Change Management – A success story in a government organization.
Ashutosh Pandey, R.T.Sundari
Any change initiative is to steer the organization away from where it’s currently headed to an
enhanced and improved future. Mostly we find the change process and improvement programs
often “fail” due to improper understanding of corporate strategic objectives and processes are not
aligned with business imperatives. The successful change will depend upon the collective power
of change initiatives, having sufficient impact on the targeted driving forces, thereby altering the
course of the organization. To have appropriate infrastructure in place will certainly support the
‘mechanics’ of change. This means having effective organizational structure, project
management office (PMO), clear roles and responsibilities, plans, communications and
measurement. For improving the future course of activities it is also essential to nurture the
individual competencies to build the organizational capabilities. In this paper we discuss about
the changes made in the organization having project based structure to matrix structure of
different functions with project base. The change initiatives are then measured with leading
indicators like cost, revenue, technology implementation and quality of deliverables. With above
orientation of change management the organization was able achieve the milestones leading
towards processes and performance improvement. It has also resulted in the client and employee
satisfaction.
Key words: Change Management, Organizational structure, Matrix structure
1. Introduction
The concept of "change management" is a familiar one in most businesses today. Any change
initiative is to steer the organization away from where it’s currently headed to an enhanced and
improved future. But, how businesses manage change and how successful they are at it varies a
lot depending on the nature of the business, the change and the people involved. Organizational
change is something that occurs throughout an organization’s life cycle. The effect of change
occurs in the entire organization rather than one part of it. Change in the organization is required
due to demand in the globalization, ever changing technology. Therefore it is necessary to
understand the present needs and accordingly the change strategy to be implemented. Change
management in this paper refers to organization-wide change, that is, change which affects all
systems, structures and processes, as well as organizational culture. This holistic approach
involves learning throughout the organization.
2. Challenges in the Government R&D organization.
In a government R&D organization, as is well-known, the software development activities are
significantly different from those of other software development companies who develop the
applications as per well defined customer requirements. In such a R&D unit, dealing with
various mega software projects, the planning itself was more complex and specification changes
during project implementation were frequent and inevitable. To begin any successful change
process, you must first start by understanding why the change must take place.
Implementing change management strategy is not easy in those organizations. CM has to find a
fine balance of Organizational Structures, Cultural Acceptance, Procedures, Processes and the
right degree of system support. It requires acceptance from the top management and support.
Buy-in has to percolate from top to bottom.
3. Change Management Model
Change Management in an organization is a result of influencing both internal and external
factors. For example, the internal environment might be affected by following factors.
Identification New/Large opportunities
Improper work distribution among employees
Performance gaps to to attain organization goals and objectives
Introduction to New Processes/ Technologies
Crisis- Financial or Resources
Everyone has few theories about change management. While there are many change
management models, most organization will choose at least one of the following three models to
implement the strategy:
1. Lewin’s Change Management Model
2. McKinsey 7-S Model
3. Kotter’s 8 Step Change Model
While each one of the models has its own advantages and disadvantages, one has to carefully
analyse the model that best suit to his organization and its culture. Mostly we find the change
process and improvement programs often “fail” due to improper understanding of corporate
strategic objectives and processes are not aligned with business imperatives. The successful
change will depend upon the collective power of change initiatives, having sufficient impact on
the targeted driving forces, thereby altering the course of the organization. Organizational
performance is core to its success. After careful analysis and evaluation of the suitability
factors, Kotter’s 8 Step model was chosen to implement the CM.
The 8 steps in this model are:
1. Increase the urgency for change.
2. Build a team dedicated to change.
3. Create the vision for change.
4. Communicate the need for change.
5. Empower staff with the ability to change.
6. Create short term goals.
7. Stay persistent.
8. Make the change permanent.
Significant advantages to this model are:
- The process is an easy step-by-step
- The focus is on preparing and accepting change, not the actual change.
- Transition is easier.
While implementing the CM, it is fore most important to evaluate various risks and financial
implications in the organization. Following Cost & Risks were analyzed on both levels i.e.
Project and organization.
Costs Risks
Project level Project delays
Missed milestones
Budget overruns
Rework required on design
Loss of work by project team
Resistance – active and passive
Project put on hold
Resources not made available
Obstacles appear unexpectedly
Project fails to deliver results
Project is fully abandoned
Organizational
level
Productivity plunges (deep and
sustained)
Loss of valued employees
Reduced quality of work
Impact on customers
Impact on suppliers
Morale declines
Legacy of failed change
Stress, confusion, fatigue
Change saturation
If the change is not
implemented
Lost investment made in the project
Lost opportunity to have invested
in other projects
Expenses not reduced
Efficiencies not gained
Revenue not increased
Waste not reduced
Regulations not met
Table 1: Analysis of Cost and Risks-Organizational vs Project level
4. Implementation of Change Management in an R & D Government Organization:
To meet challenges in implementation of CM, such an organization need to focus on changes in
following areas:
Organization’s Mission and Vision…. by continuously monitoring its Mission i.e.
purpose of its business, Vision i.e. what the Organization should look like and its
competitive strategies.
Working Mechanism can be changed by introducing new procedures, methods to attain
better performance with available resources.
Organizational Structure can be changed to be more responsive with external factors
i.e. customers, market competitions etc. Structure can be changed inside the organization
also to make life-cycle more effective.
Human behavior and Organization Culture can be redefined by training to managers
and employees for new knowledge and skills. Right-Sizing can be done to deal with
financial crisis and best fit persons can be more utilized by increasing motivation and
incentive schemes.
C-DAC Noida center (a scientific society of Ministry of communication and IT) has been
involved in R&D and application oriented design and development for various Government
Clients. Over the decades, it has acquired competency, expertise and extensive experience in the
areas of Health Informatics, Embedded Systems, Language Computing and e-Governance
domains. The organization structure was built around these domain areas. Project teams were
formed within these groups, who were responsible for design, development, testing and
implementation which led to excessive coding and little importance given to knowledge sharing.
Time lines for delivering the products were often missed. Team Members were not released to
other teams where the requirement is priority. That resulted in excess man power deployment in
each projects.
Fig 1: Project base organizational structure
During data collection and internal audits we came to know that the project documents like
designing, review reports were prepared after the activity of that phase is over. The very purpose
of the documentation seems to have been defeated as the Project Leader and his team managed
everything within their ambit.
So keeping opportunities and challenges in mind, Centre evolved some internal changes in its
functional structures. In order to create an urgency of the change, staffs are consulted for the
change management plan. First step towards this was to identify the group which will implement
the change. Software Engineering Process Group (SEPG) was formed with the representation
from different technical groups. The next was empowering the SPEG so as to work without any
hindrance.
Putting people at the top of the agenda with planning for enhanced staff performance has become
a key element of the Strategy. Accordingly, it was decided to change the organization structure
by creating four groups’ viz. Design, Development, Testing and Implementation. Within this
group projects were handled by different teams. Changing the whole structure from Project-
Based to Metric Base was a great challenge for the organization. This has helped in pooling the
skill and talent in a group with a clearly defined roles and responsibilities.
Due to this structure, the documentation has become a must from other group before they start
their work. Project Managers were from the Implementation group and they will be interacting
with the customers for the requirements and finalizing the same with them. They prepare the
System Requirement Document and forward to the Design Team for designing. The Design
Team works on the High Level Design and Low Level Design and reviews the same with the
proposed committee before releasing the Design document to the Development Group. After
coding, the application was deployed in the test server and testing team work on them by testing
the functionalities as per clients’ requirements. The common repository system was created by
the Quality Assurance Group for easy handing of the documents from the various groups. The
baseline documents were uploaded in project repository for the stakeholders to use. At the same
time Project Manager can be able to monitor the activity with the help of common repository.
The vertical functional group and horizontal project team of matrix helped to speed up the
implementation.
Fig 2: Matrix based structure
Initially, the changes made in the structure did not go well in between the groups. There have
been barriers created between the groups leading to water tight compartments. No accountability
was felt by Design, Development and Testing groups. As such, the Implementation team always
faced the pressure from the clients.
SEPG group has identified the Project Management Office (PMO) to co-ordinate with different
groups. It tracks the timeline and progress of the project and gave a good support to
implementation group. Weekly meetings were conducted by the PMO with the Team Leads of
different groups. Targets were fixed during the meeting and issues between the groups were
sorted out amicably.
5. Analyses about the result obtained due to CM
Before introducing the Change in the organizational structure there was lot of rework in the projects.
Similar modules/ functionalities developed by a number of projects but components developed under one
project were not being re-used in other projects thus resulting in duplication of work and more effort.
Same defects were noticed and experienced in different projects. Maintaining of the similar type of
modules in all projects became difficult as each group or team was developing their modules
independently.
After six months of executing the new change in structure and functionalities, we have collected the data
from different projects only to find very little improvement in the outcome. PMO began to closely
monitor the project execution and the hi cups in the process and procedures were ironed out. After one
year the improvement were felt. The following table of Customer Satisfaction was taken after one and
half years. Here you see during the project based structure overall Customer Satisfaction Index (CSI) was
between 1 and 2 whereas the matrix based structure of CSI was reached 3.
Customer Satisfaction Index in Project based Structure
Projects Availability
of Build on
Production
Documen
tation
Defect
Occurren
ce
Maintai
nability
Reliabil
ity
Perform
ance
Usabil
ity
Overall
CSI (in
Project
Based)
PGIMER 2 2 3 3 3 2 2 2
GNCTD 1 2 4 2 1 1 2 1
RIMS 1 2 3 1 1 1 1 1
SMS 3 2 3 3 3 3 3 2
Customer Satisfaction Index in Metric based Structure
Projects Availability
of Build on
Production
Documentat
ion
Defect
Occurr
ence
Maintai
nability
Reliabil
ity
Perform
ance
Usabil
ity
CSI (in
Metric
Based)
PGIMER 4 3 2 3 3 3 4 3
GNCTD 5 4 1 4 4 4 4 3
RIMS 5 3 2 4 4 4 5 3
SMS 3 3 1 4 4 3 3 3
Table 2 Customer Satisfaction Index
Fig 3: Customer Satisfaction Index
Another main benefit accrued was lowering of cost of implementation of projects. In Table 3 below for
each project we have taken ‘Size’ (i.e No of processes in the project). Against size we have compared the
re-usable components, rework, defects detected before delivery of the product and after delivery and
redundancy percentage. From the result below we can see that after the changes in the process structure
reworking has reduced due to no of re-usable components used in the projects. The defects rate after
delivery was also declined while the defects rate before delivery was high. This means that testing was
very effective. Overall the implementation cost of each project has been decreased in the matrix based
structure.
0
1
2
3
4
Overall CSI (in
Project Based)
CSI (in Metric
Based)
Implementation Cost in Project based Structure Per Process
Projects Size (No.
of
Processes)
Re-
Usable
Compone
nts
Rework
(Man
days)
Defects
detected
before
Delivery
Defects
detected
after
Delivery
Redunda
ncy %
Cost of
Product
Developme
nt (INR)
Project
Based Per
Process
Implement
ation Cost
(INR)
PGIMER 728 45 340 2673 215 42 3899500.00 5356.46
GNCTD 446 14 225 1463 175 54 2495750.00 5595.85
RIMS 875 7 324 1225 227 62 3650500.00 4172.00
SMS 678 17 275 1900 122 38 3211750.00 4737.09
Per Process Implementation Cost in Metric based Structure
Projects Size (No.
of
Processes)
Re-
Usable
Compone
nts
Rework
(Man
days)
Defects
detected
before
Delivery
Defects
detected
after
Delivery
Redunda
ncy %
Cost of
Product
Developme
nt
Per
Process
Implement
ation Cost
(INR)
PGIMER 1625 124 201 3678 202 12 6310000.00 3883.08
GNCTD 1258 76 175 2458 124 6 4671000.00 3713.04
RIMS 986 49 115 2126 62 8 3715750.00 3768.51
SMS 625 29 121 1965 57 7 2743500.00 4389.60
Table 3: Implementation Cost per Process
6. Conclusion
With above orientation of change management the organization was able achieve the milestones
leading towards processes and performance improvement. It has also resulted in the client and
employee satisfaction. Whatever change management strategy is used it should have holistic
approach for better results. Comparison of the data between the two type structures shows that there
is an average of 40% cost reduction due to the Change. The Change has Minimized Project Risks,
Accelerating Project Benefits and Optimizing current & future processes and structures. Due to the
customer satisfaction we have been able to get more projects of same type.
References:
1. Project data: QMS, CDAC Noida
2. Kotter, John P., and Dan S. Cohen, The Heart of Change: Real-Life Stories of How People
Change Their Organizations. Harvard Business Press, 2002.
3. Journal of Organizational Change Management, Professor Slawomir Magala, ISSN: 0953-4814
4. Change Management Masterclass: A Step-By-Step Guide to Successful Change Management, by
Mike Green, Published August 28th 2007 by Kogan Page
5. Change by Design: How Design Thinking Transforms Organizations and Inspires Innovation by
Tim Brown (Sep 29, 2009)
6. Organization Change: Theory and Practice (Foundations for Organizational Science series) by
W. Warner Burke (Nov 29, 2010)
7. Management of Organizational Change: K Harigopal, SAGE, 14-Apr-2006
8. Change Management Strategies for an Effective EMR Implementation : Claire McCarthy,Douglas
Eastman, HIMSS, 2010
9. Change Management 100 Success Secrets, by Gerard Blokdijk, 2008
10. Organizational and personal change management, process, plans, change management and
business development tips- www.businessballs.com.
11. Change Management Consulting Case Study by Ryan Gunhold
Mr. Ashutosh Pandey (B. Tech CSE, MS in Cyber Laws) has a total work experience of 7.5 years and a Project
engineer in CDAC Noida for the past 5 years. He is also registered as ATM (Appraisal Team Member) in SEI
(Software Engineering Institute) and helped CDAC Noida in attaining CMMI Level 3 in December 2008 and CMMI
Level 5 in February 2011. He’s Also a Member of CSI. His research interest includes Object Oriented Software
Engineering, Software Testing. He may be contacted in ashutoshpandey@cdac.in.
R.T. Sundari (Consultant) has Post graduation in Management and 35 years experience in
software designing, development and testing. She is currently heading the PMO(Project
Management Office) and SEPG (Software Engineering Process Group) in addition to Quality
Assurance division of CDAC, Nodia. She has been instrumental in attaining CMMi 5 and ISO
9001 Certifications for CDAC Noida. She has guided many national and international papers
work. She may be contacted in sundari@cdac.in

Contenu connexe

Tendances

Change management report
Change management reportChange management report
Change management reportConsultant
 
Organizational Change Management and Communications
Organizational Change Management and CommunicationsOrganizational Change Management and Communications
Organizational Change Management and CommunicationsEnamul Haque
 
John osteenb rajagopalansubramanian
John osteenb rajagopalansubramanianJohn osteenb rajagopalansubramanian
John osteenb rajagopalansubramanianPMI2011
 
Organizational Development by Prof. Dr. Aung Tun Thet
Organizational Development by Prof. Dr. Aung Tun ThetOrganizational Development by Prof. Dr. Aung Tun Thet
Organizational Development by Prof. Dr. Aung Tun ThetThu Nandi Nwe
 
Change Management Strategy/Plan
Change Management Strategy/PlanChange Management Strategy/Plan
Change Management Strategy/Plansheliashelton
 
Term Paper - Current strategic management issues
Term Paper - Current strategic management issuesTerm Paper - Current strategic management issues
Term Paper - Current strategic management issuesAsad Ali
 
Channel_2008_Ps_In_Profitability
Channel_2008_Ps_In_ProfitabilityChannel_2008_Ps_In_Profitability
Channel_2008_Ps_In_ProfitabilityFarhad Merchant
 
The Highway of Change and a Practical Framework Approach to Change
The Highway of Change and a Practical Framework Approach to ChangeThe Highway of Change and a Practical Framework Approach to Change
The Highway of Change and a Practical Framework Approach to ChangeFlevy.com Best Practices
 
Organisational change, Innovation and Transformation communication
Organisational change, Innovation and Transformation communicationOrganisational change, Innovation and Transformation communication
Organisational change, Innovation and Transformation communicationStephen Tindi
 
Anju drolia
Anju droliaAnju drolia
Anju droliaPMI2011
 
Steps to a successful performance management implementation
Steps to a successful performance management implementationSteps to a successful performance management implementation
Steps to a successful performance management implementationaemu123456
 
Assignment strategic change management
Assignment strategic change managementAssignment strategic change management
Assignment strategic change managementBhavi Bhatia
 
Management information system
Management information systemManagement information system
Management information systemPOOJA UDAYAN
 
Success And Failures In Organizational design
Success And Failures In Organizational design Success And Failures In Organizational design
Success And Failures In Organizational design Shivashankari24
 
Business transformation and business value drivers
Business transformation and business value driversBusiness transformation and business value drivers
Business transformation and business value driversJohn A. Bova
 
Bpug conference november 2012
Bpug conference november 2012 Bpug conference november 2012
Bpug conference november 2012 Maven
 
The Seven Step Change Management Plan
The Seven Step Change Management PlanThe Seven Step Change Management Plan
The Seven Step Change Management PlanCaroline Siemers
 
Change management assignment help
Change management assignment helpChange management assignment help
Change management assignment helpShami VK
 

Tendances (20)

Change management report
Change management reportChange management report
Change management report
 
Organizational Change Management and Communications
Organizational Change Management and CommunicationsOrganizational Change Management and Communications
Organizational Change Management and Communications
 
John osteenb rajagopalansubramanian
John osteenb rajagopalansubramanianJohn osteenb rajagopalansubramanian
John osteenb rajagopalansubramanian
 
Organizational Development by Prof. Dr. Aung Tun Thet
Organizational Development by Prof. Dr. Aung Tun ThetOrganizational Development by Prof. Dr. Aung Tun Thet
Organizational Development by Prof. Dr. Aung Tun Thet
 
Change Management Strategy/Plan
Change Management Strategy/PlanChange Management Strategy/Plan
Change Management Strategy/Plan
 
Term Paper - Current strategic management issues
Term Paper - Current strategic management issuesTerm Paper - Current strategic management issues
Term Paper - Current strategic management issues
 
Channel_2008_Ps_In_Profitability
Channel_2008_Ps_In_ProfitabilityChannel_2008_Ps_In_Profitability
Channel_2008_Ps_In_Profitability
 
The Highway of Change and a Practical Framework Approach to Change
The Highway of Change and a Practical Framework Approach to ChangeThe Highway of Change and a Practical Framework Approach to Change
The Highway of Change and a Practical Framework Approach to Change
 
Organisational change, Innovation and Transformation communication
Organisational change, Innovation and Transformation communicationOrganisational change, Innovation and Transformation communication
Organisational change, Innovation and Transformation communication
 
Anju drolia
Anju droliaAnju drolia
Anju drolia
 
Steps to a successful performance management implementation
Steps to a successful performance management implementationSteps to a successful performance management implementation
Steps to a successful performance management implementation
 
Assignment strategic change management
Assignment strategic change managementAssignment strategic change management
Assignment strategic change management
 
Management information system
Management information systemManagement information system
Management information system
 
Designs of Organization
Designs of OrganizationDesigns of Organization
Designs of Organization
 
Success And Failures In Organizational design
Success And Failures In Organizational design Success And Failures In Organizational design
Success And Failures In Organizational design
 
Business transformation and business value drivers
Business transformation and business value driversBusiness transformation and business value drivers
Business transformation and business value drivers
 
Bpug conference november 2012
Bpug conference november 2012 Bpug conference november 2012
Bpug conference november 2012
 
The Seven Step Change Management Plan
The Seven Step Change Management PlanThe Seven Step Change Management Plan
The Seven Step Change Management Plan
 
Performance management
Performance management Performance management
Performance management
 
Change management assignment help
Change management assignment helpChange management assignment help
Change management assignment help
 

En vedette

En vedette (18)

Paramita mukerji
Paramita mukerjiParamita mukerji
Paramita mukerji
 
Poonam ahluwalia
Poonam ahluwaliaPoonam ahluwalia
Poonam ahluwalia
 
Lakshmi varagand ramanandg_grishagarwal
Lakshmi varagand  ramanandg_grishagarwalLakshmi varagand  ramanandg_grishagarwal
Lakshmi varagand ramanandg_grishagarwal
 
Day 2 1135 - 1220 - pearl 1 - avinash kumar
Day 2   1135 - 1220 - pearl 1 - avinash kumarDay 2   1135 - 1220 - pearl 1 - avinash kumar
Day 2 1135 - 1220 - pearl 1 - avinash kumar
 
Amigas no..
Amigas no..Amigas no..
Amigas no..
 
Autoprint Machinery Mfg. Pvt. Ltd
Autoprint Machinery Mfg. Pvt. LtdAutoprint Machinery Mfg. Pvt. Ltd
Autoprint Machinery Mfg. Pvt. Ltd
 
Trade Cert
Trade CertTrade Cert
Trade Cert
 
reflexión
reflexión reflexión
reflexión
 
What B2B Marketers Can Learn From B2C Marketers and Vice Versa
What B2B Marketers Can Learn From B2C Marketers and Vice VersaWhat B2B Marketers Can Learn From B2C Marketers and Vice Versa
What B2B Marketers Can Learn From B2C Marketers and Vice Versa
 
Deep kamalsingh
Deep kamalsinghDeep kamalsingh
Deep kamalsingh
 
Troy University Diploma
Troy University DiplomaTroy University Diploma
Troy University Diploma
 
на сайт гороно днз №35
на сайт гороно днз №35на сайт гороно днз №35
на сайт гороно днз №35
 
Italian Box
Italian BoxItalian Box
Italian Box
 
Turkish Box
Turkish BoxTurkish Box
Turkish Box
 
صدقة التطوع
صدقة التطوعصدقة التطوع
صدقة التطوع
 
Day 2 1230 - 1315 - pearl 2 - alankar karpe
Day 2   1230 - 1315 - pearl 2 - alankar karpeDay 2   1230 - 1315 - pearl 2 - alankar karpe
Day 2 1230 - 1315 - pearl 2 - alankar karpe
 
Gopinath ramachandran
Gopinath ramachandranGopinath ramachandran
Gopinath ramachandran
 
Sujit sopan barhate
Sujit sopan barhateSujit sopan barhate
Sujit sopan barhate
 

Similaire à Rt sundari ashutosh_pandey

Success and failure of organization design mba b_73
Success and failure of organization design mba b_73Success and failure of organization design mba b_73
Success and failure of organization design mba b_73JJUDITHESTHERMARTINA
 
Function Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardFunction Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardDCG Software Value
 
Success and failure in organizational design
Success and failure in organizational designSuccess and failure in organizational design
Success and failure in organizational designRajamani5373
 
Organization Change Management.pptx
Organization Change Management.pptxOrganization Change Management.pptx
Organization Change Management.pptxMeghaVarghese12
 
Organization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizationsOrganization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizationsGoharSaeed6
 
Integrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationIntegrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationNUS-ISS
 
The 5 types of business transformation
The 5 types of business transformationThe 5 types of business transformation
The 5 types of business transformationSameerShaik43
 
Achieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-ProfitAchieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-ProfitCarolyn Reid
 
Achieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-ProfitAchieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-ProfitCarolyn Reid
 
SUCCESS & FAILURE OF ORGANIZATION DESIGN
SUCCESS & FAILURE OF ORGANIZATION DESIGNSUCCESS & FAILURE OF ORGANIZATION DESIGN
SUCCESS & FAILURE OF ORGANIZATION DESIGNAkshiAkshara
 
Niharika srivastava uh13027
Niharika srivastava uh13027Niharika srivastava uh13027
Niharika srivastava uh13027Guneet Singh
 
Change Practice - Managing change in the real world
Change Practice - Managing change in the real worldChange Practice - Managing change in the real world
Change Practice - Managing change in the real worldRobert Streeter
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentIJMER
 
MBA 6931, Project Management Strategy and Tactics 1 C.docx
 MBA 6931, Project Management Strategy and Tactics 1 C.docx MBA 6931, Project Management Strategy and Tactics 1 C.docx
MBA 6931, Project Management Strategy and Tactics 1 C.docxaryan532920
 
CHANGE MANAGEMENT AND COMMUNICATION STRATEGY .docx
CHANGE MANAGEMENT AND COMMUNICATION STRATEGY   .docxCHANGE MANAGEMENT AND COMMUNICATION STRATEGY   .docx
CHANGE MANAGEMENT AND COMMUNICATION STRATEGY .docxketurahhazelhurst
 

Similaire à Rt sundari ashutosh_pandey (20)

Success and failure of organization design mba b_73
Success and failure of organization design mba b_73Success and failure of organization design mba b_73
Success and failure of organization design mba b_73
 
Function Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on BoardFunction Points for Estimation - Getting Developers on Board
Function Points for Estimation - Getting Developers on Board
 
SUCCESS & FAILURE OF OD
SUCCESS & FAILURE OF ODSUCCESS & FAILURE OF OD
SUCCESS & FAILURE OF OD
 
Success and failure in organizational design
Success and failure in organizational designSuccess and failure in organizational design
Success and failure in organizational design
 
Organization Change Management.pptx
Organization Change Management.pptxOrganization Change Management.pptx
Organization Change Management.pptx
 
Organization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizationsOrganization Change Management for the handling change in organizations
Organization Change Management for the handling change in organizations
 
Integrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and TransformationIntegrating Organisational Change within IT Transition and Transformation
Integrating Organisational Change within IT Transition and Transformation
 
The 5 types of business transformation
The 5 types of business transformationThe 5 types of business transformation
The 5 types of business transformation
 
Achieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-ProfitAchieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-Profit
 
Achieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-ProfitAchieving-Corporate-Strategy-The-Path-to-Profit
Achieving-Corporate-Strategy-The-Path-to-Profit
 
SUCCESS & FAILURE OF ORGANIZATION DESIGN
SUCCESS & FAILURE OF ORGANIZATION DESIGNSUCCESS & FAILURE OF ORGANIZATION DESIGN
SUCCESS & FAILURE OF ORGANIZATION DESIGN
 
Niharika srivastava uh13027
Niharika srivastava uh13027Niharika srivastava uh13027
Niharika srivastava uh13027
 
ISO_2
ISO_2ISO_2
ISO_2
 
Managing Organizational Change Essay
Managing Organizational Change EssayManaging Organizational Change Essay
Managing Organizational Change Essay
 
Change Practice - Managing change in the real world
Change Practice - Managing change in the real worldChange Practice - Managing change in the real world
Change Practice - Managing change in the real world
 
SAP and Change Management
SAP and Change ManagementSAP and Change Management
SAP and Change Management
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile Development
 
MBA 6931, Project Management Strategy and Tactics 1 C.docx
 MBA 6931, Project Management Strategy and Tactics 1 C.docx MBA 6931, Project Management Strategy and Tactics 1 C.docx
MBA 6931, Project Management Strategy and Tactics 1 C.docx
 
CHANGE MANAGEMENT AND COMMUNICATION STRATEGY .docx
CHANGE MANAGEMENT AND COMMUNICATION STRATEGY   .docxCHANGE MANAGEMENT AND COMMUNICATION STRATEGY   .docx
CHANGE MANAGEMENT AND COMMUNICATION STRATEGY .docx
 
Change and project_management
Change and project_managementChange and project_management
Change and project_management
 

Plus de PMI2011

Bhavesh pmi final
Bhavesh  pmi finalBhavesh  pmi final
Bhavesh pmi finalPMI2011
 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sanePMI2011
 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyyaPMI2011
 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...PMI2011
 
Wilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyWilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyPMI2011
 
Vs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiVs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiPMI2011
 
Vineet jain
Vineet jainVineet jain
Vineet jainPMI2011
 
Yamuna padmanaban
Yamuna padmanabanYamuna padmanaban
Yamuna padmanabanPMI2011
 
Vimal kumarkhanna
Vimal kumarkhannaVimal kumarkhanna
Vimal kumarkhannaPMI2011
 
Venkatraman l
Venkatraman lVenkatraman l
Venkatraman lPMI2011
 
Soumen de
Soumen deSoumen de
Soumen dePMI2011
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavanPMI2011
 
Sharad pandey abhisek goswami
Sharad pandey abhisek goswamiSharad pandey abhisek goswami
Sharad pandey abhisek goswamiPMI2011
 
Soma roy sarkar
Soma roy sarkarSoma roy sarkar
Soma roy sarkarPMI2011
 
Shallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanShallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanPMI2011
 
Regeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebRegeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebPMI2011
 
Ramesh ganiga
Ramesh ganigaRamesh ganiga
Ramesh ganigaPMI2011
 
Pranabendu
PranabenduPranabendu
PranabenduPMI2011
 
Pradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadavPradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadavPMI2011
 
Parvathi karthik
Parvathi karthikParvathi karthik
Parvathi karthikPMI2011
 

Plus de PMI2011 (20)

Bhavesh pmi final
Bhavesh  pmi finalBhavesh  pmi final
Bhavesh pmi final
 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sane
 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
 
Final chakradhar purohith proposal milieu analysis (without account data un...
Final chakradhar purohith proposal milieu analysis (without account data   un...Final chakradhar purohith proposal milieu analysis (without account data   un...
Final chakradhar purohith proposal milieu analysis (without account data un...
 
Wilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyWilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthy
 
Vs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiVs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakraborti
 
Vineet jain
Vineet jainVineet jain
Vineet jain
 
Yamuna padmanaban
Yamuna padmanabanYamuna padmanaban
Yamuna padmanaban
 
Vimal kumarkhanna
Vimal kumarkhannaVimal kumarkhanna
Vimal kumarkhanna
 
Venkatraman l
Venkatraman lVenkatraman l
Venkatraman l
 
Soumen de
Soumen deSoumen de
Soumen de
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
 
Sharad pandey abhisek goswami
Sharad pandey abhisek goswamiSharad pandey abhisek goswami
Sharad pandey abhisek goswami
 
Soma roy sarkar
Soma roy sarkarSoma roy sarkar
Soma roy sarkar
 
Shallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanShallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuraman
 
Regeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebRegeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoyceb
 
Ramesh ganiga
Ramesh ganigaRamesh ganiga
Ramesh ganiga
 
Pranabendu
PranabenduPranabendu
Pranabendu
 
Pradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadavPradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadav
 
Parvathi karthik
Parvathi karthikParvathi karthik
Parvathi karthik
 

Dernier

Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Omaninstagramfab782445
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsShree Krishna Exports
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 

Dernier (20)

!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 

Rt sundari ashutosh_pandey

  • 1. Change Management – A success story in a government organization. Ashutosh Pandey, R.T.Sundari Any change initiative is to steer the organization away from where it’s currently headed to an enhanced and improved future. Mostly we find the change process and improvement programs often “fail” due to improper understanding of corporate strategic objectives and processes are not aligned with business imperatives. The successful change will depend upon the collective power of change initiatives, having sufficient impact on the targeted driving forces, thereby altering the course of the organization. To have appropriate infrastructure in place will certainly support the ‘mechanics’ of change. This means having effective organizational structure, project management office (PMO), clear roles and responsibilities, plans, communications and measurement. For improving the future course of activities it is also essential to nurture the individual competencies to build the organizational capabilities. In this paper we discuss about the changes made in the organization having project based structure to matrix structure of different functions with project base. The change initiatives are then measured with leading indicators like cost, revenue, technology implementation and quality of deliverables. With above orientation of change management the organization was able achieve the milestones leading towards processes and performance improvement. It has also resulted in the client and employee satisfaction. Key words: Change Management, Organizational structure, Matrix structure 1. Introduction The concept of "change management" is a familiar one in most businesses today. Any change initiative is to steer the organization away from where it’s currently headed to an enhanced and improved future. But, how businesses manage change and how successful they are at it varies a lot depending on the nature of the business, the change and the people involved. Organizational change is something that occurs throughout an organization’s life cycle. The effect of change occurs in the entire organization rather than one part of it. Change in the organization is required due to demand in the globalization, ever changing technology. Therefore it is necessary to understand the present needs and accordingly the change strategy to be implemented. Change management in this paper refers to organization-wide change, that is, change which affects all systems, structures and processes, as well as organizational culture. This holistic approach involves learning throughout the organization. 2. Challenges in the Government R&D organization.
  • 2. In a government R&D organization, as is well-known, the software development activities are significantly different from those of other software development companies who develop the applications as per well defined customer requirements. In such a R&D unit, dealing with various mega software projects, the planning itself was more complex and specification changes during project implementation were frequent and inevitable. To begin any successful change process, you must first start by understanding why the change must take place. Implementing change management strategy is not easy in those organizations. CM has to find a fine balance of Organizational Structures, Cultural Acceptance, Procedures, Processes and the right degree of system support. It requires acceptance from the top management and support. Buy-in has to percolate from top to bottom. 3. Change Management Model Change Management in an organization is a result of influencing both internal and external factors. For example, the internal environment might be affected by following factors. Identification New/Large opportunities Improper work distribution among employees Performance gaps to to attain organization goals and objectives Introduction to New Processes/ Technologies Crisis- Financial or Resources Everyone has few theories about change management. While there are many change management models, most organization will choose at least one of the following three models to implement the strategy: 1. Lewin’s Change Management Model 2. McKinsey 7-S Model 3. Kotter’s 8 Step Change Model While each one of the models has its own advantages and disadvantages, one has to carefully analyse the model that best suit to his organization and its culture. Mostly we find the change process and improvement programs often “fail” due to improper understanding of corporate strategic objectives and processes are not aligned with business imperatives. The successful change will depend upon the collective power of change initiatives, having sufficient impact on the targeted driving forces, thereby altering the course of the organization. Organizational performance is core to its success. After careful analysis and evaluation of the suitability factors, Kotter’s 8 Step model was chosen to implement the CM.
  • 3. The 8 steps in this model are: 1. Increase the urgency for change. 2. Build a team dedicated to change. 3. Create the vision for change. 4. Communicate the need for change. 5. Empower staff with the ability to change. 6. Create short term goals. 7. Stay persistent. 8. Make the change permanent. Significant advantages to this model are: - The process is an easy step-by-step - The focus is on preparing and accepting change, not the actual change. - Transition is easier. While implementing the CM, it is fore most important to evaluate various risks and financial implications in the organization. Following Cost & Risks were analyzed on both levels i.e. Project and organization. Costs Risks Project level Project delays Missed milestones Budget overruns Rework required on design Loss of work by project team Resistance – active and passive Project put on hold Resources not made available Obstacles appear unexpectedly Project fails to deliver results Project is fully abandoned Organizational level Productivity plunges (deep and sustained) Loss of valued employees Reduced quality of work Impact on customers Impact on suppliers Morale declines Legacy of failed change Stress, confusion, fatigue Change saturation If the change is not implemented Lost investment made in the project Lost opportunity to have invested in other projects Expenses not reduced Efficiencies not gained Revenue not increased Waste not reduced Regulations not met Table 1: Analysis of Cost and Risks-Organizational vs Project level 4. Implementation of Change Management in an R & D Government Organization:
  • 4. To meet challenges in implementation of CM, such an organization need to focus on changes in following areas: Organization’s Mission and Vision…. by continuously monitoring its Mission i.e. purpose of its business, Vision i.e. what the Organization should look like and its competitive strategies. Working Mechanism can be changed by introducing new procedures, methods to attain better performance with available resources. Organizational Structure can be changed to be more responsive with external factors i.e. customers, market competitions etc. Structure can be changed inside the organization also to make life-cycle more effective. Human behavior and Organization Culture can be redefined by training to managers and employees for new knowledge and skills. Right-Sizing can be done to deal with financial crisis and best fit persons can be more utilized by increasing motivation and incentive schemes. C-DAC Noida center (a scientific society of Ministry of communication and IT) has been involved in R&D and application oriented design and development for various Government Clients. Over the decades, it has acquired competency, expertise and extensive experience in the areas of Health Informatics, Embedded Systems, Language Computing and e-Governance domains. The organization structure was built around these domain areas. Project teams were formed within these groups, who were responsible for design, development, testing and implementation which led to excessive coding and little importance given to knowledge sharing. Time lines for delivering the products were often missed. Team Members were not released to other teams where the requirement is priority. That resulted in excess man power deployment in each projects. Fig 1: Project base organizational structure
  • 5. During data collection and internal audits we came to know that the project documents like designing, review reports were prepared after the activity of that phase is over. The very purpose of the documentation seems to have been defeated as the Project Leader and his team managed everything within their ambit. So keeping opportunities and challenges in mind, Centre evolved some internal changes in its functional structures. In order to create an urgency of the change, staffs are consulted for the change management plan. First step towards this was to identify the group which will implement the change. Software Engineering Process Group (SEPG) was formed with the representation from different technical groups. The next was empowering the SPEG so as to work without any hindrance. Putting people at the top of the agenda with planning for enhanced staff performance has become a key element of the Strategy. Accordingly, it was decided to change the organization structure by creating four groups’ viz. Design, Development, Testing and Implementation. Within this group projects were handled by different teams. Changing the whole structure from Project- Based to Metric Base was a great challenge for the organization. This has helped in pooling the skill and talent in a group with a clearly defined roles and responsibilities. Due to this structure, the documentation has become a must from other group before they start their work. Project Managers were from the Implementation group and they will be interacting with the customers for the requirements and finalizing the same with them. They prepare the System Requirement Document and forward to the Design Team for designing. The Design Team works on the High Level Design and Low Level Design and reviews the same with the proposed committee before releasing the Design document to the Development Group. After coding, the application was deployed in the test server and testing team work on them by testing the functionalities as per clients’ requirements. The common repository system was created by the Quality Assurance Group for easy handing of the documents from the various groups. The baseline documents were uploaded in project repository for the stakeholders to use. At the same time Project Manager can be able to monitor the activity with the help of common repository. The vertical functional group and horizontal project team of matrix helped to speed up the implementation.
  • 6. Fig 2: Matrix based structure Initially, the changes made in the structure did not go well in between the groups. There have been barriers created between the groups leading to water tight compartments. No accountability was felt by Design, Development and Testing groups. As such, the Implementation team always faced the pressure from the clients. SEPG group has identified the Project Management Office (PMO) to co-ordinate with different groups. It tracks the timeline and progress of the project and gave a good support to implementation group. Weekly meetings were conducted by the PMO with the Team Leads of different groups. Targets were fixed during the meeting and issues between the groups were sorted out amicably. 5. Analyses about the result obtained due to CM Before introducing the Change in the organizational structure there was lot of rework in the projects. Similar modules/ functionalities developed by a number of projects but components developed under one project were not being re-used in other projects thus resulting in duplication of work and more effort. Same defects were noticed and experienced in different projects. Maintaining of the similar type of modules in all projects became difficult as each group or team was developing their modules independently. After six months of executing the new change in structure and functionalities, we have collected the data from different projects only to find very little improvement in the outcome. PMO began to closely monitor the project execution and the hi cups in the process and procedures were ironed out. After one year the improvement were felt. The following table of Customer Satisfaction was taken after one and half years. Here you see during the project based structure overall Customer Satisfaction Index (CSI) was between 1 and 2 whereas the matrix based structure of CSI was reached 3.
  • 7. Customer Satisfaction Index in Project based Structure Projects Availability of Build on Production Documen tation Defect Occurren ce Maintai nability Reliabil ity Perform ance Usabil ity Overall CSI (in Project Based) PGIMER 2 2 3 3 3 2 2 2 GNCTD 1 2 4 2 1 1 2 1 RIMS 1 2 3 1 1 1 1 1 SMS 3 2 3 3 3 3 3 2 Customer Satisfaction Index in Metric based Structure Projects Availability of Build on Production Documentat ion Defect Occurr ence Maintai nability Reliabil ity Perform ance Usabil ity CSI (in Metric Based) PGIMER 4 3 2 3 3 3 4 3 GNCTD 5 4 1 4 4 4 4 3 RIMS 5 3 2 4 4 4 5 3 SMS 3 3 1 4 4 3 3 3 Table 2 Customer Satisfaction Index Fig 3: Customer Satisfaction Index Another main benefit accrued was lowering of cost of implementation of projects. In Table 3 below for each project we have taken ‘Size’ (i.e No of processes in the project). Against size we have compared the re-usable components, rework, defects detected before delivery of the product and after delivery and redundancy percentage. From the result below we can see that after the changes in the process structure reworking has reduced due to no of re-usable components used in the projects. The defects rate after delivery was also declined while the defects rate before delivery was high. This means that testing was very effective. Overall the implementation cost of each project has been decreased in the matrix based structure. 0 1 2 3 4 Overall CSI (in Project Based) CSI (in Metric Based)
  • 8. Implementation Cost in Project based Structure Per Process Projects Size (No. of Processes) Re- Usable Compone nts Rework (Man days) Defects detected before Delivery Defects detected after Delivery Redunda ncy % Cost of Product Developme nt (INR) Project Based Per Process Implement ation Cost (INR) PGIMER 728 45 340 2673 215 42 3899500.00 5356.46 GNCTD 446 14 225 1463 175 54 2495750.00 5595.85 RIMS 875 7 324 1225 227 62 3650500.00 4172.00 SMS 678 17 275 1900 122 38 3211750.00 4737.09 Per Process Implementation Cost in Metric based Structure Projects Size (No. of Processes) Re- Usable Compone nts Rework (Man days) Defects detected before Delivery Defects detected after Delivery Redunda ncy % Cost of Product Developme nt Per Process Implement ation Cost (INR) PGIMER 1625 124 201 3678 202 12 6310000.00 3883.08 GNCTD 1258 76 175 2458 124 6 4671000.00 3713.04 RIMS 986 49 115 2126 62 8 3715750.00 3768.51 SMS 625 29 121 1965 57 7 2743500.00 4389.60 Table 3: Implementation Cost per Process 6. Conclusion With above orientation of change management the organization was able achieve the milestones leading towards processes and performance improvement. It has also resulted in the client and employee satisfaction. Whatever change management strategy is used it should have holistic approach for better results. Comparison of the data between the two type structures shows that there is an average of 40% cost reduction due to the Change. The Change has Minimized Project Risks, Accelerating Project Benefits and Optimizing current & future processes and structures. Due to the customer satisfaction we have been able to get more projects of same type. References: 1. Project data: QMS, CDAC Noida 2. Kotter, John P., and Dan S. Cohen, The Heart of Change: Real-Life Stories of How People Change Their Organizations. Harvard Business Press, 2002. 3. Journal of Organizational Change Management, Professor Slawomir Magala, ISSN: 0953-4814
  • 9. 4. Change Management Masterclass: A Step-By-Step Guide to Successful Change Management, by Mike Green, Published August 28th 2007 by Kogan Page 5. Change by Design: How Design Thinking Transforms Organizations and Inspires Innovation by Tim Brown (Sep 29, 2009) 6. Organization Change: Theory and Practice (Foundations for Organizational Science series) by W. Warner Burke (Nov 29, 2010) 7. Management of Organizational Change: K Harigopal, SAGE, 14-Apr-2006 8. Change Management Strategies for an Effective EMR Implementation : Claire McCarthy,Douglas Eastman, HIMSS, 2010 9. Change Management 100 Success Secrets, by Gerard Blokdijk, 2008 10. Organizational and personal change management, process, plans, change management and business development tips- www.businessballs.com. 11. Change Management Consulting Case Study by Ryan Gunhold Mr. Ashutosh Pandey (B. Tech CSE, MS in Cyber Laws) has a total work experience of 7.5 years and a Project engineer in CDAC Noida for the past 5 years. He is also registered as ATM (Appraisal Team Member) in SEI (Software Engineering Institute) and helped CDAC Noida in attaining CMMI Level 3 in December 2008 and CMMI Level 5 in February 2011. He’s Also a Member of CSI. His research interest includes Object Oriented Software Engineering, Software Testing. He may be contacted in ashutoshpandey@cdac.in. R.T. Sundari (Consultant) has Post graduation in Management and 35 years experience in software designing, development and testing. She is currently heading the PMO(Project Management Office) and SEPG (Software Engineering Process Group) in addition to Quality Assurance division of CDAC, Nodia. She has been instrumental in attaining CMMi 5 and ISO 9001 Certifications for CDAC Noida. She has guided many national and international papers work. She may be contacted in sundari@cdac.in