SlideShare une entreprise Scribd logo
1  sur  14
Human Exploration Framework
Team (HEFT) Overview
Daniel L. Dumbacher, Director, Engineering Directorate
Marshall Space Flight Center

John Olson, Ph.D., Director, Directorate Integration Office
Exploration Systems Mission Directorate, NASA Headquarters

Stephen Jurczyk, Deputy Center Director
NASA Langley Research Center


NASA Project Management Challenge
February 2011
Agenda
•     HEFT Overview
•     Benefit Figures of Merit
•     Constraint Figures of Merit
•     Key Outcomes
•     General Findings
•     Human Space Flight Cost and Schedule History
•     HEFT I Integrated Cost Assessment Comparison
•     What Needs to Be Addressed to Be Affordable
•     History of Lean Developments
•     Lean Cost and Schedule Implementation Approaches
•     Summary




5-486373                                                 2
HEFT Overview
• HEFT Strategy: Create a decision framework for human space
   exploration that drives out the knowledge, capabilities, and infrastructure
   NASA needs to send people to explore multiple destinations in the Solar
   System in an efficient, sustainable way

• HEFT Goal: Generate a process that evolves into a long term, permanent
   NASA activity to support human space flight (HSF) strategic planning
   – Initially focused on standing up the organization, getting it functioning, and conducting
     a full iteration of the process
   – Outcome of the process was recommendations for human space flight capabilities and
     missions for 5-, 10-, 15-, and 20-year horizons, with Mars as the ultimate destination


• HEFT Impact: Informed the FY2012 Program Planning, Budget,
   and Execution process
      – Identified requirements for technologies and advanced systems capabilities based
         on investment strategies and design reference architectures for human missions to
         destinations beyond low-Earth orbit (LEO)
      – Met Executive Branch guidance, critical Stakeholder objectives, and HSF objectives
         and constraints
      – Is sustainable and affordable (fits within projected NASA HSF budget)
5-486373                                                                                         3
Benefit Figures of Merit
           Extend Human Presence                             Enhance Economic Impacts
           Broaden to include multiple destinations          Enhance the robustness and expand
           with initial focus on crewed missions to          competitiveness of the U.S. space industry.
           Near Earth Objects (NEOs).
                                                             Increase Public Engagement
           Develop Future Capabilities                       Seek early and frequent opportunities
           for Mars                                          for human exploration beyond Earth that
           Demonstrate technologies and advanced             build up in capability over time for a steady
           systems for human Mars orbital and surface        pace of new missions and new destinations.
           missions.
                                                             Leverage Domestic Partnerships
           Improve Scientific Knowledge                      Build alliances between NASA and other
           Conduct activities that address research          Government agencies, focusing on creating
           important to the science community.               capabilities collaboratively or in a
                                                             complementary way to reduce
           Expand Global Partnerships                        costs, increase utility, or further U.S.
           Strengthen international collaboration            scientific, diplomatic, security, or economic
           by providing opportunities for participation in   interests.
           technology development and
           demonstration, systems development, and
           operations.
5-486373
                             Characterizing Desirable Alternatives                                           4
Constraint Figures of Merit
           Affordability                            Programmatic Sustainability
           Develop exploration options that can     Develop an HSF strategy that ensures
           be implemented within the bounds of      U.S. access to LEO and maintains a balance
           projected future budgets.                between technology and system
                                                    development activities, with flexible
           Operational Complexity                   architectures.
           Evaluate exploration options based on
           the number of unique systems, number     HSF Capability Sustainment
           of launches, number of in-space          Maintain core HSF capabilities required
           operations, etc.                         to develop technologies and advanced
                                                    systems, and integrate, test, operate, and
           Programmatic Risk                        sustain systems for human exploration
           Technology and advanced systems          beyond LEO.
           development must have adequate
           budget and schedule margins.




5-486373
                               Describing Top-level Guidelines                                   5
Key Outcomes
• The process of analyzing 9 investment portfolios was effective in
  exploring a broad technical and programmatic trade space
      – Evaluated them against Executive Branch Guidance, Critical Stakeholder
        Interests, and Benefit and Constraint Figures of Merit
• Derived key insights from a large, complex dataset and
  identified options for:
      – Enabling and Enhancing Technology Development and Demonstration
        activities
      – Advanced Systems Developments including Crewed Spacecraft
        and Launch Vehicle
      – Changing the way NASA does business and opportunities for
        partnerships with other U.S. government agencies and international partners
• Further work is required to refine the Design Reference Missions
  and cost and schedule estimates
      – This can eventually lead to a NASA integrated architecture for human
        exploration beyond LEO

                  Charting a Balanced Path Forward
5-486373                                                                              6
General Findings
• Affording human exploration within expected budgets is a challenge
• NASA human space flight is a demanding and risky enterprise
  requiring sustained resources
• Safety is the cornerstone of viable options
• Commercial crew helps test our assumptions (like NetFlix did to
  Blockbuster)
• With ~$40B available over 10 years, significant progress can be made
• “Lean” developments are essential to extending and sustaining human
  presence beyond LEO
• Transitioning approaches used on relatively small projects to large
  (higher dollar value) programs/projects can have big payoffs




           Changing the Agency’s Business Model
5-486373                                                                 7
Human Space Flight Cost and Schedule History
Cost Growth                             Schedule Growth
• Average: 219% or 3.19 times           • Average: 103% or 2.03 times
  the original estimate                   the original estimate
• Median: 207%                          • Median: 108%
   growth




                            NASA Human-Rated Systems


             Improving Results by Doing Things Differently
5-486373                                                                8
HEFT I Integrated Cost Assessment Comparison

                        DRM 1             DRM 2                DRM 3
           Strategy 1
           Strategy 2
           Strategy 3




                        Charting Original 9 Investment Portfolios
5-486373                                                               9
What Needs to Be Addressed to Be Affordable
 Program/Project                   Risk Averse                  Requirements/                   Personnel/
  Management                         Culture                       Trades                        Staffing


                                                                       Clear
  Planning for Vision vs.       Cost as an Independent                                         Program / Project
                                                             Requirements/Rationale at
   Near-term Execution         Variable in Design Trades                                          Leadership
                                                                  the Right Level

  Clear & Simple Lines        Understanding Implications    Cost as Independent Variable        Right People for
    of Accountability                 of Safety                   in Design Trades                 the Role


 Business/Contractual
                               Early Issue Identification        Multiple Reviews               Long-term Skill
Relationships & Methods
                                     & Resolution                 & Approvals              Maintenance/Development
      & Incentives

   Technical Oversight                Delegation              Industry vs. Government      Use of In-House Capability
        & Insight                     of Authority                   Standards               to Support Programs

      Use of Modern               Certificate of Flight         Cost Requirements
       Technology                 Readiness Process               & Estimating

Smaller Projects / Periodic
 Achievable Milestones



 Fitting Squarely in the Budget Box is an Overarching Requirement
History of Lean Developments
           Saturn/Apollo Block Approach                 DC-X, DC-XA
           Successful building-block path to the Moon   Design and development in 4 years,
                                                        DC-XA modifications and flight in 2 years
           STS External Tank Block Upgrades
           New tank design delivered in 4 years         X-34
                                                        Ready to fly in 5 years
           Mars Exploration Rovers
           3+ years to flight                           MLAS
                                                        21 months to flight
           Deep Space-1
           3+ years to flight                           Ares I-X
                                                        18 months to flight
           LRO/LCROSS
           3.5 years to flight                          Fastsat
                                                        18 months to flight
           X-37, X-37B
           Only reusable Space Vehicle since Orbiter    Project M
                                                        Ready to fly in 1 year
           X-38
           Successful drop tests in 3-4 years


5-486373
                                 Learning Lessons from Experience                                   11
Lean Cost and Schedule Implementation Approaches
• Evolutionary Block Progression
      – Applies to a variety of projects, allowing a stepped approach to
        requirements maturation, incremental capability, technology
        infusion, development, and implementation
• Parallel Government/Industry Development
      – Allows rapid start by Government, while maturing requirements and
        competitive acquisition strategy
• Flying Class C/D, or “First Build”, and Sticking to the Designation
      – Applies to key technology demonstration missions and allows for rapidly
        advancing a selection or suite of technologies — proto-flight hardware
• Learning Curves
      – Applies to multiple unit production and also can drive infrastructure
        requirements early in the process via pathfinders
• Skunkworks Approach
      – Estimated schedule decreased by more than 20%
           • For large systems, long-lead items dominate schedule


                Finding Efficiencies that Maximize Budget
5-486373
                         & Reduce Time to Market                                  12
Summary
• NASA and the Nation will be in a constrained budget environment
  for the foreseeable future

• NASA’s program management and technical community must find
  ways to meet objectives with more efficient use of resources

• The future of human exploration is in the balance




     Living Within Our Means While Delivering Excellence
5-486373                                                            13
For more information:
               www.nasa.gov




5-486373                           14

Contenu connexe

Tendances

Ross.howard
Ross.howardRoss.howard
Ross.howard
NASAPMC
 
Uw pce gise presentation 07-17-2012
Uw pce gise presentation 07-17-2012Uw pce gise presentation 07-17-2012
Uw pce gise presentation 07-17-2012
ehmkereedy
 
Love.john
Love.johnLove.john
Love.john
NASAPMC
 
Jeff davis
Jeff davisJeff davis
Jeff davis
NASAPMC
 
Dean.baker
Dean.bakerDean.baker
Dean.baker
NASAPMC
 
Inter bounds
Inter boundsInter bounds
Inter bounds
NASAPMC
 
Book.steve
Book.steveBook.steve
Book.steve
NASAPMC
 
Pre-Feasibility Study Guideline September 2009
Pre-Feasibility Study Guideline September 2009Pre-Feasibility Study Guideline September 2009
Pre-Feasibility Study Guideline September 2009
led4lgus
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
NASAPMC
 
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts:  Workforce Planning for a Turbulent EconomyLink - Fasten Your Seatbelts:  Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
HR Florida State Council, Inc.
 

Tendances (11)

Ross.howard
Ross.howardRoss.howard
Ross.howard
 
Uw pce gise presentation 07-17-2012
Uw pce gise presentation 07-17-2012Uw pce gise presentation 07-17-2012
Uw pce gise presentation 07-17-2012
 
Love.john
Love.johnLove.john
Love.john
 
Jeff davis
Jeff davisJeff davis
Jeff davis
 
Dean.baker
Dean.bakerDean.baker
Dean.baker
 
Symons
SymonsSymons
Symons
 
Inter bounds
Inter boundsInter bounds
Inter bounds
 
Book.steve
Book.steveBook.steve
Book.steve
 
Pre-Feasibility Study Guideline September 2009
Pre-Feasibility Study Guideline September 2009Pre-Feasibility Study Guideline September 2009
Pre-Feasibility Study Guideline September 2009
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts:  Workforce Planning for a Turbulent EconomyLink - Fasten Your Seatbelts:  Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
 

En vedette

Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
NASAPMC
 
Fayssal.safie
Fayssal.safieFayssal.safie
Fayssal.safie
NASAPMC
 
Richard.grammier
Richard.grammierRichard.grammier
Richard.grammier
NASAPMC
 
Krahula john
Krahula johnKrahula john
Krahula john
NASAPMC
 
Nichols.david
Nichols.davidNichols.david
Nichols.david
NASAPMC
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonce
NASAPMC
 
Michael.hazen
Michael.hazenMichael.hazen
Michael.hazen
NASAPMC
 
Bryan.oconnor
Bryan.oconnorBryan.oconnor
Bryan.oconnor
NASAPMC
 
Adrian.mark
Adrian.markAdrian.mark
Adrian.mark
NASAPMC
 
Jim.morrison
Jim.morrisonJim.morrison
Jim.morrison
NASAPMC
 
Leon.j.douglas.d
Leon.j.douglas.dLeon.j.douglas.d
Leon.j.douglas.d
NASAPMC
 
Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
NASAPMC
 
White.p.johnson.k
White.p.johnson.kWhite.p.johnson.k
White.p.johnson.k
NASAPMC
 
Zimmerman barbier
Zimmerman barbierZimmerman barbier
Zimmerman barbier
NASAPMC
 
T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2
NASAPMC
 
Engelbrecht.joe
Engelbrecht.joeEngelbrecht.joe
Engelbrecht.joe
NASAPMC
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
NASAPMC
 

En vedette (20)

Ruszkowski.james
Ruszkowski.jamesRuszkowski.james
Ruszkowski.james
 
Mino
MinoMino
Mino
 
Fayssal.safie
Fayssal.safieFayssal.safie
Fayssal.safie
 
Richard.grammier
Richard.grammierRichard.grammier
Richard.grammier
 
Krahula john
Krahula johnKrahula john
Krahula john
 
Nichols.david
Nichols.davidNichols.david
Nichols.david
 
Thomas.coonce
Thomas.coonceThomas.coonce
Thomas.coonce
 
Michael.hazen
Michael.hazenMichael.hazen
Michael.hazen
 
Sparrow
SparrowSparrow
Sparrow
 
Bryan.oconnor
Bryan.oconnorBryan.oconnor
Bryan.oconnor
 
Adrian.mark
Adrian.markAdrian.mark
Adrian.mark
 
Jim.morrison
Jim.morrisonJim.morrison
Jim.morrison
 
Leon.j.douglas.d
Leon.j.douglas.dLeon.j.douglas.d
Leon.j.douglas.d
 
Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
 
White.p.johnson.k
White.p.johnson.kWhite.p.johnson.k
White.p.johnson.k
 
Zimmerman barbier
Zimmerman barbierZimmerman barbier
Zimmerman barbier
 
Art c
Art cArt c
Art c
 
T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2T carlson mbontrager_wtippin_lsinger_v2
T carlson mbontrager_wtippin_lsinger_v2
 
Engelbrecht.joe
Engelbrecht.joeEngelbrecht.joe
Engelbrecht.joe
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
 

Similaire à Dumbacher

Strategic technology roadmap for space x
Strategic technology roadmap for space xStrategic technology roadmap for space x
Strategic technology roadmap for space x
Carles Debart
 
Dubois Resume 2014
Dubois Resume 2014Dubois Resume 2014
Dubois Resume 2014
Rick Dubois
 
Neches Full Cv, Nsf Cyber Infrastructure, June 2012
Neches Full Cv, Nsf Cyber Infrastructure, June 2012Neches Full Cv, Nsf Cyber Infrastructure, June 2012
Neches Full Cv, Nsf Cyber Infrastructure, June 2012
RNeches
 
Streamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRLStreamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRL
cjoesten
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
Janak Singh Chauhan
 
James E Tully Resume 2016v2
James E Tully Resume 2016v2James E Tully Resume 2016v2
James E Tully Resume 2016v2
James Tully
 
D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshorn
NASAPMC
 
Evelyn Rosner - Resume P
Evelyn Rosner - Resume PEvelyn Rosner - Resume P
Evelyn Rosner - Resume P
Evelyn Rosner
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
NC Military Business Center
 

Similaire à Dumbacher (20)

Strategic technology roadmap for space x
Strategic technology roadmap for space xStrategic technology roadmap for space x
Strategic technology roadmap for space x
 
Dubois Resume 2014
Dubois Resume 2014Dubois Resume 2014
Dubois Resume 2014
 
Neches Full Cv, Nsf Cyber Infrastructure, June 2012
Neches Full Cv, Nsf Cyber Infrastructure, June 2012Neches Full Cv, Nsf Cyber Infrastructure, June 2012
Neches Full Cv, Nsf Cyber Infrastructure, June 2012
 
Military Command Post of the Future
Military Command Post of the FutureMilitary Command Post of the Future
Military Command Post of the Future
 
Managing Aerospace Projects
Managing Aerospace ProjectsManaging Aerospace Projects
Managing Aerospace Projects
 
Mobile based gnss services and applications in sub-saharan africa from idea ...
Mobile based gnss services and applications in sub-saharan africa  from idea ...Mobile based gnss services and applications in sub-saharan africa  from idea ...
Mobile based gnss services and applications in sub-saharan africa from idea ...
 
Neches Overview CV, June 2012
Neches Overview CV,  June 2012Neches Overview CV,  June 2012
Neches Overview CV, June 2012
 
Streamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRLStreamlining R&D Case Files at the AFRL
Streamlining R&D Case Files at the AFRL
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
 
Strategies for successful engineering management
Strategies for successful engineering managementStrategies for successful engineering management
Strategies for successful engineering management
 
My Career profile
My Career profileMy Career profile
My Career profile
 
James E Tully Resume 2016v2
James E Tully Resume 2016v2James E Tully Resume 2016v2
James E Tully Resume 2016v2
 
Neches Full Cv, June 2012
Neches Full Cv, June 2012Neches Full Cv, June 2012
Neches Full Cv, June 2012
 
Offshore R&D Project Management
Offshore R&D Project ManagementOffshore R&D Project Management
Offshore R&D Project Management
 
D brown gbezos_shirshorn
D brown gbezos_shirshornD brown gbezos_shirshorn
D brown gbezos_shirshorn
 
Jharna Software
Jharna SoftwareJharna Software
Jharna Software
 
Evelyn Rosner - Resume P
Evelyn Rosner - Resume PEvelyn Rosner - Resume P
Evelyn Rosner - Resume P
 
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced AnalyticsHuman/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
Human/Social Sciences/Cultural & Behavioral Dynamics and Advanced Analytics
 
Efficient project delivery joc focus - 20141030
Efficient project delivery   joc focus - 20141030Efficient project delivery   joc focus - 20141030
Efficient project delivery joc focus - 20141030
 
RBoursiquot Resume 4-24-2016
RBoursiquot Resume 4-24-2016RBoursiquot Resume 4-24-2016
RBoursiquot Resume 4-24-2016
 

Plus de NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 

Plus de NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Dernier

Dernier (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 

Dumbacher

  • 1. Human Exploration Framework Team (HEFT) Overview Daniel L. Dumbacher, Director, Engineering Directorate Marshall Space Flight Center John Olson, Ph.D., Director, Directorate Integration Office Exploration Systems Mission Directorate, NASA Headquarters Stephen Jurczyk, Deputy Center Director NASA Langley Research Center NASA Project Management Challenge February 2011
  • 2. Agenda • HEFT Overview • Benefit Figures of Merit • Constraint Figures of Merit • Key Outcomes • General Findings • Human Space Flight Cost and Schedule History • HEFT I Integrated Cost Assessment Comparison • What Needs to Be Addressed to Be Affordable • History of Lean Developments • Lean Cost and Schedule Implementation Approaches • Summary 5-486373 2
  • 3. HEFT Overview • HEFT Strategy: Create a decision framework for human space exploration that drives out the knowledge, capabilities, and infrastructure NASA needs to send people to explore multiple destinations in the Solar System in an efficient, sustainable way • HEFT Goal: Generate a process that evolves into a long term, permanent NASA activity to support human space flight (HSF) strategic planning – Initially focused on standing up the organization, getting it functioning, and conducting a full iteration of the process – Outcome of the process was recommendations for human space flight capabilities and missions for 5-, 10-, 15-, and 20-year horizons, with Mars as the ultimate destination • HEFT Impact: Informed the FY2012 Program Planning, Budget, and Execution process – Identified requirements for technologies and advanced systems capabilities based on investment strategies and design reference architectures for human missions to destinations beyond low-Earth orbit (LEO) – Met Executive Branch guidance, critical Stakeholder objectives, and HSF objectives and constraints – Is sustainable and affordable (fits within projected NASA HSF budget) 5-486373 3
  • 4. Benefit Figures of Merit Extend Human Presence Enhance Economic Impacts Broaden to include multiple destinations Enhance the robustness and expand with initial focus on crewed missions to competitiveness of the U.S. space industry. Near Earth Objects (NEOs). Increase Public Engagement Develop Future Capabilities Seek early and frequent opportunities for Mars for human exploration beyond Earth that Demonstrate technologies and advanced build up in capability over time for a steady systems for human Mars orbital and surface pace of new missions and new destinations. missions. Leverage Domestic Partnerships Improve Scientific Knowledge Build alliances between NASA and other Conduct activities that address research Government agencies, focusing on creating important to the science community. capabilities collaboratively or in a complementary way to reduce Expand Global Partnerships costs, increase utility, or further U.S. Strengthen international collaboration scientific, diplomatic, security, or economic by providing opportunities for participation in interests. technology development and demonstration, systems development, and operations. 5-486373 Characterizing Desirable Alternatives 4
  • 5. Constraint Figures of Merit Affordability Programmatic Sustainability Develop exploration options that can Develop an HSF strategy that ensures be implemented within the bounds of U.S. access to LEO and maintains a balance projected future budgets. between technology and system development activities, with flexible Operational Complexity architectures. Evaluate exploration options based on the number of unique systems, number HSF Capability Sustainment of launches, number of in-space Maintain core HSF capabilities required operations, etc. to develop technologies and advanced systems, and integrate, test, operate, and Programmatic Risk sustain systems for human exploration Technology and advanced systems beyond LEO. development must have adequate budget and schedule margins. 5-486373 Describing Top-level Guidelines 5
  • 6. Key Outcomes • The process of analyzing 9 investment portfolios was effective in exploring a broad technical and programmatic trade space – Evaluated them against Executive Branch Guidance, Critical Stakeholder Interests, and Benefit and Constraint Figures of Merit • Derived key insights from a large, complex dataset and identified options for: – Enabling and Enhancing Technology Development and Demonstration activities – Advanced Systems Developments including Crewed Spacecraft and Launch Vehicle – Changing the way NASA does business and opportunities for partnerships with other U.S. government agencies and international partners • Further work is required to refine the Design Reference Missions and cost and schedule estimates – This can eventually lead to a NASA integrated architecture for human exploration beyond LEO Charting a Balanced Path Forward 5-486373 6
  • 7. General Findings • Affording human exploration within expected budgets is a challenge • NASA human space flight is a demanding and risky enterprise requiring sustained resources • Safety is the cornerstone of viable options • Commercial crew helps test our assumptions (like NetFlix did to Blockbuster) • With ~$40B available over 10 years, significant progress can be made • “Lean” developments are essential to extending and sustaining human presence beyond LEO • Transitioning approaches used on relatively small projects to large (higher dollar value) programs/projects can have big payoffs Changing the Agency’s Business Model 5-486373 7
  • 8. Human Space Flight Cost and Schedule History Cost Growth Schedule Growth • Average: 219% or 3.19 times • Average: 103% or 2.03 times the original estimate the original estimate • Median: 207% • Median: 108% growth NASA Human-Rated Systems Improving Results by Doing Things Differently 5-486373 8
  • 9. HEFT I Integrated Cost Assessment Comparison DRM 1 DRM 2 DRM 3 Strategy 1 Strategy 2 Strategy 3 Charting Original 9 Investment Portfolios 5-486373 9
  • 10. What Needs to Be Addressed to Be Affordable Program/Project Risk Averse Requirements/ Personnel/ Management Culture Trades Staffing Clear Planning for Vision vs. Cost as an Independent Program / Project Requirements/Rationale at Near-term Execution Variable in Design Trades Leadership the Right Level Clear & Simple Lines Understanding Implications Cost as Independent Variable Right People for of Accountability of Safety in Design Trades the Role Business/Contractual Early Issue Identification Multiple Reviews Long-term Skill Relationships & Methods & Resolution & Approvals Maintenance/Development & Incentives Technical Oversight Delegation Industry vs. Government Use of In-House Capability & Insight of Authority Standards to Support Programs Use of Modern Certificate of Flight Cost Requirements Technology Readiness Process & Estimating Smaller Projects / Periodic Achievable Milestones Fitting Squarely in the Budget Box is an Overarching Requirement
  • 11. History of Lean Developments Saturn/Apollo Block Approach DC-X, DC-XA Successful building-block path to the Moon Design and development in 4 years, DC-XA modifications and flight in 2 years STS External Tank Block Upgrades New tank design delivered in 4 years X-34 Ready to fly in 5 years Mars Exploration Rovers 3+ years to flight MLAS 21 months to flight Deep Space-1 3+ years to flight Ares I-X 18 months to flight LRO/LCROSS 3.5 years to flight Fastsat 18 months to flight X-37, X-37B Only reusable Space Vehicle since Orbiter Project M Ready to fly in 1 year X-38 Successful drop tests in 3-4 years 5-486373 Learning Lessons from Experience 11
  • 12. Lean Cost and Schedule Implementation Approaches • Evolutionary Block Progression – Applies to a variety of projects, allowing a stepped approach to requirements maturation, incremental capability, technology infusion, development, and implementation • Parallel Government/Industry Development – Allows rapid start by Government, while maturing requirements and competitive acquisition strategy • Flying Class C/D, or “First Build”, and Sticking to the Designation – Applies to key technology demonstration missions and allows for rapidly advancing a selection or suite of technologies — proto-flight hardware • Learning Curves – Applies to multiple unit production and also can drive infrastructure requirements early in the process via pathfinders • Skunkworks Approach – Estimated schedule decreased by more than 20% • For large systems, long-lead items dominate schedule Finding Efficiencies that Maximize Budget 5-486373 & Reduce Time to Market 12
  • 13. Summary • NASA and the Nation will be in a constrained budget environment for the foreseeable future • NASA’s program management and technical community must find ways to meet objectives with more efficient use of resources • The future of human exploration is in the balance Living Within Our Means While Delivering Excellence 5-486373 13
  • 14. For more information: www.nasa.gov 5-486373 14