DEMAND PLANNING LEADERSHIP EXCHANGE
PRESENTS:



                   The web event will begin momentarily with
                                  your host:


                                    & Guest Commentator



April 17th, 2013                                plan4demand
Proven SAP Partner                            “Plan4Demand has consistently put
                                              in extra effort to ensure our Griffin
  More than 500 successful SCP               plant consolidation and demand
   engagements in the past decade.            planning projects were successful.”
                                                      -Scott Strickland, VP Information Systems
  We’re known for driving measurable                                           Black & Decker
   results in tools that are adopted across
   our client organizations.
  Our experts have an average of 10 years
   supply chain experience.
  Our SAP team is deep in both technology
   and supply chain planning expertise; have
   managed multiple implementations; have
   a functional specialty.
3


    Session 1 explored decisions that effect the technical
    design of the your system
         Guides you toward design aspects that builds a strong DP
         foundation
         A phase II redesign for these points will be painful.
    Session 2 has a functional slant that will allow you to
    better leverage the application
         Sets the stage for a successful go-live
         Guides you on successful forecast performance tracking and
         improved process management
4


    #6  Developing a Working Prototype
    #7  Manage the Forecasting Process
    #8  Change Management
        – Start with Roles & Responsibilities
    #9 Exception Management
    #10 Forecast Performance
5


    Improve the quality of your decisions and decrease idle time
    between decisions by building a “Working Prototype”
         Planning solutions are difficult to depict in PowerPoint and often
         clients face change management and alignment issues when they
         first see the configured solution during testing
         While a working prototype expands the initial design phase of
         the project it provides a payout throughout the rest of the project.
          Helps mitigate risk and institutionalizes a learning organization better
           prepared for system hand-off
          Moves people more quickly from a “Look & Feel” focus to a “Use of
           Data” focus
          Provides a better understanding of how
           transactions are interrelated and the impact
           on the overall system design
6



    Client used prototype               Client did not use prototype
     Used DP Bill of Material           Interactive demand planning
      capabilities which could have       graphical capabilities were
      resulted in a delayed design        expected when most Data Views
      decision                            were built in a tabular format
     Allowed planners opportunity to    Less efficient Data Views existed
      see the configured solution and     because user navigational needs
      assess alignment with business      not well understood (e.g. drilling
      needs                               down on selected key figures)
                                         Built early negative attitudes
     Facilitated Fit/Gap analysis
                                          resulting from a perceived
     Started the user adoption           inefficient design
      process early and kept team        Delayed Go Live caused by users
      engaged                             advancing the learning curve, high
                                          risk of reverting to old ways
7



    The process, by it’s nature of
    being part art and part science
    is vulnerable to subjectivity.
         The process needs to be tightly
         defined and managed
         Understand the drivers of
          uncertainty and apply focus to those critical areas
          Cleaning historical demand for one time events or other anomalies
          Managing statistical forecasting exceptions and tuning models
          Incorporating judgmental input and measure/understand the impacts
            such as potential bias
         This focus reduces clutter in the forecasting process and leads to
         improved forecast results
8


    Impacts of maintaining structure in the forecasting process:
         Reduces likelihood of bias entering the forecast process
         Builds a high level of credibility in the forecast
          Remember since the output of forecasting is an estimate (i.e. “best
            guess”) there is a certain amount of “leap of faith” that everyone takes.
         Allows for faster development of action plans to close
         “forecasting gaps”, such as significant gaps to the Budget /
         Quarterly Revisions
          Forecast is better understood and respected
         Creates an ecosystem for sustainable change
          Shapes the way people think about and approach the forecasting
            process, addressing issues and making trade off decisions
         Drives standardized workflow – locally & globally
9

    Focused approach achieved by
    aligning planning book / data views
    with the key steps in the forecasting
    process:
     Clean History Planning Book
     Statistical Forecast Planning Book
     Consensus Forecast development,
       validation and modifications
       Planning Book
    Less art & more science is better at
    this stage
    It’s a building block process that is
    standards-driven to ensure quality
    results
10


     Our Demand Planning Process
      Roles & Responsibilities are:
           Answer on your screen

      A. Not Well Defined
      B. Defined For Supply Chain Only
      C. Defined For All Demand Planning Process
         Key Stakeholders, But Lack Adherence
      D. Defined, Well Structured & Adhered To
      E. Do Not Know
11


     Change Management is an area that needs constant
     care and feeding. The most effective ways to ease the
     transition to a new or improved DP process are:
         Have a solid understanding of the core competencies
         required for the Demand Planning Process
         Ensure roles and responsibilities are defined or redefined
         properly to meet the goals of the new or improved design
         Assess your demand planning team’s fit to these roles and
         responsibilities
          Identify team’s strengths and improvement opportunities
Gain an understanding of the core competencies your
company needs to succeed at Demand Planning
    Determine the team’s process and technology              Consensus
                                                               Based
    strengths and identify opportunities for                  Demand
                                                              Planning
    improvement. Examples include:
     Collaboration & Generation of the Consensus
                                                        APO         Analytical
       Forecast                                       Demand          Skills
                                                      Planning
     Improved Statistical Forecasting Capabilities
     Effective use of exception based management
    Mainly accomplished through attrition hire demand planners
    familiar with DP best practice process knowledge as well as
    having prior APO DP experience. This can be a major asset
    throughout the implementation.
13

     It is not uncommon for projects to shortcut or eliminate efforts
     around Roles and Responsibilities
      You see this happening more if the tasks are to redefine the roles and
       responsibilities
      For example, redefining existing position roles and responsibilities can be
       quite the endeavor as HR will need to be involved and senior
       management approval is often required
      The impact of not doing this however is on the ability to measure
       demand planner performance and adherence to the new process
     Take the time to define or redefine in order to meet the new or
     changing goals
      Captures “Tribal Knowledge” and “Know-How”
      Rationalizes common best practices and captures critical knowledge to
       pass on to others in a systematic way
      Drives a “change in thinking” within the team from a production culture to
       a performance culture through understanding “end game” and “personal
       measurements”
      Engages the team to think beyond their specific “silo area”
14


     Build transparency in      R = Responsible, A = Accountable, C = Consulted, I = Informed

     the communication of       Activity
                                                                                          Demand
                                                                                          Planner
                                                                                                       Sr.
                                                                                                    Demand Demand    Sales
                                                                                                    Planner Manager Finance   Mktg   SPS    CCID

     the Roles and              Drive highest level of item/location forecast accuracy
                                Publish regular forecast accuracy updates and forecast
                                                                                             R          R      R       C, I    A      A      C, I

                                actualization to cross functional partners to drive
     Responsibilities           consensus on problem areas and messaging
                                Understand and challenge the assumptions of
                                                                                                R     R        R      C, I     A      A     C, I

                                assessments or changes to the forecasts based on cross
      Clear Job Descriptions   functional inputs
                                Inquire about forecast changes and request for
                                                                                                R     R        A      C, I    C, I   C, I   C, I


       and use of RACI          additional investigation if changes do not meet
                                expectations                                                    A     A        A       C,I     R      R      R

       Matrix are tools at      Identifying the impact of trade spend and any
                                assumptions of that impact on sales lifts                       A     A       C, I     A      C, I    R     C, I

       your disposal
                                Provide DSMP volumetric impact by customer                      A     A       C, I     A      C, I    R     C, I
                                Provide merchandising calendars and explanation to
                                specific promotions and sales lifts                             A     A       C, I     A       R     C, I   C, I

      Do not fear an           Provide recommendations for overriding changes in
                                forecast inputs based on understanding of implications

       evolving process,
                                and assessments of impacts                                      R     R        A      C, I    C, I   C, I   C, I
                                Gain consensus and alignment of forecast inputs to be
                                entered into APO DP from cross functional team                  R     R        A      C, I     A      A      A
       allow it to change and   Provide input to Demand Review meeting based on
                                pre-defined templates                                           R     R        A      C, I    C, I   C, I   C, I
       become a driver for      Facilitate Demand Review meeting to Brand Manager
                                Make the decision on the forecast volume based on
                                                                                                A     A        R      C, I    C, I   C, I   C, I


       enhancing supply         facts and consensus from respective cross functional
                                inputs.                                                         R     R        A      C, I    C, I   C, I   C, I

       chain performance
15

     Any DP roles and
     responsibilities assessment
     needs to cover the
     analytical and statistical
     competency of the team to
     determine how to best
     focus training and / or skill
     enhancements
     Do not be afraid to bring
     in a statistician to help
     analyze historical demand
     patterns and recommend
     model selection and tuning
     approaches for go live and
     post go live optimization
16


     Our Exception Based Management Process is Best
                   Described As Being:
                   Answer on your screen

               A. Not Well Defined
               B. In General More Reactive
               C. More Proactive
               D. No Exception Based Management Used
17


 Become reliant on exception
 management to surface future
 issues today.
     Look for recent trends in alerts
      For example, are we consistently
        under or over forecasting for
        recent time periods implying
        potential forecast bias?
     Do not overreact to an
     exception but rather look for
     repeated patterns (i.e. pattern
     recognition)
      Do not be afraid to use Excel
        pivot tables to help identify
        patterns in alerts by looking at
        product and customer groupings
18


     Build a strong Management by Exception (MBE) process
         Ensure the process is skewed towards proactive MBE which
         anticipates exceptions within the forecasts
          Maintain the highest focus in this area
         Continue to use reactive MBE or ones which deal with
         detection of exceptions that already have occurred
          If proper focus is delivered to proactive MBE the need for the
            reactive MBE will lessen over time


            Example of
            identifying potential
            obsolete products
19


     Statistical forecast thresholds
     are defined via forecast
     alert profiles and contain
     Information / Warning /
     Error status capabilities to
     help with prioritization

     Define alert threshold values that result in a manageable number of
     alerts being reviewed by a demand planner
      One of the major pain points expressed by planners across industry
       verticals is “too many alerts”
      For macro driven alerts the macro itself may need to be modified which
       involves some configuration
      A working prototype would provide good insight on alert threshold tuning
       needs prior to go live
      Use of pattern recognition is critical
20


 Build flexibility into your
 Forecast Performance
                                  Baseline & Consensus Forecast
 Measurement & Tracking
 Process                          7000
                                  6000

      Provide the ability to      5000
                                  4000
      measure all inputs that     3000
      make up the consensus       2000

      forecast number             1000
                                     0
       Statistical forecast



                                                                             Sep-11




                                                                                                                                   Sep-12




                                                                                                                                                                                         Sep-13
                                                  Mar-11
                                                           May-11




                                                                                                        Mar-12
                                                                                                                 May-12




                                                                                                                                                              Mar-13
                                                                                                                                                                       May-13
                                                                                                                          Jul-12
                                         Jan-11




                                                                    Jul-11




                                                                                               Jan-12




                                                                                                                                                     Jan-13




                                                                                                                                                                                Jul-13


                                                                                                                                                                                                  Nov-13
                                                                                      Nov-11




                                                                                                                                            Nov-12
        performance to get the
        historical / objective                                                        Baseline Fcst                                Consensus Fcst
        perspective
       Sales & Marketing
        inputs/overrides to
        gauge where working
        well and where to focus
21


     Track performance at the input/influence level of aggregation
        Provide drill down capability that will allow you to isolate the
        contributors of the error
        The statistical forecast is often measured at multiple levels of the
         forecast hierarchy for the supply chain
          - Item x Location for Distribution Planning
          - Item for Manufacturing & Purchasing
        An example from a Food company for Sales & Marketing inputs:
          - Sales: Item x Key Account for next 3 months
          - Marketing: Item for months 3 -18
22

     FVA is defined as the change in a forecasting performance metric (whatever metric
     you happen to be using, such as MAPE, forecast accuracy or bias) that can be attributed
     to each particular step and participant in your forecasting process
     FVA analysis also compares both the statistical forecast and the analyst forecast to
     what’s called a naïve forecast
             In FVA analysis, you would compare the analyst’s override to the statistically
             generated forecast to determine if the override makes the forecast better


                                                   In this case, the naïve model was able to achieve MAPE of 25%
                                                   • The statistical forecast added value by reducing MAPE five
                                                     percentage points to 20%
                                                   • However, the analyst override actually made the forecast worse,
                                                     increasing MAPE to 30%
                                                   • The override’s FVA was five percentage points less than the naïve
                                                     model’s FVA, and was 10 percentage points less than the
                                                     statistical forecast’s FVA

Source: Michael Gilliland SAS Chicago APICS 2011
23

     Measure lagged forecast
     error and lagged               For a chemicals company this meant:
     forecast bias to                 -   Lag1 (i.e. Forecast for April;
     determine what is not                Developed in March) for
     working and what are the             distribution and manufacturing
     implications                     -   Lag 6 (i.e. Forecast for September;
      The lags must reflect the
                                          Developed in March) for Purchasing
        distribution,
        manufacturing and
        purchasing lead time
        requirements
     Enables ongoing
     improvement of forecast
     performance as we
     measure not only the
     statistical forecast but
     also all of the intelligence
     components and at the
     levels provided
24

     Adults learn in a very different way, the new social media is
     training us to communicate in short rapid bursts
      With a prototype that builds out throughout the project we are able to
        capture and validate changes and move at a rapid pace
     The Forecast Process, by it’s nature of being part art and part
     science is vulnerable to subjectivity and an easy process to run-off
     course
      Maintain enough control to enable consistency without stifling change
     An Exception Management process is very similar to a diet. Hard
     to start, keep on track and moving, but pays off in the long run
     Forecast performance is key to a successful Demand Planning
     process. Solid KPIs will allow you to insure continuous progress.
     Follow the trend line not the headline
Join us on LinkedIn: Demand Planning Leadership Exchange
Follow us on Twitter: @Plan4Demand

                        THANK YOU!


         Save the Date or Click Below to Register!

                S&OP HANA | May 8th
  Presented by Andrew McCall, S&OP Solution Leader




                   If you use SAP to Plan… Think
For Additional Information or a PDF Copy

                Contact:
              Jaime Reints
             412.733.5011
    jaime.reints@plan4demand.com

More Related Content

More from Plan4Demand

Demand Planning Leadership Exchange: Demand Sensing - Are You Ready?
Demand Planning Leadership Exchange: Demand Sensing - Are You Ready? Demand Planning Leadership Exchange: Demand Sensing - Are You Ready?
Demand Planning Leadership Exchange: Demand Sensing - Are You Ready? Plan4Demand
 
SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...
SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...
SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...Plan4Demand
 
SAP® S&OP powered by SAP HANA®: Practical Steps to Launch for Results
SAP® S&OP powered by SAP HANA®: Practical Steps to Launch for ResultsSAP® S&OP powered by SAP HANA®: Practical Steps to Launch for Results
SAP® S&OP powered by SAP HANA®: Practical Steps to Launch for ResultsPlan4Demand
 
12 days of Bricks Matter
12 days of Bricks Matter12 days of Bricks Matter
12 days of Bricks MatterPlan4Demand
 
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Plan4Demand
 
Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...
Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...
Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...Plan4Demand
 
Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...
Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...
Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...Plan4Demand
 
SAP CVN Supply Network Planning - Supply Planning Engine Selection
SAP CVN Supply Network Planning - Supply Planning Engine SelectionSAP CVN Supply Network Planning - Supply Planning Engine Selection
SAP CVN Supply Network Planning - Supply Planning Engine SelectionPlan4Demand
 
S&OP Leadership Exchange: Profit Plan Gap Closers
S&OP Leadership Exchange: Profit Plan Gap ClosersS&OP Leadership Exchange: Profit Plan Gap Closers
S&OP Leadership Exchange: Profit Plan Gap ClosersPlan4Demand
 
S&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your BusinessS&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your BusinessPlan4Demand
 
Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...Plan4Demand
 

More from Plan4Demand (11)

Demand Planning Leadership Exchange: Demand Sensing - Are You Ready?
Demand Planning Leadership Exchange: Demand Sensing - Are You Ready? Demand Planning Leadership Exchange: Demand Sensing - Are You Ready?
Demand Planning Leadership Exchange: Demand Sensing - Are You Ready?
 
SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...
SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...
SAP Global Available to Promise (gATP) 101: Global Visibility vs. Global Avai...
 
SAP® S&OP powered by SAP HANA®: Practical Steps to Launch for Results
SAP® S&OP powered by SAP HANA®: Practical Steps to Launch for ResultsSAP® S&OP powered by SAP HANA®: Practical Steps to Launch for Results
SAP® S&OP powered by SAP HANA®: Practical Steps to Launch for Results
 
12 days of Bricks Matter
12 days of Bricks Matter12 days of Bricks Matter
12 days of Bricks Matter
 
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
 
Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...
Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...
Demand Planning Leadership Exchange: Increasing Forecast Accuracy... Does it ...
 
Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...
Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...
Demand Planning Leadership Exchange: Tips to Optimize JDA Demand Planning mod...
 
SAP CVN Supply Network Planning - Supply Planning Engine Selection
SAP CVN Supply Network Planning - Supply Planning Engine SelectionSAP CVN Supply Network Planning - Supply Planning Engine Selection
SAP CVN Supply Network Planning - Supply Planning Engine Selection
 
S&OP Leadership Exchange: Profit Plan Gap Closers
S&OP Leadership Exchange: Profit Plan Gap ClosersS&OP Leadership Exchange: Profit Plan Gap Closers
S&OP Leadership Exchange: Profit Plan Gap Closers
 
S&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your BusinessS&OP Leadership Exchange: Tailoring S&OP to Fit your Business
S&OP Leadership Exchange: Tailoring S&OP to Fit your Business
 
Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...Strategies for making the most of SAP technology that supports Sales and Oper...
Strategies for making the most of SAP technology that supports Sales and Oper...
 

Recently uploaded

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Recently uploaded (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

Demand Planning Leadership Exchange: 10 tips for SAP APO DP | Part 2

  • 1. DEMAND PLANNING LEADERSHIP EXCHANGE PRESENTS: The web event will begin momentarily with your host: & Guest Commentator April 17th, 2013 plan4demand
  • 2. Proven SAP Partner “Plan4Demand has consistently put in extra effort to ensure our Griffin  More than 500 successful SCP plant consolidation and demand engagements in the past decade. planning projects were successful.” -Scott Strickland, VP Information Systems  We’re known for driving measurable Black & Decker results in tools that are adopted across our client organizations.  Our experts have an average of 10 years supply chain experience.  Our SAP team is deep in both technology and supply chain planning expertise; have managed multiple implementations; have a functional specialty.
  • 3. 3 Session 1 explored decisions that effect the technical design of the your system Guides you toward design aspects that builds a strong DP foundation A phase II redesign for these points will be painful. Session 2 has a functional slant that will allow you to better leverage the application Sets the stage for a successful go-live Guides you on successful forecast performance tracking and improved process management
  • 4. 4 #6 Developing a Working Prototype #7 Manage the Forecasting Process #8 Change Management – Start with Roles & Responsibilities #9 Exception Management #10 Forecast Performance
  • 5. 5 Improve the quality of your decisions and decrease idle time between decisions by building a “Working Prototype” Planning solutions are difficult to depict in PowerPoint and often clients face change management and alignment issues when they first see the configured solution during testing While a working prototype expands the initial design phase of the project it provides a payout throughout the rest of the project.  Helps mitigate risk and institutionalizes a learning organization better prepared for system hand-off  Moves people more quickly from a “Look & Feel” focus to a “Use of Data” focus  Provides a better understanding of how transactions are interrelated and the impact on the overall system design
  • 6. 6 Client used prototype Client did not use prototype  Used DP Bill of Material  Interactive demand planning capabilities which could have graphical capabilities were resulted in a delayed design expected when most Data Views decision were built in a tabular format  Allowed planners opportunity to  Less efficient Data Views existed see the configured solution and because user navigational needs assess alignment with business not well understood (e.g. drilling needs down on selected key figures)  Built early negative attitudes  Facilitated Fit/Gap analysis resulting from a perceived  Started the user adoption inefficient design process early and kept team  Delayed Go Live caused by users engaged advancing the learning curve, high risk of reverting to old ways
  • 7. 7 The process, by it’s nature of being part art and part science is vulnerable to subjectivity. The process needs to be tightly defined and managed Understand the drivers of uncertainty and apply focus to those critical areas  Cleaning historical demand for one time events or other anomalies  Managing statistical forecasting exceptions and tuning models  Incorporating judgmental input and measure/understand the impacts such as potential bias This focus reduces clutter in the forecasting process and leads to improved forecast results
  • 8. 8 Impacts of maintaining structure in the forecasting process: Reduces likelihood of bias entering the forecast process Builds a high level of credibility in the forecast  Remember since the output of forecasting is an estimate (i.e. “best guess”) there is a certain amount of “leap of faith” that everyone takes. Allows for faster development of action plans to close “forecasting gaps”, such as significant gaps to the Budget / Quarterly Revisions  Forecast is better understood and respected Creates an ecosystem for sustainable change  Shapes the way people think about and approach the forecasting process, addressing issues and making trade off decisions Drives standardized workflow – locally & globally
  • 9. 9 Focused approach achieved by aligning planning book / data views with the key steps in the forecasting process:  Clean History Planning Book  Statistical Forecast Planning Book  Consensus Forecast development, validation and modifications Planning Book Less art & more science is better at this stage It’s a building block process that is standards-driven to ensure quality results
  • 10. 10 Our Demand Planning Process Roles & Responsibilities are: Answer on your screen A. Not Well Defined B. Defined For Supply Chain Only C. Defined For All Demand Planning Process Key Stakeholders, But Lack Adherence D. Defined, Well Structured & Adhered To E. Do Not Know
  • 11. 11 Change Management is an area that needs constant care and feeding. The most effective ways to ease the transition to a new or improved DP process are: Have a solid understanding of the core competencies required for the Demand Planning Process Ensure roles and responsibilities are defined or redefined properly to meet the goals of the new or improved design Assess your demand planning team’s fit to these roles and responsibilities  Identify team’s strengths and improvement opportunities
  • 12. Gain an understanding of the core competencies your company needs to succeed at Demand Planning Determine the team’s process and technology Consensus Based strengths and identify opportunities for Demand Planning improvement. Examples include:  Collaboration & Generation of the Consensus APO Analytical Forecast Demand Skills Planning  Improved Statistical Forecasting Capabilities  Effective use of exception based management Mainly accomplished through attrition hire demand planners familiar with DP best practice process knowledge as well as having prior APO DP experience. This can be a major asset throughout the implementation.
  • 13. 13 It is not uncommon for projects to shortcut or eliminate efforts around Roles and Responsibilities  You see this happening more if the tasks are to redefine the roles and responsibilities  For example, redefining existing position roles and responsibilities can be quite the endeavor as HR will need to be involved and senior management approval is often required  The impact of not doing this however is on the ability to measure demand planner performance and adherence to the new process Take the time to define or redefine in order to meet the new or changing goals  Captures “Tribal Knowledge” and “Know-How”  Rationalizes common best practices and captures critical knowledge to pass on to others in a systematic way  Drives a “change in thinking” within the team from a production culture to a performance culture through understanding “end game” and “personal measurements”  Engages the team to think beyond their specific “silo area”
  • 14. 14 Build transparency in R = Responsible, A = Accountable, C = Consulted, I = Informed the communication of Activity Demand Planner Sr. Demand Demand Sales Planner Manager Finance Mktg SPS CCID the Roles and Drive highest level of item/location forecast accuracy Publish regular forecast accuracy updates and forecast R R R C, I A A C, I actualization to cross functional partners to drive Responsibilities consensus on problem areas and messaging Understand and challenge the assumptions of R R R C, I A A C, I assessments or changes to the forecasts based on cross  Clear Job Descriptions functional inputs Inquire about forecast changes and request for R R A C, I C, I C, I C, I and use of RACI additional investigation if changes do not meet expectations A A A C,I R R R Matrix are tools at Identifying the impact of trade spend and any assumptions of that impact on sales lifts A A C, I A C, I R C, I your disposal Provide DSMP volumetric impact by customer A A C, I A C, I R C, I Provide merchandising calendars and explanation to specific promotions and sales lifts A A C, I A R C, I C, I  Do not fear an Provide recommendations for overriding changes in forecast inputs based on understanding of implications evolving process, and assessments of impacts R R A C, I C, I C, I C, I Gain consensus and alignment of forecast inputs to be entered into APO DP from cross functional team R R A C, I A A A allow it to change and Provide input to Demand Review meeting based on pre-defined templates R R A C, I C, I C, I C, I become a driver for Facilitate Demand Review meeting to Brand Manager Make the decision on the forecast volume based on A A R C, I C, I C, I C, I enhancing supply facts and consensus from respective cross functional inputs. R R A C, I C, I C, I C, I chain performance
  • 15. 15 Any DP roles and responsibilities assessment needs to cover the analytical and statistical competency of the team to determine how to best focus training and / or skill enhancements Do not be afraid to bring in a statistician to help analyze historical demand patterns and recommend model selection and tuning approaches for go live and post go live optimization
  • 16. 16 Our Exception Based Management Process is Best Described As Being: Answer on your screen A. Not Well Defined B. In General More Reactive C. More Proactive D. No Exception Based Management Used
  • 17. 17 Become reliant on exception management to surface future issues today. Look for recent trends in alerts  For example, are we consistently under or over forecasting for recent time periods implying potential forecast bias? Do not overreact to an exception but rather look for repeated patterns (i.e. pattern recognition)  Do not be afraid to use Excel pivot tables to help identify patterns in alerts by looking at product and customer groupings
  • 18. 18 Build a strong Management by Exception (MBE) process Ensure the process is skewed towards proactive MBE which anticipates exceptions within the forecasts  Maintain the highest focus in this area Continue to use reactive MBE or ones which deal with detection of exceptions that already have occurred  If proper focus is delivered to proactive MBE the need for the reactive MBE will lessen over time Example of identifying potential obsolete products
  • 19. 19 Statistical forecast thresholds are defined via forecast alert profiles and contain Information / Warning / Error status capabilities to help with prioritization Define alert threshold values that result in a manageable number of alerts being reviewed by a demand planner  One of the major pain points expressed by planners across industry verticals is “too many alerts”  For macro driven alerts the macro itself may need to be modified which involves some configuration  A working prototype would provide good insight on alert threshold tuning needs prior to go live  Use of pattern recognition is critical
  • 20. 20 Build flexibility into your Forecast Performance Baseline & Consensus Forecast Measurement & Tracking Process 7000 6000 Provide the ability to 5000 4000 measure all inputs that 3000 make up the consensus 2000 forecast number 1000 0  Statistical forecast Sep-11 Sep-12 Sep-13 Mar-11 May-11 Mar-12 May-12 Mar-13 May-13 Jul-12 Jan-11 Jul-11 Jan-12 Jan-13 Jul-13 Nov-13 Nov-11 Nov-12 performance to get the historical / objective Baseline Fcst Consensus Fcst perspective  Sales & Marketing inputs/overrides to gauge where working well and where to focus
  • 21. 21 Track performance at the input/influence level of aggregation Provide drill down capability that will allow you to isolate the contributors of the error  The statistical forecast is often measured at multiple levels of the forecast hierarchy for the supply chain - Item x Location for Distribution Planning - Item for Manufacturing & Purchasing  An example from a Food company for Sales & Marketing inputs: - Sales: Item x Key Account for next 3 months - Marketing: Item for months 3 -18
  • 22. 22 FVA is defined as the change in a forecasting performance metric (whatever metric you happen to be using, such as MAPE, forecast accuracy or bias) that can be attributed to each particular step and participant in your forecasting process FVA analysis also compares both the statistical forecast and the analyst forecast to what’s called a naïve forecast In FVA analysis, you would compare the analyst’s override to the statistically generated forecast to determine if the override makes the forecast better In this case, the naïve model was able to achieve MAPE of 25% • The statistical forecast added value by reducing MAPE five percentage points to 20% • However, the analyst override actually made the forecast worse, increasing MAPE to 30% • The override’s FVA was five percentage points less than the naïve model’s FVA, and was 10 percentage points less than the statistical forecast’s FVA Source: Michael Gilliland SAS Chicago APICS 2011
  • 23. 23 Measure lagged forecast error and lagged For a chemicals company this meant: forecast bias to - Lag1 (i.e. Forecast for April; determine what is not Developed in March) for working and what are the distribution and manufacturing implications - Lag 6 (i.e. Forecast for September;  The lags must reflect the Developed in March) for Purchasing distribution, manufacturing and purchasing lead time requirements Enables ongoing improvement of forecast performance as we measure not only the statistical forecast but also all of the intelligence components and at the levels provided
  • 24. 24 Adults learn in a very different way, the new social media is training us to communicate in short rapid bursts  With a prototype that builds out throughout the project we are able to capture and validate changes and move at a rapid pace The Forecast Process, by it’s nature of being part art and part science is vulnerable to subjectivity and an easy process to run-off course  Maintain enough control to enable consistency without stifling change An Exception Management process is very similar to a diet. Hard to start, keep on track and moving, but pays off in the long run Forecast performance is key to a successful Demand Planning process. Solid KPIs will allow you to insure continuous progress. Follow the trend line not the headline
  • 25. Join us on LinkedIn: Demand Planning Leadership Exchange Follow us on Twitter: @Plan4Demand THANK YOU! Save the Date or Click Below to Register! S&OP HANA | May 8th Presented by Andrew McCall, S&OP Solution Leader If you use SAP to Plan… Think
  • 26. For Additional Information or a PDF Copy Contact: Jaime Reints 412.733.5011 jaime.reints@plan4demand.com