SlideShare une entreprise Scribd logo
1  sur  2
CURRICULUM VITAE
IDENTITY
 Name :Paulo Nkondi Nkengue
 Date of Birth: 10 October 1984
 ID Number: 004851354ZE048
 Residence: Luanda /benfica
 Citizen: Angolan
 Passport No: N1184167
 Position: Electrician(Operator)
SUMMARY
 After my high school in general industrial electricity and then I went to the
College where I did my Engineering in industrial electricity and I did my
Computer Science Training and English course
EDUCATION BACK GROUND
 Primary school
 High school in general industrial electricity
 Engineering degree in industrial electricity
 Electricity course Training level 1
 Electricity Training
 PBS Behavior Observation Team Training
 Excellent Safety Performance (Angola LNG)
 Computer Science Training
 English Course Training
 BST Safety Training

EMPLOYMENT HISTORY
 2015 I actually work for ESPACIE SERVICES Prevision of Service to Angoflex (A
sonangol-Technip Association) as a Maintenance Electrician
 My Tasks:
Preparation of electrical Cable, test of electrical cable and Elaboration of plan
Installation, Assembling, Repairing and installing Motors
Maintaining all electrical equipments in Project, Prevention and curative of
Motors Helix and Meltech (take up and pay off) when they‘re broken down.
 From 2014 -2015 I worked for ESPACIE SERVICES Prevision of Service to
Angoflex(A sonangol-Technip Association) as an OPERATOR OF PRODUTION of
UMBILCAL at Lobito in (KAOMBO PROJECT,ENI and DALIA-TOTAL E&P)
 My Task: Participation in fabrication of umbilical in all operation: Assemblage of
Umbilical(Filler ,Pipe, Electrical cable and Optical wireless ) and extrusion
operation and operate in all machine like Helix ,carrousel and Meltech (take up
and pay off) used to enroll up electrical cable or Umbilical to the bobines
(Project ENI ,DALIA and KAOMBO)
Preparation of Cable, Elaboration of plan Installation and Test of Cable in
KAOMBO Project (TOTAL), Dalia replacement and ENI
 From Jun 2009Dec 2011 I worked at BECHTEL INTER (AngolaLNG Project)
as an Electrician Industrial
MAIN TASKS
 Preparation of Cable and Elaboration of plan Installation in Project Angola LNG
 Assembling, starting and installing Asynchronous Motors in Project Angola LNG
 Maintaining all equipments electrical in Project, Prevention, Periodic and
curative when they‘re broken down
.
ADDITIONAL INFORMATION
 Availability on Time
 Good capacity for learning and adaptation and I like Team Work
 Enough capacity to take on tasks that carry responsibility

SPOKEN LANGUAGES
 Portuguese CONTACTOS
 English 937724300,918190526, 936322536
 French e-mail:Paulo.nkengue@yahoo.fr

Contenu connexe

En vedette

Cte lin
Cte linCte lin
Cte linEdi
 
Itcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact SheetItcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact SheetITCN Asia
 
Curso de saúde baseada em evidências
Curso de saúde baseada em evidênciasCurso de saúde baseada em evidências
Curso de saúde baseada em evidênciasmedNuclearHuap
 
Mateo alejandro salgado prieto proyecto
Mateo alejandro salgado prieto proyectoMateo alejandro salgado prieto proyecto
Mateo alejandro salgado prieto proyectoMateo Salgado
 
Woodward, Alex profile
Woodward, Alex profileWoodward, Alex profile
Woodward, Alex profileAlex Woodward
 
Lte workshop business plan-final
Lte workshop  business plan-finalLte workshop  business plan-final
Lte workshop business plan-finalKhazane Hassan
 
【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!
【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!
【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!SORACOM,INC
 
ウェブ解析のススメ
ウェブ解析のススメウェブ解析のススメ
ウェブ解析のススメ瀧田幸介
 
Paralelo entre los algunos modelos de gestión educativa magda
Paralelo entre los algunos modelos de gestión educativa magdaParalelo entre los algunos modelos de gestión educativa magda
Paralelo entre los algunos modelos de gestión educativa magdaLeny Giraldo H.
 
Cycling, Hot Dogs, Marginal Gains and Digital Marketing
Cycling, Hot Dogs, Marginal Gains and Digital MarketingCycling, Hot Dogs, Marginal Gains and Digital Marketing
Cycling, Hot Dogs, Marginal Gains and Digital MarketingWayne Barker
 
AAI (Airports Authority of India) PPT
AAI (Airports Authority of India) PPTAAI (Airports Authority of India) PPT
AAI (Airports Authority of India) PPTLokesh Negi
 
Iron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanIron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanSajid Ali
 
Actualizacion RCP guias 2015 aha
Actualizacion RCP guias 2015 ahaActualizacion RCP guias 2015 aha
Actualizacion RCP guias 2015 ahaAndres Dimitri
 

En vedette (20)

Decade20130506
Decade20130506Decade20130506
Decade20130506
 
Biografías de escritores abejorraleños
Biografías de escritores abejorraleñosBiografías de escritores abejorraleños
Biografías de escritores abejorraleños
 
Cte lin
Cte linCte lin
Cte lin
 
Itcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact SheetItcn Asia 2009 Fact Sheet
Itcn Asia 2009 Fact Sheet
 
Curso de saúde baseada em evidências
Curso de saúde baseada em evidênciasCurso de saúde baseada em evidências
Curso de saúde baseada em evidências
 
Proyecto pág web esc sec téc 4 y 26
Proyecto pág web esc sec téc 4 y 26Proyecto pág web esc sec téc 4 y 26
Proyecto pág web esc sec téc 4 y 26
 
Mateo alejandro salgado prieto proyecto
Mateo alejandro salgado prieto proyectoMateo alejandro salgado prieto proyecto
Mateo alejandro salgado prieto proyecto
 
Woodward, Alex profile
Woodward, Alex profileWoodward, Alex profile
Woodward, Alex profile
 
Lte workshop business plan-final
Lte workshop  business plan-finalLte workshop  business plan-final
Lte workshop business plan-final
 
APEX
APEXAPEX
APEX
 
【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!
【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!
【Connected.J1】SORACOM応用事例 ~モバイル通信だからできる!
 
ウェブ解析のススメ
ウェブ解析のススメウェブ解析のススメ
ウェブ解析のススメ
 
Quantification of Saline Aquifers for Geological Storage of CO2 – Experiences...
Quantification of Saline Aquifers for Geological Storage of CO2 – Experiences...Quantification of Saline Aquifers for Geological Storage of CO2 – Experiences...
Quantification of Saline Aquifers for Geological Storage of CO2 – Experiences...
 
Haskell study 5
Haskell study 5Haskell study 5
Haskell study 5
 
Paralelo entre los algunos modelos de gestión educativa magda
Paralelo entre los algunos modelos de gestión educativa magdaParalelo entre los algunos modelos de gestión educativa magda
Paralelo entre los algunos modelos de gestión educativa magda
 
Cycling, Hot Dogs, Marginal Gains and Digital Marketing
Cycling, Hot Dogs, Marginal Gains and Digital MarketingCycling, Hot Dogs, Marginal Gains and Digital Marketing
Cycling, Hot Dogs, Marginal Gains and Digital Marketing
 
AAI (Airports Authority of India) PPT
AAI (Airports Authority of India) PPTAAI (Airports Authority of India) PPT
AAI (Airports Authority of India) PPT
 
Anemia y erc
Anemia y erc Anemia y erc
Anemia y erc
 
Iron & Steel Industry Of Pakistan
Iron & Steel Industry Of PakistanIron & Steel Industry Of Pakistan
Iron & Steel Industry Of Pakistan
 
Actualizacion RCP guias 2015 aha
Actualizacion RCP guias 2015 ahaActualizacion RCP guias 2015 aha
Actualizacion RCP guias 2015 aha
 

Similaire à cv

Ngigi Daniel resume
Ngigi Daniel resumeNgigi Daniel resume
Ngigi Daniel resumeDaniel Ngigi
 
BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1Dominic Dadzie
 
Bridge electrical engineering work1
Bridge electrical engineering work1Bridge electrical engineering work1
Bridge electrical engineering work1Dominic Dadzie
 
Ervin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Buagas
 
ngum denise ambe CV the most recent 2016
ngum  denise ambe CV the most recent 2016ngum  denise ambe CV the most recent 2016
ngum denise ambe CV the most recent 2016Ngum Ambe
 
Ivan new_cv_updated
Ivan new_cv_updatedIvan new_cv_updated
Ivan new_cv_updatedIvan Horan
 
Up-to-Date Leonel resume
Up-to-Date Leonel resumeUp-to-Date Leonel resume
Up-to-Date Leonel resumeLeonel Enriquez
 
Dzakpasu Andy Sefakor C.V
Dzakpasu Andy Sefakor C.VDzakpasu Andy Sefakor C.V
Dzakpasu Andy Sefakor C.VAndy Dzakpasu
 
Edson filipe Elite_cv_ 2015 EN
Edson filipe Elite_cv_ 2015 ENEdson filipe Elite_cv_ 2015 EN
Edson filipe Elite_cv_ 2015 ENedson Filipe
 
Eslam mohamed bahr
Eslam mohamed bahrEslam mohamed bahr
Eslam mohamed bahrEslam bahr
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016Jashim Pd-2
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Jashim Pd-2
 
CV Sudarmaji
CV Sudarmaji CV Sudarmaji
CV Sudarmaji Darma_ Ji
 

Similaire à cv (20)

Ngigi Daniel resume
Ngigi Daniel resumeNgigi Daniel resume
Ngigi Daniel resume
 
BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1
 
Bridge electrical engineering work1
Bridge electrical engineering work1Bridge electrical engineering work1
Bridge electrical engineering work1
 
Ervin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & ResumeErvin Guinit Buagas CV & Resume
Ervin Guinit Buagas CV & Resume
 
ngum denise ambe CV the most recent 2016
ngum  denise ambe CV the most recent 2016ngum  denise ambe CV the most recent 2016
ngum denise ambe CV the most recent 2016
 
Ivan new_cv_updated
Ivan new_cv_updatedIvan new_cv_updated
Ivan new_cv_updated
 
CV Turyan Salimov
CV Turyan SalimovCV Turyan Salimov
CV Turyan Salimov
 
CV Indra Puji S Oct 2015
CV Indra Puji S Oct 2015CV Indra Puji S Oct 2015
CV Indra Puji S Oct 2015
 
Up-to-Date Leonel resume
Up-to-Date Leonel resumeUp-to-Date Leonel resume
Up-to-Date Leonel resume
 
Yaya Sunarya CV
Yaya Sunarya CVYaya Sunarya CV
Yaya Sunarya CV
 
Dzakpasu Andy Sefakor C.V
Dzakpasu Andy Sefakor C.VDzakpasu Andy Sefakor C.V
Dzakpasu Andy Sefakor C.V
 
Edson filipe Elite_cv_ 2015 EN
Edson filipe Elite_cv_ 2015 ENEdson filipe Elite_cv_ 2015 EN
Edson filipe Elite_cv_ 2015 EN
 
The last Curriculum Vitae CV
The last Curriculum Vitae CVThe last Curriculum Vitae CV
The last Curriculum Vitae CV
 
CV2015
CV2015CV2015
CV2015
 
Eslam mohamed bahr
Eslam mohamed bahrEslam mohamed bahr
Eslam mohamed bahr
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
 
Nagappa
NagappaNagappa
Nagappa
 
CV Sudarmaji
CV Sudarmaji CV Sudarmaji
CV Sudarmaji
 
ERHINYOJARE O. FIDELIS (1)
ERHINYOJARE O. FIDELIS (1)ERHINYOJARE O. FIDELIS (1)
ERHINYOJARE O. FIDELIS (1)
 

cv

  • 1. CURRICULUM VITAE IDENTITY  Name :Paulo Nkondi Nkengue  Date of Birth: 10 October 1984  ID Number: 004851354ZE048  Residence: Luanda /benfica  Citizen: Angolan  Passport No: N1184167  Position: Electrician(Operator) SUMMARY  After my high school in general industrial electricity and then I went to the College where I did my Engineering in industrial electricity and I did my Computer Science Training and English course EDUCATION BACK GROUND  Primary school  High school in general industrial electricity  Engineering degree in industrial electricity  Electricity course Training level 1  Electricity Training  PBS Behavior Observation Team Training  Excellent Safety Performance (Angola LNG)  Computer Science Training  English Course Training  BST Safety Training  EMPLOYMENT HISTORY  2015 I actually work for ESPACIE SERVICES Prevision of Service to Angoflex (A sonangol-Technip Association) as a Maintenance Electrician  My Tasks: Preparation of electrical Cable, test of electrical cable and Elaboration of plan Installation, Assembling, Repairing and installing Motors Maintaining all electrical equipments in Project, Prevention and curative of Motors Helix and Meltech (take up and pay off) when they‘re broken down.  From 2014 -2015 I worked for ESPACIE SERVICES Prevision of Service to Angoflex(A sonangol-Technip Association) as an OPERATOR OF PRODUTION of UMBILCAL at Lobito in (KAOMBO PROJECT,ENI and DALIA-TOTAL E&P)
  • 2.  My Task: Participation in fabrication of umbilical in all operation: Assemblage of Umbilical(Filler ,Pipe, Electrical cable and Optical wireless ) and extrusion operation and operate in all machine like Helix ,carrousel and Meltech (take up and pay off) used to enroll up electrical cable or Umbilical to the bobines (Project ENI ,DALIA and KAOMBO) Preparation of Cable, Elaboration of plan Installation and Test of Cable in KAOMBO Project (TOTAL), Dalia replacement and ENI  From Jun 2009Dec 2011 I worked at BECHTEL INTER (AngolaLNG Project) as an Electrician Industrial MAIN TASKS  Preparation of Cable and Elaboration of plan Installation in Project Angola LNG  Assembling, starting and installing Asynchronous Motors in Project Angola LNG  Maintaining all equipments electrical in Project, Prevention, Periodic and curative when they‘re broken down . ADDITIONAL INFORMATION  Availability on Time  Good capacity for learning and adaptation and I like Team Work  Enough capacity to take on tasks that carry responsibility  SPOKEN LANGUAGES  Portuguese CONTACTOS  English 937724300,918190526, 936322536  French e-mail:Paulo.nkengue@yahoo.fr