SlideShare a Scribd company logo
A PRESENTATION ON -
AUTOMATED ELEVATOR WITH OVERLOAD ALERT
DEPARTMENT OF ELECTRONICS AND INSTRUMENTATION
PRESENTED BY – HARSH
SHUKLA 2000520320026
GROUP NO – 14
GUIDED BY –
ER.PRIYANKA
WHAT
MOTIVATES ME
?
ABLE TO -
SAVE LIFE'S FROM ELEVATOR ACCIDENTS.
CREATE HASSLE FREE ENVIRONMENT.
OVERCOME THE FEAR OF ELEVATOR
WORK FAST
PROBLEMS
WITH OVERLOADED ELEVATORS
 lead the elevator to stop working especially in the elevators that contain an overload sensor.
 can pose a danger to passengers
 can cause additional stress to the worn rope and damaged parts
 More than 53% of elevator-related deaths were from falls.
SOLUTION
AUTOMATED ELEVATOR WITH OVERLOAD
ALERT
This system helps to indicate limit of an elevator, which is how many people can be inside an elevator at a
particular time.
Automated Elevator With Overload Alert
COMPONENTS REQUIRED:-
8051 series Microcontroller
Transistor
Door
Voltage Regulator
IR Receivers
LED
Push Button
Diodes
IR LED’s
7- Segment Displays
555 Timers
Automated Elevator With Overload Alert
OBJECTIVE :-
 To avoid the inconvenience caused by elevator breakdowns, this project is gaining widespread
attention.
 The main target of the automated elevated with overload alert system to prevent elevator from damage
 to ensure a speed that is within the limits of safety and minimalizes the time travel and also provides
comfort to the passengers.
 using a 7-segment display to disclose the number of people present inside of the elevator
 Infra- Red sensor pairs are placed near the lifts door that sense a person entering or leaving the lift.
 THE SIMULATION FOR THIS SYSTEM HAS BEEN DONE USING KEIL UVISION4 AND PROTEUS SOFTWARE.
 THE CODING WAS WRITTEN AND DEBUGGED USING KEIL UVISION4 WHILE THE SIMULATION WAS DONE USING
PROTEUS.
 USING THE KEIL UVISION4 SOFTWARE, THE CODING WAS CONVERTED TO .HEX FILE AFTER DEBUGGED.
 THIS .HEX FILE WAS THEN USED FOR THE MICROCONTROLLER SIMULATION IN PROTEUS.
 THE PHYSICAL IMPLEMENTATION OF THIS LAB WAS DONE BY FIRSTLY CONNECTING THE CIRCUIT OF THE SYSTEM
ON THE BREADBOARD. THE CONNECTION IS AS SHOWN
SOFTWARE REQUIRED
Automated
Elevator
With Overload
Alert
BLOCK DIAGRAM :-
FLOW CHART AND METHODOLOGY
The system
displays the
number of
people
inside an
elevator with
the help of 7
segment
display
Each pair
consists of 2
sensor pairs
placed at a
certain
distance
from one
another in
the opposite
direction
The system
includes
Infrared
Sensor pairs
which are
placed near
the elevator
door
These
sensors
senses when
a person
enters an
elevator and
it opens the
door of the
elevator and
simultaneou
sly
increments
the counter
for the
number of
people
entering the
elevator
The IR
transmitter
is used to
transmit IR
rays straight
to the
receiver
which
receives the
input and
feeds this to
an 8051
Microcontrol
leR
The
microcontrol
ler process
this input
received
The system
even
includes a
buzzer for
demonstrati
ng an alarm.
The buzzer
starts
ringing as
soon as
more
number of
people
enters the
elevator
than the
limit of the
elevator
This will
cause the
counter to
be
decremente
d and the
buzzer stops
ringing as
soon as the
counter is
less or equal
to the limit
of the
elevator set.
RESULTS
 THIS MODEL IS A USER FRIENDLY AS WELL AS DOES NOT REQUIRE MANUAL SUPERVISION SINCE A COUNT IS ALREADY PROVIDED EACH TIME THE
ELEVATOR OPERATES.
 AFTER THE TWO STAGES OF TESTING THE ELEVATOR SYSTEM WHICH ARE SIMULATION AND IMPLEMENTATION OF HARDWARE, IT IS SATISFIED TO
SAY THAT THE RESULTS ARE AT ITS EXPECTED BECAUSE THEY ARE CONSISTENT WITH EACH OTHER
 THE CONNECTION ON THE BREADBOARD IS ALSO AN IMPORTANT THING TO HIGHLIGHT. IT IS A MUST TO DOUBLE CHECK THE CONNECTION
BEFORE SUPPLYING A POWER SUPPLY.
 THIS IS BECAUSE SOME CONNECTION MIGHT BECOME LOOSE OR IN TOUCH WITH EACH OTHER THIS MODEL IS A USER FRIENDLY AS WELL AS DOES
NOT REQUIRE MANUAL SUPERVISION SINCE A COUNT IS ALREADY PROVIDED EACH TIME THE ELEVATOR OPERATES.
CONCLUSION
 IN CONCLUSION, THE RISE OF TALL BUILDINGS HAS LED TO THE INCREASE IN DEMAND FOR MORE SOPHISTICATED
ELEVATORS, THEREFORE ELEVATOR DISPATCH SYSTEMS ARE BEING CONTINUOUSLY IMPROVED AND ARE FOREVER
CHANGING.
 ADDITIONALLY, THE DISPATCH SYSTEMS AIM AT ERADICATING CROWDS AT PEAK TRAFFIC PERIODS WITHIN BUILDINGS
AND AT CONSTANTLY DEVELOPING NEW DISPATCH SYSTEM THAT CAN OVERCOME THESE PROBLEMS.
 ONE WAY TO ACHIEVE THIS IS BY GROUPING PEOPLE BASED ON THEIR DESTINATIONS. ASSIGNING ELEVATORS TO
SPECIFIC FLOORS WILL ALSO REDUCE CROWDS AND AVOID INSTANCES OF OVERLAPPING ELEVATORS.
 THE PROPOSED SCHEME IS IMPLEMENTED AND TESTING OF THE ALGORITHM (PROGRAM) ON THE MODEL IS USED TO
VALIDATE THE EFFICIENCY ON THE MICROCONTROLLER.
 TO CONCLUDE WE HAVE DESIGNED AND IMPLEMENTED A PROTOTYPE ELEVATOR AND ITS CONTROL SYSTEMS USING
A VERY LOW COST MICROCONTROLLER BASED CIRCUIT
REFERENCES
[1] ÁKOS BECKER, DEPARTMENT OF ELECTRONICS TECHNOLOGY, BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS, BUDAPEST,
HUNGARY
[2] CHEAH, SIEW HOON (2006) MICROCONTROLLER BASED LIFT CONTROL SYSTEM. FACULTY OF ELECTRICAL & ELECTRONIC ENGINEERING,
UNIVERSITY MALAYSIA PAHANG.
[3] POORVI BEHRE, VIVEKA NEMA, AND BHUPENDRA BADONIYA, CONGESTION-FREE ELEVATOR CONTROL USING MICROCONTROLLER,
INTERNATIONAL JOURNAL OF SCIENTIFIC & ENGINEERING RESEARCH VOLUME 4, ISSUE 1, JANUARY-2013 1, ISSN 2229-5518.
[4] MUHIBUL HAQUE BHUYAN, MD. MAIDUL HAQUE, M. ABDUR RAUF AND MD. MAZHARUL ISLAM KHAN DEPARTMENT OF ELECTRICAL AND
ELECTRONIC ENGINEERING DAFFODIL INTERNATIONAL UNIVERSITY, SHUKRABAD, DHAKA, BANGLADESH DEPARTMENT OF

More Related Content

Similar to PROJECT PPT.pptx

K10888 ramratan malav (mechanical measurement & control theory,application)
K10888 ramratan malav (mechanical measurement & control theory,application)K10888 ramratan malav (mechanical measurement & control theory,application)
K10888 ramratan malav (mechanical measurement & control theory,application)
9672269693
 
Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
ASWATHY VG
 
Real-time monitoring of tower cranes
Real-time monitoring of tower cranesReal-time monitoring of tower cranes
Real-time monitoring of tower cranes
Maher Nadar
 
Surveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnelsSurveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnels
Sutikno Simanjuntak
 

Similar to PROJECT PPT.pptx (20)

Me303_Automatic Car Washing Machine (1).pptx
Me303_Automatic Car Washing Machine (1).pptxMe303_Automatic Car Washing Machine (1).pptx
Me303_Automatic Car Washing Machine (1).pptx
 
A novel approach of lift control in automatic car parking using plc
A novel approach of lift control in automatic car parking using plcA novel approach of lift control in automatic car parking using plc
A novel approach of lift control in automatic car parking using plc
 
VRM Online Support | Solution Far Beyond Classical Condition Monitoring
VRM Online Support | Solution Far Beyond Classical Condition MonitoringVRM Online Support | Solution Far Beyond Classical Condition Monitoring
VRM Online Support | Solution Far Beyond Classical Condition Monitoring
 
PLC 5.pdf
PLC 5.pdfPLC 5.pdf
PLC 5.pdf
 
Contigency analysis and security system taking different cases
Contigency analysis  and security system taking different casesContigency analysis  and security system taking different cases
Contigency analysis and security system taking different cases
 
ITGP15.pptx
ITGP15.pptxITGP15.pptx
ITGP15.pptx
 
K10888 ramratan malav (mechanical measurement & control theory,application)
K10888 ramratan malav (mechanical measurement & control theory,application)K10888 ramratan malav (mechanical measurement & control theory,application)
K10888 ramratan malav (mechanical measurement & control theory,application)
 
Nabil slide fyp1 new
Nabil slide fyp1 newNabil slide fyp1 new
Nabil slide fyp1 new
 
A novel signaling system for better railway network management
A novel signaling system for better railway network managementA novel signaling system for better railway network management
A novel signaling system for better railway network management
 
VTME ELEVATOR CONSULTANTS Emergency operations ew nov14
VTME ELEVATOR CONSULTANTS Emergency operations ew nov14VTME ELEVATOR CONSULTANTS Emergency operations ew nov14
VTME ELEVATOR CONSULTANTS Emergency operations ew nov14
 
Esert the complete system design to make railway traffic effective, safer a...
Esert   the complete system design to make railway traffic effective, safer a...Esert   the complete system design to make railway traffic effective, safer a...
Esert the complete system design to make railway traffic effective, safer a...
 
1986 Multilevel Constraint-Based Configuration Article
1986 Multilevel Constraint-Based Configuration Article1986 Multilevel Constraint-Based Configuration Article
1986 Multilevel Constraint-Based Configuration Article
 
Project report for railway security monotorin system
Project report for railway security monotorin systemProject report for railway security monotorin system
Project report for railway security monotorin system
 
Intelligent transport systems
Intelligent  transport systemsIntelligent  transport systems
Intelligent transport systems
 
Transformer
TransformerTransformer
Transformer
 
Real-time monitoring of tower cranes
Real-time monitoring of tower cranesReal-time monitoring of tower cranes
Real-time monitoring of tower cranes
 
Surveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnelsSurveillance and control systems for highway tunnels
Surveillance and control systems for highway tunnels
 
Need for platform-to-track intrusion detection systems in automated metro lines
Need for platform-to-track intrusion detection systems in automated metro linesNeed for platform-to-track intrusion detection systems in automated metro lines
Need for platform-to-track intrusion detection systems in automated metro lines
 
TPMS- Theft Prevention Management System
TPMS- Theft Prevention Management SystemTPMS- Theft Prevention Management System
TPMS- Theft Prevention Management System
 
2-03.pdf
2-03.pdf2-03.pdf
2-03.pdf
 

Recently uploaded

Article writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptxArticle writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptx
abhinandnam9997
 
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
aagad
 
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkkaudience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
lolsDocherty
 
Production 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptxProduction 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptx
ChloeMeadows1
 

Recently uploaded (14)

Bug Bounty Blueprint : A Beginner's Guide
Bug Bounty Blueprint : A Beginner's GuideBug Bounty Blueprint : A Beginner's Guide
Bug Bounty Blueprint : A Beginner's Guide
 
Case study on merger of Vodafone and Idea (VI).pptx
Case study on merger of Vodafone and Idea (VI).pptxCase study on merger of Vodafone and Idea (VI).pptx
Case study on merger of Vodafone and Idea (VI).pptx
 
Statistical Analysis of DNS Latencies.pdf
Statistical Analysis of DNS Latencies.pdfStatistical Analysis of DNS Latencies.pdf
Statistical Analysis of DNS Latencies.pdf
 
Article writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptxArticle writing on excessive use of internet.pptx
Article writing on excessive use of internet.pptx
 
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
一比一原版UTS毕业证悉尼科技大学毕业证成绩单如何办理
 
ER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAEER(Entity Relationship) Diagram for online shopping - TAE
ER(Entity Relationship) Diagram for online shopping - TAE
 
Cyber Security Services Unveiled: Strategies to Secure Your Digital Presence
Cyber Security Services Unveiled: Strategies to Secure Your Digital PresenceCyber Security Services Unveiled: Strategies to Secure Your Digital Presence
Cyber Security Services Unveiled: Strategies to Secure Your Digital Presence
 
How Do I Begin the Linksys Velop Setup Process?
How Do I Begin the Linksys Velop Setup Process?How Do I Begin the Linksys Velop Setup Process?
How Do I Begin the Linksys Velop Setup Process?
 
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkkaudience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
audience research (emma) 1.pptxkkkkkkkkkkkkkkkkk
 
Production 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptxProduction 2024 sunderland culture final - Copy.pptx
Production 2024 sunderland culture final - Copy.pptx
 
Premier Mobile App Development Agency in USA.pdf
Premier Mobile App Development Agency in USA.pdfPremier Mobile App Development Agency in USA.pdf
Premier Mobile App Development Agency in USA.pdf
 
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and GuidelinesMulti-cluster Kubernetes Networking- Patterns, Projects and Guidelines
Multi-cluster Kubernetes Networking- Patterns, Projects and Guidelines
 
The Use of AI in Indonesia Election 2024: A Case Study
The Use of AI in Indonesia Election 2024: A Case StudyThe Use of AI in Indonesia Election 2024: A Case Study
The Use of AI in Indonesia Election 2024: A Case Study
 
Pvtaan Social media marketing proposal.pdf
Pvtaan Social media marketing proposal.pdfPvtaan Social media marketing proposal.pdf
Pvtaan Social media marketing proposal.pdf
 

PROJECT PPT.pptx

  • 1. A PRESENTATION ON - AUTOMATED ELEVATOR WITH OVERLOAD ALERT DEPARTMENT OF ELECTRONICS AND INSTRUMENTATION PRESENTED BY – HARSH SHUKLA 2000520320026 GROUP NO – 14 GUIDED BY – ER.PRIYANKA
  • 2. WHAT MOTIVATES ME ? ABLE TO - SAVE LIFE'S FROM ELEVATOR ACCIDENTS. CREATE HASSLE FREE ENVIRONMENT. OVERCOME THE FEAR OF ELEVATOR WORK FAST
  • 3. PROBLEMS WITH OVERLOADED ELEVATORS  lead the elevator to stop working especially in the elevators that contain an overload sensor.  can pose a danger to passengers  can cause additional stress to the worn rope and damaged parts  More than 53% of elevator-related deaths were from falls.
  • 4. SOLUTION AUTOMATED ELEVATOR WITH OVERLOAD ALERT This system helps to indicate limit of an elevator, which is how many people can be inside an elevator at a particular time.
  • 5. Automated Elevator With Overload Alert COMPONENTS REQUIRED:- 8051 series Microcontroller Transistor Door Voltage Regulator IR Receivers LED Push Button Diodes IR LED’s 7- Segment Displays 555 Timers
  • 6. Automated Elevator With Overload Alert OBJECTIVE :-  To avoid the inconvenience caused by elevator breakdowns, this project is gaining widespread attention.  The main target of the automated elevated with overload alert system to prevent elevator from damage  to ensure a speed that is within the limits of safety and minimalizes the time travel and also provides comfort to the passengers.  using a 7-segment display to disclose the number of people present inside of the elevator  Infra- Red sensor pairs are placed near the lifts door that sense a person entering or leaving the lift.
  • 7.  THE SIMULATION FOR THIS SYSTEM HAS BEEN DONE USING KEIL UVISION4 AND PROTEUS SOFTWARE.  THE CODING WAS WRITTEN AND DEBUGGED USING KEIL UVISION4 WHILE THE SIMULATION WAS DONE USING PROTEUS.  USING THE KEIL UVISION4 SOFTWARE, THE CODING WAS CONVERTED TO .HEX FILE AFTER DEBUGGED.  THIS .HEX FILE WAS THEN USED FOR THE MICROCONTROLLER SIMULATION IN PROTEUS.  THE PHYSICAL IMPLEMENTATION OF THIS LAB WAS DONE BY FIRSTLY CONNECTING THE CIRCUIT OF THE SYSTEM ON THE BREADBOARD. THE CONNECTION IS AS SHOWN SOFTWARE REQUIRED
  • 9. FLOW CHART AND METHODOLOGY The system displays the number of people inside an elevator with the help of 7 segment display Each pair consists of 2 sensor pairs placed at a certain distance from one another in the opposite direction The system includes Infrared Sensor pairs which are placed near the elevator door These sensors senses when a person enters an elevator and it opens the door of the elevator and simultaneou sly increments the counter for the number of people entering the elevator The IR transmitter is used to transmit IR rays straight to the receiver which receives the input and feeds this to an 8051 Microcontrol leR The microcontrol ler process this input received The system even includes a buzzer for demonstrati ng an alarm. The buzzer starts ringing as soon as more number of people enters the elevator than the limit of the elevator This will cause the counter to be decremente d and the buzzer stops ringing as soon as the counter is less or equal to the limit of the elevator set.
  • 10. RESULTS  THIS MODEL IS A USER FRIENDLY AS WELL AS DOES NOT REQUIRE MANUAL SUPERVISION SINCE A COUNT IS ALREADY PROVIDED EACH TIME THE ELEVATOR OPERATES.  AFTER THE TWO STAGES OF TESTING THE ELEVATOR SYSTEM WHICH ARE SIMULATION AND IMPLEMENTATION OF HARDWARE, IT IS SATISFIED TO SAY THAT THE RESULTS ARE AT ITS EXPECTED BECAUSE THEY ARE CONSISTENT WITH EACH OTHER  THE CONNECTION ON THE BREADBOARD IS ALSO AN IMPORTANT THING TO HIGHLIGHT. IT IS A MUST TO DOUBLE CHECK THE CONNECTION BEFORE SUPPLYING A POWER SUPPLY.  THIS IS BECAUSE SOME CONNECTION MIGHT BECOME LOOSE OR IN TOUCH WITH EACH OTHER THIS MODEL IS A USER FRIENDLY AS WELL AS DOES NOT REQUIRE MANUAL SUPERVISION SINCE A COUNT IS ALREADY PROVIDED EACH TIME THE ELEVATOR OPERATES.
  • 11. CONCLUSION  IN CONCLUSION, THE RISE OF TALL BUILDINGS HAS LED TO THE INCREASE IN DEMAND FOR MORE SOPHISTICATED ELEVATORS, THEREFORE ELEVATOR DISPATCH SYSTEMS ARE BEING CONTINUOUSLY IMPROVED AND ARE FOREVER CHANGING.  ADDITIONALLY, THE DISPATCH SYSTEMS AIM AT ERADICATING CROWDS AT PEAK TRAFFIC PERIODS WITHIN BUILDINGS AND AT CONSTANTLY DEVELOPING NEW DISPATCH SYSTEM THAT CAN OVERCOME THESE PROBLEMS.  ONE WAY TO ACHIEVE THIS IS BY GROUPING PEOPLE BASED ON THEIR DESTINATIONS. ASSIGNING ELEVATORS TO SPECIFIC FLOORS WILL ALSO REDUCE CROWDS AND AVOID INSTANCES OF OVERLAPPING ELEVATORS.  THE PROPOSED SCHEME IS IMPLEMENTED AND TESTING OF THE ALGORITHM (PROGRAM) ON THE MODEL IS USED TO VALIDATE THE EFFICIENCY ON THE MICROCONTROLLER.  TO CONCLUDE WE HAVE DESIGNED AND IMPLEMENTED A PROTOTYPE ELEVATOR AND ITS CONTROL SYSTEMS USING A VERY LOW COST MICROCONTROLLER BASED CIRCUIT
  • 12. REFERENCES [1] ÁKOS BECKER, DEPARTMENT OF ELECTRONICS TECHNOLOGY, BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS, BUDAPEST, HUNGARY [2] CHEAH, SIEW HOON (2006) MICROCONTROLLER BASED LIFT CONTROL SYSTEM. FACULTY OF ELECTRICAL & ELECTRONIC ENGINEERING, UNIVERSITY MALAYSIA PAHANG. [3] POORVI BEHRE, VIVEKA NEMA, AND BHUPENDRA BADONIYA, CONGESTION-FREE ELEVATOR CONTROL USING MICROCONTROLLER, INTERNATIONAL JOURNAL OF SCIENTIFIC & ENGINEERING RESEARCH VOLUME 4, ISSUE 1, JANUARY-2013 1, ISSN 2229-5518. [4] MUHIBUL HAQUE BHUYAN, MD. MAIDUL HAQUE, M. ABDUR RAUF AND MD. MAZHARUL ISLAM KHAN DEPARTMENT OF ELECTRICAL AND ELECTRONIC ENGINEERING DAFFODIL INTERNATIONAL UNIVERSITY, SHUKRABAD, DHAKA, BANGLADESH DEPARTMENT OF