Presented to: Oklahoma FFHSC
                Date: November 1, 2012
Presented by: Stephanie Schroeder, CSP
 Definitions
 Documentation
 Training
 Program Audits
 Hazard/RiskCategory Tables
 DC System Hazards
 Arc-rated   (AR)
  • Previously flame resistant (FR)
  • Reported in ATPV or EBT
  • AR is FR, but FR is not AR
 Informational    note
  • Previously fine print note
 Incident energy analysis
 Arc flash protection boundary
Approach Boundaries Review
          Any point on an exposed,
            energized electrical
          conductor or circuit part



                                Prohibited approach boundary


                                      Restricted approach boundary


                                         Limited approach boundary




                                                 Arc Flash Boundary
 Relationships with Contractors
 Article 110.1(C)

  • Required meeting between host employer and
    external contractor
  • Must be documented
 Training Requirements for Emergencies
 Article 110.2(C)
  • Automatic external defibrillator (AED) training shall
   be certified by the employer annually
 Training   Requirements for Employees Article
 110.2
  • Employer must determine employee compliance
    with this standard annually
  • Employee retraining every 3 years
  • Employer must retain description of content
 Electrical
           Safety Auditing
 Article 110.3(H)
  • Audit of employers electrical safety program
  • Including field work
  • Frequency must not exceed 3 years
  • Must be documented
 Electrically   Safe Working Conditions, Article
 130.2(A)
  • Rearrangement of the article may require equipment
    to be de-energized more often
  • Within the Limited Approach Boundary (LAB)
  • Equipment interaction with increased risk


 Energized   work permit, Article 130.2(B)
  • Diagnostics work exemptions still apply
 Arc
    Flash Hazard Analysis
 2009 Article 130.3, Exception No. 1
  • Allowed exception to AFHA for certain systems less
   than 240 volts supplied by small transformer
 Rescinded  in 2012
 Article 130.5, Informational Note No. 5
  • Refer to IEEE 1584 for three-phase systems rated
   less than 240 volts
 DCShock Protection Boundaries             Article
 130.4(C)(a)
 • Similar in format to the AC boundaries
 • Minimum voltage addressed is 100 VDC
 AFHA  Equipment Labeling
 Article 130.5(C)
 • Equipment likely to require maintenance, servicing,
  adjustments while energized shall be field marked
  with a label
 AFHA  Equipment Labeling
 Article 130.5(C)
 • The labels have to include the following three lines 1)
  At least one of the following
      a. Available incident energy and the working distance or
      b. Minimum arc rating of clothing or
      c. Required level of PPE or
      d. Highest Hazard/Risk Category (HRC)
 • 2) Nominal system voltage
 • 3) Arc flash boundary
 AFHA  Equipment Labeling
 Article 130.5(C)
 • ONE EXCEPTION: Labels applied prior to September
  30, 2011 and when they contain
   available incident energy or
   required level of personal protective equipment
 Personal Protective Equipment
 Article 130.7(C)
  • Hearing Protection
  • AR Clothing Systems
  • Head Protection
  • Modified Hand Protection
 HazardRisk Categories (AC Voltages)
 Table 130.7(C)(15)(a)
  • Conditions were moved into the tables
  • Descriptions now include arc flash boundaries
  • HRC2* removed and replaced by HRC2
 HazardRisk Categories (DC Voltages)
 Table 130.7(C)(15)(b)
  • Similar in format to the AC equipment table
  • Based on energized work and arcing currents
  • Maximum voltage range is 1000 VDC
 Safety Related Maintenance
 Article 205
  • Single line diagrams must be current and legible
  • Equipment must be maintained IAW
    manufacturers’ instructions
  • Maintenance, tests and inspections of overcurrent
    devices must be documented.
 HazardAnalysis, Risk Estimation and Risk
 Evaluation Procedure - Annex F
  • Provides a model for evaluating hazards
  • Identifies hazards and assess risks
  • Completed prior to starting work
 Public   comments closed 6/22/13
  • Definition of Qualified Person
  • Risk Assessment Procedures
  • Emergency response
  • Focus on training/retraining documentation
  • Deletion of PPE Category 0
  • Yes/No tables for arc flash hazards
 Technical   Committee draft due 2/8/13
 NFPA.org
 http://www.nfpa.org/AboutTheCodes/About
 TheCodes.asp?docnum=70E&tab=nextedi
 tion

 Disclaimer: Only significant changes were
 highlighted in this briefing, please refer to
 the 2012 NFPA 70E for details.
 Stephanie   Schroeder
  • FAA, Mike Monroney Aeronautical Center, OKC
  • Stephanie.schroeder@faa.gov
  • 405-954-0371

Contenu connexe

Tendances

Arc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and IndusryArc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and IndusryAtlantic Training, LLC.
 
10 Most Common PPE Mistakes in Electrical Arc Flash
10 Most Common PPE Mistakes in Electrical Arc Flash10 Most Common PPE Mistakes in Electrical Arc Flash
10 Most Common PPE Mistakes in Electrical Arc FlashMagid
 
Arc flash analysis and electrical hazards
Arc flash analysis and electrical hazardsArc flash analysis and electrical hazards
Arc flash analysis and electrical hazardsVB Engineering
 
Arc Flash Analysis Training by Illinois Institute of Technology
Arc Flash Analysis Training by Illinois Institute of TechnologyArc Flash Analysis Training by Illinois Institute of Technology
Arc Flash Analysis Training by Illinois Institute of TechnologyAtlantic Training, LLC.
 
NFPA 70E Electrical Safety in the Workplace by Hortica
NFPA 70E  Electrical Safety in the Workplace by HorticaNFPA 70E  Electrical Safety in the Workplace by Hortica
NFPA 70E Electrical Safety in the Workplace by HorticaAtlantic Training, LLC.
 
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...Thorne & Derrick International
 
70 e ppt short 2012
70 e ppt short 201270 e ppt short 2012
70 e ppt short 2012dalerj
 
Arc Flash Safety by Murray State University
Arc Flash Safety by Murray State UniversityArc Flash Safety by Murray State University
Arc Flash Safety by Murray State UniversityAtlantic Training, LLC.
 
Practical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsPractical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsLiving Online
 
Arc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanArc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanB Bhargav Reddy
 
Electrical Safety in Construction by South Carolina State Association
Electrical Safety in Construction by South Carolina State AssociationElectrical Safety in Construction by South Carolina State Association
Electrical Safety in Construction by South Carolina State AssociationAtlantic Training, LLC.
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncAtlantic Training, LLC.
 
Electrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk ManagementElectrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk ManagementSchneider Electric
 

Tendances (20)

Arc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and IndusryArc Flash Safety Training by Pennsylvania Department of Labor and Indusry
Arc Flash Safety Training by Pennsylvania Department of Labor and Indusry
 
10 Most Common PPE Mistakes in Electrical Arc Flash
10 Most Common PPE Mistakes in Electrical Arc Flash10 Most Common PPE Mistakes in Electrical Arc Flash
10 Most Common PPE Mistakes in Electrical Arc Flash
 
NFPA 70E Training By SASCO
NFPA 70E Training By SASCONFPA 70E Training By SASCO
NFPA 70E Training By SASCO
 
Arc flash analysis and electrical hazards
Arc flash analysis and electrical hazardsArc flash analysis and electrical hazards
Arc flash analysis and electrical hazards
 
Arc Flash Analysis Training by Illinois Institute of Technology
Arc Flash Analysis Training by Illinois Institute of TechnologyArc Flash Analysis Training by Illinois Institute of Technology
Arc Flash Analysis Training by Illinois Institute of Technology
 
Arc flash safety
Arc flash safetyArc flash safety
Arc flash safety
 
NFPA 70E Electrical Safety in the Workplace by Hortica
NFPA 70E  Electrical Safety in the Workplace by HorticaNFPA 70E  Electrical Safety in the Workplace by Hortica
NFPA 70E Electrical Safety in the Workplace by Hortica
 
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
Introduction to Arc Flash - Revisions to the NFPA 70E, Electrically Safe Wor...
 
Introduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical HazardsIntroduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical Hazards
 
70 e ppt short 2012
70 e ppt short 201270 e ppt short 2012
70 e ppt short 2012
 
Arc Flash Safety by Murray State University
Arc Flash Safety by Murray State UniversityArc Flash Safety by Murray State University
Arc Flash Safety by Murray State University
 
Practical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety ProfessionalsPractical Arc Flash Protection for Electrical Safety Professionals
Practical Arc Flash Protection for Electrical Safety Professionals
 
Arc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanArc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All Mean
 
Electrical Safety Training by ISRI
Electrical Safety Training by ISRIElectrical Safety Training by ISRI
Electrical Safety Training by ISRI
 
What is an arc flash?
What is an arc flash? What is an arc flash?
What is an arc flash?
 
Electrical Safety in Construction by South Carolina State Association
Electrical Safety in Construction by South Carolina State AssociationElectrical Safety in Construction by South Carolina State Association
Electrical Safety in Construction by South Carolina State Association
 
Significant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, IncSignificant Changes To NFPA 70E by Hoydar Buck, Inc
Significant Changes To NFPA 70E by Hoydar Buck, Inc
 
Arc Flash Training
Arc Flash TrainingArc Flash Training
Arc Flash Training
 
Frank Conte Arc flash program
Frank Conte Arc flash programFrank Conte Arc flash program
Frank Conte Arc flash program
 
Electrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk ManagementElectrical Arc Flash Safety and Risk Management
Electrical Arc Flash Safety and Risk Management
 

Similaire à Offshc nfpa 70 e

Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisPower System Operation
 
Selective Coodination
Selective CoodinationSelective Coodination
Selective Coodinationmichaeljmack
 
Short Circuit, Protective Device Coordination
Short Circuit, Protective Device CoordinationShort Circuit, Protective Device Coordination
Short Circuit, Protective Device Coordinationmichaeljmack
 
arcflashsolutions2-160226132648
arcflashsolutions2-160226132648arcflashsolutions2-160226132648
arcflashsolutions2-160226132648Brian Y. Smith
 
Electrical Safety by Industrial Safety Institute
Electrical Safety by Industrial Safety InstituteElectrical Safety by Industrial Safety Institute
Electrical Safety by Industrial Safety InstituteAtlantic Training, LLC.
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modelingguestf8e1f7
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Knowmilestoneseng
 
Using High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash HazardsUsing High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash Hazardsmichaeljmack
 
ETAP - Arc flash introduction
ETAP - Arc flash introductionETAP - Arc flash introduction
ETAP - Arc flash introductionHimmelstern
 
ETAP - Arcflash analysis & mitigation methods
ETAP - Arcflash analysis &  mitigation  methodsETAP - Arcflash analysis &  mitigation  methods
ETAP - Arcflash analysis & mitigation methodsHimmelstern
 
Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsJames S Nasby
 
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSCRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSArchili Kokhtashvili
 
Where COTS meets MOTS
Where COTS meets MOTSWhere COTS meets MOTS
Where COTS meets MOTSHursley EMC
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordinationHimmelstern
 

Similaire à Offshc nfpa 70 e (20)

Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
 
Selective Coodination
Selective CoodinationSelective Coodination
Selective Coodination
 
Short Circuit, Protective Device Coordination
Short Circuit, Protective Device CoordinationShort Circuit, Protective Device Coordination
Short Circuit, Protective Device Coordination
 
arcflashsolutions2-160226132648
arcflashsolutions2-160226132648arcflashsolutions2-160226132648
arcflashsolutions2-160226132648
 
Electrical Safety by Industrial Safety Institute
Electrical Safety by Industrial Safety InstituteElectrical Safety by Industrial Safety Institute
Electrical Safety by Industrial Safety Institute
 
2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling2010 Arc Flash Hazard and Power Distribution Modeling
2010 Arc Flash Hazard and Power Distribution Modeling
 
Arc Flash Hazards
Arc Flash HazardsArc Flash Hazards
Arc Flash Hazards
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
 
Using High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash HazardsUsing High Resistance Grounding to Mitigate Arc Flash Hazards
Using High Resistance Grounding to Mitigate Arc Flash Hazards
 
ETAP - Arc flash introduction
ETAP - Arc flash introductionETAP - Arc flash introduction
ETAP - Arc flash introduction
 
Electric Utility Solutions: Arc Flash Analysis
Electric Utility Solutions: Arc Flash AnalysisElectric Utility Solutions: Arc Flash Analysis
Electric Utility Solutions: Arc Flash Analysis
 
HVM NFPA 70E White Paper
HVM NFPA 70E White PaperHVM NFPA 70E White Paper
HVM NFPA 70E White Paper
 
ETAP - Arcflash analysis & mitigation methods
ETAP - Arcflash analysis &  mitigation  methodsETAP - Arcflash analysis &  mitigation  methods
ETAP - Arcflash analysis & mitigation methods
 
NFPA 20
NFPA 20 NFPA 20
NFPA 20
 
1489 series circuit breaker guide
1489 series circuit breaker guide1489 series circuit breaker guide
1489 series circuit breaker guide
 
Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC Considerations
 
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSCRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
 
Time current curves
Time current curvesTime current curves
Time current curves
 
Where COTS meets MOTS
Where COTS meets MOTSWhere COTS meets MOTS
Where COTS meets MOTS
 
ETAP - device coordination
ETAP - device coordinationETAP - device coordination
ETAP - device coordination
 

Plus de OFFSHC

OFFSHC gets briefed on IEDs
OFFSHC gets briefed on IEDsOFFSHC gets briefed on IEDs
OFFSHC gets briefed on IEDsOFFSHC
 
September 2014 OFFSHC newsletter
September 2014 OFFSHC newsletterSeptember 2014 OFFSHC newsletter
September 2014 OFFSHC newsletterOFFSHC
 
Weathering the Storm - OGE and OSHA
Weathering the Storm - OGE and OSHA Weathering the Storm - OGE and OSHA
Weathering the Storm - OGE and OSHA OFFSHC
 
February 2014 OFFSHC Newsletter
February 2014 OFFSHC NewsletterFebruary 2014 OFFSHC Newsletter
February 2014 OFFSHC NewsletterOFFSHC
 
2013 12 27 OFFSHC News
2013 12 27 OFFSHC News2013 12 27 OFFSHC News
2013 12 27 OFFSHC NewsOFFSHC
 
OFFSHC BBP
OFFSHC BBP OFFSHC BBP
OFFSHC BBP OFFSHC
 
2013 10 18 OFFSHC Newsletter
2013 10 18 OFFSHC Newsletter2013 10 18 OFFSHC Newsletter
2013 10 18 OFFSHC NewsletterOFFSHC
 
2013 08 26 OFFSHC Newsletter
2013 08 26 OFFSHC Newsletter2013 08 26 OFFSHC Newsletter
2013 08 26 OFFSHC NewsletterOFFSHC
 
2013 06 30 OFFSHC Newsletter
2013 06 30 OFFSHC Newsletter2013 06 30 OFFSHC Newsletter
2013 06 30 OFFSHC NewsletterOFFSHC
 
2013 02 28 OFFSHC Newsletter
2013 02 28 OFFSHC Newsletter2013 02 28 OFFSHC Newsletter
2013 02 28 OFFSHC NewsletterOFFSHC
 
2013 04 29 OFFSHC Newsletter
2013 04 29 OFFSHC Newsletter2013 04 29 OFFSHC Newsletter
2013 04 29 OFFSHC NewsletterOFFSHC
 
OFFSHC Safety Management Systems
OFFSHC Safety Management SystemsOFFSHC Safety Management Systems
OFFSHC Safety Management SystemsOFFSHC
 
OSHA OKC Area Update 2013
OSHA OKC Area Update 2013OSHA OKC Area Update 2013
OSHA OKC Area Update 2013OFFSHC
 
Nfpa70 e 2012 hrc no logo
Nfpa70 e 2012 hrc no logoNfpa70 e 2012 hrc no logo
Nfpa70 e 2012 hrc no logoOFFSHC
 
2012 10 24 offshc newsletter
2012 10 24 offshc newsletter2012 10 24 offshc newsletter
2012 10 24 offshc newsletterOFFSHC
 
2012 09 26 offshc newsletter
2012 09 26 offshc newsletter2012 09 26 offshc newsletter
2012 09 26 offshc newsletterOFFSHC
 
Haz com 2012 workshop
Haz com 2012 workshopHaz com 2012 workshop
Haz com 2012 workshopOFFSHC
 
2012 08 17 offshc newsletter
2012 08 17  offshc newsletter2012 08 17  offshc newsletter
2012 08 17 offshc newsletterOFFSHC
 
2012 07 25 offshc newsletter
2012 07 25  offshc newsletter2012 07 25  offshc newsletter
2012 07 25 offshc newsletterOFFSHC
 
GHS Short
GHS ShortGHS Short
GHS ShortOFFSHC
 

Plus de OFFSHC (20)

OFFSHC gets briefed on IEDs
OFFSHC gets briefed on IEDsOFFSHC gets briefed on IEDs
OFFSHC gets briefed on IEDs
 
September 2014 OFFSHC newsletter
September 2014 OFFSHC newsletterSeptember 2014 OFFSHC newsletter
September 2014 OFFSHC newsletter
 
Weathering the Storm - OGE and OSHA
Weathering the Storm - OGE and OSHA Weathering the Storm - OGE and OSHA
Weathering the Storm - OGE and OSHA
 
February 2014 OFFSHC Newsletter
February 2014 OFFSHC NewsletterFebruary 2014 OFFSHC Newsletter
February 2014 OFFSHC Newsletter
 
2013 12 27 OFFSHC News
2013 12 27 OFFSHC News2013 12 27 OFFSHC News
2013 12 27 OFFSHC News
 
OFFSHC BBP
OFFSHC BBP OFFSHC BBP
OFFSHC BBP
 
2013 10 18 OFFSHC Newsletter
2013 10 18 OFFSHC Newsletter2013 10 18 OFFSHC Newsletter
2013 10 18 OFFSHC Newsletter
 
2013 08 26 OFFSHC Newsletter
2013 08 26 OFFSHC Newsletter2013 08 26 OFFSHC Newsletter
2013 08 26 OFFSHC Newsletter
 
2013 06 30 OFFSHC Newsletter
2013 06 30 OFFSHC Newsletter2013 06 30 OFFSHC Newsletter
2013 06 30 OFFSHC Newsletter
 
2013 02 28 OFFSHC Newsletter
2013 02 28 OFFSHC Newsletter2013 02 28 OFFSHC Newsletter
2013 02 28 OFFSHC Newsletter
 
2013 04 29 OFFSHC Newsletter
2013 04 29 OFFSHC Newsletter2013 04 29 OFFSHC Newsletter
2013 04 29 OFFSHC Newsletter
 
OFFSHC Safety Management Systems
OFFSHC Safety Management SystemsOFFSHC Safety Management Systems
OFFSHC Safety Management Systems
 
OSHA OKC Area Update 2013
OSHA OKC Area Update 2013OSHA OKC Area Update 2013
OSHA OKC Area Update 2013
 
Nfpa70 e 2012 hrc no logo
Nfpa70 e 2012 hrc no logoNfpa70 e 2012 hrc no logo
Nfpa70 e 2012 hrc no logo
 
2012 10 24 offshc newsletter
2012 10 24 offshc newsletter2012 10 24 offshc newsletter
2012 10 24 offshc newsletter
 
2012 09 26 offshc newsletter
2012 09 26 offshc newsletter2012 09 26 offshc newsletter
2012 09 26 offshc newsletter
 
Haz com 2012 workshop
Haz com 2012 workshopHaz com 2012 workshop
Haz com 2012 workshop
 
2012 08 17 offshc newsletter
2012 08 17  offshc newsletter2012 08 17  offshc newsletter
2012 08 17 offshc newsletter
 
2012 07 25 offshc newsletter
2012 07 25  offshc newsletter2012 07 25  offshc newsletter
2012 07 25 offshc newsletter
 
GHS Short
GHS ShortGHS Short
GHS Short
 

Offshc nfpa 70 e

  • 1. Presented to: Oklahoma FFHSC Date: November 1, 2012 Presented by: Stephanie Schroeder, CSP
  • 2.  Definitions  Documentation  Training  Program Audits  Hazard/RiskCategory Tables  DC System Hazards
  • 3.  Arc-rated (AR) • Previously flame resistant (FR) • Reported in ATPV or EBT • AR is FR, but FR is not AR  Informational note • Previously fine print note  Incident energy analysis  Arc flash protection boundary
  • 4. Approach Boundaries Review Any point on an exposed, energized electrical conductor or circuit part Prohibited approach boundary Restricted approach boundary Limited approach boundary Arc Flash Boundary
  • 5.  Relationships with Contractors Article 110.1(C) • Required meeting between host employer and external contractor • Must be documented
  • 6.  Training Requirements for Emergencies Article 110.2(C) • Automatic external defibrillator (AED) training shall be certified by the employer annually
  • 7.  Training Requirements for Employees Article 110.2 • Employer must determine employee compliance with this standard annually • Employee retraining every 3 years • Employer must retain description of content
  • 8.  Electrical Safety Auditing Article 110.3(H) • Audit of employers electrical safety program • Including field work • Frequency must not exceed 3 years • Must be documented
  • 9.  Electrically Safe Working Conditions, Article 130.2(A) • Rearrangement of the article may require equipment to be de-energized more often • Within the Limited Approach Boundary (LAB) • Equipment interaction with increased risk  Energized work permit, Article 130.2(B) • Diagnostics work exemptions still apply
  • 10.  Arc Flash Hazard Analysis 2009 Article 130.3, Exception No. 1 • Allowed exception to AFHA for certain systems less than 240 volts supplied by small transformer  Rescinded in 2012 Article 130.5, Informational Note No. 5 • Refer to IEEE 1584 for three-phase systems rated less than 240 volts
  • 11.  DCShock Protection Boundaries Article 130.4(C)(a) • Similar in format to the AC boundaries • Minimum voltage addressed is 100 VDC
  • 12.  AFHA Equipment Labeling Article 130.5(C) • Equipment likely to require maintenance, servicing, adjustments while energized shall be field marked with a label
  • 13.  AFHA Equipment Labeling Article 130.5(C) • The labels have to include the following three lines 1) At least one of the following  a. Available incident energy and the working distance or  b. Minimum arc rating of clothing or  c. Required level of PPE or  d. Highest Hazard/Risk Category (HRC) • 2) Nominal system voltage • 3) Arc flash boundary
  • 14.  AFHA Equipment Labeling Article 130.5(C) • ONE EXCEPTION: Labels applied prior to September 30, 2011 and when they contain  available incident energy or  required level of personal protective equipment
  • 15.  Personal Protective Equipment Article 130.7(C) • Hearing Protection • AR Clothing Systems • Head Protection • Modified Hand Protection
  • 16.  HazardRisk Categories (AC Voltages) Table 130.7(C)(15)(a) • Conditions were moved into the tables • Descriptions now include arc flash boundaries • HRC2* removed and replaced by HRC2
  • 17.  HazardRisk Categories (DC Voltages) Table 130.7(C)(15)(b) • Similar in format to the AC equipment table • Based on energized work and arcing currents • Maximum voltage range is 1000 VDC
  • 18.  Safety Related Maintenance Article 205 • Single line diagrams must be current and legible • Equipment must be maintained IAW manufacturers’ instructions • Maintenance, tests and inspections of overcurrent devices must be documented.
  • 19.  HazardAnalysis, Risk Estimation and Risk Evaluation Procedure - Annex F • Provides a model for evaluating hazards • Identifies hazards and assess risks • Completed prior to starting work
  • 20.  Public comments closed 6/22/13 • Definition of Qualified Person • Risk Assessment Procedures • Emergency response • Focus on training/retraining documentation • Deletion of PPE Category 0 • Yes/No tables for arc flash hazards  Technical Committee draft due 2/8/13
  • 21.  NFPA.org  http://www.nfpa.org/AboutTheCodes/About TheCodes.asp?docnum=70E&tab=nextedi tion  Disclaimer: Only significant changes were highlighted in this briefing, please refer to the 2012 NFPA 70E for details.
  • 22.  Stephanie Schroeder • FAA, Mike Monroney Aeronautical Center, OKC • Stephanie.schroeder@faa.gov • 405-954-0371

Notes de l'éditeur

  1. Article 90 IntroductionSection 90.2(A) (Revision)This section now uses a very important word: “inspection.” Electrical inspectors also can be exposed to hazards during inspections of installations, and this standard will now cover them. The proposed language reads: “This standard addresses electrical safety requirements for employee workplaces that are necessary for the practical safeguarding of employees during activities such as the installation, inspection, operation …” (emphasis added).Section 90.2(A)(4) (Revision)The words at the end of this section, “… that are not an integral part of a generating plant, substation or control center …” will be deleted, and this section will now read: “Installations used by the electric utility, such as office buildings, warehouses, garages, machine shops and recreational buildings.” This deletion clarifies that NFPA 70E applies to these areas, even if they are part of a generating plant, substation or control center.
  2. Changes Throughout DocumentArc-Rated (New) The 2012 edition of NFPA 70E will use the term “arc-rated” or “AR” before any reference to “flame-resistant” or “FR.” The term “arc-rated” refers to a material property or attribute in terms of a material’s performance when exposed to an electric arc. Arc-rated material is flame-resistant, but flame-resistant material may not be arc-rated.Ebt= Energy of break open thresholdFine Print Note (Revision) The term “fine print note (FPN)” is changing to “informational note.” This change provides consistency between the National Electrical Code (NEC) and NFPA 70E.
  3. Article 110 General Requirements for Electrical Safety-Related Work PracticesSection 110.1(C) (New)This section is new to the code and will require a documented meeting between the host employer and contract employer.
  4. Article110.6(C) Emergency Procedures (Revision)The 2012 edition will require the use of an automatic external defibrillator (AED) in addition to the existing requirement of training and employer certification of cardiopulmonary resuscitation (CPR).
  5. Paragraph 110.2(D)(1)(f) – Qualified Person TrainingThe employer shall use regular supervision or inspections on atleast an annual frequency to determine employee compliancewith this standard. The OSHA law of CFR 1910.269(a)(2)(iii) isstricter, requiring supervision AND inspections.Paragraph 110.2(D)(3) – Employee RetrainingIn addition to retraining for non-compliance, new equipment, orunfamiliar procedures, retraining shall be performed every threeyears or more frequently.Paragraph 110.2(E) – Training DocumentationThe employer must now retain a description of training contentin addition the employees’ names and date of the training.
  6. Paragraph 110.3(H) – Electrical Safety AuditingThis new section requires the employer’s electrical safetyprogram be audited at least every three years. This auditis to include field work, not just a review of paperwork. Ifdiscrepancies are identified in the audit, appropriate changesin training or procedures shall be implemented. The audit shallbe documented.
  7. Paragraph 130.2 – Electrically Safe Working conditionsThere were revisions in the arrangement of this Article. Thisparagraph could require placing the equipment into anelectrically safe work condition more often. If the employeewill be within the limited approach boundary, or the employeeis interacting with equipment that has an increased chance ofcreating an arc flash, the equipment must be de-energized. Anexample is switching a circuit breaker that has not been properlyMaintained.Section 130.1 (Relocation and New Section)The 2012 edition will feature Section 130.1 renumbered as 130.2. Proposed language for a new 130.1 states: “All requirements of this article shall apply whether an incident energy analysis is completed or if the tables 130.7(C)(9) and (C)(10) are utilized in lieu of incident energy analysis.” The new language is intended to help clarify that, when the table method is used, the other requirements of this section, such as providing proper justification and completing the energized work permit, still apply.Section 130.1(A) General (Revision)The 2009 edition requires that energized conductors or circuit parts be placed into an electrically safe working condition before an employee works within the LAB. New language expands this requirement to apply if any of the following conditions exist:• The employee is within the LAB (same as before)• The employee interacts with equipment where conductors or circuit parts are not exposed, but an increased risk of arc flash hazard exists• An informational note is added that refers to the definition of “arc flash hazard” in Article 100.Section 130.1(B)(1) Where Required (Revision)The proposed text changes and additions include “When working within the limited approach boundary or the arc flash boundary of exposed energized electrical parts … .” This language is intended to help clarify when the code requires an energized work permit.
  8. Deletion of Former Paragraph 130.3 Exception No. 1The prior edition did not require arc flash hazard analysis forcertain circuits 240 volt and less supplied by small transformers.This exception was rescinded. Now in 130.5 InformationalNote No. 5 it refers to the IEEE 1584 Standard for any detailsregarding these circuits.Section 130.3 Exception No. 1 (Revision)This exception is based on language found in Institute of Electrical and Electronics Engineers (IEEE) Std. 1584—Guide for Performing Arc-Flash Hazard Calculations. Exception 1 stated that an arc flash hazard analysis shall not be required on circuits rated 240 volts (V) or less and supplied by one transformer if the transformer is less than 125 kilovolt-amperes.
  9. DC shock protection information was added to the new table130.4(C)(b). It has the same format as the AC table which istable 130.4(C)(a).
  10. The required labeling has significantly changed. The 2009edition started the requirement for arc flash analysis equipmentlabeling. This prior edition only required field marking onequipment displaying available incident energy or required levelof PPE.The new edition is more specific with the equipment requiringlabels. Only equipment that would be worked on in an energizedstate requires the labeling.The labels have to include the following three lines of information1) At least one of the followinga. Available incident energy and the correspondingworking distance orb. Minimum arc rating of clothing orc. Required level of PPE ord. Highest Hazard/Risk Category (HRC) for the equipment2) Nominal system voltage3) Arc flash boundaryThe one exception is that if the labels were applied prior toSeptember 30, 2011, they are acceptable if they contain theavailable incident energy or required level of PPE.The method of calculating and supporting data shall be documented.
  11. The required labeling has significantly changed. The 2009edition started the requirement for arc flash analysis equipmentlabeling. This prior edition only required field marking onequipment displaying available incident energy or required levelof PPE.The new edition is more specific with the equipment requiringlabels. Only equipment that would be worked on in an energizedstate requires the labeling.The labels have to include the following three lines of information1) At least one of the followinga. Available incident energy and the correspondingworking distance orb. Minimum arc rating of clothing orc. Required level of PPE ord. Highest Hazard/Risk Category (HRC) for the equipment2) Nominal system voltage3) Arc flash boundary
  12. The one exception is that if the labels were applied prior toSeptember 30, 2011, they are acceptable if they contain theavailable incident energy or required level of PPE.
  13. Paragraph 130.7(C)(5)– Additional Requirement for Hearing ProtectionEmployees shall wear hearing protection when working within the arc flash boundary. The existing requirement has beento wear hearing protection in HRC 0 or higher locations ifperforming a listed task.Paragraph 130.7(C)(9)– Restriction with Arc Rated ClothingSystems Using other ClothingThe rating of a clothing system can not be increased by use ofnon-arc rated clothing.Paragraph 130.7(C)(10)(b)– New Requirements for Head ProtectionAn arc rated balaclava or arc rated hood shall be worn when the back of the head is within the arc flash boundary. An arc ratedhood shall be worn when the hazard exposure is over 12 cal/cm2.Paragraph 130.7(C)(10)(d)– Modified Requirements forHand ProtectionThe requirement for leather gloves or FR gloves was changed to heavy duty leather gloves or arc rated (AR) gloves. TheInformational Note describes what is considered a heavy dutyleather glove.
  14. Table 130.7(C)(15)(a)– Hazard Risk Categories with ACVoltagesThis table name was changed from 130.7(C)(9) to 130.7(C)(15)(a). The content changed as follows:The conditions of applicability were relocated from footnotes to the equipment headings. For example, apanelboard with voltages >240 up to 600 has a maximumof 25kA short current available, maximum clearing time ofupstream protection of 2 cycles, and a minimum workingdistance of 18 inches. If the equipment does not conformto the conditions, the calculation method must be used forincident energy analysis per 130.7(C)(15).2) The equipment descriptions now include the arc flash boundary distance based on the conditions of applicability.3) The hazard risk category (HRC) 2* was replaced with HRC2. In essence HRCs 2 and 2* were combined and thestricter PPE requirements of HRC 2* now apply to the HRC2.4) The prior equipment category of “Panelboards or Switchboards Rated >240 V and up to 600 V” was modifiedto “Panelboards or other equipment rated >240 V and up to600 V,” deleting “Switchboards.”5) The equipment category 600 V class motor control center(MCC) was split into to two sections with differing conditions.The first category pertains to working within the buckets.The second section pertains to interacting with a bus.
  15. Table 130.7(C)(15)(b)– New - Hazard Risk Categories withDC VoltagesA new table for hazard risk categories was added for DC equipment. It is in a similar format as the AC equipment table.The maximum voltage range included is 600 volts DC. Guidanceis given in Informative Annex D in section D.8 on calculating DCincident energy where the equipment is not covered in the new table.
  16. Changes to Chapter 2 – Safety RelatedMaintenanceRequirementsSection 205.2– Single Line DiagramThe added requirementstates that, “A single-linediagram, where providedfor the electrical system,shall be maintained in alegible condition and shall be kept current.” This is not requiringa single-line diagram, but if one is used, it has to be readableand be updated.Section 205.3 – General MaintenanceEquipment must be maintained IAW manufacturers’ instructions or industry consensus standards to reduce the risk of failure and subsequent exposure of employees to electrical hazards. Section 205.4 – Added Requirement for OvercurrentProtective DevicesMaintenance, tests, and inspections shall be documented. Thispertains to the required maintenance in section 205.3.
  17. Article 110.3(F)Identification and Risk Assessment ProcedureRequires employees to identify hazards and assess risks prior to starting work.
  18. NFPA 70E Technical Committee reports to NEC Technical Correlating Committee reports to NFPAStandards Council EEI Representatives to the TC:• Mike Madrigal, KCP&L (Principal)http://esafetyline.com/eei/conference%20pdf%20files/EEIfall2012/WashingtonUpdate_MichaelMadrigal.pdfReceived 462 Public input CommentsCreated 168 first Revisions