Objective:
Student should be able to
Measure the shear strength parameters using the
tri-axial test.
Theory
When conducting site investigations for buildings, in
most circumstances short term stability will be the most
critical. Therefore this document will deal only with the
determination of total shear strength parameters of
cohesive soils using, Unconsolidated Undrained Tests.
There may be instances where effective shear strength
parameters are required, and they would require other
forms of tests such as Consolidated Undrained or
Drained. Determination of those parameters will be
dealt with in the proposed Sri Lankan standard on
laboratory testing of soils.
Specimens used for the test are of cylindrical shape and
should be undisturbed. Specimen is subjected to a
confining fluid pressure in a tri-axial chamber and axial
load (deviator load) is applied in a strain controlled or
stress controlled manner. In all stages of the test
untrained conditions are maintained without allowing
for any pore water pressure dissipation. Method does
not generally measure pore water pressures and
parameters determined are therefore in terms of total
stresses.
Determine the applied failure load Pa,f for each
specimen tested. The applied failure load is defined as
the maximum applied load during the test. Calculate the
applied failure stress σa,f :
equipment
Equipment

Function
An apparatus shall be provided to keep the cylindrical soil
specimen, enclosed by a rubber
membrane sealed to the specimen cap and base, under the
applied chamber pressure. The apparatus shall include a
bushing and piston aligned with the axis of the specimen.
Axial load is applied to the specimen through this system and
friction in the system should be minimized

Triaxial Compression Chamber
There shall be a system capable of applying and maintaining
the chamber pressure constant at the desired value (within 10
kPa) throughout the test. This device is connected to the
triaxial chamber through pressure control devices. Pressure
may be applied through hydraulic pressure system or by
compressed air.
Chamber Pressure Application
device

Axial Loading Device

Specimen cap and base

Rubber Membranes,
Membrane stretcher and 0 rings

There shall be a device to provide the axial load in a specified
controlled manner at the desired rate.It should have a
sufficient loading capacity and should be free from vibrations.
It may be a by a screw jack driven by an electric motor
through geared transmission, a hydraulic pneumatic loading
device or any other suitable device. If it is a strain controlled
device it should be capable of providing rates within 0.05
mm/min to 10 mm/min.
There should be an impermeable, rigid cap and base to prevent
drainage of the specimen. Both the cap and base should have a
plane surface of contact and a circular cross section of
diameter equal to that of the specimen. The specimen base
should be coupled to the tri-axial chamber base to prevent any
lateral motion or tilting. The specimen cap should be designed
to receive the piston such that the piston to cap contact area is
concentric with the cap. A hole shall be made on top of the
cap to receive the piston. The weight of the cap shall be less
than 0.5% of the anticipated applied axial load at failure.
Rubber membranes should be used to encase the specimen to
provide reliable protection against leakage. Membranes should
be carefully inspected prior to use, and those with any flaws or
pinholes should be discarded. The membrane thickness shall
not exceed 1 % of the diameter of the specimen. The
upstretched membrane diameter shall be between 75% and
90% of the specimen diameter. The membrane shall be sealed
to the specimen base and cap with rubber 0 - rings with
diameter less than 75% of the specimen diameter. There shall
be a membrane stretcher to suit the size of the specimen.
procedures:
Preparation of the Sample
Specimens used for the test shall be undisturbed. They should
be of a minimum diameter 33 mm and a have a length/diameter
ratio between 2 and 3. Specimen should be weighed to the
nearest 0.01 g prior to the testing.Specimens should be handled
very carefully to minimize disturbance, change cross section or
loss of moisture. Specimens shall be uniform circular cross
section with ends perpendicular to the axis of the specimen. If
excessive irregularities are present at the ends due to crumbling,
crushing or pebbles, ends may be packed with soil from the
trimmings to produce the desired surface. Weight of the
specimen should be determined and encased by the membrane
and sealed to the specimen base and cap immediately after the
preparation, with the help of 0 rings.
Procedure of Testing
Tri-axial chamber shall be assembled with the specimen
encased in rubber membrane, and sealed to the specimen cap
and base and kept in position. Axial load piston should be
brought to contact with the specimen cap and proper seating
should be provided. When dealing with soft soils special care
must be taken not to overload the specimen with the weight of
the piston. Chamber shall be filled with the confining fluid
(usually water) and placed in position in the axial loading
device. Special care should be taken in aligning the axial load
device, the axial load measuring device and the tri-axial
chamber to prevent application of lateral force to the
pistonduring testing.
Thereafter the chamber pressure maintaining and measuring
device shall be attached and adjusted to provide the desired
chamber pressure.
Axial load measuring device is usually located outside the triaxial chamber and chamber pressure will produce an upward
force on the piston that will react against the axial loading
device. In this case axial load measuring device should be
adjusted to read zero prior to the application of the deviator
load.
Data and analysis

Specimen calculation
Applied cell pressure = 100 KN/m2
Axial deformation dial reading = 75
Axial deformation = 75 x 0.001 x 25.4= 1.905 mm
Axial strain = 0.022411
Deviator Load = 58 x 1.828 = 106.024 N
Deviator Stress = 106.024 / (1000 x 0.00115953) = 91.44 kN / m2
Discussion
 We were supposed to test three samples, but because of obstacles we faced
such as broken membrane, we could only do one sample.
That was ok, as we applied the Q-Test where the shear failure envelope is
straight horizontal line.

 There is no drainage. Thus the test is done under constant volume
conditions.
 The axial load may be applied at the desired strain rate,
approximately 10 min after the application of chamber pressure.
Proving ring readings should be recorded for intervals of axial
deformation. Sufficient readings should be taken to capture the
stress-strain curve. Thus more frequent reading are required, at the
initial stages to capture the initial stiff part of the curve and also as
the failure approaches to capture the failure point. If the sample has
not failed showing a reduction in the deviator load, loading shall be
continued to 15% strain. If the residual strengths are required test
may be continued further.
Conclusion

At the end of the test specimen shall be taken out, failure
patterns may be noted and moisture contentof the sample
should be determined. Test should be performed on at
least two other identical samples at different chamber
pressures to construct the failure envelope and to
determine the shear strength parameters
reference
1. Norliza Muhammad, mechanic laboratory,(2006). Gradation Test. (2007),
Norliza Muhammad, FajarBaktiSdn. Bhd.
2. M.S. Mamlouk and J.P. Zaniewski, mechanic of structur Engineers, 1999,
Addison-Wesley, Menlo Park CA

More Related Content

What's hot

1-D Consolidation Test
1-D Consolidation Test1-D Consolidation Test
1-D Consolidation Test
A K
 
Density, (relative density) specific gravity & absorption of coarse aggre...
Density, (relative density) specific gravity & absorption of coarse aggre...Density, (relative density) specific gravity & absorption of coarse aggre...
Density, (relative density) specific gravity & absorption of coarse aggre...
Muhammad Saleem
 

What's hot (20)

CBR Test
CBR TestCBR Test
CBR Test
 
Laboratory soil compaction test
Laboratory soil compaction testLaboratory soil compaction test
Laboratory soil compaction test
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
 
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
Geotechnical Engineering-II [Lec #7A: Boussinesq Method]
 
1-D Consolidation Test
1-D Consolidation Test1-D Consolidation Test
1-D Consolidation Test
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
 
Class 7 Consolidation Test ( Geotechnical Engineering )
Class 7    Consolidation Test ( Geotechnical Engineering )Class 7    Consolidation Test ( Geotechnical Engineering )
Class 7 Consolidation Test ( Geotechnical Engineering )
 
Examples on total consolidation
Examples on total  consolidationExamples on total  consolidation
Examples on total consolidation
 
Sieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - ReportSieve analysis of coarse and fine aggregate - Report
Sieve analysis of coarse and fine aggregate - Report
 
Geo Technical Engineering (computing lateral earth pressure)
Geo Technical Engineering (computing lateral earth pressure)Geo Technical Engineering (computing lateral earth pressure)
Geo Technical Engineering (computing lateral earth pressure)
 
DETERMINATION OF AGGREGATE IMPACT VALUE.
DETERMINATION OF AGGREGATE IMPACT VALUE.DETERMINATION OF AGGREGATE IMPACT VALUE.
DETERMINATION OF AGGREGATE IMPACT VALUE.
 
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
Geotechnical Engineering-II [Lec #19: General Bearing Capacity Equation]
 
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #27: Infinite Slope Stability Analysis]
 
Density, (relative density) specific gravity & absorption of coarse aggre...
Density, (relative density) specific gravity & absorption of coarse aggre...Density, (relative density) specific gravity & absorption of coarse aggre...
Density, (relative density) specific gravity & absorption of coarse aggre...
 
Plate load test ppt
Plate load test pptPlate load test ppt
Plate load test ppt
 
Standard proctor test
Standard proctor testStandard proctor test
Standard proctor test
 
Unconfined Compression Test
Unconfined Compression TestUnconfined Compression Test
Unconfined Compression Test
 
Class 8 Triaxial Test ( Geotechnical Engineering )
Class 8    Triaxial Test ( Geotechnical Engineering )Class 8    Triaxial Test ( Geotechnical Engineering )
Class 8 Triaxial Test ( Geotechnical Engineering )
 
Sieve analysis test report
Sieve analysis test reportSieve analysis test report
Sieve analysis test report
 
Atterberg Limit Test
Atterberg Limit Test  Atterberg Limit Test
Atterberg Limit Test
 

Similar to Tri axial test

Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docxSheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
bjohn46
 
178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...
178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...
178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...
Ramiro Bautista A.
 

Similar to Tri axial test (20)

Astm d 4767_95_triaxial_cu_cohesive_soils
Astm d 4767_95_triaxial_cu_cohesive_soilsAstm d 4767_95_triaxial_cu_cohesive_soils
Astm d 4767_95_triaxial_cu_cohesive_soils
 
Ex 10 unconfined compression test
Ex 10 unconfined compression testEx 10 unconfined compression test
Ex 10 unconfined compression test
 
Bursting Strength ISO 13938-2 (Part-II)
Bursting Strength ISO 13938-2 (Part-II)  Bursting Strength ISO 13938-2 (Part-II)
Bursting Strength ISO 13938-2 (Part-II)
 
Bursting strength ISO 13938-1 (Part-I)
Bursting strength ISO 13938-1 (Part-I)Bursting strength ISO 13938-1 (Part-I)
Bursting strength ISO 13938-1 (Part-I)
 
Direct shear test triaxial test
Direct shear test triaxial testDirect shear test triaxial test
Direct shear test triaxial test
 
Abhishek sagar 121vc00235
Abhishek sagar 121vc00235Abhishek sagar 121vc00235
Abhishek sagar 121vc00235
 
Fabric testing
Fabric testingFabric testing
Fabric testing
 
Astm d2938 unconfined compressive strength
Astm d2938 unconfined compressive strengthAstm d2938 unconfined compressive strength
Astm d2938 unconfined compressive strength
 
Diploma 3 Strength_of_Materials.pdf
Diploma 3 Strength_of_Materials.pdfDiploma 3 Strength_of_Materials.pdf
Diploma 3 Strength_of_Materials.pdf
 
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docxSheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
 
Tensile
TensileTensile
Tensile
 
Part 1 introduction to triaxial testing
Part 1 introduction to triaxial testingPart 1 introduction to triaxial testing
Part 1 introduction to triaxial testing
 
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOILDETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
DETERMINATION OF UNCONFINED COMPRESSIVE STRENGTH OF SOIL
 
Compressive strength of concrete cubs
Compressive strength of concrete cubsCompressive strength of concrete cubs
Compressive strength of concrete cubs
 
178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...
178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...
178749411 astm-d-1633-00-standard-methods-for-compressive-strength-of-molded-...
 
Bs 1881 121 1983
Bs 1881 121 1983Bs 1881 121 1983
Bs 1881 121 1983
 
Flexural strength in concrete test
Flexural strength in concrete test Flexural strength in concrete test
Flexural strength in concrete test
 
Water sensitivity test (tsr)
Water sensitivity test (tsr)Water sensitivity test (tsr)
Water sensitivity test (tsr)
 
Insitu and lab tests
Insitu and lab testsInsitu and lab tests
Insitu and lab tests
 
Insitu and lab test
Insitu and lab testInsitu and lab test
Insitu and lab test
 

More from Natalie Ulza

PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
Natalie Ulza
 
4.1 planning schedulling
4.1 planning schedulling4.1 planning schedulling
4.1 planning schedulling
Natalie Ulza
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
Natalie Ulza
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
Natalie Ulza
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak
Natalie Ulza
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chart
Natalie Ulza
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
Natalie Ulza
 
2.1 concept of leader ship
2.1 concept of leader ship2.1 concept of leader ship
2.1 concept of leader ship
Natalie Ulza
 
1.1.4 interpret project manager
1.1.4 interpret  project manager1.1.4 interpret  project manager
1.1.4 interpret project manager
Natalie Ulza
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
Natalie Ulza
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
Natalie Ulza
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
Natalie Ulza
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
Natalie Ulza
 

More from Natalie Ulza (20)

miraculous discovery
miraculous discoverymiraculous discovery
miraculous discovery
 
PENEMUAN AJAIB
PENEMUAN AJAIBPENEMUAN AJAIB
PENEMUAN AJAIB
 
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
 
amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5
 
4.1 planning schedulling
4.1 planning schedulling4.1 planning schedulling
4.1 planning schedulling
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
 
3.4 scaffolding
3.4 scaffolding3.4 scaffolding
3.4 scaffolding
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak
 
3.1 the usage of bar chart
3.1 the usage of bar chart3.1 the usage of bar chart
3.1 the usage of bar chart
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
 
2.1 concept of leader ship
2.1 concept of leader ship2.1 concept of leader ship
2.1 concept of leader ship
 
1.1.4 interpret project manager
1.1.4 interpret  project manager1.1.4 interpret  project manager
1.1.4 interpret project manager
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
 
BOD TEST
BOD TESTBOD TEST
BOD TEST
 
TURBIDITY TEST
TURBIDITY TESTTURBIDITY TEST
TURBIDITY TEST
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Tri axial test

  • 3. Objective: Student should be able to Measure the shear strength parameters using the tri-axial test.
  • 4. Theory When conducting site investigations for buildings, in most circumstances short term stability will be the most critical. Therefore this document will deal only with the determination of total shear strength parameters of cohesive soils using, Unconsolidated Undrained Tests. There may be instances where effective shear strength parameters are required, and they would require other forms of tests such as Consolidated Undrained or Drained. Determination of those parameters will be dealt with in the proposed Sri Lankan standard on laboratory testing of soils. Specimens used for the test are of cylindrical shape and should be undisturbed. Specimen is subjected to a confining fluid pressure in a tri-axial chamber and axial load (deviator load) is applied in a strain controlled or stress controlled manner. In all stages of the test untrained conditions are maintained without allowing for any pore water pressure dissipation. Method does not generally measure pore water pressures and parameters determined are therefore in terms of total stresses.
  • 5. Determine the applied failure load Pa,f for each specimen tested. The applied failure load is defined as the maximum applied load during the test. Calculate the applied failure stress σa,f :
  • 6.
  • 7. equipment Equipment Function An apparatus shall be provided to keep the cylindrical soil specimen, enclosed by a rubber membrane sealed to the specimen cap and base, under the applied chamber pressure. The apparatus shall include a bushing and piston aligned with the axis of the specimen. Axial load is applied to the specimen through this system and friction in the system should be minimized Triaxial Compression Chamber There shall be a system capable of applying and maintaining the chamber pressure constant at the desired value (within 10 kPa) throughout the test. This device is connected to the triaxial chamber through pressure control devices. Pressure may be applied through hydraulic pressure system or by compressed air. Chamber Pressure Application device Axial Loading Device Specimen cap and base Rubber Membranes, Membrane stretcher and 0 rings There shall be a device to provide the axial load in a specified controlled manner at the desired rate.It should have a sufficient loading capacity and should be free from vibrations. It may be a by a screw jack driven by an electric motor through geared transmission, a hydraulic pneumatic loading device or any other suitable device. If it is a strain controlled device it should be capable of providing rates within 0.05 mm/min to 10 mm/min. There should be an impermeable, rigid cap and base to prevent drainage of the specimen. Both the cap and base should have a plane surface of contact and a circular cross section of diameter equal to that of the specimen. The specimen base should be coupled to the tri-axial chamber base to prevent any lateral motion or tilting. The specimen cap should be designed to receive the piston such that the piston to cap contact area is concentric with the cap. A hole shall be made on top of the cap to receive the piston. The weight of the cap shall be less than 0.5% of the anticipated applied axial load at failure. Rubber membranes should be used to encase the specimen to provide reliable protection against leakage. Membranes should be carefully inspected prior to use, and those with any flaws or pinholes should be discarded. The membrane thickness shall not exceed 1 % of the diameter of the specimen. The upstretched membrane diameter shall be between 75% and 90% of the specimen diameter. The membrane shall be sealed to the specimen base and cap with rubber 0 - rings with diameter less than 75% of the specimen diameter. There shall be a membrane stretcher to suit the size of the specimen.
  • 8. procedures: Preparation of the Sample Specimens used for the test shall be undisturbed. They should be of a minimum diameter 33 mm and a have a length/diameter ratio between 2 and 3. Specimen should be weighed to the nearest 0.01 g prior to the testing.Specimens should be handled very carefully to minimize disturbance, change cross section or loss of moisture. Specimens shall be uniform circular cross section with ends perpendicular to the axis of the specimen. If excessive irregularities are present at the ends due to crumbling, crushing or pebbles, ends may be packed with soil from the trimmings to produce the desired surface. Weight of the specimen should be determined and encased by the membrane and sealed to the specimen base and cap immediately after the preparation, with the help of 0 rings.
  • 9. Procedure of Testing Tri-axial chamber shall be assembled with the specimen encased in rubber membrane, and sealed to the specimen cap and base and kept in position. Axial load piston should be brought to contact with the specimen cap and proper seating should be provided. When dealing with soft soils special care must be taken not to overload the specimen with the weight of the piston. Chamber shall be filled with the confining fluid (usually water) and placed in position in the axial loading device. Special care should be taken in aligning the axial load device, the axial load measuring device and the tri-axial chamber to prevent application of lateral force to the pistonduring testing. Thereafter the chamber pressure maintaining and measuring device shall be attached and adjusted to provide the desired chamber pressure. Axial load measuring device is usually located outside the triaxial chamber and chamber pressure will produce an upward force on the piston that will react against the axial loading device. In this case axial load measuring device should be adjusted to read zero prior to the application of the deviator load.
  • 10. Data and analysis Specimen calculation Applied cell pressure = 100 KN/m2 Axial deformation dial reading = 75 Axial deformation = 75 x 0.001 x 25.4= 1.905 mm Axial strain = 0.022411
  • 11. Deviator Load = 58 x 1.828 = 106.024 N Deviator Stress = 106.024 / (1000 x 0.00115953) = 91.44 kN / m2
  • 12.
  • 13.
  • 14. Discussion  We were supposed to test three samples, but because of obstacles we faced such as broken membrane, we could only do one sample. That was ok, as we applied the Q-Test where the shear failure envelope is straight horizontal line.  There is no drainage. Thus the test is done under constant volume conditions.  The axial load may be applied at the desired strain rate, approximately 10 min after the application of chamber pressure. Proving ring readings should be recorded for intervals of axial deformation. Sufficient readings should be taken to capture the stress-strain curve. Thus more frequent reading are required, at the initial stages to capture the initial stiff part of the curve and also as the failure approaches to capture the failure point. If the sample has not failed showing a reduction in the deviator load, loading shall be continued to 15% strain. If the residual strengths are required test may be continued further.
  • 15. Conclusion At the end of the test specimen shall be taken out, failure patterns may be noted and moisture contentof the sample should be determined. Test should be performed on at least two other identical samples at different chamber pressures to construct the failure envelope and to determine the shear strength parameters
  • 16. reference 1. Norliza Muhammad, mechanic laboratory,(2006). Gradation Test. (2007), Norliza Muhammad, FajarBaktiSdn. Bhd. 2. M.S. Mamlouk and J.P. Zaniewski, mechanic of structur Engineers, 1999, Addison-Wesley, Menlo Park CA