case study
Carina & Gemini
The Carina and Gemini buildings in
the Central area of Milton Keynes were
built in the late 1960’s in the first wave
of building work for the New Town. The
buildings were in need of refurbishment.
25% of Carina and 75% of Gemini were
occupied. CBS were contracted to
refurbish the heating and air conditioning
in the unoccupied areas whilst keeping
the occupied areas running. In total, there
was 2160m2
of office space to refurbish.
By specifying the latest Mitsubishi VRF
equipment, the new system will allow
prospective tenants to keep the office space
as open plan or divide it into smaller offices.
In keeping with the Milton Keynes tradition,
the areas directly around the condensing
units are landscaped with heavy, mature
planting to reduce the visual impact of the
fifteen condensing units that were needed to
service the new buildings.
CBS were contracted to carry out a full
demolition of the inside of the building,
removing existing pipework, electrical cabling
and the heating system from the ceiling
voids. Ten forty foot roll-on roll-off skips were
filled with rubbish and another three of the
same size were filled with scrap metal. This
demolition work cleared the way for CBS and
the other trades to begin the new installation
work.
The new VRF system was designed to allow
each quarter section of the building to be
controlled independently. Each section has
it’s own dry riser cupboard for electrics and
room controls and a wet riser cupboard for
refrigeration pipework.
The environmental control is via a G50
Centralised Controller and each fan coil
unit associated with it can be controlled
independently from a touch screen.
Each quarter of the building has it’s own
Branch Controller which feeds four fan coil
units. The conditioned air is positively ducted
into four way diffusers from each fan coil unit.
The ceiling void acts as the return air plenum.
Fresh air is an important part of the system,
the design utilizes 9 Lossnay heat recovery
fresh air systems. There is one fresh air heat
exchanger for each quarter of the floor space.
Fresh air is fed into the return side of the fan
coil units.
One key element of the system design is the
ability to use “soft drawn” copper pipe for
the majority of the installation inside of the
buildings. Dave Boshier, Managing Director
of CBS “A system design incorporating soft
drawn copper pipe is a real benefit for us as
the installer and for the client as it means that
installations will proceed at a much higher
rate. There is no brazing involved, all of the
joints have flared connections. We have pipe
runs of over 15 meters with no joins. This
really minimises the risk of refrigerant leaks.”
Milton Keynes
In the 1960’s the government identified an
area of North Buckinghamshire as a possible
site for a large new town. The New Town
encompassed the existing towns of Bletchley,
Stony Stratford and Wolverton. The New
Town took its name from the village of Milton
Keynes located on the site. In 1967 building
began and the New Town of Milton Keynes
was born. The population is currently around
275,000.
Installation
complete Refit of the HVAC systems
“CBS came up with innovative
solutions to the challenges faced
in these buildings, meaning that
the work was completed faster and
at a lower cost, I would thoroughly
recommend them.”
Steve Coull
Sales Director
Astra Office Interiors
Local.
Dependable.
Professional.
Leak checking/
sanitising the
condensate lines prior
to commissioning
A unit being
commissioned and the
louvers being put back
in place
One of the three
condenser enclosures
for the building
Comfort Building Services are based in Basingstoke
and operate within a radius of approximately 100
miles. CBS employ a crew of engineers who’s
combined skills cover all areas of building services.
Investors in People
Active participants of the Investors in People
programme and with the policy of developing their
own engineers CBS operate an apprentice-training
programme in conjunction with the local colleges.
Gas Safe, HVCA, NICEIC
In accordance with the requirements of their trades
CBS engineers hold the relevant professional
qualifications.
Comfort Building Services Ltd Sterling House
Stroudley Road, Basingstoke, Hampshire, RG24 8UG
T: 01256 842500 F: 01256 814661,
www.cbsuk.com, enquiries@cbsuk.com
Project Data
Category	 Installation
Description	 Replacement of the entire 	
	 heating, ventilation & air
	 conditioning system 		
	 during a complete refit
Timescale	 4 Months
Value	 £500,000 - 750,000
Services
- Decommissioning
- Equipment Installation
- Commissioning
- Landscaping condenser enclosures
4593

More Related Content

Similar to Carina & Gemini Case Study[1]

Schiedel Commercial Brochure
Schiedel Commercial BrochureSchiedel Commercial Brochure
Schiedel Commercial BrochureSchiedel UK
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016Steve Edgson
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDYPaul Harrison
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects BrochureSteven MacDonald
 
223 Williams St ANCR Article
223 Williams St ANCR Article223 Williams St ANCR Article
223 Williams St ANCR ArticlePaul Saly
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014GWT
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from DribuildMichael McVey
 
MKUH Project Fact Sheet X-Ray room 3 & 4
MKUH Project Fact Sheet X-Ray room 3 & 4MKUH Project Fact Sheet X-Ray room 3 & 4
MKUH Project Fact Sheet X-Ray room 3 & 4Alessandro Annunziata
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Centeraiahouston
 
Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...
Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...
Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...SustainableEnergyAut
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetDeanDallwitz
 
The Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFThe Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFManan Sethi
 
CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015Steve kelly
 
CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015Faye Savill
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EBArn Akbarieh
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between SystemsVictor Ashkenazy
 
the bloomberg office headquarters in London.pptx
the bloomberg office headquarters in London.pptxthe bloomberg office headquarters in London.pptx
the bloomberg office headquarters in London.pptxumerufitti
 

Similar to Carina & Gemini Case Study[1] (20)

Guys Hospital[1]
Guys Hospital[1]Guys Hospital[1]
Guys Hospital[1]
 
Schiedel Commercial Brochure
Schiedel Commercial BrochureSchiedel Commercial Brochure
Schiedel Commercial Brochure
 
ICE Case Study 2016
ICE Case Study 2016ICE Case Study 2016
ICE Case Study 2016
 
Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
Citigroup clayco
Citigroup claycoCitigroup clayco
Citigroup clayco
 
223 Williams St ANCR Article
223 Williams St ANCR Article223 Williams St ANCR Article
223 Williams St ANCR Article
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
Office fit out from Dribuild
Office fit out from DribuildOffice fit out from Dribuild
Office fit out from Dribuild
 
MKUH Project Fact Sheet X-Ray room 3 & 4
MKUH Project Fact Sheet X-Ray room 3 & 4MKUH Project Fact Sheet X-Ray room 3 & 4
MKUH Project Fact Sheet X-Ray room 3 & 4
 
COH Permitting Center
COH Permitting CenterCOH Permitting Center
COH Permitting Center
 
Lms
LmsLms
Lms
 
Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...
Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...
Energy Show 2022 - Opportunities and Challenges to Upgrades in the Commercial...
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact Sheet
 
The Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFThe Advanced Facade Technology – CCF
The Advanced Facade Technology – CCF
 
CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015
 
CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015CS GROUP BROCHURE 2015
CS GROUP BROCHURE 2015
 
LEED_NC and LEED_EB
LEED_NC and LEED_EBLEED_NC and LEED_EB
LEED_NC and LEED_EB
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
 
the bloomberg office headquarters in London.pptx
the bloomberg office headquarters in London.pptxthe bloomberg office headquarters in London.pptx
the bloomberg office headquarters in London.pptx
 

Carina & Gemini Case Study[1]

  • 1. case study Carina & Gemini The Carina and Gemini buildings in the Central area of Milton Keynes were built in the late 1960’s in the first wave of building work for the New Town. The buildings were in need of refurbishment. 25% of Carina and 75% of Gemini were occupied. CBS were contracted to refurbish the heating and air conditioning in the unoccupied areas whilst keeping the occupied areas running. In total, there was 2160m2 of office space to refurbish. By specifying the latest Mitsubishi VRF equipment, the new system will allow prospective tenants to keep the office space as open plan or divide it into smaller offices. In keeping with the Milton Keynes tradition, the areas directly around the condensing units are landscaped with heavy, mature planting to reduce the visual impact of the fifteen condensing units that were needed to service the new buildings. CBS were contracted to carry out a full demolition of the inside of the building, removing existing pipework, electrical cabling and the heating system from the ceiling voids. Ten forty foot roll-on roll-off skips were filled with rubbish and another three of the same size were filled with scrap metal. This demolition work cleared the way for CBS and the other trades to begin the new installation work. The new VRF system was designed to allow each quarter section of the building to be controlled independently. Each section has it’s own dry riser cupboard for electrics and room controls and a wet riser cupboard for refrigeration pipework. The environmental control is via a G50 Centralised Controller and each fan coil unit associated with it can be controlled independently from a touch screen. Each quarter of the building has it’s own Branch Controller which feeds four fan coil units. The conditioned air is positively ducted into four way diffusers from each fan coil unit. The ceiling void acts as the return air plenum. Fresh air is an important part of the system, the design utilizes 9 Lossnay heat recovery fresh air systems. There is one fresh air heat exchanger for each quarter of the floor space. Fresh air is fed into the return side of the fan coil units. One key element of the system design is the ability to use “soft drawn” copper pipe for the majority of the installation inside of the buildings. Dave Boshier, Managing Director of CBS “A system design incorporating soft drawn copper pipe is a real benefit for us as the installer and for the client as it means that installations will proceed at a much higher rate. There is no brazing involved, all of the joints have flared connections. We have pipe runs of over 15 meters with no joins. This really minimises the risk of refrigerant leaks.” Milton Keynes In the 1960’s the government identified an area of North Buckinghamshire as a possible site for a large new town. The New Town encompassed the existing towns of Bletchley, Stony Stratford and Wolverton. The New Town took its name from the village of Milton Keynes located on the site. In 1967 building began and the New Town of Milton Keynes was born. The population is currently around 275,000. Installation complete Refit of the HVAC systems
  • 2. “CBS came up with innovative solutions to the challenges faced in these buildings, meaning that the work was completed faster and at a lower cost, I would thoroughly recommend them.” Steve Coull Sales Director Astra Office Interiors Local. Dependable. Professional. Leak checking/ sanitising the condensate lines prior to commissioning A unit being commissioned and the louvers being put back in place One of the three condenser enclosures for the building Comfort Building Services are based in Basingstoke and operate within a radius of approximately 100 miles. CBS employ a crew of engineers who’s combined skills cover all areas of building services. Investors in People Active participants of the Investors in People programme and with the policy of developing their own engineers CBS operate an apprentice-training programme in conjunction with the local colleges. Gas Safe, HVCA, NICEIC In accordance with the requirements of their trades CBS engineers hold the relevant professional qualifications. Comfort Building Services Ltd Sterling House Stroudley Road, Basingstoke, Hampshire, RG24 8UG T: 01256 842500 F: 01256 814661, www.cbsuk.com, enquiries@cbsuk.com Project Data Category Installation Description Replacement of the entire heating, ventilation & air conditioning system during a complete refit Timescale 4 Months Value £500,000 - 750,000 Services - Decommissioning - Equipment Installation - Commissioning - Landscaping condenser enclosures 4593