Tower Sharing Benefits
Benefits
Sharing of infrastructure can lead to several benefits. Operators resorting to
infrastructure sharing would reduce their payback time significantly by reducing
both their operating expenditures and capital expenditures.


Infrastructure sharing can be used in both the start-up phase to build coverage
quickly and longer term, and to build more cost effective coverage in rural areas.
Sharing arrangement provides the highest savings in cases of low traffic demand and
more efficiency is achieved by pooling resources.

For new telecom companies such infrastructure sharing will mean not just faster rollout
but also savings in billions of Peso’s. To set up every telecom towers the cost ranges
between Php 1.5 to Php 4.0 million
Shared
Infrastructure
Sharing can be broadly classified into 2 groups


                            Passive Infrastructure sharing
                            Active Elements



Passive Infrastructure sharing (tower sharing) : Passive infrastructure being one of the
most important components of a mobile network, the same has been a critical area
of operations for telecom companies in the past. With increasing competition
posing an urgent need for telecom companies to expand their coverage and sharpen
their focus on core operation.


Active Elements: Two or more operators deploy a completely shared radio network and
in some case, a partly shared core network. The shared radio network consist of Radio
base station, Radio network controllers, Transmissions. Active sharing is not allowed
by regulations
Passive Infrastructure

or Non-Electronic Infrastructure
Tower Type:

Telecom towers are broadly
classified as:

 Greenfield sites
 Rooftop sites
Typical rooftop sites:

• Pole mount
• 25 m Mast
Medium Duty Angular & Tubular Tower Type:
Heavy Duty 4-legged Angular Towers:
WIRELESS NETWORK
Mobile Network
Network Plan
Naga City Network Plan
RF Survey Report
Economic Side
Key benefits relating to the tower sharing :
• Greenfield tower sites requires a capital expenditures of Php 1.5 to Php 4m.
  Given the high capital investments required in the business, tower sharing
  are highly leveraged.

• Stable and predictable cash flow. Once a tower asset is rented out, it usually
  generates a stable and predictable cash flow of tower rentals.

• Tower operating expenses can be shared, such as site rentals, O&M expenses,
  and energy and fuel expenses

• Enhancement of profitability. Tower sharing can help operators lower their operating
 cost and capital expenditures and earn better margins.

• Shorter and faster Roll out time
Construction Cost
Greenfield SST MD Sites

                                           30m Tower        36m Tower         45m Tower        53m Tower        65m Tower        71m Tower

Construction plan & As-built drawings           14,000.00        14,000.00        14,000.00        14,000.00        14,000.00        14,000.00
Site Design
GF OD SST MD                                   458,918.91       513,055.91       690,068.06       946,149.75      1,137,130.15     1,477,529.82
Foundation and Earth Work
Masts, Towers and Monopole Work
Equipment Stand and Housing Work
Electric and Mechanical Systems Work
SST MD 30m, material                           275,875.37       348,468.60       467,770.58       707,096.13      1,132,826.89     1,229,596.13
Masts, Towers and Monopoles
Electrical and Mech. Systems-Material
ME Outdoor                                      59,669.58        59,669.58        59,669.58        71,794.58        71,794.58        71,794.58
Site Preparation
Masts, Towers and Monopoles
Electrical and Mech. Systems-Material
Base frame2/3G(WF200x100-L4900m)                43,565.08        43,565.08        43,565.08        43,565.08        43,565.08        43,565.08
Equipment Stands and Housings-Material
Transp. cost for CME Kitting                    14,132.26        14,132.26        14,132.26        30,179.82        39,874.13        95,208.93
Transportation
Fence & Yard                                   146,845.85       146,845.85       155,901.87       180,845.66       166,128.13       184,652.50
Site Preparation
Transp. Tower materials                         19,691.06        24,921.74        33,518.01        76,062.03       110,774.18       322,362.97
Tower Transportation
Power Connection                               170,000.00       170,000.00       170,000.00       170,000.00       170,000.00       170,000.00
Electrical and Mechanical System Work
Amount                                       1,202,698.09     1,334,659.01     1,648,625.42      2,239,693.05     2,886,093.13     3,608,709.98

Site Acquisition / Permits                     350,000.00       350,000.00       350,000.00       350,000.00       350,000.00       350,000.00
Permits : Pre-Con to Post-Construction
Total Cost                               PHP 1,552,698.09 PHP 1,684,659.01 PHP 1,998,625.42 PHP 2,589,693.05 PHP 3,236,093.13 PHP 3,958,709.98
CONSTRUCTION COST
Co-Location


                          CO-LOCATE 30 - 35m   CO-LOCATE 36 -45m   CO-LOCATE 46 - 55m   CO-LOCATE 56 - 65m
Permits                        110,000.00           110,000.00          110,000.00          110,000.00
Technical Site Survey          33,550.00            33,550.00           33,550.00            33,550.00
Site Design                     4,270.00             4,270.00            4,270.00            4,270.00
Tower
   Services                     14,487.50           14,487.50           14,487.50            14,487.50
   Materials                    33,791.35           33,791.35           33,791.35            33,791.35
Baseframe + Foundation
   Services                     54,961.00           54,961.00           54,961.00            54,961.00
   Materials                    32,268.24           32,268.24           32,268.24            32,268.24
Electrical & Mechanical
   Services                    196,091.14           201,276.14          206,461.14          211,646.14
   Materials                   77,081.26            80,950.67           84,820.09            88,689.50
TOTAL                          556,500.48           565,554.89          574,609.31          583,663.72
Conclusion:




• Sharing of infrastructure reduces significantly the capital expenditures of
every mobile operators, and provides faster rate in terms of roll out activities.

•The concept will provide savings on operational expenses.

•Tower sharing is a viable alternative in rural areas, and for the purpose of
 road coverage.
References :


 Growth Opportunities in the Philippines, Frost & Sullivan Press Release 2009

 Philippines Telecom Brief, Ken Zita

 Trends of Technological Innovation style in the Philippine Mobile
  Telecommunication Industry

 Philippine Economic Growth: Can it last? , Emmanuel S. De Dios

Contenu connexe

Tendances

Opex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiOpex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmi
Qarib Raza
 
Telecom interconnect Billing Basics
Telecom interconnect Billing   BasicsTelecom interconnect Billing   Basics
Telecom interconnect Billing Basics
Shilpin Pvt. Ltd.
 

Tendances (20)

Fundamentals of Mobile Network Sharing
Fundamentals of Mobile Network SharingFundamentals of Mobile Network Sharing
Fundamentals of Mobile Network Sharing
 
The 3CX VoIP PBX phone System
The 3CX VoIP PBX phone SystemThe 3CX VoIP PBX phone System
The 3CX VoIP PBX phone System
 
Opex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiOpex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmi
 
IBS/DAS mini training review
IBS/DAS mini training reviewIBS/DAS mini training review
IBS/DAS mini training review
 
project report on DATACENTER
project report on DATACENTERproject report on DATACENTER
project report on DATACENTER
 
Fttx arcitectures
Fttx arcitecturesFttx arcitectures
Fttx arcitectures
 
What is business support systems (BSS) in telecom
What is business support systems (BSS) in telecomWhat is business support systems (BSS) in telecom
What is business support systems (BSS) in telecom
 
IP RAN 100NGN
IP RAN 100NGNIP RAN 100NGN
IP RAN 100NGN
 
Telecom interconnect Billing Basics
Telecom interconnect Billing   BasicsTelecom interconnect Billing   Basics
Telecom interconnect Billing Basics
 
Concept of appropriation, allotment and obligations
Concept of appropriation, allotment and obligationsConcept of appropriation, allotment and obligations
Concept of appropriation, allotment and obligations
 
Ip ran v1.1
Ip ran v1.1Ip ran v1.1
Ip ran v1.1
 
Open Access Network: Infrastructure sharing
Open Access Network: Infrastructure sharingOpen Access Network: Infrastructure sharing
Open Access Network: Infrastructure sharing
 
3GPP
3GPP3GPP
3GPP
 
Voip
VoipVoip
Voip
 
Intelligent Asset Performance & Energy Management for Pulp & Paper Industries
Intelligent Asset Performance & Energy Management for Pulp & Paper IndustriesIntelligent Asset Performance & Energy Management for Pulp & Paper Industries
Intelligent Asset Performance & Energy Management for Pulp & Paper Industries
 
Globtel AIR Solution
Globtel AIR SolutionGlobtel AIR Solution
Globtel AIR Solution
 
3CX Sales Presentation English
3CX Sales Presentation English3CX Sales Presentation English
3CX Sales Presentation English
 
How to Organize a Primary Cooperative
How to Organize a Primary CooperativeHow to Organize a Primary Cooperative
How to Organize a Primary Cooperative
 
IPRAN BASICS.pdf
IPRAN BASICS.pdfIPRAN BASICS.pdf
IPRAN BASICS.pdf
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 

En vedette (6)

Infrastructure sharing in bangladesh bottlenecks and way forward
Infrastructure sharing in bangladesh   bottlenecks and way forwardInfrastructure sharing in bangladesh   bottlenecks and way forward
Infrastructure sharing in bangladesh bottlenecks and way forward
 
Market Research India - Telecom Towers Market in India 2009
Market Research India - Telecom Towers Market in India 2009Market Research India - Telecom Towers Market in India 2009
Market Research India - Telecom Towers Market in India 2009
 
Building a Business Case for Shared Services
Building a Business Case for Shared ServicesBuilding a Business Case for Shared Services
Building a Business Case for Shared Services
 
Technology Cost Optimization Strategies
Technology Cost Optimization StrategiesTechnology Cost Optimization Strategies
Technology Cost Optimization Strategies
 
Economics of Network Sharing
Economics of Network SharingEconomics of Network Sharing
Economics of Network Sharing
 
telecommunication-ppt
telecommunication-ppttelecommunication-ppt
telecommunication-ppt
 

Similaire à Tower sharing concept

cost appraisal
cost appraisalcost appraisal
cost appraisal
ahmong4
 
3667 course book 2011
3667 course book 20113667 course book 2011
3667 course book 2011
Darren Penk
 

Similaire à Tower sharing concept (20)

INDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptxINDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptx
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
cost appraisal
cost appraisalcost appraisal
cost appraisal
 
3667 course book 2011
3667 course book 20113667 course book 2011
3667 course book 2011
 
Wind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENSWind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENS
 
RCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcreeRCREEE-enerMENA_pgesco profile-rcree
RCREEE-enerMENA_pgesco profile-rcree
 
CPRSouth_9 20140911 @ South Africa
CPRSouth_9 20140911 @ South AfricaCPRSouth_9 20140911 @ South Africa
CPRSouth_9 20140911 @ South Africa
 
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
CICC Accounting by Cebu Gov. Gwen Garcia on Feb. 26, 2009
 
Guide otn ang
Guide otn angGuide otn ang
Guide otn ang
 
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material LiftingIRJET-  	  Design and Manufacturing of Ladder Roof Lift for Material Lifting
IRJET- Design and Manufacturing of Ladder Roof Lift for Material Lifting
 
CSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - InfographicCSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - Infographic
 
Kusile Project Brochure
Kusile Project BrochureKusile Project Brochure
Kusile Project Brochure
 
Orissa wicomm-product presentation
Orissa wicomm-product presentationOrissa wicomm-product presentation
Orissa wicomm-product presentation
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
Peak shaving of an EV Aggregator Using Quadratic Programming
Peak shaving of an EV Aggregator Using Quadratic ProgrammingPeak shaving of an EV Aggregator Using Quadratic Programming
Peak shaving of an EV Aggregator Using Quadratic Programming
 
Solarlightsystems
SolarlightsystemsSolarlightsystems
Solarlightsystems
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Presentation on project Initiating Telecom
Presentation on project Initiating TelecomPresentation on project Initiating Telecom
Presentation on project Initiating Telecom
 

Dernier

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Dernier (20)

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 

Tower sharing concept

  • 1. Tower Sharing in Telco Industry : Its Leverage and Economic Value Engr . Paul N. Jacob Project Planning UST Grad School
  • 3. Benefits Sharing of infrastructure can lead to several benefits. Operators resorting to infrastructure sharing would reduce their payback time significantly by reducing both their operating expenditures and capital expenditures. Infrastructure sharing can be used in both the start-up phase to build coverage quickly and longer term, and to build more cost effective coverage in rural areas. Sharing arrangement provides the highest savings in cases of low traffic demand and more efficiency is achieved by pooling resources. For new telecom companies such infrastructure sharing will mean not just faster rollout but also savings in billions of Peso’s. To set up every telecom towers the cost ranges between Php 1.5 to Php 4.0 million
  • 5. Sharing can be broadly classified into 2 groups  Passive Infrastructure sharing  Active Elements Passive Infrastructure sharing (tower sharing) : Passive infrastructure being one of the most important components of a mobile network, the same has been a critical area of operations for telecom companies in the past. With increasing competition posing an urgent need for telecom companies to expand their coverage and sharpen their focus on core operation. Active Elements: Two or more operators deploy a completely shared radio network and in some case, a partly shared core network. The shared radio network consist of Radio base station, Radio network controllers, Transmissions. Active sharing is not allowed by regulations
  • 7. Tower Type: Telecom towers are broadly classified as:  Greenfield sites  Rooftop sites
  • 8. Typical rooftop sites: • Pole mount • 25 m Mast
  • 9. Medium Duty Angular & Tubular Tower Type:
  • 10. Heavy Duty 4-legged Angular Towers:
  • 11.
  • 18. Key benefits relating to the tower sharing : • Greenfield tower sites requires a capital expenditures of Php 1.5 to Php 4m. Given the high capital investments required in the business, tower sharing are highly leveraged. • Stable and predictable cash flow. Once a tower asset is rented out, it usually generates a stable and predictable cash flow of tower rentals. • Tower operating expenses can be shared, such as site rentals, O&M expenses, and energy and fuel expenses • Enhancement of profitability. Tower sharing can help operators lower their operating cost and capital expenditures and earn better margins. • Shorter and faster Roll out time
  • 19. Construction Cost Greenfield SST MD Sites 30m Tower 36m Tower 45m Tower 53m Tower 65m Tower 71m Tower Construction plan & As-built drawings 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 Site Design GF OD SST MD 458,918.91 513,055.91 690,068.06 946,149.75 1,137,130.15 1,477,529.82 Foundation and Earth Work Masts, Towers and Monopole Work Equipment Stand and Housing Work Electric and Mechanical Systems Work SST MD 30m, material 275,875.37 348,468.60 467,770.58 707,096.13 1,132,826.89 1,229,596.13 Masts, Towers and Monopoles Electrical and Mech. Systems-Material ME Outdoor 59,669.58 59,669.58 59,669.58 71,794.58 71,794.58 71,794.58 Site Preparation Masts, Towers and Monopoles Electrical and Mech. Systems-Material Base frame2/3G(WF200x100-L4900m) 43,565.08 43,565.08 43,565.08 43,565.08 43,565.08 43,565.08 Equipment Stands and Housings-Material Transp. cost for CME Kitting 14,132.26 14,132.26 14,132.26 30,179.82 39,874.13 95,208.93 Transportation Fence & Yard 146,845.85 146,845.85 155,901.87 180,845.66 166,128.13 184,652.50 Site Preparation Transp. Tower materials 19,691.06 24,921.74 33,518.01 76,062.03 110,774.18 322,362.97 Tower Transportation Power Connection 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 170,000.00 Electrical and Mechanical System Work Amount 1,202,698.09 1,334,659.01 1,648,625.42 2,239,693.05 2,886,093.13 3,608,709.98 Site Acquisition / Permits 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00 350,000.00 Permits : Pre-Con to Post-Construction Total Cost PHP 1,552,698.09 PHP 1,684,659.01 PHP 1,998,625.42 PHP 2,589,693.05 PHP 3,236,093.13 PHP 3,958,709.98
  • 20. CONSTRUCTION COST Co-Location CO-LOCATE 30 - 35m CO-LOCATE 36 -45m CO-LOCATE 46 - 55m CO-LOCATE 56 - 65m Permits 110,000.00 110,000.00 110,000.00 110,000.00 Technical Site Survey 33,550.00 33,550.00 33,550.00 33,550.00 Site Design 4,270.00 4,270.00 4,270.00 4,270.00 Tower Services 14,487.50 14,487.50 14,487.50 14,487.50 Materials 33,791.35 33,791.35 33,791.35 33,791.35 Baseframe + Foundation Services 54,961.00 54,961.00 54,961.00 54,961.00 Materials 32,268.24 32,268.24 32,268.24 32,268.24 Electrical & Mechanical Services 196,091.14 201,276.14 206,461.14 211,646.14 Materials 77,081.26 80,950.67 84,820.09 88,689.50 TOTAL 556,500.48 565,554.89 574,609.31 583,663.72
  • 21.
  • 22. Conclusion: • Sharing of infrastructure reduces significantly the capital expenditures of every mobile operators, and provides faster rate in terms of roll out activities. •The concept will provide savings on operational expenses. •Tower sharing is a viable alternative in rural areas, and for the purpose of road coverage.
  • 23. References :  Growth Opportunities in the Philippines, Frost & Sullivan Press Release 2009  Philippines Telecom Brief, Ken Zita  Trends of Technological Innovation style in the Philippine Mobile Telecommunication Industry  Philippine Economic Growth: Can it last? , Emmanuel S. De Dios