Design for Operations
Space Shuttle vs. Sea Launch

         Bo Bejmuk
Shuttle                            Sea Launch




                                                           Courtesy of the Sea Launch Company
Space Shuttle designed for ascent
performance, multi functionality    Zenit Rocket designed to strict
and minimum development cost        operational requirements

Result:                             Result:

Costly ground operations            Automation and robust design
Costly mission planning             Simple and cost effective operations
Costly flight operations            Great benefit to cost of ownership 2
Space Shuttle – Magnificent flying system
    but difficult and costly to operate




                                            3
Initial Naive Concept of Ground Operations




                                             4
Operational Reality




         NASA, KSC Photo, dated September 25, 1979, index number “KSC-79PC-500”   5
Lack of Robustness and Design Margins
  Complicated flight Planning and Increased Cost
Problem
• The launch probability predictions for early Shuttle flights was less than
  50%
   – More than half of the measured winds aloft violated the vehicle’s certified
     boundaries
Corrective Actions
• System Integration led the evolution from a single ascent I-load, through
  seasonal I-loads, alternate I-loads, and finally arriving at DOLILU
• This process extended over a 10+ year period
• Concurrently the Program executed 3 load cycles (Integrated Vehicle
  Baseline Characterization - IVBC) combined with hardware modifications
  to expand vehicle certified envelopes
• Current launch probability is well in excess of 95%
Lesson
• Commit to a DOLILU approach during early development
   – Significantly improves margins
• Use additional margins on not well understood environments
                                                                                   6
• Will enhance robustness and simplify operations
Ascent Design Operations Evolution
                                          100                                                                                     High
                                                                       Lesson Learned:   Reliance on Operations Process
Percent of Winds Violating Certification (%)



                                                                                         to Maintain Margin is Expensive




                                                                                                                                         Operations Overhead
                                                                                                Ascent Operations
                                                                                                Overhead
                                               50                                                                                 Med




                                                                                            Certification Violations

                                               0                                                                                  Low

                                                   1975                  1985                      1995                    2005
                                                            Seasonal              Alternate
                                               Annual                   Monthly           Day-of-Launch                            7
Day-of-Launch I-Loads Evolution
                          (10 years +)
             Early Flights                                       Present Flights
            Single I-Loads                                          DOLILU
                    Qa        Over 50% of winds                                  Qa
                              violated certified
                              envelope

                                   Qb                                                                     Qb




                                           Expanded Certified
                                               Envelope


                                                   3-Hour Wind
                                                   Variation


Certified                Annual Wind
Envelope                  Variation                              DOLILU drives toward center of Qa – Qb
                                                                 envelope and reduces winds violation to < 5%

                                                                                                      8
Where did We go Wrong?
Problem
• Insufficient definition of operational requirements during
  development phase
   – Concentration on performance requirements but not on operational
     considerations
   – Shuttle design organizations were not responsible for operational cost
   – Very few incentives for development contractors
Result
• Very labor intensive (high operational cost) vehicle was developed
  and put into operations
Lesson
• Must have the Concept of Operations defined
• Define and levy the operational requirements on contractors to
  support the Concept of Operations
• Must have continuity and integration between designers, ground
  operations, and flight operations requirements during the
  developmental phase                                                   9
Sea Launch Zenit Rocket Very Efficient and
Easy to Operate                  Courtesy of the Sea Launch Company




                                                         10
Launch Platform




                  Courtesy of the Sea Launch Company   11
Assembly and Command Ship




                        Courtesy of the Sea Launch Company
                                                  12
Launch




                                              13



         Courtesy of the Sea Launch Company
Sea Launch – Zenit Derived Launch System
                                     • Major integration of existing and new
                                       elements
                                        – Two stage Ukrainian Zenit
                                        – 3rd stage Russian Block DM
                                        – New payload accommodation &
                                          composite fairing
                                        – Modified semi-submersible oil drilling
                                          platform into a launch pad
                                        – New command and control and rocket
                                          assembly ship
Courtesy of the Sea Launch Company   • System was built and brought to
                                       operational state in less than 3.5 years
                                        – 24 flights to date

                                                                               14
Sea Launch Operations
                                          • Integration of rocket stages
                                            and payload at home port in
                                            Long Beach, CA
                                          • Launches performed from the
                                            Equator, 154 degrees west
                                            (south of Hawaii)
Courtesy of the Sea Launch Company

                       Small Team performs ground checkout and launch
                                      Ground Processing            Launch
                                            Team                   Team*
                     Americans                 80                    40
                     Russians                  200                   140
                     Ukrainians                50                    50
                     Norwegians                75                    70
                     Totals                    405                   300

          * Launch Team is a subset of the Ground Processing Team; Ground
          Processing team members that are not required to participate in launch at
                                                                                      15
          sea are sent back to their companies and are off the Sea Launch payroll
Lessons Learned from Sea Launch

• Zenit extremely automated launch vehicle
   – Very little interaction with crew during checkout, pre-launch, and
     flight
• Single string accountability, no duplications of effort (to
  some extent driven by export compliance restrictions)
• Low operational cost benefited from original design criteria
  of Zenit
   – Rollout to pad, fuel and launch in 90 minutes
   – Allows very little time for ground or flight crew involvement
   – Imposes requirements for automatic processes




                                                                     16
The Big Lesson

• If we want simple and cost effective
  operations we must design for operations
  – Shuttle designed for performance and minimum
    development cost
  – Sea Launch Zenit Rocket designed to strict
    operational requirements
• NASA is in control of operations destiny of
  new programs
  – Narrow window of opportunity




                                                   17

More Related Content

What's hot

Robert.bayt
Robert.baytRobert.bayt
Robert.baytNASAPMC
 
Supply Chain Vendor Management Success Storyborad
Supply Chain Vendor Management Success  StoryboradSupply Chain Vendor Management Success  Storyborad
Supply Chain Vendor Management Success Storyboradyuvrajgill
 
Short agilefordba
Short agilefordbaShort agilefordba
Short agilefordbaShane Hayes
 
Successfully Migrate Cisco Call Manager 4x To 7x With a Proven Framework
Successfully Migrate Cisco Call Manager 4x To 7x  With a Proven FrameworkSuccessfully Migrate Cisco Call Manager 4x To 7x  With a Proven Framework
Successfully Migrate Cisco Call Manager 4x To 7x With a Proven Frameworkglamba
 
Performing Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin ForgePerforming Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin ForgeNovell
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Chris Colson
 
Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Railways and Harbours
 
Subversion Edge Overview
Subversion Edge OverviewSubversion Edge Overview
Subversion Edge OverviewLotharSchubert
 
Scaling product ownership product camp atlanta 2011
Scaling product ownership   product camp atlanta 2011Scaling product ownership   product camp atlanta 2011
Scaling product ownership product camp atlanta 2011Peter Saddington
 

What's hot (11)

Robert.bayt
Robert.baytRobert.bayt
Robert.bayt
 
Supply Chain Vendor Management Success Storyborad
Supply Chain Vendor Management Success  StoryboradSupply Chain Vendor Management Success  Storyborad
Supply Chain Vendor Management Success Storyborad
 
Short agilefordba
Short agilefordbaShort agilefordba
Short agilefordba
 
Successfully Migrate Cisco Call Manager 4x To 7x With a Proven Framework
Successfully Migrate Cisco Call Manager 4x To 7x  With a Proven FrameworkSuccessfully Migrate Cisco Call Manager 4x To 7x  With a Proven Framework
Successfully Migrate Cisco Call Manager 4x To 7x With a Proven Framework
 
MSC GPS TAPS Part 2 career counselor crash courses part 2
MSC GPS TAPS Part 2 career counselor crash courses part 2MSC GPS TAPS Part 2 career counselor crash courses part 2
MSC GPS TAPS Part 2 career counselor crash courses part 2
 
Performing Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin ForgePerforming Sandboxed Testing with PlateSpin Forge
Performing Sandboxed Testing with PlateSpin Forge
 
Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)Allied Reliability Phase II EMP Development Overview (March 2009)
Allied Reliability Phase II EMP Development Overview (March 2009)
 
Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)Transnet’S Competitive Supplier Development Program (Csdp)
Transnet’S Competitive Supplier Development Program (Csdp)
 
Subversion Edge Overview
Subversion Edge OverviewSubversion Edge Overview
Subversion Edge Overview
 
Scaling product ownership product camp atlanta 2011
Scaling product ownership   product camp atlanta 2011Scaling product ownership   product camp atlanta 2011
Scaling product ownership product camp atlanta 2011
 
27ian2011 hp
27ian2011   hp27ian2011   hp
27ian2011 hp
 

Similar to Bejmuk bo

Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasAras
 
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...Amazon Web Services
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...Forum for the Future
 
Airbus military engineering update 2012
Airbus military engineering update 2012Airbus military engineering update 2012
Airbus military engineering update 2012ICSA, LLC
 
Coates Product Brochure
Coates Product BrochureCoates Product Brochure
Coates Product Brochuremckenzs
 
Informa Airport Operations Brochure
Informa Airport Operations BrochureInforma Airport Operations Brochure
Informa Airport Operations BrochureAndrea Hoymann
 
Innovation in Action Conference - Clean Sky with focus on engines, presented...
Innovation in Action Conference  - Clean Sky with focus on engines, presented...Innovation in Action Conference  - Clean Sky with focus on engines, presented...
Innovation in Action Conference - Clean Sky with focus on engines, presented...cleanskyju
 
DoDAF Integration Architecture
DoDAF Integration ArchitectureDoDAF Integration Architecture
DoDAF Integration ArchitectureDavid Daniel
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
8 jude correa-moderncontainership
8 jude correa-moderncontainership8 jude correa-moderncontainership
8 jude correa-moderncontainershipmakarone
 
Automate your way to agility
Automate your way to agilityAutomate your way to agility
Automate your way to agilityYuval Yeret
 
Flight Controls - Chapter 5
Flight Controls - Chapter 5Flight Controls - Chapter 5
Flight Controls - Chapter 5junio_oliveira
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completionAkshaya Mishra
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsSESAR Joint Undertaking
 
The Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designThe Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designRiley Smith
 
Win Friends and Influence People... with DSLs
Win Friends and Influence People... with DSLsWin Friends and Influence People... with DSLs
Win Friends and Influence People... with DSLsVladimir Bacvanski, PhD
 

Similar to Bejmuk bo (20)

Internship Portfolio
Internship PortfolioInternship Portfolio
Internship Portfolio
 
Jet Select Aviation
Jet Select AviationJet Select Aviation
Jet Select Aviation
 
Boeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with ArasBoeing Insitu's Enterprise PLM Journey with Aras
Boeing Insitu's Enterprise PLM Journey with Aras
 
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
Overview of CTE's CloudEnable Platform to Develop, Deploy, Secure and Manage ...
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
 
Airbus military engineering update 2012
Airbus military engineering update 2012Airbus military engineering update 2012
Airbus military engineering update 2012
 
Coates Product Brochure
Coates Product BrochureCoates Product Brochure
Coates Product Brochure
 
Informa Airport Operations Brochure
Informa Airport Operations BrochureInforma Airport Operations Brochure
Informa Airport Operations Brochure
 
Innovation in Action Conference - Clean Sky with focus on engines, presented...
Innovation in Action Conference  - Clean Sky with focus on engines, presented...Innovation in Action Conference  - Clean Sky with focus on engines, presented...
Innovation in Action Conference - Clean Sky with focus on engines, presented...
 
Scrum and Lean - Om Band
Scrum and Lean - Om BandScrum and Lean - Om Band
Scrum and Lean - Om Band
 
DoDAF Integration Architecture
DoDAF Integration ArchitectureDoDAF Integration Architecture
DoDAF Integration Architecture
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
8 jude correa-moderncontainership
8 jude correa-moderncontainership8 jude correa-moderncontainership
8 jude correa-moderncontainership
 
Automate your way to agility
Automate your way to agilityAutomate your way to agility
Automate your way to agility
 
Flight Controls - Chapter 5
Flight Controls - Chapter 5Flight Controls - Chapter 5
Flight Controls - Chapter 5
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
The Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities designThe Importance of Integration of subsurface with surface facilities design
The Importance of Integration of subsurface with surface facilities design
 
Win Friends and Influence People... with DSLs
Win Friends and Influence People... with DSLsWin Friends and Influence People... with DSLs
Win Friends and Influence People... with DSLs
 

More from NASAPMC

Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski johnNASAPMC
 
Yew manson
Yew mansonYew manson
Yew mansonNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wood frank
Wood frankWood frank
Wood frankNASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joeNASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuartNASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahmNASAPMC
 
Snow lee
Snow leeSnow lee
Snow leeNASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krageNASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marcoNASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mikeNASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karleneNASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Paradis william
Paradis williamParadis william
Paradis williamNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe williamNASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralfNASAPMC
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerryNASAPMC
 

More from NASAPMC (20)

Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 
Mulenburg jerry
Mulenburg jerryMulenburg jerry
Mulenburg jerry
 

Recently uploaded

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 

Recently uploaded (20)

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 

Bejmuk bo

  • 1. Design for Operations Space Shuttle vs. Sea Launch Bo Bejmuk
  • 2. Shuttle Sea Launch Courtesy of the Sea Launch Company Space Shuttle designed for ascent performance, multi functionality Zenit Rocket designed to strict and minimum development cost operational requirements Result: Result: Costly ground operations Automation and robust design Costly mission planning Simple and cost effective operations Costly flight operations Great benefit to cost of ownership 2
  • 3. Space Shuttle – Magnificent flying system but difficult and costly to operate 3
  • 4. Initial Naive Concept of Ground Operations 4
  • 5. Operational Reality NASA, KSC Photo, dated September 25, 1979, index number “KSC-79PC-500” 5
  • 6. Lack of Robustness and Design Margins Complicated flight Planning and Increased Cost Problem • The launch probability predictions for early Shuttle flights was less than 50% – More than half of the measured winds aloft violated the vehicle’s certified boundaries Corrective Actions • System Integration led the evolution from a single ascent I-load, through seasonal I-loads, alternate I-loads, and finally arriving at DOLILU • This process extended over a 10+ year period • Concurrently the Program executed 3 load cycles (Integrated Vehicle Baseline Characterization - IVBC) combined with hardware modifications to expand vehicle certified envelopes • Current launch probability is well in excess of 95% Lesson • Commit to a DOLILU approach during early development – Significantly improves margins • Use additional margins on not well understood environments 6 • Will enhance robustness and simplify operations
  • 7. Ascent Design Operations Evolution 100 High Lesson Learned: Reliance on Operations Process Percent of Winds Violating Certification (%) to Maintain Margin is Expensive Operations Overhead Ascent Operations Overhead 50 Med Certification Violations 0 Low 1975 1985 1995 2005 Seasonal Alternate Annual Monthly Day-of-Launch 7
  • 8. Day-of-Launch I-Loads Evolution (10 years +) Early Flights Present Flights Single I-Loads DOLILU Qa Over 50% of winds Qa violated certified envelope Qb Qb Expanded Certified Envelope 3-Hour Wind Variation Certified Annual Wind Envelope Variation DOLILU drives toward center of Qa – Qb envelope and reduces winds violation to < 5% 8
  • 9. Where did We go Wrong? Problem • Insufficient definition of operational requirements during development phase – Concentration on performance requirements but not on operational considerations – Shuttle design organizations were not responsible for operational cost – Very few incentives for development contractors Result • Very labor intensive (high operational cost) vehicle was developed and put into operations Lesson • Must have the Concept of Operations defined • Define and levy the operational requirements on contractors to support the Concept of Operations • Must have continuity and integration between designers, ground operations, and flight operations requirements during the developmental phase 9
  • 10. Sea Launch Zenit Rocket Very Efficient and Easy to Operate Courtesy of the Sea Launch Company 10
  • 11. Launch Platform Courtesy of the Sea Launch Company 11
  • 12. Assembly and Command Ship Courtesy of the Sea Launch Company 12
  • 13. Launch 13 Courtesy of the Sea Launch Company
  • 14. Sea Launch – Zenit Derived Launch System • Major integration of existing and new elements – Two stage Ukrainian Zenit – 3rd stage Russian Block DM – New payload accommodation & composite fairing – Modified semi-submersible oil drilling platform into a launch pad – New command and control and rocket assembly ship Courtesy of the Sea Launch Company • System was built and brought to operational state in less than 3.5 years – 24 flights to date 14
  • 15. Sea Launch Operations • Integration of rocket stages and payload at home port in Long Beach, CA • Launches performed from the Equator, 154 degrees west (south of Hawaii) Courtesy of the Sea Launch Company Small Team performs ground checkout and launch Ground Processing Launch Team Team* Americans 80 40 Russians 200 140 Ukrainians 50 50 Norwegians 75 70 Totals 405 300 * Launch Team is a subset of the Ground Processing Team; Ground Processing team members that are not required to participate in launch at 15 sea are sent back to their companies and are off the Sea Launch payroll
  • 16. Lessons Learned from Sea Launch • Zenit extremely automated launch vehicle – Very little interaction with crew during checkout, pre-launch, and flight • Single string accountability, no duplications of effort (to some extent driven by export compliance restrictions) • Low operational cost benefited from original design criteria of Zenit – Rollout to pad, fuel and launch in 90 minutes – Allows very little time for ground or flight crew involvement – Imposes requirements for automatic processes 16
  • 17. The Big Lesson • If we want simple and cost effective operations we must design for operations – Shuttle designed for performance and minimum development cost – Sea Launch Zenit Rocket designed to strict operational requirements • NASA is in control of operations destiny of new programs – Narrow window of opportunity 17