1. Discovery
New
National Aeronautics and Space Administration Frontiers
Discovery and New Frontiers
Project Budget Report Process
Project Management Challenge
2011
Donna Patterson, Digital Fusion
D&NF Business Manager
Used 2010
February with permission 0
2. Discovery
Programs Overview New
Frontiers
• Uncoupled program addressing high-priority science objectives in solar system exploration
• Frequent opportunities for science community to propose full investigations
• Fixed-price cost cap (cradle to grave), excluding the launch vehicle
• Full and open competition
• Principal Investigator-led project
• Established in 1992 • Established in 2003
• $425M cap per mission (FY09) • $625M cap per mission (FY10)
• Mission opportunities every 18 to 24 mos • Mission opportunities every 42 to 52 mos
• Open science competition for all solar • Addresses high-priority investigations
system objects, except for the Earth and identified by the National Academy of
the Sun Sciences
February 2010 1
3. Discovery
D&NF Science Mission Targets New
Frontiers
Kepler
– The Moon (Lunar Prospector, M3, GRAIL)
– Mars (Mars Pathfinder, ASPERA-3)
– Inner Planets (MESSENGER, Strofio)
Dawn
– Outer Planets (New Horizons, Juno)
– Comets (CONTOUR, Stardust, Deep Impact, EPOXI, NExT)
Stardust
– Asteroids (NEAR, Dawn)
– Interplanetary Space (Genesis) Mars Pathfinder
Genesis
– Extra-Solar System (Kepler)
MESSENGER
M3 on Chadrayaan-1
Juno
New Horizons
NEAR
Lunar Prospector
CONTOUR
ASPERA-3
on Mars Express
Strofio on BepiColombo GRAIL
October 23, 2007 2
4. Discovery
Project Life Cycle New
Frontiers
AO Development AO Implementation
Draft AO Final AO
Release Release
Step 1 1
Step Step 2 2
Step
CSR
CSR
Competitive Evaluation
Selection
KDP A
KDP B KDP C KDP D KDP E KDP F
Phase A A
Phase Phase B
Phase B Phase C
Phase C Phase D Phase E
(Concept (Operations & Data
(Preliminary Design) (Detailed Design) (Development)
Studies) Analysis)
Formulation
Formulation Implementation
CR
Initial Final Project
Cost Proposal Cost Proposal Confirmed Cost
Annual Annual Annual Annual Annual Annual Annual
PPBE Submit PPBE Submit PPBE Submit PPBE Submit PPBE Submit PPBE Submit PPBE Submit
Science/Mission Selection led by SMD Program Implementation led by Discovery Program Office
Program Implementation led by D&NF Program Office
February 2010 3
5. Discovery
Program Organization New
Frontiers
Phase B, C, D, E
Confirmation Review at end of Phase B
Associate Administrator
Governing PMC for the Decision Authority makes confirmation
Science Mission Directorate (SMD) decision
PM becomes heavily engaged following
selection
D&NF
NASA Headquarters Program Director
Lead
Lead
Program Executive
Program
Scientist Mission
Mission Program
Program Executive Scientist
Program Office D&NF
Program Manager
Mission Manager
Projects Principal Investigators
NASA Ctr. CMC or
Appointed Board
Programmatic Reporting
Project Manager & Accountability
(Implementing Organization)
Scientific Reporting
& Accountability
6. Discovery
Budget Process: Interfaces and Interactions New
Frontiers
Program Office
Responsibilities Headquarters
Project Offices • Track all project funding and cost
Responsibilities • Provide monthly budget Implementation Responsibilities
performance presentations to budget request,
• Provide Monthly Reports PPBE input info HQ, PO, MSFC CFO Project requests • Advocate/justify program
• Identify liens and threats • Request fund transfer within (PPBE) and budget
Monthly reports
• Identify reserves Program implementation budget Monthly report roll-up • Execute funds consistent
• Identify workforce Budget and • Develop detailed Program, with Operating Plan,
• Submit PPBE input Operating Plan Planning, Budgeting and Budget drill actions appropriation actions,
• Track project cost guidelines Evaluation (PPBE) Plans and Budget drill responses and law
agreements Notify of funding Operating Plans for the Program, • Transfer approved
• Report cost agreement authorization integrate for projects Coordinate funding budgeted funds
changes transfers (PRs) • Administer HQ held
• Monitor MSFC contracts,
• Monitor project Operating Plan futures and other
including 533M input Funding transfer
performance against total • Integrate 533/IEMP data and program-level budgets
533s or IEMP data notice
cost monthly reports • Review/revise
• Prepare 533s or enter Maintain PBRs • Maintain PBRs Maintain PBRs recommended budget
IEMP data, if applicable
Funding
PPBE Input
Implementing Organizations
Funding Authorization
Cost Phasing Plans
(Non-project Related)
Notice
Responsibilities
Funding
PPBE Input
• Input IEMP data
Implementing Organizations
(Project Related)
Responsibilities
• Input IEMP data
February 2010 5
7. Discovery
Project Budget Report Process Motivation New
Frontiers
• Due to the timing of official budgetary documents, budget changes inevitably occur
up to the printing of the Program Resource Guidance (PRG)
• Preparing the Program Planning Budget Execution (PPBE) and other budget
submits in this environment can be a complex, time-consuming, and a frustrating
activity
– Reconciling the project budget history at the program and project levels
– Identifying and correcting errors
– Ensuring 100% confidence in each project budget
• Additionally, the lack of clear, complete trace of project budget changes hinders
program office ability to study project cost increases
– Understanding the drivers behind cost increases
– Tracing the effects of NASA process changes on life cycle cost
Solution:
Project Budget Report (PBR) and Quarterly Budget Status (QBS) processes
February 2010 6
8. Discovery
Project Budget Report (1 of 3) New
Frontiers
• Used to document and communicate each project’s funding profile and
adjustments over the life of the project
− Created and maintained by the Program Office (PO)
− Distributed by the PO to Headquarters (HQ) and projects
− A budget tracking tool, not a funding authorization by NASA
• PBR serves as an acknowledgement of the approved project new obligation
authority (NOA) profile and any adjustments made to the profile
− Issued at the beginning of each fiscal year and revised throughout the year to
capture all funding changes
− Supporting documentation referenced
− Explanatory comments included to provide understanding and traceability
− Has played a major role in helping to prevent budget and funding misunderstandings
and errors
− Signed by the Principal Investigator (when applicable), Project Manager, Program
Manager, and Program Director at the beginning of each FY and after a project re-
plan or major funding adjustment
• Documents a project’s life cycle cost by fiscal year, phase, and implementing
organizations
February 2010 7
9. Discovery
Project Budget Report (2 of 3) New
Frontiers
Project A NEW FRONTIERS PROGRAM Project A
FY 2010 ADJUSTED PROJECT BUDGET REPORT FY 2010
CTR: JPL PROJECT #: 112233 PLRA:
ANALYST: Jane Doe UPN: 132-46. 678-90 REV: 1
PHONE: (256) 961-0000 DATE: 5/4/2010
CURRENT APPROVED PROJECT LIFE CYCLE COST PROFILE FY2010
Phase C/D Phase C/D Phase E TOTAL BASELINE
$K FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC LCC COST CAP
TOTAL PROJECT 260,059.000 485,848.000 237,173.000 152,768.000 21,424.000 14,381.000 17,800.000 18,080.000 17,839.000 84,687.000 1,050,000.000 1,050,000.000
JPL 204,987.886 397,434.743 168,728.331 68,048.000 21,424.000 8,053.000 11,820.000 12,102.000 11,286.000 40,236.000 739,132.074
GSFC 2,251.764 5,174.764 4,287.236 715.000 138.000 478.000 486.000 590.000 2,665.000 14,534.000
KSC 46,000.000 51,600.000 59,400.000 79,400.000 190,400.000
MSFC/SwRI 6,725.000 31,500.943 4,668.000 4,605.000 6,190.000 5,502.000 5,492.000 5,963.000 41,786.000 105,706.943
JSC 43.200 43.200
MSFC 94.350 94.350 89.433 183.783
FUNDING PROFILE DESCRIPTION / EXPLANATION:
1st QTR FUNDING PROFILE ADJUSTMENT #1
Phase C/D Phase C/D Phase E TOTAL
Center FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC ADJUSTMENT PR#
TOTAL ADJ
JPL (5.000) (5.000) 4200316052
APL 5.000 5.000 4200317845
Adjustment #1 Explanation:
Transfer $5K to APL to set up Government Bill of Lading (GBL) account.
2nd QTR FUNDING PROFILE ADJUSTMENT #1
Phase C/D Phase C/D Phase E TOTAL
Center FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC ADJUSTMENT PR#
TOTAL ADJ
JPL 4,186.000 (1,000.000) 3,186.000
GSFC 214.000 214.000
KSC (4,400.000) 1,000.000 (3,400.000)
Adjustment #1 Explanation:
FY10 KSC funding decrease in the amount of $4.4M due to $3.4M LV price reduction, plus a $1.0M loan to be paid back from JPL in FY11. Out of the $4.4M total transfer, $214K
will go to GSFC for the addition of an instrument manager and the balance of $4.186M will go to JPL to help replenish the reserve profile.
ADJUSTED PROJECT LIFE CYCLE COST (NOA) PROFILE FY2010
Phase C/D Phase C/D Phase E TOTAL BASELINE
$K FY2009 Total Prior FY2010 FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 BTC LCC COST CAP
TOTAL PROJECT 260,059.000 485,848.000 237,173.000 152,768.000 21,424.000 14,381.000 17,800.000 18,080.000 17,839.000 84,687.000 1,050,000.000 1,050,000.000
JPL 204,987.886 397,434.743 172,909.331 67,048.000 21,424.000 8,053.000 11,820.000 12,102.000 11,286.000 40,236.000 742,313.074
GSFC 2,251.764 5,174.764 4,501.236 715.000 138.000 478.000 486.000 590.000 2,665.000 14,748.000
KSC 46,000.000 51,600.000 55,000.000 80,400.000 187,000.000
MSFC/SwRI 6,725.000 31,500.943 4,668.000 4,605.000 6,190.000 5,502.000 5,492.000 5,963.000 41,786.000 105,706.943
JSC 43.200 43.200
MSFC 94.350 94.350 89.433 183.783
APL 5.000 5.000
FUNDING PROFILE DESCRIPTION / EXPLANATION:
As per KDP-C decision and memorandum, the project management (internal to NASA) approved LCC is $1050M, while the Agency/MD externally reported LCC is $1107M.
The Agency/MD externally reported $1107M includes $57M for the IPAO 70% Cost Confidence Level, which is reported under the Unallocated Future Expenses (UFE) budget line, and
to be managed by HQ/SMD. The $57M for UFE is neither managed by nor made available to the project without prior approval from either the DPMC or the APMC.
February 2010 8
10. Discovery
Project Budget Report (3 of 3) New
Frontiers
FY2010 MILESTONE SCHEDULE JUNO Top Level Schedule
2005 2006 2007 2008 2009 2010 2011 2012
FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12
Phase B (33 mths) Phase C (20 mths) Phase D (16 mths) Phase E (thru 10/2018)
JUNO Top Level Schedule
ATP
11/28
CRR
10/24
PMSR
5/21
PDR/NAR
5/12
CR
KDP-C
7/15 8/5
IBR
2/3
CDR
4/20
SIR
3/4
KDP-D
4/1 8/31
ERR 3/2
PSR
LRR
FRR
8/4 PLAR
7/7 10/4
Deep Space
Maneuver
9/28
BL-L2 PSRD P-L2 PSRD F-L2 PSRD FS/LV ICD (F) EPDT Plan (F) JOISRLSR p2 PP Pre-Launch Rpt (F)
SYSTEM ENG Requirements 1/19 5/1 8/30 V&V Plan (F) 7/1
PAYLOAD
2008 Requirements & Preliminary Design
2009 2010
Refer to Payload Schedule for Details
Flight Instr Req'd for Inst'l
7/2 UVS
2011
6-21 FGM 6-29 JADE
2012
6/28 JEDI 7-14 JIRAM 6-25 WAVES
FLIGHT
FY08
SYSTEM
Requirements/Trades/Analysis & Risk Reduction FY09 Preliminary Design Detail Design FY10 FY11 6-28 JUNOCAM 5-26 MWR
FY12
PIU Flight Box
PDDU
2/19 2/26 PDDU ATU
POWER PDDU 7/27/10 CME 6/11/10
Phase C
Design/Procurements
(20 mths) Fabrication
Phase D
C&DH EDU#1
Assy & Test
FT Wing
#2 3
(16 mths) PIU 5/20/10
Qual Battery 5/05/10 Phase E
Flight Battery 2/01/11
(thru 10/2018)
C&DH CR Solar Cell Testing/LL Proc 2/11 1/26 9/4
#1 PSR C&DH B 7/19
IBR CDR
CCA IRAD Dev/EGSE Cap Dev EDU Dev Assembly & Test ATU #1 #2 C&DH A
PDR/NAR KDP-C SIR KDP-DJPL ERR8/17 RFIS 4/6/10
3/2 LRR
TLGA 5/11/10 8/4 PLAR Deep Sp
TELECOM
2/3 2/4 1/21 7/6 Vault Pnl to 4/9 X-Band MGA 5/11/10 HGA 8/31/10
5/12 7/15 SDST Proc
8/5 Preliminary Design/LL Proc Detailed Design 3/4 & 4/1
Fabricate Test 8/31 LGAs 5/11/10
FRR 7/7 10/4 Maneuve
4/20 2/25 2/10 4/5 LEGEND:
MECHANICAL &
F-L2 PSRD STRUCTURES
FS/LV ICDDesign
Configuration Trades (F) EPDT Plan (F)
Dev / Fab & Assy Test Vault JOISRLSR p2 PP Pre-Launch Rpt (F)
= PDR
Struc to Prop = CDR
8/30 V&V Plan (F) 7/1 4/28 = Payload Del'y
3/5 2/17
PROPULSION Prop/Struc = Funded Margin
Preliminary Design/LL Proc Design Procure Tanks, Main Engine & REMs Flight Instr Req'd for Inst'l = Critical Path
Prop/Struc Integ
= Milestone
SRU RFP
Refer to Payload Schedule for Details
SRU Study Contract SRU PDRs 5/13 3/5 7/2 UVS = Complete Milestone
6-21 FGM 6-29 JADE
8/31
GN&C
SRU LL Procurement Fab Material SRU Assy & Test 6/28 JEDI 7-14 JIRAM 6-25 WAVES
IMU/SUN Procure 4/22
6-28 JUNOCAM 5-26 MWR
Preliminary Design FLIGHT SOFTWARE
Detail DesignAAC
ADDITIONAL COMMENTS
#1
3/17
GIF CMIC #0
3/2
#3 #4 #4.1#5 #6 SOFTWARE FUNCTIONALITY
Rel 3.0 COMM & TELEMETRY
Rel 4.0 S/C, GNC
1) Juno project profile as reflected above asBoard Approved LCC profile FSW Development FSW Builds funding re-routed to Juno from DSN for CFDP software compliance.Rel 5.0 PAYLOADS this
IRAD the & Box SW does not include $107K of PIU Flight Box Juno received
Rel 6.0 S/W ATPs
funding in FY2007. 1st SCE Del Final SCE Del
PDDU
2/19
TESTBEDS S/C Emulators (Plyd Dels) 2/26 PDDU ATU3/4 #1 #2 #2 #1
STL STL Cert PDDU 7/27/10 CME 6/11/10
Fabrication Assy & Test #2
4/1 3
7/1
PIU 5/20/10
ASSY, TEST & Instruments to ATLO LAUNCH
C&DH EDU#1 Qual Battery 5/05/10 Flight Battery 2/01/11
LAUNCH OPS FT Wing
3/11 ATLO Start SS I&T Pld Env Test Sys 8/5
2/11 1/26 9/4 C&DH B 7/19 Launch Ops Launch Period (8/5-8/26)
MS PR Ops Cncpt L3 K&D
MDNav
3/24
MOS
7/14
MDNav
2/19
MOS
9/15
#1 6/7 ORR
EDU Dev
10/13 3/22 4/27 Assembly & Test
10/5 F-L3/P-L4 MOS ATU #1 #2 C&DH A
Training
MISSION SYSTEM Trade Studies Requirements P-L3 3/24 7/14 F-L47/287/27
APPROVAL SIGNATURES: F-L3 MD/NAV #3 #3.1 3.2 8/17
#4 ATLO
#5RFIS 4/6/10 #6 Launch Del TLGA 5/11/10
Del
2/4 1/21
Ground Data System Engineering 7/6 Vault GDS SW Development
Pnl to JPL 4/9 X-Band MGA 5/11/10 #7 Contingency
HGA 8/31/10
roc Detailed Design Fabricate & Test LGAs 5/11/10
PRINCIPAL INVESTIGATOR DATE PROGRAM MANAGER DATE
2/25 2/10 4/5 LEGEND:
Design Dev / Fab & Assy Test Vault = PDR
PROJECT MANAGER DATE Struc to Prop PROGRAM DIRECTOR DATE = CDR
4/28 = Payload Del'y
3/5 2/17
Prop/Struc = Funded Marg
oc Design Procure Tanks, Main Engine & REMs
= Critical Path
February 2010 Prop/Struc Integ
= Milestone9
11. Discovery
Budget Profile Changes New
Frontiers
Example:
Project Phase C/D: Fiscal Year 2010
2010 Operating Plan
October
2010 Center Funding Re-allocations
October - September
PPBE2012 Budget Cycle, PRG received from HQ
March
PPBE2012 Project over-guide submit
April
PPBE2012 Final Budget Approval
May
Major Project Re-plan
July
Final PBR released for signatures and becomes
starting point for FY11
September
Oct 1st Qtr Jan 2nd Qtr Apr 3rd Qtr Jul 4th Qtr
12. Discovery
Quarterly Budget Status (1 of 3) New
Frontiers
• Reflects the current fiscal year budget transactions, including any
adjustments to the approved NOA and distributions
− Reports the current fiscal year only
− Reflects NOA, any adjustments, and funding distributions by Center
− Reports are distributed to HQ, PO, and Project Manager/Principal Investigator
• Comments are added to fully document the reasoning or purpose of any
adjustment to the approved NOA to maintain our understanding of the profile
and any changes to the profile over the life of the project
• QBS is not signed; distributed quarterly by the PO
• QBS has improved the tracking and analysis of the current fiscal year funding
levels
− Reports detail funding transactions for all project partners
− QBS (and PBR) creates a funding trace for each project
− Provides details of all funding transactions during current FY
− Like the PBR, has played a major role in helping to prevent budget and funding
misunderstandings and errors
February 2010 11
13. Discovery
Quarterly Budget Status (2 of 3) New
Frontiers
Project A QUARTERLY BUDGET STATUS (QBS) Project A
FY 2010 2nd QUARTER FY 2010
TOTAL PROJECT ($K) DATE: 5/4/2010 PROJECT LCC ($K)
PBR FY10 ADJUSTED NOA 237,173.000 PROJECT #: 112233 $1,050,000.000
QBS FY10 ADJUSTED NOA 237,173.000 ANALYST: Jane Doe
TOTAL DISTRIBUTED 226,379.135 PHONE: (256) 961-0000
TOTAL UNDISTRIBUTED 10,793.865
TOTAL FORWARD FUNDING -
JPL ($K)
PBR FY10 ADJUSTED NOA 168,728.331
TOTAL ADJUSTMENTS 4,181.000 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr ADJ # 1 (5.000) Oct FY10 4200316052 2010 SCEX22010D 804068.01.01 Transfer $5K to APL to set up Government Bill of Lading (GBL) account.
FY10 KSC funding decrease in the amount of $4.4M due to $3.4M LV
2nd Qtr ADJ # 1 4,186.000 Jan FY10 2010 SCEX22010D
price reduction, plus a $1.0M loan to be paid back from JPL in FY11.
QBS FY10 ADJUSTED NOA 172,909.331
TOTAL DISTRIBUTIONS 162,329.466 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr DIST # 3 26,751.764 Oct FY10 4200316052 2010 SCEX22010D 804068.01.01 Budget Distribution
1st Qtr DIST # 4 30,000.000 Nov FY10 4200318506 2010 SCEX22010D 804068.01.01 Budget Distribution
1st Qtr DIST # 10 7,419.000 Dec FY10 4200321816 2010 SCEX22010D 804068.01.01 Budget Distribution
1st Qtr DIST # 11 976.000 Dec FY10 4200323008 2010 SCEX22010D 804068.01.01 Budget Distribution
2nd Qtr DIST # 13 7,600.000 Jan FY10 4200324160 2010 SCEX22010D 804068.01.01 Budget Distribution
2nd Qtr DIST # 15 89,004.879 Jan FY10 4200326295 2010 SCEX22010D 804068.01.01 Budget Distribution
2nd Qtr DIST # 20 577.823 Feb FY10 Not Assigned 2010 SCEX22010D 804068.01.01 Budget Distribution
TOTAL UNDISTRIBUTED 10,579.865
TOTAL FORWARD FUNDING
GSFC ($K)
PBR FY10 ADJUSTED NOA 4,287.236
TOTAL ADJUSTMENTS 214.000 FY 2010 Month PR Number PY Fund WBS Comments
$3.4M LV Price reduction. Transfer $4.186M to JPL (reserves) and
2nd Qtr ADJ # 1 214.000 Jan FY10 2010 SCEX22010D $214K to GSFC for addition of Instrument Manager. JPL to repay $1M
in FY11.
QBS FY10 ADJUSTED NOA 4,501.236
TOTAL DISTRIBUTIONS 4,287.236 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr DIST # 1 2,248.236 Oct FY10 2010 SCEX22010D Budget Distribution
1st Qtr DIST # 2 340.000 Nov FY10 2010 SCEX22010D Budget Distribution
1st Qtr DIST # 9 450.000 Dec FY10 2010 SCEX22010D Budget Distribution
2nd Qtr DIST # 14 1,249.000 Jan FY10 2010 SCEX22010D Budget Distribution
TOTAL UNDISTRIBUTED 214.000
TOTAL FORWARD FUNDING
February 2010 12
14. Discovery
Quarterly Budget Status (3 of 3) New
Frontiers
KSC ($K)
PBR FY10 ADJUSTED NOA 59,400.000
TOTAL ADJUSTMENTS (4,400.000) FY 2010 Month PR Number PY Fund WBS Comments
$3.4M LV Price reduction. Transfer $4.186M to JPL (reserves) and
2nd Qtr ADJ # 1 (4,400.000) Jan FY10 2010 SCEX22010D $214K to GSFC for addition of Instrument Manager. JPL to repay $1M
in FY11.
QBS FY10 ADJUSTED NOA 55,000.000
TOTAL DISTRIBUTIONS 55,000.000 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr DIST # 7 14,100.000 Oct FY10 2010 SCEX22010D Budget Distribution
1st Qtr DIST # 8 4,000.000 Nov FY10 2010 SCEX22010D Budget Distribution
1st Qtr DIST # 12 4,000.000 Dec FY10 2010 SCEX22010D Budget Distribution
2nd Qtr DIST # 17 32,900.000 Jan FY10 2010 SCEX22010D Budget Distribution
TOTAL UNDISTRIBUTED -
TOTAL FORWARD FUNDING
MSFC/SwRI ($K)
PBR FY10 ADJUSTED NOA 4,668.000
QBS FY10 ADJUSTED NOA 4,668.000
TOTAL DISTRIBUTIONS 4,668.000 FY 2010 Month PR Number PY Fund WBS Comments
2nd Qtr DIST # 16 997.000 Jan FY10 4200324473 2010 SCEX22010D 804068.04.01 Budget Distribution
2nd Qtr DIST # 18 2,964.433 Feb FY10 4200329000 2010 SCEX22010D 804068.04.01 Budget Distribution
2nd Qtr DIST # 19 706.567 Feb FY10 4200318902 2010 SCEX22010D 804068.04.01 Budget Distribution
TOTAL UNDISTRIBUTED -
TOTAL FORWARD FUNDING
MSFC ($K)
PBR FY10 ADJUSTED NOA 89.433
QBS FY10 ADJUSTED NOA 89.433
TOTAL DISTRIBUTIONS 89.433 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr DIST # 6 89.433 Oct FY10 2010 SCEX22010D Budget Distribution
TOTAL UNDISTRIBUTED -
TOTAL FORWARD FUNDING
APL ($K)
PBR FY10 ADJUSTED NOA
TOTAL ADJUSTMENTS 5.000 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr ADJ # 1 5.000 Oct FY10 4200317845 2010 SCEX22010D 804068.01.04 Transfer $5K to APL to set up Government Bill of Lading (GBL) account.
QBS FY10 ADJUSTED NOA 5.000
TOTAL DISTRIBUTIONS 5.000 FY 2010 Month PR Number PY Fund WBS Comments
1st Qtr DIST # 5 5.000 Nov FY10 4200317845 2010 SCEX22010D 804068.01.04 Budget Distribution
TOTAL UNDISTRIBUTED -
TOTAL FORWARD FUNDING
February 2010 13
15. Discovery
Project Budget Report Benefits New
Frontiers
• PBR Documents a project’s life cycle cost by fiscal year, phase, and
implementing organizations
• QBS has improved the tracking and analysis of the current fiscal year funding
levels
• Together, the PBR and QBS have
– Cut the time required to develop the program PPBE budget by more than 50%
– Reduced the time required to verify and distribute funds to the project organizations
by 50%
– Ensured 100% agreement and confidence in each project budget and the distribution
of funds by both program and project management
– Proven to be a valuable record of the project or programmatic budget, facilitating
data mining
The PBR has proven so successful,
it is being implemented for other SMD programs
February 2010 14
16. Discovery
New
Frontiers
Supplemental Data and Backup
February 2010 15
17. Discovery
Acronyms New
Frontiers
AO Announcement of Opportunity
ASPERA Analyzer of Space Plasma and Energetic
Atoms
CFO Chief Financial Officer
CMC Center Management Council
CONTOUR Comet Nucleus TOUR
CR Confirmation Review
CSR Concept Study Report
D&NF Discovery and New Frontiers
FY Fiscal Year
GRAIL Gravity Recovery and Interior Laboratory
HQ Headquarters
IEMP Integrated Enterprise Management Program
KDP Key Decision Point
M3 Moon Mineralogy Mapper
MESSENGER MErcury Surface, Space ENvironment,
Geochemistry, and Ranging
MSFC Marshall Space Flight Center
NEAR Near Earth Asteroid Rendezvous
NOA New Obligation Authority
PBR Project Budget Report
PDS Planetary Data System
PMC Program Management Council
PO Program Office
PPBE Program Planning Budget Execution
PRG Program Resource Guidance
PSD Planetary Science Division
QBS Quarterly Budget Status
SMD Science Mission Directorate
February 2010 16