Acronyms
Program-for-Results
An Overview and Experiences
OECD Workshop - May 19, 2014
Acronyms
Program for Results (PforR) Operations and Portfolio
 The PforR Instrument was introduced in January 2012 as World Bank’s third Instrument
in addition to Investment Project Financing (IPF) and Development Policy Financing
(DPF)
 To date we noted good progress:
 Fourteen operations approved by the Board totaling $2.5 billion of Bank financing
supporting a total of $5.3 billion of government Programs.
− About 13.5% of Bank financing has been disbursed to date
− For projects approved for more than 6 months period, about 18.9% have already been
disbursed.
 Another sixteen operations under preparation, for $2.2 billion of Bank financing
 Operations approved to date are in six different regions in a range of country
typologies (from fragile states to MICs)
− 67% were in IDA countries
− Diversified in both regions and sectors
2
Acronyms
PforR Approved and under Preparation Operations
(as of May 2014)
Morocco (4) Nepal
Tanzania (2)
Uganda
Indonesia
Mozambique
Uruguay
Vietnam (2)
Kenya
India (3)
BangladeshMexico Pakistan
Croatia
Moldova
Brazil
Bolivia
Ethiopia(2)
Rwanda (2)
Tunisia
Afghanistan
3
Acronyms
Breakdown by Region and Sector
4
32%
14%
3%
14%
18%
19%
Pipeline Operations by Region
(financing amount)
Africa
EastAsiaandPacific
EuropeandCentralAsia
LatinAmericaandCaribbean
MiddleEastandNorthAfrica
SouthAsia
7%
7%
5% 1%
8%
5%
6%
13%
31%
2%
15%
Pipeline Operations by Sector
(financing amount)
Education
Health
SocialProtection
PublicFinancialManagement
CompetitiveIndustriesPractice
PublicSectorGovernance
SocialDevelopment
Transport
Urban
Aggricultureandrural
development
Acronyms
 PforR objective
 Help clients improve the efficiency of their programs of expenditures
and achieve lasting results by strengthening institutions and building
capacity
 PforR key features
 Finances and supports clients’ programs of expenditures, using
program systems
 Disburses upon achievement of program results, not inputs
 Focuses on strengthening the institutional capacity needed for
programs to achieve their desired results
 Provides assurance that Bank financing is used appropriately and
that the environmental and social impacts of the program are
adequately addressed
PforR: Objective & Key Features
5
Acronyms
Implementation Mechanism
A Complementary Financing Instrument
Funds for specific
expenditures
Funds for non-
earmarked general
budget support
Funds for specific
expenditure
program
Bank IPF rules and procedures
Country policy processes
Investment
Project Financing
(IPF)
Development
Policy Financing
(DPF)
Program Lending
(PforR)
Program systems
6
Acronyms
What does PforR Involve and What is Different?
 Identification of government program(s) of expenditures (or part
thereof) to be supported
 Identification of key program results and definition of DLIs
 Assessment of the program, from technical, systems and risks aspects
 Identification of actions to enhance capacity and systems
performance, as needed
 Implementation Support, i.e. Bank support to client in implementing
its program in accordance with agreements reached with the Bank
during preparation of the PforR operation
7
Acronyms
Key to Incentives -- Disbursement Linked Indicators (DLIs)
 DLIs are driven by outputs, outcomes, intermediate outputs,
process/performance indicators and are the basis for disbursement
 DLIs indicators should be:
 tangible,
 transparent,
 verifiable, and
 under government’s influence
 If DLIs are partially met, then there can be partial disbursements
 Verifications arrangements have to be put in place, typically handled by
government independent entities (usually in charge of conducting audits) or by
private firms
8
Acronyms
9
What Clients Like about it?
 Clients welcome use of their own country systems.
 Like the results focus
 Increased client participation in negotiations (showing enhanced ownership)
 Largely positive with appreciation for reduced Bank transaction processes.
 Support capacity building and system improvements and efforts to improve
effectiveness and efficiencies of total government expenditures on a program
(and not just Bank financing)
 Welcome the dialogue shift from details to results.
 ‘more intellectual engagement’ in implementation support
 Verification of results is institutionalized
 Increased choice in Bank financing instruments allow for better matching of
needs on the ground.
Acronyms
Examples of DLIs from Current Operations
Nepal Results-Based Bridges Improvement and Maintenance
System improvements: % of bridge works completed on planned schedule
Ethiopia – Health Millennium Development Goals
Program outcomes: % of deliveries attended by skilled birth providers
Morocco National Initiative for Human Development (Phase II) Program
Access to services: % population provided with access to improved water supply in INDH rural communes
10
Acronyms
Examples of Actions to Enhance System Performance
Morocco - National Initiative for Human Development (INDH) Phase II Program
• upgrade of INDH Grievance Redress Mechanism
Uruguay - Road Rehabilitation and Maintenance Program
• development of environmental audit system for works
Tanzania - Urban Local Government Strengthening Program
• establishment of a Records Keeping Management System
11
Acronyms
 The Bank’s Board asked that an initial review of
experience with PforR be conducted after about 2
years of implementation
 The review is underway and aims to:
 Assess the early experience with the design and
implementation of PforR operations;
 Identify emerging early lessons and recommend
proposed changes to the PforR framework, as needed.
The Two Year Review of PforR
12
Acronyms
Approach for the Two Year Review
Reporting back
Prepare initial report for CODE
Based on feedback provided, prepare for Board
discussion
Interviews, initial findings , and consultations
Design protocols for semi-structured
interviews
Identify initial findings from the
various inputs
Consult with clients and key
partners and stakeholders
Initial Stage of Information Gathering
Desk and literature review
Short Survey
(for non -users)
Longer Survey
(for PforR users)
13
Acronyms
For More Information on PforR Operations:
• All approved operations and related documents and
assessments are on the website
• The pipeline of operations is also on the website as well as the
project information documents
• The two year review information will be posted as it becomes
available
Please visit the website:
http://www.worldbank.org/ProgramforResults
14
Acronyms
THANK YOU!

Contenu connexe

Tendances

Review and Assessment of the the PCDP
Review and Assessment of the the PCDP Review and Assessment of the the PCDP
Review and Assessment of the the PCDP jo bitonio
 
Vision, Mission, Goals & Policy Setting
Vision, Mission, Goals & Policy SettingVision, Mission, Goals & Policy Setting
Vision, Mission, Goals & Policy SettingJo Balucanag - Bitonio
 
Guide on Cooperative Operation and Management
Guide on Cooperative Operation and Management Guide on Cooperative Operation and Management
Guide on Cooperative Operation and Management jo bitonio
 
Institutional Planning.pptx
Institutional Planning.pptxInstitutional Planning.pptx
Institutional Planning.pptxLolita De Leon
 
COP26 Glasgow Climate Pact- Outcome Document
COP26 Glasgow Climate Pact- Outcome DocumentCOP26 Glasgow Climate Pact- Outcome Document
COP26 Glasgow Climate Pact- Outcome DocumentEnergy for One World
 
Air (Prevention and Control of Pollution)Act, 1981
Air (Prevention and Control of Pollution)Act, 1981Air (Prevention and Control of Pollution)Act, 1981
Air (Prevention and Control of Pollution)Act, 1981KUSH VERMA
 
Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Leo Lukose
 
Utilization of CETF and CDF
Utilization of CETF and CDFUtilization of CETF and CDF
Utilization of CETF and CDFjo bitonio
 
Planning
PlanningPlanning
Planning789052
 
Management Performance Tools for cooperatives
Management Performance Tools for cooperativesManagement Performance Tools for cooperatives
Management Performance Tools for cooperativesjo bitonio
 
Grant development and process.pdf
Grant development and process.pdfGrant development and process.pdf
Grant development and process.pdfGuta Mengesha
 
CCXG Forum, September 2023, Key takeaways
CCXG Forum, September 2023, Key takeawaysCCXG Forum, September 2023, Key takeaways
CCXG Forum, September 2023, Key takeawaysOECD Environment
 
National adaptation planning (NAP) processes and EbA
 National adaptation planning (NAP) processes and EbA National adaptation planning (NAP) processes and EbA
National adaptation planning (NAP) processes and EbAExternalEvents
 
Performance Report Questionnaire for Cooperatives
Performance Report Questionnaire for CooperativesPerformance Report Questionnaire for Cooperatives
Performance Report Questionnaire for CooperativesJo Balucanag - Bitonio
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementMohamad Ashrafi
 

Tendances (20)

Report on Cancun COP16
Report on Cancun COP16Report on Cancun COP16
Report on Cancun COP16
 
Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment
 
Review and Assessment of the the PCDP
Review and Assessment of the the PCDP Review and Assessment of the the PCDP
Review and Assessment of the the PCDP
 
Vision, Mission, Goals & Policy Setting
Vision, Mission, Goals & Policy SettingVision, Mission, Goals & Policy Setting
Vision, Mission, Goals & Policy Setting
 
CARBON AUDIT
CARBON AUDITCARBON AUDIT
CARBON AUDIT
 
PROJECT LIFE CYCLE
PROJECT LIFE CYCLEPROJECT LIFE CYCLE
PROJECT LIFE CYCLE
 
Guide on Cooperative Operation and Management
Guide on Cooperative Operation and Management Guide on Cooperative Operation and Management
Guide on Cooperative Operation and Management
 
Institutional Planning.pptx
Institutional Planning.pptxInstitutional Planning.pptx
Institutional Planning.pptx
 
COP26 Glasgow Climate Pact- Outcome Document
COP26 Glasgow Climate Pact- Outcome DocumentCOP26 Glasgow Climate Pact- Outcome Document
COP26 Glasgow Climate Pact- Outcome Document
 
Air (Prevention and Control of Pollution)Act, 1981
Air (Prevention and Control of Pollution)Act, 1981Air (Prevention and Control of Pollution)Act, 1981
Air (Prevention and Control of Pollution)Act, 1981
 
Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981Air (prevention and control of pollution) act, 1981
Air (prevention and control of pollution) act, 1981
 
Utilization of CETF and CDF
Utilization of CETF and CDFUtilization of CETF and CDF
Utilization of CETF and CDF
 
Planning
PlanningPlanning
Planning
 
Management Performance Tools for cooperatives
Management Performance Tools for cooperativesManagement Performance Tools for cooperatives
Management Performance Tools for cooperatives
 
Grant development and process.pdf
Grant development and process.pdfGrant development and process.pdf
Grant development and process.pdf
 
Coop Structure
Coop StructureCoop Structure
Coop Structure
 
CCXG Forum, September 2023, Key takeaways
CCXG Forum, September 2023, Key takeawaysCCXG Forum, September 2023, Key takeaways
CCXG Forum, September 2023, Key takeaways
 
National adaptation planning (NAP) processes and EbA
 National adaptation planning (NAP) processes and EbA National adaptation planning (NAP) processes and EbA
National adaptation planning (NAP) processes and EbA
 
Performance Report Questionnaire for Cooperatives
Performance Report Questionnaire for CooperativesPerformance Report Questionnaire for Cooperatives
Performance Report Questionnaire for Cooperatives
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 

En vedette

Visual Analytics and Security Intelligence
Visual Analytics and Security IntelligenceVisual Analytics and Security Intelligence
Visual Analytics and Security IntelligenceRaffael Marty
 
W3C Content Security Policy
W3C Content Security PolicyW3C Content Security Policy
W3C Content Security PolicyMarkus Wichmann
 
The Estee Lauder Company - History, Evolution, Present and the Future
The Estee Lauder Company - History, Evolution, Present and the FutureThe Estee Lauder Company - History, Evolution, Present and the Future
The Estee Lauder Company - History, Evolution, Present and the FutureGreg Thain
 
Estee lauder Strategic Management ppt
Estee lauder Strategic  Management pptEstee lauder Strategic  Management ppt
Estee lauder Strategic Management pptDhanushka Kannangara
 
Design Thinking: Finding Problems Worth Solving In Health
Design Thinking: Finding Problems Worth Solving In HealthDesign Thinking: Finding Problems Worth Solving In Health
Design Thinking: Finding Problems Worth Solving In HealthAdam Connor
 
The Future of Everything
The Future of EverythingThe Future of Everything
The Future of EverythingCharbel Zeaiter
 

En vedette (7)

Visual Analytics and Security Intelligence
Visual Analytics and Security IntelligenceVisual Analytics and Security Intelligence
Visual Analytics and Security Intelligence
 
Estee Lauder
Estee LauderEstee Lauder
Estee Lauder
 
W3C Content Security Policy
W3C Content Security PolicyW3C Content Security Policy
W3C Content Security Policy
 
The Estee Lauder Company - History, Evolution, Present and the Future
The Estee Lauder Company - History, Evolution, Present and the FutureThe Estee Lauder Company - History, Evolution, Present and the Future
The Estee Lauder Company - History, Evolution, Present and the Future
 
Estee lauder Strategic Management ppt
Estee lauder Strategic  Management pptEstee lauder Strategic  Management ppt
Estee lauder Strategic Management ppt
 
Design Thinking: Finding Problems Worth Solving In Health
Design Thinking: Finding Problems Worth Solving In HealthDesign Thinking: Finding Problems Worth Solving In Health
Design Thinking: Finding Problems Worth Solving In Health
 
The Future of Everything
The Future of EverythingThe Future of Everything
The Future of Everything
 

Similaire à Program-for-Results - An Overview and experiences in results-based funding

LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxLECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxmansoor584949
 
world_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptxworld_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptxDilanFernando33
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 
E-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and OversightE-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and Oversightepass2015
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsFAO
 
Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...
Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...
Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...IJAEMSJORNAL
 
EPA Chesapeake Bay Trading and Offsets
EPA Chesapeake Bay Trading and OffsetsEPA Chesapeake Bay Trading and Offsets
EPA Chesapeake Bay Trading and OffsetsCleanH2O
 
Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...
Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...
Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...icgfmconference
 
Afghanistan0000Report000Sequence007
Afghanistan0000Report000Sequence007Afghanistan0000Report000Sequence007
Afghanistan0000Report000Sequence007Naseeb Muhammadi
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalGerald Ogoko
 
New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...OECD Governance
 
Monitoring and Evaluation Policy
Monitoring and Evaluation PolicyMonitoring and Evaluation Policy
Monitoring and Evaluation PolicyKomal Zahra
 
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...FIDAfrique-IFADAfrica
 
National Audit Office: Lessons from welfare reform programmes, 25th feb
National Audit Office: Lessons from welfare reform programmes, 25th febNational Audit Office: Lessons from welfare reform programmes, 25th feb
National Audit Office: Lessons from welfare reform programmes, 25th febAssociation for Project Management
 
PPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdfPPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdfssusered96e2
 
Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Mohamed Rafique
 
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...Iwl Pcu
 

Similaire à Program-for-Results - An Overview and experiences in results-based funding (20)

LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptxLECTURE-1 Introduction to Project Concept, Lifecycle .pptx
LECTURE-1 Introduction to Project Concept, Lifecycle .pptx
 
world_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptxworld_bank_pefa_in_la_dec_4_2012.pptx
world_bank_pefa_in_la_dec_4_2012.pptx
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
E-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and OversightE-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and Oversight
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project Proposals
 
M&E WORKSHOP
M&E WORKSHOPM&E WORKSHOP
M&E WORKSHOP
 
Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...
Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...
Effectiveness of the Public Financial Management Assessment Tool or (PFMAT) i...
 
EPA Chesapeake Bay Trading and Offsets
EPA Chesapeake Bay Trading and OffsetsEPA Chesapeake Bay Trading and Offsets
EPA Chesapeake Bay Trading and Offsets
 
Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...
Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...
Workshop Session I: Public Expenditure Financial Accountability (PEFA) Assess...
 
Afghanistan0000Report000Sequence007
Afghanistan0000Report000Sequence007Afghanistan0000Report000Sequence007
Afghanistan0000Report000Sequence007
 
Abuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314finalAbuja-CPPR NE Report 200314final
Abuja-CPPR NE Report 200314final
 
New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...New developments in the infrastructure space in OECD countries - Isabel RIAL,...
New developments in the infrastructure space in OECD countries - Isabel RIAL,...
 
Government_ME_systems.ppt
Government_ME_systems.pptGovernment_ME_systems.ppt
Government_ME_systems.ppt
 
Monitoring and Evaluation Policy
Monitoring and Evaluation PolicyMonitoring and Evaluation Policy
Monitoring and Evaluation Policy
 
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
Report on the Training of Monitoring and Evaluation staff of IFAD Projects in...
 
National Audit Office: Lessons from welfare reform programmes, 25th feb
National Audit Office: Lessons from welfare reform programmes, 25th febNational Audit Office: Lessons from welfare reform programmes, 25th feb
National Audit Office: Lessons from welfare reform programmes, 25th feb
 
PPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdfPPP Reference Guide Version 3 - PPP Framework.pdf
PPP Reference Guide Version 3 - PPP Framework.pdf
 
Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9
 
Uganda - NAP Climate Change Adaptation Experiences
Uganda  - NAP Climate Change Adaptation ExperiencesUganda  - NAP Climate Change Adaptation Experiences
Uganda - NAP Climate Change Adaptation Experiences
 
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
 

Plus de Development Co-operation Directorate (DCD-DAC)

Plus de Development Co-operation Directorate (DCD-DAC) (20)

TOSSD 2020 Data - Key Figures
TOSSD 2020 Data - Key FiguresTOSSD 2020 Data - Key Figures
TOSSD 2020 Data - Key Figures
 
TOSSD 2020 data - Key Figures
TOSSD 2020 data - Key FiguresTOSSD 2020 data - Key Figures
TOSSD 2020 data - Key Figures
 
OECD Financing for Sustainable Development
OECD Financing for Sustainable Development OECD Financing for Sustainable Development
OECD Financing for Sustainable Development
 
Summary DSI OECD seminar on triangular co-operation
Summary DSI OECD seminar on triangular co-operation Summary DSI OECD seminar on triangular co-operation
Summary DSI OECD seminar on triangular co-operation
 
Market Place on Triangular Co-operation Projects
Market Place on Triangular Co-operation ProjectsMarket Place on Triangular Co-operation Projects
Market Place on Triangular Co-operation Projects
 
PF4SD 2020 expert discussions key takeaways
PF4SD 2020 expert discussions key takeawaysPF4SD 2020 expert discussions key takeaways
PF4SD 2020 expert discussions key takeaways
 
Summary 2019 International Meeting on Triangular Co-operation
Summary 2019 International Meeting on Triangular Co-operationSummary 2019 International Meeting on Triangular Co-operation
Summary 2019 International Meeting on Triangular Co-operation
 
Agenda 2019 International Meeting on Triangular Co-operation
Agenda 2019 International Meeting on Triangular Co-operationAgenda 2019 International Meeting on Triangular Co-operation
Agenda 2019 International Meeting on Triangular Co-operation
 
Arab Concessional Financing for Development
Arab Concessional Financing for DevelopmentArab Concessional Financing for Development
Arab Concessional Financing for Development
 
Financing for Development Series: ECIS
 Financing for Development Series: ECIS Financing for Development Series: ECIS
Financing for Development Series: ECIS
 
Reporting issues. Providers of development co-operation beyond the DAC.
Reporting issues. Providers of development co-operation beyond the DAC.Reporting issues. Providers of development co-operation beyond the DAC.
Reporting issues. Providers of development co-operation beyond the DAC.
 
OECD 2019 Civil Society Days Conference Programme
OECD 2019 Civil Society Days Conference ProgrammeOECD 2019 Civil Society Days Conference Programme
OECD 2019 Civil Society Days Conference Programme
 
Conference highlights - OECD Civil Society Days 2019
Conference highlights - OECD Civil Society Days 2019Conference highlights - OECD Civil Society Days 2019
Conference highlights - OECD Civil Society Days 2019
 
Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...
Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...
Amountsmobilisedfromtheprivatesectorbydevelopmentfinanceinterventionsin201217...
 
Enabling Civil Society for Sustainable Development: Select Survey Findings
Enabling Civil Society for Sustainable Development: Select Survey FindingsEnabling Civil Society for Sustainable Development: Select Survey Findings
Enabling Civil Society for Sustainable Development: Select Survey Findings
 
Engaging Civil Society Organisations through Triangular Co-operation
Engaging Civil Society Organisations through Triangular Co-operationEngaging Civil Society Organisations through Triangular Co-operation
Engaging Civil Society Organisations through Triangular Co-operation
 
Summary GPI side-event in BAPA+40 (2019)
Summary GPI side-event in BAPA+40 (2019)Summary GPI side-event in BAPA+40 (2019)
Summary GPI side-event in BAPA+40 (2019)
 
Factsheet - Private sector engagement through triangular co-operation
Factsheet - Private sector engagement through triangular co-operationFactsheet - Private sector engagement through triangular co-operation
Factsheet - Private sector engagement through triangular co-operation
 
Summary GPI side-event in Global South-South Development Expo (2018)
Summary GPI side-event in Global South-South Development Expo (2018)Summary GPI side-event in Global South-South Development Expo (2018)
Summary GPI side-event in Global South-South Development Expo (2018)
 
Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017
Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017
Trilateral Cooperation Experiences and Challenges - Seminar Brasilia 2017
 

Dernier

FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 

Dernier (20)

FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 

Program-for-Results - An Overview and experiences in results-based funding

  • 1. Acronyms Program-for-Results An Overview and Experiences OECD Workshop - May 19, 2014
  • 2. Acronyms Program for Results (PforR) Operations and Portfolio  The PforR Instrument was introduced in January 2012 as World Bank’s third Instrument in addition to Investment Project Financing (IPF) and Development Policy Financing (DPF)  To date we noted good progress:  Fourteen operations approved by the Board totaling $2.5 billion of Bank financing supporting a total of $5.3 billion of government Programs. − About 13.5% of Bank financing has been disbursed to date − For projects approved for more than 6 months period, about 18.9% have already been disbursed.  Another sixteen operations under preparation, for $2.2 billion of Bank financing  Operations approved to date are in six different regions in a range of country typologies (from fragile states to MICs) − 67% were in IDA countries − Diversified in both regions and sectors 2
  • 3. Acronyms PforR Approved and under Preparation Operations (as of May 2014) Morocco (4) Nepal Tanzania (2) Uganda Indonesia Mozambique Uruguay Vietnam (2) Kenya India (3) BangladeshMexico Pakistan Croatia Moldova Brazil Bolivia Ethiopia(2) Rwanda (2) Tunisia Afghanistan 3
  • 4. Acronyms Breakdown by Region and Sector 4 32% 14% 3% 14% 18% 19% Pipeline Operations by Region (financing amount) Africa EastAsiaandPacific EuropeandCentralAsia LatinAmericaandCaribbean MiddleEastandNorthAfrica SouthAsia 7% 7% 5% 1% 8% 5% 6% 13% 31% 2% 15% Pipeline Operations by Sector (financing amount) Education Health SocialProtection PublicFinancialManagement CompetitiveIndustriesPractice PublicSectorGovernance SocialDevelopment Transport Urban Aggricultureandrural development
  • 5. Acronyms  PforR objective  Help clients improve the efficiency of their programs of expenditures and achieve lasting results by strengthening institutions and building capacity  PforR key features  Finances and supports clients’ programs of expenditures, using program systems  Disburses upon achievement of program results, not inputs  Focuses on strengthening the institutional capacity needed for programs to achieve their desired results  Provides assurance that Bank financing is used appropriately and that the environmental and social impacts of the program are adequately addressed PforR: Objective & Key Features 5
  • 6. Acronyms Implementation Mechanism A Complementary Financing Instrument Funds for specific expenditures Funds for non- earmarked general budget support Funds for specific expenditure program Bank IPF rules and procedures Country policy processes Investment Project Financing (IPF) Development Policy Financing (DPF) Program Lending (PforR) Program systems 6
  • 7. Acronyms What does PforR Involve and What is Different?  Identification of government program(s) of expenditures (or part thereof) to be supported  Identification of key program results and definition of DLIs  Assessment of the program, from technical, systems and risks aspects  Identification of actions to enhance capacity and systems performance, as needed  Implementation Support, i.e. Bank support to client in implementing its program in accordance with agreements reached with the Bank during preparation of the PforR operation 7
  • 8. Acronyms Key to Incentives -- Disbursement Linked Indicators (DLIs)  DLIs are driven by outputs, outcomes, intermediate outputs, process/performance indicators and are the basis for disbursement  DLIs indicators should be:  tangible,  transparent,  verifiable, and  under government’s influence  If DLIs are partially met, then there can be partial disbursements  Verifications arrangements have to be put in place, typically handled by government independent entities (usually in charge of conducting audits) or by private firms 8
  • 9. Acronyms 9 What Clients Like about it?  Clients welcome use of their own country systems.  Like the results focus  Increased client participation in negotiations (showing enhanced ownership)  Largely positive with appreciation for reduced Bank transaction processes.  Support capacity building and system improvements and efforts to improve effectiveness and efficiencies of total government expenditures on a program (and not just Bank financing)  Welcome the dialogue shift from details to results.  ‘more intellectual engagement’ in implementation support  Verification of results is institutionalized  Increased choice in Bank financing instruments allow for better matching of needs on the ground.
  • 10. Acronyms Examples of DLIs from Current Operations Nepal Results-Based Bridges Improvement and Maintenance System improvements: % of bridge works completed on planned schedule Ethiopia – Health Millennium Development Goals Program outcomes: % of deliveries attended by skilled birth providers Morocco National Initiative for Human Development (Phase II) Program Access to services: % population provided with access to improved water supply in INDH rural communes 10
  • 11. Acronyms Examples of Actions to Enhance System Performance Morocco - National Initiative for Human Development (INDH) Phase II Program • upgrade of INDH Grievance Redress Mechanism Uruguay - Road Rehabilitation and Maintenance Program • development of environmental audit system for works Tanzania - Urban Local Government Strengthening Program • establishment of a Records Keeping Management System 11
  • 12. Acronyms  The Bank’s Board asked that an initial review of experience with PforR be conducted after about 2 years of implementation  The review is underway and aims to:  Assess the early experience with the design and implementation of PforR operations;  Identify emerging early lessons and recommend proposed changes to the PforR framework, as needed. The Two Year Review of PforR 12
  • 13. Acronyms Approach for the Two Year Review Reporting back Prepare initial report for CODE Based on feedback provided, prepare for Board discussion Interviews, initial findings , and consultations Design protocols for semi-structured interviews Identify initial findings from the various inputs Consult with clients and key partners and stakeholders Initial Stage of Information Gathering Desk and literature review Short Survey (for non -users) Longer Survey (for PforR users) 13
  • 14. Acronyms For More Information on PforR Operations: • All approved operations and related documents and assessments are on the website • The pipeline of operations is also on the website as well as the project information documents • The two year review information will be posted as it becomes available Please visit the website: http://www.worldbank.org/ProgramforResults 14