged furnace ceiling. Water
pipe. Exposed pipes experience high corrosion                     cooled coils are exposed when refractory is damaged causing
                                                                  excessive corrosion of water coils to take place
Screw plate becomes
  very thin




  Last piece eaten up


Figure 9: Feeding becomes thin due to excessive wear and tear.   Figure 10: Repair of one of the components of feeding system
Last piece of screw totally eaten up.                            (screw conveyor)
Figure 11: Moving floor damaged due to wrong design and    Figure 12: Replacement of new moving due to old one worn out
excessive wear and tear – repair works being carried out   beyond repair
Fan blade eaten up –
                                                  becomes very thin!
Figure 13: Damaged impeller of flue gas fan   Figure 14: Impeller becomes paper thin due to excessive wear and
                                              tear
Worn out soot blower




Figure 15: Damaged soot blower           Figure 16: Soot blower repaired

Contenu connexe

En vedette

Presentación Pacto de Socios para certificado de profesionalidad
Presentación Pacto de Socios para certificado de profesionalidadPresentación Pacto de Socios para certificado de profesionalidad
Presentación Pacto de Socios para certificado de profesionalidadIEBS Business School
 
Name one gay club/bar for each of these global cities? And a little descripti...
Name one gay club/bar for each of these global cities? And a little descripti...Name one gay club/bar for each of these global cities? And a little descripti...
Name one gay club/bar for each of these global cities? And a little descripti...olsonqswrkyjwxq
 
Story To Reflect Upon 25,26
Story To Reflect Upon 25,26Story To Reflect Upon 25,26
Story To Reflect Upon 25,26OH TEIK BIN
 
Semana 2 actividad 2.2 función de un lms - josé jaime ruiz - ges
Semana 2   actividad 2.2 función de un lms - josé jaime ruiz - gesSemana 2   actividad 2.2 función de un lms - josé jaime ruiz - ges
Semana 2 actividad 2.2 función de un lms - josé jaime ruiz - gesSea Experto
 
Media Monitoring als Erfolgsfaktor - Beispiel M-Adaptive
Media Monitoring als Erfolgsfaktor - Beispiel M-AdaptiveMedia Monitoring als Erfolgsfaktor - Beispiel M-Adaptive
Media Monitoring als Erfolgsfaktor - Beispiel M-AdaptiveMBrainDE
 
Eman Jaheen Resume 2(1)- e.jaheen@outlook
Eman  Jaheen Resume 2(1)- e.jaheen@outlookEman  Jaheen Resume 2(1)- e.jaheen@outlook
Eman Jaheen Resume 2(1)- e.jaheen@outlookEman Jaheen
 
The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...
The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...
The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...Snag
 
Energia, potencia y trabajo!
Energia, potencia y trabajo!Energia, potencia y trabajo!
Energia, potencia y trabajo!danielasandoval96
 
CallReps Company Presentations
CallReps Company PresentationsCallReps Company Presentations
CallReps Company PresentationsSalespointApp
 

En vedette (15)

Presentación Pacto de Socios para certificado de profesionalidad
Presentación Pacto de Socios para certificado de profesionalidadPresentación Pacto de Socios para certificado de profesionalidad
Presentación Pacto de Socios para certificado de profesionalidad
 
Name one gay club/bar for each of these global cities? And a little descripti...
Name one gay club/bar for each of these global cities? And a little descripti...Name one gay club/bar for each of these global cities? And a little descripti...
Name one gay club/bar for each of these global cities? And a little descripti...
 
Story To Reflect Upon 25,26
Story To Reflect Upon 25,26Story To Reflect Upon 25,26
Story To Reflect Upon 25,26
 
Conor2011
Conor2011Conor2011
Conor2011
 
Semana 2 actividad 2.2 función de un lms - josé jaime ruiz - ges
Semana 2   actividad 2.2 función de un lms - josé jaime ruiz - gesSemana 2   actividad 2.2 función de un lms - josé jaime ruiz - ges
Semana 2 actividad 2.2 función de un lms - josé jaime ruiz - ges
 
Media Monitoring als Erfolgsfaktor - Beispiel M-Adaptive
Media Monitoring als Erfolgsfaktor - Beispiel M-AdaptiveMedia Monitoring als Erfolgsfaktor - Beispiel M-Adaptive
Media Monitoring als Erfolgsfaktor - Beispiel M-Adaptive
 
Informatica bb 2011
Informatica bb 2011Informatica bb 2011
Informatica bb 2011
 
Eman Jaheen Resume 2(1)- e.jaheen@outlook
Eman  Jaheen Resume 2(1)- e.jaheen@outlookEman  Jaheen Resume 2(1)- e.jaheen@outlook
Eman Jaheen Resume 2(1)- e.jaheen@outlook
 
Antologia español
Antologia españolAntologia español
Antologia español
 
IPad2 manual_del_usuario
IPad2 manual_del_usuarioIPad2 manual_del_usuario
IPad2 manual_del_usuario
 
The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...
The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...
The Rising Cost of Bad Hires: How to Stay Compliant with Background Checks an...
 
Energia, potencia y trabajo!
Energia, potencia y trabajo!Energia, potencia y trabajo!
Energia, potencia y trabajo!
 
Semiótica y señalética
Semiótica y señaléticaSemiótica y señalética
Semiótica y señalética
 
CallReps Company Presentations
CallReps Company PresentationsCallReps Company Presentations
CallReps Company Presentations
 
Usenix lisa 2011
Usenix lisa 2011Usenix lisa 2011
Usenix lisa 2011
 

Plus de Musa Sabri

Flow rate and pressure head
Flow rate and pressure headFlow rate and pressure head
Flow rate and pressure headMusa Sabri
 
Sonic Soot Blower System
Sonic Soot Blower SystemSonic Soot Blower System
Sonic Soot Blower SystemMusa Sabri
 
Pneumatic system
Pneumatic systemPneumatic system
Pneumatic systemMusa Sabri
 
Fluid power, Hydraulic & penumatic
Fluid power, Hydraulic & penumaticFluid power, Hydraulic & penumatic
Fluid power, Hydraulic & penumaticMusa Sabri
 
Engineering ethics in Islam
Engineering ethics in IslamEngineering ethics in Islam
Engineering ethics in IslamMusa Sabri
 
Biomass handling system
Biomass handling systemBiomass handling system
Biomass handling systemMusa Sabri
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping designMusa Sabri
 
Valve types and selection
Valve types and selectionValve types and selection
Valve types and selectionMusa Sabri
 
Simple Piping design
Simple Piping designSimple Piping design
Simple Piping designMusa Sabri
 
Cylinder force and speed calc
Cylinder force and speed calcCylinder force and speed calc
Cylinder force and speed calcMusa Sabri
 
Thomas screw conveyor design
Thomas screw conveyor designThomas screw conveyor design
Thomas screw conveyor designMusa Sabri
 
Boilers and Thermic Fluidheaters
Boilers and Thermic FluidheatersBoilers and Thermic Fluidheaters
Boilers and Thermic FluidheatersMusa Sabri
 
Motor selection
Motor selectionMotor selection
Motor selectionMusa Sabri
 
Agricultural engineering in malaysia
Agricultural engineering in malaysiaAgricultural engineering in malaysia
Agricultural engineering in malaysiaMusa Sabri
 

Plus de Musa Sabri (15)

Flow rate and pressure head
Flow rate and pressure headFlow rate and pressure head
Flow rate and pressure head
 
Sonic Soot Blower System
Sonic Soot Blower SystemSonic Soot Blower System
Sonic Soot Blower System
 
Pneumatic system
Pneumatic systemPneumatic system
Pneumatic system
 
Fluid power, Hydraulic & penumatic
Fluid power, Hydraulic & penumaticFluid power, Hydraulic & penumatic
Fluid power, Hydraulic & penumatic
 
Engineering ethics in Islam
Engineering ethics in IslamEngineering ethics in Islam
Engineering ethics in Islam
 
Biomass handling system
Biomass handling systemBiomass handling system
Biomass handling system
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping design
 
Valve types and selection
Valve types and selectionValve types and selection
Valve types and selection
 
Simple Piping design
Simple Piping designSimple Piping design
Simple Piping design
 
Cylinder force and speed calc
Cylinder force and speed calcCylinder force and speed calc
Cylinder force and speed calc
 
Thomas screw conveyor design
Thomas screw conveyor designThomas screw conveyor design
Thomas screw conveyor design
 
Gear ratios
Gear ratiosGear ratios
Gear ratios
 
Boilers and Thermic Fluidheaters
Boilers and Thermic FluidheatersBoilers and Thermic Fluidheaters
Boilers and Thermic Fluidheaters
 
Motor selection
Motor selectionMotor selection
Motor selection
 
Agricultural engineering in malaysia
Agricultural engineering in malaysiaAgricultural engineering in malaysia
Agricultural engineering in malaysia
 

Dernier

原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 

Dernier (20)

原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 

Pal oil mill machines

  • 1. Chronology of Operational Challenges Item Challenges Root Cause Reference 1 Furnace no draft Low ash melting point of EFB fibers 1. Faxes from Hartalega to Vyncke, • Combustion chamber is kept • The inherent property of low ash reference constantly underpressure to avoid melting point of EFB fibers resulted a. H.A.-Vync-KML-43 explosion or leakage of flame to in formation of ‘soft’ and ‘sticky’ b. H.A.-Vync-KML-44 outside of the chamber. ashes. c. H.A.-Vync-KML-46 • This underpressure is created by a • These soft and sticky ashes formed d. H.A.-Vync-KML-51 large suction fan mounted. before adhere to the thermal oil coils, hot the chimney. Between the water economisors and dust collector 2. Faxes from Vyncke to Hartalega, combustion chamber and suction fan blocking the travel path hot gases. reference are thermal oil coils and dust • Therefore pressure of the a. 1.2549 dated 20.08.2003 collectors where the hot gases combustion chamber increases. b. 1.2549 dated 02.09.2003 produced from the combustion chamber would to pass through. 3. Figures 1, 2, 3, and 4 • The combustion chamber draft is monitored real time by a pressure sensor. The plant stops whenever combustion chamber’s pressure goes to positive (no vacuum). • We experienced frequently furnace no draft situation that resulted in stoppage of the plant. 2 Excessive clinker formation Low ash melting point of EFB fibers 1. Faxes from Hartalega to Vyncke, • Excessive clinkers were formed on • A softened / melted ash due to the reference the furnace (combustion chamber low melting point property of empty a. H.A.-Vync-KML-43 side wall), furnace floor (step grate) fruit bunches and its high potassium b. H.A.-Vync-KML-44 and at the furnace ceiling. content resulted in formation of hard c. H.A.-Vync-KML-46 silica like clinker on the mentioned d. H.A.-Vync-KML-49 Damaged furnace refractory wall surfaces. e. H.A.-Vync-KML-51 • Accumulation of clinker resulted in
  • 2. collapse of refractory lining of 2. Fax from Vyncke to Hartalega, furnace side wall and furnace reference 1.2549 dated 02.09.2003 ceiling. 3. Purchase order no. to replace (overhaul) old refractory with new a. 041999 b. 040225 c. 042141 d. 042127 e. 042129 f. 042473 g. 042309 4. Figures 5, 6, 7 and 8 3 High furnace temperature Low calorific value of EFB fibers 1. Fax from Hartalega to Vyncke, • Frequent occurrence of high furnace • Owing to this characteristic, reference H.A.-Vync-KML-51 temperature. equipment in the plant such as • A temperature sensor senses the thermal oil coil and combustion furnace temperature continually. chamber are undersized Once temperature reaches the limit, • To compensate for the reduced the system will cut off to prevent surface area of these equipment (due over-temperature situation. to undersizing), the operating • Over temperature may results in temperature has to be higher in order melt down of the furnace and greatly to attain the required capacity shortens the lifespan of the plant. • Operating in higher temperature also Hence the necessity of the safety cut resulted in other problems off to prevent over-temperature. mentioned earlier such as clinker formation due to melting ashes and blockage of pathway of hot gases. 4 Over estimation of fuel density Low density of EFB fibers 1. Faxes from Hartalega to Vyncke, • Owing to the fact that EFB fibers are • EFB fibers were assumed to have reference
  • 3. a relatively new biomass fuel, density of 250 kg/m3 a. H.A.-Vync-KML-46 therefore its properties are not well • Actual density was found to be b. H.A.-Vync-KML-49 established. around 105 kg/m3 • The density of EFB fibers were 2. Faxes from Vyncke to Hartalega, wrongly estimated by Vyncke, reference resulting in undersizing of the a. 1.2549 dated 20.08.2003 feeding systems b. 1.2549 dated 02.09.2003 • Therefore feeding conveyors speeds c. 1.2549 dated 09.09.2003 were increased to accommodate the undersize condition, resulting in 3. Figures 9, 10, 11, and 12 much higher wear and tear. 5 Damaged moving floor (ESB) Abrasive property of EFB fibers 1. Faxes from Hartalega to Vyncke, • Moving floor is a fuel feeding • Owing to the highly abrasive referece system that installed at floor level. property of the EFB fibers, the a. H.A.-Vync-KML-49 • This system consists of 3 to 4 welding joints of the moving floor b. H.A.-Vync-KML-51 ladders, each ladder moving back that were in direct contact with the and forth in a horizontal direction EFB fibers were ‘grinded’ of, 2. Faxes from Vyncke to Hartalega, parallel to the floor resulting in breakages. referece • Its function is to discharge biomass a. 1.2549 dated 09.09.2003 materials into feeding screws to Entanglement of EFB fibers b. 1.2549 dated 13.10.2003 convey fuel to the combustion • EFB fibers tend to entangle, making chamber. this material difficult to convey by 3. Figures 11 and 12 • Moving floor (ESB) for EFB fibers the moving floor. encountered extremely high wear • Some modifications were carried out 4. Purchase order no. 037770 to and tear and was also unable to but were unsuccessful, instead lead purchase new moving floor function well to further damages to the moving • A new moving floor was purchased floor. after only running the plant for 18 months 6 Over current of screw conveyors Abrasive property of EFB fibers 1. Faxes from Hartalega to Vyncke, • Motors of screw conveyors • Owing to the highly abrasive referece conveying EFB fibers frequently property of the EFB fibers, screw a. H.A.-Vync-KML-57
  • 4. experienced over current. conveyors experience high wear and b. H.A.-Vync-KML-58 tear Breakage of screw conveyors 2. Figures 9 and 10 • Screw conveyors broke not long Entanglement of EFB fibers after plant started operation • EFB fibers tend to entangle, making 3. Purchase order no. for repair of this material difficult to convey by screw conveyor Breakage of silo mixer the screw conveyors. a. 030048 • Mixer is installed at the intermediate • When EFB fibers are entangled, b. 041288 silo forces resisting the screw conveyors c. 041499 are much increased resulting in over d. 040998 current and breakages. • Due also to entanglement, silo mixer 4. Purchase order no.030076 to replace experience high forces that results in silo mixer high wear and tear and short fatigue cycle 7 Damaged impeller of flue gas fan Impermeability of EFB fibers 1. Fax from Hartalega to Vyncke, • Flue gas fan impeller welding joints • Due to impermeability of the EFB referece H.A.-Vync-KML-60 cracked fibers, primary and secondary air • Flue gas fan impellers were flows were increased to provide 2. Figures 13 and 14 noticeably thinner within less than more air for combustion. 12 months in operations • Increase in primary and secondary 3. Purchase order no. for purchase of air flows have to be compensated by new flue gas fan impeller increasing the speed of the flue gas a. 031117 fan (suction fan installed before the b. 040699 chimney) to maintain a negative c. 041781 pressure inside the combustion chamber. Highly abrasive property of EFB fibers • Due to high ash and potassium content of EFB fibers, the flue gas fan impeller where the air flow
  • 5. speed is the highest experienced high wear and tear High operating temperature • Due to the plant being undersized because of unanticipated problems associated with EFB fibers as biomass fuel, the thermal oil heaters were forced to run at higher temperature in order to achieve its design capacity. • This has resulted in accelerated deterioration of parts 8 Biomass boilers 1&2 unable to deliver Furnace no draft 1. Faxes from Hartalega to Vyncke, up to the design capacity • Flue gas fan impeller speed has to be reference • All the above has resulted in the increased to increase the furnace a. H.A.-Vync-KML-51 boilers 1 and 2 unable to deliver heat underpressure to compensate for the b. H.A.-Vync-KML-54 energy up to the design capacity increase in primary and secondary • Designed capacity 15Gcal/hr air flows due to impermeability of 2. Email from Vyncke to Hartalega the EFB fibers. From Jef Mestdagh to Kuan Mun • This has resulted in reduced Leong dated 24.12.2003 retention time of hot gases within the system, therefore reducing the time 3. Contract signed between Vyncke of heat transfer to the thermal oil and Hartalega Excessive clinker formation • Excessive clinkers were formed due to the low ash softening point of EFB fibers. • Its furnace design temperature of 1,000ºC is not sustainable as excessive clinker will form
  • 6. High furnace temperature • To deliver the designed capacity, the boilers need to be forced to run at extremely high temperature (furnace temperature above 1,100ºC. • At such high temperature, the risk of the system cutting off is high as the cut off limit is 1,200ºC. Over-estimation of fuel density • Due to over estimation of density of EFB fibers, all feeding systems are under-sized. • Tuning up their operating speed will increase wear and tear, not a good engineering practice. Sticky ashes • Build up of soot and sticky ashes around thermal oil coils, creating an insulating layer and therefore reducing heat exchanging surface. • Plant has to be stopped frequently to clean of the soot 9 Damaged Soot Blowers Abrasive nature of EFB fibers 1. Figures 15 and 16 • Soot blowers are installed to use • Owing to the abrasive nature of EFB compress air to blow away soot fiber and its high ash content, the formed on the outer surface of the soot blowers have higher wear and thermal oil coils. tear rate. • These soot blowers experienced high wear and tear
  • 7. 10 Damaged multicyclones Abrasive nature of EFB fibers 1. Purchase order no. 039586 for • A dust collector installed between Owing to the abrasive nature of EFB replacement of cyclones the thermal oil coil and flue gas fan fiber and its high ash content, the to collect dust / soot before dedustor and cyclones have higher wear 2. Purchase order no. 040792 to repair discharging out through the chimney and tear rate. dedustor • Within the dust collector, there are multi-cyclones, these cyclones experienced high wear and tear PHOTOGRAPHS Blocked cyclone Cyclone not Soot formation blocked Figure 1: Softened ashes sticking to the thermal oil coils Figure 2: Blocked cyclones in dust collector
  • 8. Heat exchanger coils Thick soot Figure 4: Blocked economisor heat exchanger coils Figure 3: Cyclones cleaned - unblocked Clinker Steps clearly visible Figure 5: Excessive clinker formation on furnace floor (step Figure 6: Without clinker, steps of the furnace floor is clearly
  • 9. grate) visible Exposed cooling tube Cooling tubes Figure 7: Damaged refractory at furnace ceiling, exposing cooling Figure 8: Repair underway for damaged furnace ceiling. Water pipe. Exposed pipes experience high corrosion cooled coils are exposed when refractory is damaged causing excessive corrosion of water coils to take place
  • 10. Screw plate becomes very thin Last piece eaten up Figure 9: Feeding becomes thin due to excessive wear and tear. Figure 10: Repair of one of the components of feeding system Last piece of screw totally eaten up. (screw conveyor)
  • 11. Figure 11: Moving floor damaged due to wrong design and Figure 12: Replacement of new moving due to old one worn out excessive wear and tear – repair works being carried out beyond repair
  • 12. Fan blade eaten up – becomes very thin! Figure 13: Damaged impeller of flue gas fan Figure 14: Impeller becomes paper thin due to excessive wear and tear
  • 13. Worn out soot blower Figure 15: Damaged soot blower Figure 16: Soot blower repaired