13. Spring Loading/Assembly Check Hot & Cold Loads Compress Spring to Solid and Release 3 Times Zero out Load Cell Compress Spring to Cold Load Mark Cold Location on Can Measure for Travel Stop Length Compress Spring to Hot Load
14. Spring Loading/Assembly Mark Hot Location on Can Measure Distance Between Loads Should Match Desired Travel Compress Spring to Cold Load & Place in Travel Stops Release Load and Check Travel Stops Remove Spring & Move to Table Using Hoist
15. Spring Loading/Assembly Add Name Tag and Straps Drill & Hammer Rivets into Place Measure the Remaining Slot for Hydro-Test Stops Put Stops in Place & Strap Them Down Last Step: Measure and Adjust Load Flange Height if Necessary
40. Thank You for joining PT&P’s Engineered Pipe Support Webinar Please forward any additional questions or inquiries to us at info@pipingtech.com or visit our website at www.pipingtech.com
Notes de l'éditeur
Note: This particular spring can has a cut-away view for demonstration purposes
Note: We use double-point suspension instead of single-point suspension
Note: Other vendors supports—not PT&P
Note: Other vendors supports—not PT&P
Note: Other vendors supports—not PT&P
Note: Other vendors supports—not PT&P
Note: In the case you want to use your existing spring support