SlideShare une entreprise Scribd logo
1  sur  38
 Born : 28 July 1951

Benimàmet, Valencia, Spain
 Nationality : Spanish

 Education : Polytechnic University Of Valencia

Swiss Ferdral Institute Of Technology
 Santiago Calatrava Valls is a Spanish architect, sculptor and

structural engineer whose principal office is in Zurich, Switzerland.
He has office in Zurich, Paris and in New York, Where he now
resides.
Calatrava's early career was largely dedicated to bridges and railway stations, with
designs that elevated the status of civil engineering projects to new heights.
His Montjuic Communications Tower in Barcelona, Spain (1991) in the heart of the 1992
Olympics site, as well as the Allen Lambert Galleria in Toronto, Canada (1992), were
important works and turning points in his career, leading to a wide range of
commissions. The Quadracci Pavilion (2001) of the Milwaukee Art Museum was his first
building in the United States. Calatrava's entry into high-rise design began with an
innovative 54-story-high twisting tower called Turning Torso (2005), located in Malmö,
Sweden.
 Works of antony Gaudi
 Human figure and nature’s creativity
 Experimentation with materials and their properties
 Blends impressive visual style and the strict rules of engineering
 Symbolic AND recognizable the world over for the sense of movement captureD in a

stationary object.
 Long sweeping lines, stark white materials and a flawless use of glass and light.
 Had a definite vision of inside and outside, the concave and convex, of how we face

the specific world
1.
2.
3.

HSB TURNING TORSO
PONT D’ORLEANS
PUENTE DE LA MUJER
 HSB Turning Torso is

one of the tallest
residential buildings in
Europe and holds
apartments, offices and
meeting facilities.
 The vision of HSB

Turning Torso is based
on a sculpture called
Twisting Torso by
Santiago Calatrava
himself. Inspiration from
the human body in a
twisting motion.
 190 metres high
 Consists of nine cubes with five floors each
 Together with intermediate floors a total of 54

floors
 Each floor has 400m² of available space.
 147 apartments from cube three to nine.
 Meeting facilities on the two top floors.
 Each floor consists of a square part around

the core and a triangular part which is
supported by an external steel structure.
 The entire construction twists 90 degrees on

its way up with each floor tilting by 1.6
degrees
• Ground breaking 14th Feb 2001
• Construction started June 2001
• Casting of foundation March 2002
• Foundations complete August 2002
• Completion date November 2005
FA C A D
E

•facade is a glass and aluminum construction
•2,800 panels and 2,250 windows

•Follow the twist of the building, the windows are
leaning either inwards or outwards by 0 to 7
degrees.

R O TAT I O N
OF FLOORS
Forms for the floors were rotated approx. 1.6
degrees for each floor in order to create the
characteristic twist of the building.
OUTER STEEL
S U P O RT A N D
SPINE

•The steel support is a welded construction with a very
thorough paint treatment for optimal protection against
corrosion.

•The outer steel support consists of a steel column
and 20 horizontal and 18 diagonal ”steel cigars”
LIFTS
•3 lifts service the residential part of the
building and HSB Turning Torso Meetings
•Two separate lifts service the offices :
ensures high capacity and minimum
waiting even during “rush hour” and in
the instances when a lift is closed for
maintenance.
SHEETING &
F O U N D AT I O N S
Foundation: built directly on the
limestone bedrock.
Profiled steel plates, forming the
foundation shaft, were driven 15 m.
into the ground and a further 3m into
the limestone bedrock
Concrete beams, poured at regular
intervals on the inside of the sheeting
to stabilize the steel lining against the
pressure of the soil outside
Concrete construction was poured
onto the bedrock, 30 meters in
diameter and 7 meters thick
CLIMBING
FORMS
AND
BEAMS

Each cube were made with socalled self-compacting concrete.
Because of its flow capacity, this
type of concrete does not need
vibrating.
• The total commercial space is
approximately 4,000 m² in the lower two
cubes i.e. 10 floors.
•The commercial area has its own lifts and
all conceivable comforts in heating,
cooling and IT systems.
•The top 2 floors(53rd & 54th) are used
primarily for meetings.

 There are 147 Apartments spread

across the 6 floors.
 Apart from the fact that he made the building similar to one of his award winning

marble design,Calatrava wanted the people residing/working in the building to have a
360 degree Panoramic view of the beauty that surrounded the building.
N
 INCLINED ARCH

BRIDGE BY
CALATRAVA OVER
THE RIVER LOIRE
ORLEANS, FRANCE
 THE ARCH IS

INCLINED INWARDS
AT ANGLE OF 68
DEGREES
 LOCATED ON ONE

SIDE OF BRIDGE
DECK & AS TALL AS 8
FLOORS(25 M)
 TWO
CONCRETE
TRIPODS OF
THREE
INCLINED
BRANCHES
SUPPORT THE
CENTRAL ARCH
SPAN.
 THE TRIPOD
REPRESENTS
THREE
FINGERS OF
THE HAND AS
NATURAL
EXTENSION OF
ARCH.
 THE OPTIMAL
USE OF
SUPPORT
HELPS ONE
OBSERVE A
PIERS - REINFORCED CONCRETE
ARCH - STEEL
SUSPENDERS - STEEL
ABUTMENTS - REINFORCED
CONCRETE
MAIN SPAN - 200 M
TOTAL LENGTH - 470 M
DECK WIDTH - 26 M
4 TRAFFIC LANES
2 CYCLE PATHS AND 2 WALKWAYS
THE DECK IS ASSYMMERTRICAL AND CURVED FROM BOTTOM
THE DECK REPRESENTS A SHIP’S HULL AND THE
ARCH REPRESENTS MAST OF THE BOAT
THE DEPTH OF THE BOX GIRDER IS 3.25 M
THE WIDTH IS MAXIMUM AT THE CENTRE
EACH TRIPOD HAS ONE
FINGER ALONG :
(BLUE) THE VISUAL
CONTINUATION OF THE
ARCH

COMPRESSIVE
FORCES FROM ARCH
(RED) IN THE SAME
PLANE SUPPORTING
THE SPAN OF ARCH
(ORANGE) THE THIRD
SUPPORTS THE WIDTH
OF THE DECK
THE HANGERS
STABLIZE THE ARCH
AND DISTRIBUTE THE
FORCE CREATED BY
THE INCLINATION,ON
THE DECK.
THE CABLES ARE
PLACED EVERY 4.2 M IN
THE PLANE OF ARCH
THE CABLES HAVE A
DIA OF 5.5 CM &THE
ONES CONNECTING
THE EXTERIOR SIDE
HAVE A DIA OF 3.6 CM
Designed by Calatrava,its
construction was started in
1998 and got completed
on 20th December 2001

It is a foot bridge and is
held in its place by
cantelevers(a design
pioneered by Calatrava)
•Cantilever spar cable-stayed bridge (this design
has been pioneered by Calatrava)
•Was built by the company URSSA, at its plant in
Victoria, in Bilbao, Spain, and brought to Buenos
Aires in several shipments.
•One stabilizing pylon, pointing skyward at a 45degree angle
•Its design represents a couple dancing tango unique asymmetrical arrangement
•White pylon represents the man with rope holding
the central curvature of the bridge that symbolizes
the woman – a typical step of tango.
•Footbridge
•Has two fixed sections and
one movable part
•The pylon has cables
suspending the part of the
bridge that rotates 90
degrees in order to allow
water traffic to pass
•When it swings the far end
comes to a resting point
•The rotary section relies on
a central pile of white
concrete that houses the
rotating mechanism
•It has a unique rotation
mechanism; it’s one of the
biggest of the world, with 20
electric engines commanded
by a computer
The metal structure of the
bridge has been entirely
made of steel and the
straps (suspendors) are
made up of galvanized
steel wires of high
resistance of circular
section
•The big inclinated pylon it
is formed by sheets of
steel of different
thicknesses with rigid
material interiors
•Total length: 170 m
•Central rotating span: 102
m
•Width of deck: 6,20 m
•Height of pylon: 39 m
•Weight: 800 tons
•Time to open: less than 2
min
•Sustaining cables: 19
•Santiago Calatrava exemplifies sculptural expression and engineering through architecture.
Calatrava’s work is like music: well orchestrated
•Even though his buildings are known for their aesthetics, they never compromise on the
grounds of functionality
•He builds energy efficient structures
•The fact that much of his work is centred around
water adds a further dimension to his work.
•His designs are sometimes criticized for impracticality
•All his designs are not economical
•The trainstation Gare do Oriente in Lisbon is known for being very uncomfortable, especially with
wind and rainy weather.
Made by :
Udaiy Khanna
Parth Bansal

Contenu connexe

Tendances

Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatravaParul Sharma
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptxPrituJadhav1
 
Case study milwaukee art museum.
Case study  milwaukee art museum.Case study  milwaukee art museum.
Case study milwaukee art museum.rajitk97
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Jeesmon Babu
 
Capitol complex, Case Study & (Chandigarh & Brasilia)
Capitol complex, Case Study & (Chandigarh & Brasilia)Capitol complex, Case Study & (Chandigarh & Brasilia)
Capitol complex, Case Study & (Chandigarh & Brasilia)Saurav Chaudhary
 
Bernard Tschumi Philosophy
Bernard Tschumi PhilosophyBernard Tschumi Philosophy
Bernard Tschumi PhilosophyGaurav Singh
 
London aquatic center Case study
London aquatic center Case studyLondon aquatic center Case study
London aquatic center Case studyrohan joshi
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research DocumentNicholas Socrates
 
The Milwaukee Art Museum
The Milwaukee Art MuseumThe Milwaukee Art Museum
The Milwaukee Art Museumjexpoz
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABISelf employed
 

Tendances (20)

RENZO PIANO
RENZO PIANORENZO PIANO
RENZO PIANO
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
Petronas towers
Petronas towersPetronas towers
Petronas towers
 
Case study milwaukee art museum.
Case study  milwaukee art museum.Case study  milwaukee art museum.
Case study milwaukee art museum.
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study
 
Capitol complex, Case Study & (Chandigarh & Brasilia)
Capitol complex, Case Study & (Chandigarh & Brasilia)Capitol complex, Case Study & (Chandigarh & Brasilia)
Capitol complex, Case Study & (Chandigarh & Brasilia)
 
Hearst tower, NYC
Hearst tower, NYCHearst tower, NYC
Hearst tower, NYC
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Bernard Tschumi Philosophy
Bernard Tschumi PhilosophyBernard Tschumi Philosophy
Bernard Tschumi Philosophy
 
London aquatic center Case study
London aquatic center Case studyLondon aquatic center Case study
London aquatic center Case study
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
The Milwaukee Art Museum
The Milwaukee Art MuseumThe Milwaukee Art Museum
The Milwaukee Art Museum
 
Guggenheim museum in NYC
Guggenheim museum in NYCGuggenheim museum in NYC
Guggenheim museum in NYC
 
Gherkin london
Gherkin londonGherkin london
Gherkin london
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
Norman Foster
Norman FosterNorman Foster
Norman Foster
 
Guggenheim museum,newyork
Guggenheim museum,newyorkGuggenheim museum,newyork
Guggenheim museum,newyork
 
Ar.Richard Roger
Ar.Richard Roger Ar.Richard Roger
Ar.Richard Roger
 
Alvaro siza
Alvaro sizaAlvaro siza
Alvaro siza
 

Similaire à Santiago calatrava

Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed studyMelbin Biju
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed studyMelbin Biju
 
Water pumping station, Isle of dogs, London.
Water pumping station, Isle of dogs, London.Water pumping station, Isle of dogs, London.
Water pumping station, Isle of dogs, London.Mayur Waghulde
 
calatrava-140117020203-phpapp01.pdf
calatrava-140117020203-phpapp01.pdfcalatrava-140117020203-phpapp01.pdf
calatrava-140117020203-phpapp01.pdfssuser993b9a
 
Calatrava In Contemporary Architecture
Calatrava In Contemporary ArchitectureCalatrava In Contemporary Architecture
Calatrava In Contemporary Architecturemahambet
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid ArchitectsDhanveersinh Chavda
 
Postmodernism, Neo Modernism
Postmodernism, Neo ModernismPostmodernism, Neo Modernism
Postmodernism, Neo ModernismAnant Nautiyal
 
Learning from the maestro- Case study of FRANK OWEN GEHRY project
Learning from the maestro- Case study of FRANK OWEN GEHRY projectLearning from the maestro- Case study of FRANK OWEN GEHRY project
Learning from the maestro- Case study of FRANK OWEN GEHRY projectRiday Saha
 
The space frame structure
The space frame structureThe space frame structure
The space frame structurebadekarbhavana
 
MODERN ARCHITECTURE.pptx
MODERN ARCHITECTURE.pptxMODERN ARCHITECTURE.pptx
MODERN ARCHITECTURE.pptxMourish Arun
 
Pompidou centre,metz
Pompidou centre,metzPompidou centre,metz
Pompidou centre,metzbansaldhruv
 
postmodernarchitecture-220221093903.pdf
postmodernarchitecture-220221093903.pdfpostmodernarchitecture-220221093903.pdf
postmodernarchitecture-220221093903.pdfSekarAri1
 
Post modern architecture
Post modern architecturePost modern architecture
Post modern architectureLipikaPandey
 
CONTEMPORARY ARCHITECTURE (1910 1920)globally ex
CONTEMPORARY ARCHITECTURE (1910 1920)globally exCONTEMPORARY ARCHITECTURE (1910 1920)globally ex
CONTEMPORARY ARCHITECTURE (1910 1920)globally exRizwan ul Abidin
 

Similaire à Santiago calatrava (20)

Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed study
 
Cn tower.. a detailed study
Cn tower.. a detailed studyCn tower.. a detailed study
Cn tower.. a detailed study
 
Water pumping station, Isle of dogs, London.
Water pumping station, Isle of dogs, London.Water pumping station, Isle of dogs, London.
Water pumping station, Isle of dogs, London.
 
calatrava-140117020203-phpapp01.pdf
calatrava-140117020203-phpapp01.pdfcalatrava-140117020203-phpapp01.pdf
calatrava-140117020203-phpapp01.pdf
 
Norman foster
Norman foster Norman foster
Norman foster
 
Norman foster
Norman foster Norman foster
Norman foster
 
Calatrava In Contemporary Architecture
Calatrava In Contemporary ArchitectureCalatrava In Contemporary Architecture
Calatrava In Contemporary Architecture
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
 
Postmodernism, Neo Modernism
Postmodernism, Neo ModernismPostmodernism, Neo Modernism
Postmodernism, Neo Modernism
 
Learning from the maestro- Case study of FRANK OWEN GEHRY project
Learning from the maestro- Case study of FRANK OWEN GEHRY projectLearning from the maestro- Case study of FRANK OWEN GEHRY project
Learning from the maestro- Case study of FRANK OWEN GEHRY project
 
Richard Rogers
Richard RogersRichard Rogers
Richard Rogers
 
Turning torso
Turning torsoTurning torso
Turning torso
 
The space frame structure
The space frame structureThe space frame structure
The space frame structure
 
MODERN ARCHITECTURE.pptx
MODERN ARCHITECTURE.pptxMODERN ARCHITECTURE.pptx
MODERN ARCHITECTURE.pptx
 
Pompidou centre,metz
Pompidou centre,metzPompidou centre,metz
Pompidou centre,metz
 
postmodernarchitecture-220221093903.pdf
postmodernarchitecture-220221093903.pdfpostmodernarchitecture-220221093903.pdf
postmodernarchitecture-220221093903.pdf
 
Post modern architecture
Post modern architecturePost modern architecture
Post modern architecture
 
CONTEMPORARY ARCHITECTURE (1910 1920)globally ex
CONTEMPORARY ARCHITECTURE (1910 1920)globally exCONTEMPORARY ARCHITECTURE (1910 1920)globally ex
CONTEMPORARY ARCHITECTURE (1910 1920)globally ex
 
Eiffel tower
Eiffel tower Eiffel tower
Eiffel tower
 

Dernier

How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsPooky Knightsmith
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptxJonalynLegaspi2
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 

Dernier (20)

How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young minds
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 

Santiago calatrava

  • 1.
  • 2.  Born : 28 July 1951 Benimàmet, Valencia, Spain  Nationality : Spanish  Education : Polytechnic University Of Valencia Swiss Ferdral Institute Of Technology  Santiago Calatrava Valls is a Spanish architect, sculptor and structural engineer whose principal office is in Zurich, Switzerland. He has office in Zurich, Paris and in New York, Where he now resides.
  • 3. Calatrava's early career was largely dedicated to bridges and railway stations, with designs that elevated the status of civil engineering projects to new heights. His Montjuic Communications Tower in Barcelona, Spain (1991) in the heart of the 1992 Olympics site, as well as the Allen Lambert Galleria in Toronto, Canada (1992), were important works and turning points in his career, leading to a wide range of commissions. The Quadracci Pavilion (2001) of the Milwaukee Art Museum was his first building in the United States. Calatrava's entry into high-rise design began with an innovative 54-story-high twisting tower called Turning Torso (2005), located in Malmö, Sweden.
  • 4.
  • 5.  Works of antony Gaudi  Human figure and nature’s creativity  Experimentation with materials and their properties
  • 6.
  • 7.
  • 8.  Blends impressive visual style and the strict rules of engineering  Symbolic AND recognizable the world over for the sense of movement captureD in a stationary object.  Long sweeping lines, stark white materials and a flawless use of glass and light.  Had a definite vision of inside and outside, the concave and convex, of how we face the specific world
  • 9. 1. 2. 3. HSB TURNING TORSO PONT D’ORLEANS PUENTE DE LA MUJER
  • 10.
  • 11.  HSB Turning Torso is one of the tallest residential buildings in Europe and holds apartments, offices and meeting facilities.  The vision of HSB Turning Torso is based on a sculpture called Twisting Torso by Santiago Calatrava himself. Inspiration from the human body in a twisting motion.
  • 12.  190 metres high  Consists of nine cubes with five floors each  Together with intermediate floors a total of 54 floors  Each floor has 400m² of available space.  147 apartments from cube three to nine.  Meeting facilities on the two top floors.  Each floor consists of a square part around the core and a triangular part which is supported by an external steel structure.  The entire construction twists 90 degrees on its way up with each floor tilting by 1.6 degrees
  • 13. • Ground breaking 14th Feb 2001 • Construction started June 2001 • Casting of foundation March 2002 • Foundations complete August 2002 • Completion date November 2005
  • 14. FA C A D E •facade is a glass and aluminum construction •2,800 panels and 2,250 windows •Follow the twist of the building, the windows are leaning either inwards or outwards by 0 to 7 degrees. R O TAT I O N OF FLOORS Forms for the floors were rotated approx. 1.6 degrees for each floor in order to create the characteristic twist of the building.
  • 15. OUTER STEEL S U P O RT A N D SPINE •The steel support is a welded construction with a very thorough paint treatment for optimal protection against corrosion. •The outer steel support consists of a steel column and 20 horizontal and 18 diagonal ”steel cigars”
  • 16. LIFTS •3 lifts service the residential part of the building and HSB Turning Torso Meetings •Two separate lifts service the offices : ensures high capacity and minimum waiting even during “rush hour” and in the instances when a lift is closed for maintenance.
  • 17. SHEETING & F O U N D AT I O N S Foundation: built directly on the limestone bedrock. Profiled steel plates, forming the foundation shaft, were driven 15 m. into the ground and a further 3m into the limestone bedrock Concrete beams, poured at regular intervals on the inside of the sheeting to stabilize the steel lining against the pressure of the soil outside Concrete construction was poured onto the bedrock, 30 meters in diameter and 7 meters thick
  • 18. CLIMBING FORMS AND BEAMS Each cube were made with socalled self-compacting concrete. Because of its flow capacity, this type of concrete does not need vibrating.
  • 19. • The total commercial space is approximately 4,000 m² in the lower two cubes i.e. 10 floors. •The commercial area has its own lifts and all conceivable comforts in heating, cooling and IT systems. •The top 2 floors(53rd & 54th) are used primarily for meetings.  There are 147 Apartments spread across the 6 floors.
  • 20.
  • 21.  Apart from the fact that he made the building similar to one of his award winning marble design,Calatrava wanted the people residing/working in the building to have a 360 degree Panoramic view of the beauty that surrounded the building. N
  • 22.
  • 23.  INCLINED ARCH BRIDGE BY CALATRAVA OVER THE RIVER LOIRE ORLEANS, FRANCE  THE ARCH IS INCLINED INWARDS AT ANGLE OF 68 DEGREES  LOCATED ON ONE SIDE OF BRIDGE DECK & AS TALL AS 8 FLOORS(25 M)
  • 24.  TWO CONCRETE TRIPODS OF THREE INCLINED BRANCHES SUPPORT THE CENTRAL ARCH SPAN.  THE TRIPOD REPRESENTS THREE FINGERS OF THE HAND AS NATURAL EXTENSION OF ARCH.  THE OPTIMAL USE OF SUPPORT HELPS ONE OBSERVE A
  • 25. PIERS - REINFORCED CONCRETE ARCH - STEEL SUSPENDERS - STEEL ABUTMENTS - REINFORCED CONCRETE MAIN SPAN - 200 M TOTAL LENGTH - 470 M DECK WIDTH - 26 M 4 TRAFFIC LANES 2 CYCLE PATHS AND 2 WALKWAYS
  • 26. THE DECK IS ASSYMMERTRICAL AND CURVED FROM BOTTOM THE DECK REPRESENTS A SHIP’S HULL AND THE ARCH REPRESENTS MAST OF THE BOAT THE DEPTH OF THE BOX GIRDER IS 3.25 M THE WIDTH IS MAXIMUM AT THE CENTRE
  • 27. EACH TRIPOD HAS ONE FINGER ALONG : (BLUE) THE VISUAL CONTINUATION OF THE ARCH COMPRESSIVE FORCES FROM ARCH (RED) IN THE SAME PLANE SUPPORTING THE SPAN OF ARCH (ORANGE) THE THIRD SUPPORTS THE WIDTH OF THE DECK
  • 28. THE HANGERS STABLIZE THE ARCH AND DISTRIBUTE THE FORCE CREATED BY THE INCLINATION,ON THE DECK. THE CABLES ARE PLACED EVERY 4.2 M IN THE PLANE OF ARCH THE CABLES HAVE A DIA OF 5.5 CM &THE ONES CONNECTING THE EXTERIOR SIDE HAVE A DIA OF 3.6 CM
  • 29.
  • 30. Designed by Calatrava,its construction was started in 1998 and got completed on 20th December 2001 It is a foot bridge and is held in its place by cantelevers(a design pioneered by Calatrava)
  • 31. •Cantilever spar cable-stayed bridge (this design has been pioneered by Calatrava) •Was built by the company URSSA, at its plant in Victoria, in Bilbao, Spain, and brought to Buenos Aires in several shipments. •One stabilizing pylon, pointing skyward at a 45degree angle •Its design represents a couple dancing tango unique asymmetrical arrangement •White pylon represents the man with rope holding the central curvature of the bridge that symbolizes the woman – a typical step of tango. •Footbridge
  • 32. •Has two fixed sections and one movable part •The pylon has cables suspending the part of the bridge that rotates 90 degrees in order to allow water traffic to pass •When it swings the far end comes to a resting point •The rotary section relies on a central pile of white concrete that houses the rotating mechanism •It has a unique rotation mechanism; it’s one of the biggest of the world, with 20 electric engines commanded by a computer
  • 33.
  • 34. The metal structure of the bridge has been entirely made of steel and the straps (suspendors) are made up of galvanized steel wires of high resistance of circular section •The big inclinated pylon it is formed by sheets of steel of different thicknesses with rigid material interiors
  • 35. •Total length: 170 m •Central rotating span: 102 m •Width of deck: 6,20 m •Height of pylon: 39 m •Weight: 800 tons •Time to open: less than 2 min •Sustaining cables: 19
  • 36.
  • 37. •Santiago Calatrava exemplifies sculptural expression and engineering through architecture. Calatrava’s work is like music: well orchestrated •Even though his buildings are known for their aesthetics, they never compromise on the grounds of functionality •He builds energy efficient structures •The fact that much of his work is centred around water adds a further dimension to his work. •His designs are sometimes criticized for impracticality •All his designs are not economical •The trainstation Gare do Oriente in Lisbon is known for being very uncomfortable, especially with wind and rainy weather.
  • 38. Made by : Udaiy Khanna Parth Bansal