SlideShare a Scribd company logo
1 of 17
Upgrading PeopleSoft Financials from 8.9
to 9.2
Advice You Need to Know from an Early
Adopter
Grant Chappell
VNSNY– Director of Business Systems
Michael Merrill
Elire Partner & Strategic Roadmap Expert
Introductions
Michael Merrill
Elire Partner & Strategic Roadmap Expert
--16 years of PeopleSoft project management, implementation/upgrade
stage lead, and module lead experience
Grant Chappell
VNSNY– Director of Business Systems
VNSNY
 Founded in 1893, the Visiting Nurse Service of New York (VNSNY) is the largest not-
for-profit home- and community-based health care organization in the United States,
serving the five boroughs of New York City and Nassau, Suffolk, and Westchester
Counties, as well as parts of upstate New York
 The Visiting Nurse Service of New York offers a wide range of home health care
services, including medical nursing services, management of chronic conditions, and
care to meet the needs of every generation, from at-risk infants to those at the end of
life
Project Summary
 VNSNY was able to successfully upgrade GL, AM, AP, PO, and ePro from PeopleSoft
version 8.9/PeopleTools 8.49 to 9.2/PeopleTools 8.53 in just 7.5 months using
Oracle’s newly released 8.9 to 9.2 path
 VNSNY had only a very lean team of internal and external functional/technical
resources
 VNSNY was also able to successfully maximize the use of a non-full time external
PeopleSoft Admin/Upgrader resource
Project Objectives
 Pair Elire consultants with VNSNY staff so that VNSNY staff can expand their already solid knowledge base to
include the new features and technologies of the 9.2 application/tools 8.53 release
 Evaluate and analyze the many new features Oracle has added since version 8.9 which could result in
 cost savings,
 productivity gains, and/or
 decreased error rates
 Remove non-value add customizations
 Improve service where appropriate and deliver increased end user value
Project Methodology
 The phases which represent key transition points in the project life cycle of our Elire
Success DeliveredTM
upgrade methodology are illustrated below
Project Methodology
Plan Phase
 Elire and VNSNY used a series of well organized meetings and gate reviews to ensure
entrance and exit criteria for the various phases are satisfied
 Gate Kick Offs are critical parts of the Elire Success DeliveredTM
methodology and were
held at the beginning of key phases to allow for a detailed review of
 Roles and responsibilities for the particular phase
 Deliverables for the particular phase
 Process flows and procedures for the particular phase
Software Install
Fit Gap
 During Fit Gap we worked to understand the capacity the project could take on so that
scope could be properly categorized into core and variable scope
 Core Scope: Basics required to upgrade to 9.2 – the project’s primary goal
 Variable Scope: Additional scope which would lead to an enhanced future state –
things to tackle while “the hood is open” – which won’t jeopardize the project’s
timeline and milestones
Fit Gap
 The following were reviewed, in a series of facilitated working sessions involving the Client IT
and Business representatives to set the approved Project Scope
 Current State
 Although a formal Current State document was not produced, it was helpful to begin
the facilitated Fit Gap sessions with a walk through of key business process to ensure
all resources were on the same page prior to determining the Fit/Gap of that process
 Compare Report Analysis
 Determined which customizations would carry forward
 New functionality or functionality that was previously available but unused
 The first priority was high-impact features and functionality or low-hanging fruit:
features that are easy to implement and do not fundamentally change established
business processes
Fit Gap
 All details of the Analysis were
compiled in a Solution Deliverable as
shown in the below example for the
New Features tab
 Allowed for all Compare Report, New
Feature, and Wish List/Work Request
Enhancement details to be stored in
one place
 Captured overview information,
priority, cost/benefit, and other
pertinent information
Fit Gap
 Following the completion of the Fit Gap,
leadership reviewed the following to
determine the official project scope:
 The business priority of all core and
variable scope items
 A high-level cost benefit analysis of all
core and variable scope items
 The project’s FTE capacity
 The project milestones
Reapplication / Configuration
 Reapplication of existing customizations and development efforts were tracked via a
Development Tracker
Development Tracker
Test Moves
 The project used a series of Test Moves to perfect the upgrade process and build
consensus for the production upgrade
 The three major technical phases included:
 The Initial Pass
 The first pass was used to create the DEV environment
 The Test Move to Production Passes
 After completing the Initial Pass, the project conducted three Test Moves
 With each iteration we perfected the process and prepared to go live
 The Final Move to Production Pass
 In the Final Move to Production Pass, the most recent successful output of the
Test Move to Production Pass (generally UAT) was the Source
Success Delivered
The Elire project model for PeopleSoft upgrades works very well. The
key components of the model are: high quality consultants, robust
artifact requirements, well defined phase objectives and Elire senior
leadership oversight. The Elire consultants were some of the best I have
worked with, I would recommend them without reservation. The Elire
documentation requirements and phase objectives complimented and
supported each other. The Solutions Requirements Deliverable
document was the bedrock of the project and used repeatedly by the
team. All of the above comes together through the strong project
oversight of Elire Senior leadership. Senior leadership set the stage for
each project phase and constantly monitored progress/issues. In
closing, I highly recommend Elire for PeopleSoft upgrades.
–Grant Chappell, Director of Business Systems, Visiting Nurse Service of New York

More Related Content

What's hot

4+ yrs_Exp .Net Resume
4+ yrs_Exp .Net Resume4+ yrs_Exp .Net Resume
4+ yrs_Exp .Net ResumeGandhi Goli
 
SAP ChaRM and Retrofit
SAP ChaRM and Retrofit SAP ChaRM and Retrofit
SAP ChaRM and Retrofit Mark Hansraj
 
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and PlanningPeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and PlanningArvind Rajan
 
06 project time management
06  project time management06  project time management
06 project time managementAla Ibrahim
 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTAlpha Sirius
 
Git Introduction
Git IntroductionGit Introduction
Git IntroductionGareth Hall
 
PeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid MobilePeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid MobileNERUG
 
Git flow for daily use
Git flow for daily useGit flow for daily use
Git flow for daily useMediacurrent
 
Active directory interview questions
Active directory interview  questionsActive directory interview  questions
Active directory interview questionsAnand Dhouni
 
Version Control & Git
Version Control & GitVersion Control & Git
Version Control & GitCraig Smith
 
Variant Management
Variant ManagementVariant Management
Variant ManagementAras
 
Software Architecture Development Proposal PowerPoint Presentation Slides
Software Architecture Development Proposal PowerPoint Presentation SlidesSoftware Architecture Development Proposal PowerPoint Presentation Slides
Software Architecture Development Proposal PowerPoint Presentation SlidesSlideTeam
 
2015 04 Preparing for the SAP S/4HANA Migration
2015 04 Preparing for the SAP S/4HANA Migration2015 04 Preparing for the SAP S/4HANA Migration
2015 04 Preparing for the SAP S/4HANA MigrationBluefin Solutions
 
Oracle hcm cloud overview
Oracle hcm cloud overviewOracle hcm cloud overview
Oracle hcm cloud overviewTrevor Hewitt
 
SAP Solution Manger 7.2
SAP Solution Manger 7.2SAP Solution Manger 7.2
SAP Solution Manger 7.2Lokesh Modem
 
SAVIC Sap s4 hana transition brochure
SAVIC Sap s4 hana transition brochure SAVIC Sap s4 hana transition brochure
SAVIC Sap s4 hana transition brochure Supriya SAVIC
 
Understanding oracle fusion accounting hub
Understanding oracle fusion accounting hubUnderstanding oracle fusion accounting hub
Understanding oracle fusion accounting hubManoj Sharma
 
Water balance assessment of the Gandaki River Basin
Water balance assessment of the Gandaki River BasinWater balance assessment of the Gandaki River Basin
Water balance assessment of the Gandaki River BasinHI-AWARE
 

What's hot (20)

4+ yrs_Exp .Net Resume
4+ yrs_Exp .Net Resume4+ yrs_Exp .Net Resume
4+ yrs_Exp .Net Resume
 
SAP ChaRM and Retrofit
SAP ChaRM and Retrofit SAP ChaRM and Retrofit
SAP ChaRM and Retrofit
 
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and PlanningPeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
 
Project Estimation
Project EstimationProject Estimation
Project Estimation
 
Milestones
MilestonesMilestones
Milestones
 
06 project time management
06  project time management06  project time management
06 project time management
 
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENTSUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
SUCCESSFUL CHARM IMPLEMENTATION IN A VALIDATED ENVIRONMENT
 
Git Introduction
Git IntroductionGit Introduction
Git Introduction
 
PeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid MobilePeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
 
Git flow for daily use
Git flow for daily useGit flow for daily use
Git flow for daily use
 
Active directory interview questions
Active directory interview  questionsActive directory interview  questions
Active directory interview questions
 
Version Control & Git
Version Control & GitVersion Control & Git
Version Control & Git
 
Variant Management
Variant ManagementVariant Management
Variant Management
 
Software Architecture Development Proposal PowerPoint Presentation Slides
Software Architecture Development Proposal PowerPoint Presentation SlidesSoftware Architecture Development Proposal PowerPoint Presentation Slides
Software Architecture Development Proposal PowerPoint Presentation Slides
 
2015 04 Preparing for the SAP S/4HANA Migration
2015 04 Preparing for the SAP S/4HANA Migration2015 04 Preparing for the SAP S/4HANA Migration
2015 04 Preparing for the SAP S/4HANA Migration
 
Oracle hcm cloud overview
Oracle hcm cloud overviewOracle hcm cloud overview
Oracle hcm cloud overview
 
SAP Solution Manger 7.2
SAP Solution Manger 7.2SAP Solution Manger 7.2
SAP Solution Manger 7.2
 
SAVIC Sap s4 hana transition brochure
SAVIC Sap s4 hana transition brochure SAVIC Sap s4 hana transition brochure
SAVIC Sap s4 hana transition brochure
 
Understanding oracle fusion accounting hub
Understanding oracle fusion accounting hubUnderstanding oracle fusion accounting hub
Understanding oracle fusion accounting hub
 
Water balance assessment of the Gandaki River Basin
Water balance assessment of the Gandaki River BasinWater balance assessment of the Gandaki River Basin
Water balance assessment of the Gandaki River Basin
 

Viewers also liked

Helix Plan Oveview V10
Helix Plan Oveview V10Helix Plan Oveview V10
Helix Plan Oveview V10gcjacobs
 
Upgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For SuccessUpgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For SuccessCedar Consulting
 
Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessHuron Consulting Group
 
What's New in the PeopleSoft 9.2 Accounts Payable Module?
What's New in the PeopleSoft 9.2 Accounts Payable Module?What's New in the PeopleSoft 9.2 Accounts Payable Module?
What's New in the PeopleSoft 9.2 Accounts Payable Module?NERUG
 
PeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and BeyondPeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and BeyondFastestBeastute
 
Sample Slides From Using Personality Trait Assessments For Talent Selection &...
Sample Slides From Using Personality Trait Assessments For Talent Selection &...Sample Slides From Using Personality Trait Assessments For Talent Selection &...
Sample Slides From Using Personality Trait Assessments For Talent Selection &...RV Rhodes LLC
 
Dankwambo transition vers les normes ipsas et leur impact sur la transparence...
Dankwambo transition vers les normes ipsas et leur impact sur la transparence...Dankwambo transition vers les normes ipsas et leur impact sur la transparence...
Dankwambo transition vers les normes ipsas et leur impact sur la transparence...icgfmconference
 
Thesis Gap Analysis
Thesis Gap AnalysisThesis Gap Analysis
Thesis Gap AnalysisNathan Nash
 
HATCH! OPEN. #10 - Big Five Personality Traits
HATCH! OPEN. #10 - Big Five Personality TraitsHATCH! OPEN. #10 - Big Five Personality Traits
HATCH! OPEN. #10 - Big Five Personality TraitsAnh Ngoc Vu
 
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check Arvind Rajan
 
Gap Analysis
Gap AnalysisGap Analysis
Gap AnalysisTICS
 
Intrinsic Rewards in the Workplace
Intrinsic Rewards in the WorkplaceIntrinsic Rewards in the Workplace
Intrinsic Rewards in the WorkplaceIrv Holmes
 
Selecting CRM Software
Selecting CRM SoftwareSelecting CRM Software
Selecting CRM Softwaresbeshuk
 

Viewers also liked (18)

PeopleSoft 9.2 Upgrade - A Roadmap
PeopleSoft 9.2 Upgrade - A RoadmapPeopleSoft 9.2 Upgrade - A Roadmap
PeopleSoft 9.2 Upgrade - A Roadmap
 
Helix Plan Oveview V10
Helix Plan Oveview V10Helix Plan Oveview V10
Helix Plan Oveview V10
 
Upgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For SuccessUpgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For Success
 
Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = Success
 
What's New in the PeopleSoft 9.2 Accounts Payable Module?
What's New in the PeopleSoft 9.2 Accounts Payable Module?What's New in the PeopleSoft 9.2 Accounts Payable Module?
What's New in the PeopleSoft 9.2 Accounts Payable Module?
 
PeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and BeyondPeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and Beyond
 
Hays PeopleSoft upgrade
Hays PeopleSoft upgradeHays PeopleSoft upgrade
Hays PeopleSoft upgrade
 
Sample Slides From Using Personality Trait Assessments For Talent Selection &...
Sample Slides From Using Personality Trait Assessments For Talent Selection &...Sample Slides From Using Personality Trait Assessments For Talent Selection &...
Sample Slides From Using Personality Trait Assessments For Talent Selection &...
 
Dankwambo transition vers les normes ipsas et leur impact sur la transparence...
Dankwambo transition vers les normes ipsas et leur impact sur la transparence...Dankwambo transition vers les normes ipsas et leur impact sur la transparence...
Dankwambo transition vers les normes ipsas et leur impact sur la transparence...
 
oxfam 9.2 upgrade
oxfam 9.2 upgradeoxfam 9.2 upgrade
oxfam 9.2 upgrade
 
Thesis Gap Analysis
Thesis Gap AnalysisThesis Gap Analysis
Thesis Gap Analysis
 
HATCH! OPEN. #10 - Big Five Personality Traits
HATCH! OPEN. #10 - Big Five Personality TraitsHATCH! OPEN. #10 - Big Five Personality Traits
HATCH! OPEN. #10 - Big Five Personality Traits
 
Leadership & Trust
Leadership & TrustLeadership & Trust
Leadership & Trust
 
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
 
Gap Analysis
Gap AnalysisGap Analysis
Gap Analysis
 
Intrinsic Rewards in the Workplace
Intrinsic Rewards in the WorkplaceIntrinsic Rewards in the Workplace
Intrinsic Rewards in the Workplace
 
Selecting CRM Software
Selecting CRM SoftwareSelecting CRM Software
Selecting CRM Software
 
Gap analysis
Gap analysisGap analysis
Gap analysis
 

Similar to Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know from an Early Adopter

Linda_SonHing_Resume
Linda_SonHing_ResumeLinda_SonHing_Resume
Linda_SonHing_ResumeLinda SonHing
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
GXC Advisory Board Business Windows 7 Accelerated Migration September2012
GXC Advisory Board Business Windows 7 Accelerated Migration September2012GXC Advisory Board Business Windows 7 Accelerated Migration September2012
GXC Advisory Board Business Windows 7 Accelerated Migration September2012Craig Borysowich
 
Synergy6.5 Change4.7 Ecp
Synergy6.5 Change4.7 EcpSynergy6.5 Change4.7 Ecp
Synergy6.5 Change4.7 EcpBill Duncan
 
CV Alan Leakey v9_3
CV Alan Leakey v9_3CV Alan Leakey v9_3
CV Alan Leakey v9_3Alan Leakey
 
CHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docx
CHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docxCHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docx
CHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docxcravennichole326
 
Project Success: The Basis of the Five Immutable Principles
Project Success: The Basis of the Five Immutable PrinciplesProject Success: The Basis of the Five Immutable Principles
Project Success: The Basis of the Five Immutable PrinciplesGlen Alleman
 
Difference Unified Processes
Difference Unified ProcessesDifference Unified Processes
Difference Unified ProcessesHARKUL
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeTheodore Van Patten, Jr.
 
Kristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatKristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatTEST Huddle
 
An Overview of RUP methodology
An Overview of RUP methodologyAn Overview of RUP methodology
An Overview of RUP methodologyMasoud Kalali
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsRaja Bavani
 

Similar to Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know from an Early Adopter (20)

Linda_SonHing_Resume
Linda_SonHing_ResumeLinda_SonHing_Resume
Linda_SonHing_Resume
 
Life Cycle Pases
Life Cycle PasesLife Cycle Pases
Life Cycle Pases
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Hrishikesh Ganpule CV
Hrishikesh Ganpule CVHrishikesh Ganpule CV
Hrishikesh Ganpule CV
 
GXC Advisory Board Business Windows 7 Accelerated Migration September2012
GXC Advisory Board Business Windows 7 Accelerated Migration September2012GXC Advisory Board Business Windows 7 Accelerated Migration September2012
GXC Advisory Board Business Windows 7 Accelerated Migration September2012
 
Synergy6.5 Change4.7 Ecp
Synergy6.5 Change4.7 EcpSynergy6.5 Change4.7 Ecp
Synergy6.5 Change4.7 Ecp
 
5 Steps to a Successful ERP Implementation
5 Steps to a Successful ERP Implementation5 Steps to a Successful ERP Implementation
5 Steps to a Successful ERP Implementation
 
Analysis Phase
Analysis PhaseAnalysis Phase
Analysis Phase
 
T24 Temenos Earned Value Management & Project Planning Presentation
T24 Temenos Earned Value Management & Project Planning PresentationT24 Temenos Earned Value Management & Project Planning Presentation
T24 Temenos Earned Value Management & Project Planning Presentation
 
CV Alan Leakey v9_3
CV Alan Leakey v9_3CV Alan Leakey v9_3
CV Alan Leakey v9_3
 
CHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docx
CHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docxCHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docx
CHAPTER 11 ManagingSystemsImplementationChapter 11 describ.docx
 
Project Success: The Basis of the Five Immutable Principles
Project Success: The Basis of the Five Immutable PrinciplesProject Success: The Basis of the Five Immutable Principles
Project Success: The Basis of the Five Immutable Principles
 
Difference Unified Processes
Difference Unified ProcessesDifference Unified Processes
Difference Unified Processes
 
Project charter and plan document for millennium upgrade
Project charter and plan document for millennium upgradeProject charter and plan document for millennium upgrade
Project charter and plan document for millennium upgrade
 
Kristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's SeatKristian Fischer - Put Test in the Driver's Seat
Kristian Fischer - Put Test in the Driver's Seat
 
Shivani_CV
Shivani_CVShivani_CV
Shivani_CV
 
Andrew Thomson Resume
Andrew Thomson ResumeAndrew Thomson Resume
Andrew Thomson Resume
 
An Overview of RUP methodology
An Overview of RUP methodologyAn Overview of RUP methodology
An Overview of RUP methodology
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 

More from NERUG

Jd edwards upgrade roundtable at innovate15 empire merchants case study
Jd edwards upgrade roundtable at innovate15 empire merchants case studyJd edwards upgrade roundtable at innovate15 empire merchants case study
Jd edwards upgrade roundtable at innovate15 empire merchants case studyNERUG
 
Sales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoft
Sales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoftSales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoft
Sales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoftNERUG
 
The Business Case for Hosting JD Edwards in the Cloud
The Business Case for Hosting JD Edwards in the CloudThe Business Case for Hosting JD Edwards in the Cloud
The Business Case for Hosting JD Edwards in the CloudNERUG
 
PM 201: Emotional Intelligence for Project Managers
PM 201: Emotional Intelligence for Project ManagersPM 201: Emotional Intelligence for Project Managers
PM 201: Emotional Intelligence for Project ManagersNERUG
 
Implementing Cloud Financials
Implementing Cloud FinancialsImplementing Cloud Financials
Implementing Cloud FinancialsNERUG
 
Implementation of eProfile and Benefits of using Talent Summary and Manager D...
Implementation of eProfile and Benefits of using Talent Summary and Manager D...Implementation of eProfile and Benefits of using Talent Summary and Manager D...
Implementation of eProfile and Benefits of using Talent Summary and Manager D...NERUG
 
Cool Functionality and Workarounds to Make Your Life Easier - JD Edwards World
Cool Functionality and Workarounds to Make Your Life Easier - JD Edwards WorldCool Functionality and Workarounds to Make Your Life Easier - JD Edwards World
Cool Functionality and Workarounds to Make Your Life Easier - JD Edwards WorldNERUG
 
Hosted FAH Integrated with PeopleSoft for Deferred Revenue Recognition
Hosted FAH Integrated with PeopleSoft for Deferred Revenue RecognitionHosted FAH Integrated with PeopleSoft for Deferred Revenue Recognition
Hosted FAH Integrated with PeopleSoft for Deferred Revenue RecognitionNERUG
 
JD Edwards Archiving and Upgrades - a Case Study from DBG
JD Edwards Archiving and Upgrades - a Case Study from DBGJD Edwards Archiving and Upgrades - a Case Study from DBG
JD Edwards Archiving and Upgrades - a Case Study from DBGNERUG
 
PeopleSoft Roadmap
PeopleSoft RoadmapPeopleSoft Roadmap
PeopleSoft RoadmapNERUG
 

More from NERUG (10)

Jd edwards upgrade roundtable at innovate15 empire merchants case study
Jd edwards upgrade roundtable at innovate15 empire merchants case studyJd edwards upgrade roundtable at innovate15 empire merchants case study
Jd edwards upgrade roundtable at innovate15 empire merchants case study
 
Sales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoft
Sales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoftSales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoft
Sales Tax Compliance within Oracle E-Business Suite / JD Edwards / PeopleSoft
 
The Business Case for Hosting JD Edwards in the Cloud
The Business Case for Hosting JD Edwards in the CloudThe Business Case for Hosting JD Edwards in the Cloud
The Business Case for Hosting JD Edwards in the Cloud
 
PM 201: Emotional Intelligence for Project Managers
PM 201: Emotional Intelligence for Project ManagersPM 201: Emotional Intelligence for Project Managers
PM 201: Emotional Intelligence for Project Managers
 
Implementing Cloud Financials
Implementing Cloud FinancialsImplementing Cloud Financials
Implementing Cloud Financials
 
Implementation of eProfile and Benefits of using Talent Summary and Manager D...
Implementation of eProfile and Benefits of using Talent Summary and Manager D...Implementation of eProfile and Benefits of using Talent Summary and Manager D...
Implementation of eProfile and Benefits of using Talent Summary and Manager D...
 
Cool Functionality and Workarounds to Make Your Life Easier - JD Edwards World
Cool Functionality and Workarounds to Make Your Life Easier - JD Edwards WorldCool Functionality and Workarounds to Make Your Life Easier - JD Edwards World
Cool Functionality and Workarounds to Make Your Life Easier - JD Edwards World
 
Hosted FAH Integrated with PeopleSoft for Deferred Revenue Recognition
Hosted FAH Integrated with PeopleSoft for Deferred Revenue RecognitionHosted FAH Integrated with PeopleSoft for Deferred Revenue Recognition
Hosted FAH Integrated with PeopleSoft for Deferred Revenue Recognition
 
JD Edwards Archiving and Upgrades - a Case Study from DBG
JD Edwards Archiving and Upgrades - a Case Study from DBGJD Edwards Archiving and Upgrades - a Case Study from DBG
JD Edwards Archiving and Upgrades - a Case Study from DBG
 
PeopleSoft Roadmap
PeopleSoft RoadmapPeopleSoft Roadmap
PeopleSoft Roadmap
 

Recently uploaded

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 

Recently uploaded (20)

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know from an Early Adopter

  • 1. Upgrading PeopleSoft Financials from 8.9 to 9.2 Advice You Need to Know from an Early Adopter Grant Chappell VNSNY– Director of Business Systems Michael Merrill Elire Partner & Strategic Roadmap Expert
  • 2. Introductions Michael Merrill Elire Partner & Strategic Roadmap Expert --16 years of PeopleSoft project management, implementation/upgrade stage lead, and module lead experience Grant Chappell VNSNY– Director of Business Systems
  • 3. VNSNY  Founded in 1893, the Visiting Nurse Service of New York (VNSNY) is the largest not- for-profit home- and community-based health care organization in the United States, serving the five boroughs of New York City and Nassau, Suffolk, and Westchester Counties, as well as parts of upstate New York  The Visiting Nurse Service of New York offers a wide range of home health care services, including medical nursing services, management of chronic conditions, and care to meet the needs of every generation, from at-risk infants to those at the end of life
  • 4. Project Summary  VNSNY was able to successfully upgrade GL, AM, AP, PO, and ePro from PeopleSoft version 8.9/PeopleTools 8.49 to 9.2/PeopleTools 8.53 in just 7.5 months using Oracle’s newly released 8.9 to 9.2 path  VNSNY had only a very lean team of internal and external functional/technical resources  VNSNY was also able to successfully maximize the use of a non-full time external PeopleSoft Admin/Upgrader resource
  • 5. Project Objectives  Pair Elire consultants with VNSNY staff so that VNSNY staff can expand their already solid knowledge base to include the new features and technologies of the 9.2 application/tools 8.53 release  Evaluate and analyze the many new features Oracle has added since version 8.9 which could result in  cost savings,  productivity gains, and/or  decreased error rates  Remove non-value add customizations  Improve service where appropriate and deliver increased end user value
  • 6. Project Methodology  The phases which represent key transition points in the project life cycle of our Elire Success DeliveredTM upgrade methodology are illustrated below
  • 8. Plan Phase  Elire and VNSNY used a series of well organized meetings and gate reviews to ensure entrance and exit criteria for the various phases are satisfied  Gate Kick Offs are critical parts of the Elire Success DeliveredTM methodology and were held at the beginning of key phases to allow for a detailed review of  Roles and responsibilities for the particular phase  Deliverables for the particular phase  Process flows and procedures for the particular phase
  • 10. Fit Gap  During Fit Gap we worked to understand the capacity the project could take on so that scope could be properly categorized into core and variable scope  Core Scope: Basics required to upgrade to 9.2 – the project’s primary goal  Variable Scope: Additional scope which would lead to an enhanced future state – things to tackle while “the hood is open” – which won’t jeopardize the project’s timeline and milestones
  • 11. Fit Gap  The following were reviewed, in a series of facilitated working sessions involving the Client IT and Business representatives to set the approved Project Scope  Current State  Although a formal Current State document was not produced, it was helpful to begin the facilitated Fit Gap sessions with a walk through of key business process to ensure all resources were on the same page prior to determining the Fit/Gap of that process  Compare Report Analysis  Determined which customizations would carry forward  New functionality or functionality that was previously available but unused  The first priority was high-impact features and functionality or low-hanging fruit: features that are easy to implement and do not fundamentally change established business processes
  • 12. Fit Gap  All details of the Analysis were compiled in a Solution Deliverable as shown in the below example for the New Features tab  Allowed for all Compare Report, New Feature, and Wish List/Work Request Enhancement details to be stored in one place  Captured overview information, priority, cost/benefit, and other pertinent information
  • 13. Fit Gap  Following the completion of the Fit Gap, leadership reviewed the following to determine the official project scope:  The business priority of all core and variable scope items  A high-level cost benefit analysis of all core and variable scope items  The project’s FTE capacity  The project milestones
  • 14. Reapplication / Configuration  Reapplication of existing customizations and development efforts were tracked via a Development Tracker
  • 16. Test Moves  The project used a series of Test Moves to perfect the upgrade process and build consensus for the production upgrade  The three major technical phases included:  The Initial Pass  The first pass was used to create the DEV environment  The Test Move to Production Passes  After completing the Initial Pass, the project conducted three Test Moves  With each iteration we perfected the process and prepared to go live  The Final Move to Production Pass  In the Final Move to Production Pass, the most recent successful output of the Test Move to Production Pass (generally UAT) was the Source
  • 17. Success Delivered The Elire project model for PeopleSoft upgrades works very well. The key components of the model are: high quality consultants, robust artifact requirements, well defined phase objectives and Elire senior leadership oversight. The Elire consultants were some of the best I have worked with, I would recommend them without reservation. The Elire documentation requirements and phase objectives complimented and supported each other. The Solutions Requirements Deliverable document was the bedrock of the project and used repeatedly by the team. All of the above comes together through the strong project oversight of Elire Senior leadership. Senior leadership set the stage for each project phase and constantly monitored progress/issues. In closing, I highly recommend Elire for PeopleSoft upgrades. –Grant Chappell, Director of Business Systems, Visiting Nurse Service of New York