INTRODUCTION
Plastering is the method covering various components of a building with a
plastic material to form a durable surface
Plastering is done to achieve the following objects:
 To protect the external surfaces against penetration of rain water and other
atmospheric agencies.
 To give smooth surface in which dust and dirt cannot lodge.
 To provide an even, smooth, regular, clean and durable finished surface and thus
to improve appearance.
 To cover up the use of inferior quality materials and joints formed in the
masonry work.
 To provide satisfactory base for white washing, color washing etc.
 The object of internal plastering is to protect the surface against dust and
vermin nuisance.
 Dry Mix Mortar Technology and Products Expo is a three day event that will be held
in Shanghai in China.
 In 2003, the Company established its Dry Mix Mortar Plant, the first of its kind in
India, manufacturing plastering materials and tile fixing compounds required for the
Housing industry.
 The Plant, established in collaboration with M-tech, Germany, is located in the
Kaanchipuram District of Tamil Nadu near Sriperumbdur.
HISTORY
RAW MATERIALS
Dry Mix Mortar → (cement → sand → stone dust
→ water)
Dry Mix Mortar)
PREPARATION OF D.M.M.
METHODOLGY
All construction work depends on
 QUALITY
 TIME
 ECONOMY
The new technique is to adopt in plastering is DMM method.
IMPLEMENTATION PURPOSES
IF WE Implement D.M.M. METHOD, WE CAN
ACHIVE plastering with
 Assured Good Quality
 Stipulated Time(Schedule)
 Economy in Construction
HOW ABOUT QUALITY?????
 The management supplies the Materials to the contractor.
 The materials which are mixed (Dry mix)is of known Proportions.
 That proportions is thoroughly mixed in front of the Engineers or
Supervisors.
 After mixing, the dry mortar is put to gunny bags, that bags is known as
DMM bags.
 For contractors side workers they have only mixed Water to the given
DMM bags.
 There is no (minimum) Wastage of the materials.
 As the Quantity of RMM bag supplied to the contractors is noted.
 Hence after supply of each bag the Area of Plastered surface is Noted.
 After plastering the area should be Checked & Verified.
By all these factors the management knows the Quality of mixing &
supplying. After supplying of each DMM bag, they know how much area to
be plastered also. Hence Quality is achieved.
HOW ABOUT TIME (SCHEDULE)???????
 The Dry mortar required for plastering is mixed in machine mixer.
 Mixing of mortar by labour is replaced by mixer machine.
 By continuous mixing of dry mortar in a day by mixer, the time will
be consumed for Contractor also.
 As the mixing time is reduce for contractor they can plaster large
area with their stipulated time.
 Hence the Bar Chart or Gant Chart of plastering work will also be
finished within the schedule.
 After finishing the plastering (after curing) within the schedule the
painting work also started early. Hence Time (Schedule) is achieved.
HOW ABOUT ECONOMY???????
 Supply the DMM bags to the contractor for plastering work.
 The contractor side workers have only mix Water.
 Hence mixing Time is reduced for the contractors they also achieve large Area in a day.
 By this, the management can talked about the Revised rate for plastering with the Contractor.
 By this we can reduce 0.5paisa to 1.0 rupee, after discussing with the contractor.
 Before DMM method, Interior Plastering-Rs 16/ft, Exterior Plastering-Rs17/ft , Ceiling
Plastering- Rs 18/ft.
 After introducing DMM method, Interior Plastering-Rs 15/ft, Exterior Plastering-Rs16/ft
,Ceiling Plastering- Rs 17/ft. Hence economy is achieved.
TESTS AND RESULTS
TESTS ON CEMENT:-
Fineness of cement:
Percentage residue for a given sample of cement is 5.3%
Specific gravity of cement:
Specific gravity of cement is 2.95
Normal consistency of cement:
The normal consistency of the given sample of cement is 33% of water by weight
of cement
Initial setting time of cement:
The initial setting time of given sample of cement is 37min
Storage time of cement:
The strength of cement is also depends on the storage time of cement
TESTS ON SAND:-
Sieve analysis of sand:
Fineness modulus of fine aggregate i.e, sand is found to be 4.67
Specific gravity of sand:
The specific gravity of sand is 3.18
TESTS ON CEMENT MORTAR:
COMPRESSIVE STRENGTH TEST:
The Compressive strength is the most important of all the properties. This
is carried out to determine compressive strength of cement mortar by preparing
standard cubes made of good Portland cement and standard sand mortar in the ratio
1:6. The size of the mould is 70.6mm x 70.6mm. After curing, cubes are tested in
compression testing machine.
For Freshly Prepared Mortar:
SL.N
O
Days of curing Compressive strength of 1:6
ratio
1 3days 17.2N/mm2
2 7days 28 N/mm2
3 28days 56 N/mm2
Mixing the water after 2hours of mixing dry mortar:
SL.NO Days of curing Compressive strength of 1:6 ratio
1 3days 18.1 N/mm2
2 7days 28.1 N/mm2
3 28days 55.5 N/mm2
Mixing the water after 2days of mixing dry mortar:
SL.NO Days of curing Compressive strength of 1:6 ratio
1 3days 19.2 N/mm2
2 7days 28.5 N/mm2
3 28days 56.1 N/mm2
PREPRATION OF CONCRETE CUBES AND TESTS
INSTRUMENTS USED FOR PREPARATION OF DRY MIX MORTAR
CONCLUSION
In the present construction system, the use of innovative methodology will be most
important to complete the construction activities as early as possible. As suggested
earlier the construction activities depends upon the Quality, Time Schedule &
Economy in construction.
The implemented technique may be more useful to high rise structures or
skyscrapers. The DMM technique is to be adopted for the multi-storeyed building,
apartment construction or any other high rise structures.
The introduced DMM technique is more reliable to the construction, as it depends
upon the Quality, Time Schedule & Economy of the construction.
THANKING YOU

Contenu connexe

Tendances

Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452
SHUBHAM DABHADE
 
Floor finishes
Floor finishes Floor finishes
Floor finishes
Rita Mitra
 

Tendances (20)

Flooring
FlooringFlooring
Flooring
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materials
 
Admixture of concrete
Admixture of concreteAdmixture of concrete
Admixture of concrete
 
READY MIX CONCRETE
READY MIX CONCRETEREADY MIX CONCRETE
READY MIX CONCRETE
 
Enamel paint
Enamel paintEnamel paint
Enamel paint
 
Concrete admixtures
Concrete admixturesConcrete admixtures
Concrete admixtures
 
Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452Advanced material of construction..ppt24545452
Advanced material of construction..ppt24545452
 
Paints
PaintsPaints
Paints
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
Waterproofing in structure
Waterproofing in structureWaterproofing in structure
Waterproofing in structure
 
1.plastering
1.plastering1.plastering
1.plastering
 
GGBS
GGBSGGBS
GGBS
 
Soil cement
Soil cementSoil cement
Soil cement
 
Paints
PaintsPaints
Paints
 
Concrete
ConcreteConcrete
Concrete
 
Floor finishes
Floor finishes Floor finishes
Floor finishes
 
light weight concrete
light weight concretelight weight concrete
light weight concrete
 
Pervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the DetailsPervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the Details
 
Advancement of concrete technology
Advancement of concrete technologyAdvancement of concrete technology
Advancement of concrete technology
 

En vedette

Types Of Motar
Types Of MotarTypes Of Motar
Types Of Motar
sandip287
 

En vedette (19)

UBP
UBPUBP
UBP
 
Mortar & Mixing
Mortar & MixingMortar & Mixing
Mortar & Mixing
 
Plastering
PlasteringPlastering
Plastering
 
Dry mortar production line——Hengfu Electronic Machinery Co.,LTD
Dry mortar production line——Hengfu Electronic Machinery Co.,LTDDry mortar production line——Hengfu Electronic Machinery Co.,LTD
Dry mortar production line——Hengfu Electronic Machinery Co.,LTD
 
Why dalmia readymix
Why dalmia readymixWhy dalmia readymix
Why dalmia readymix
 
ISOMAT_Plasters & mortars
ISOMAT_Plasters & mortarsISOMAT_Plasters & mortars
ISOMAT_Plasters & mortars
 
Types Of Motar
Types Of MotarTypes Of Motar
Types Of Motar
 
1st Mortars
1st  Mortars1st  Mortars
1st Mortars
 
MORTAR BUILDING MATERIALS
MORTAR BUILDING MATERIALSMORTAR BUILDING MATERIALS
MORTAR BUILDING MATERIALS
 
Ultra tech
Ultra techUltra tech
Ultra tech
 
organización del foroe
 organización del foroe organización del foroe
organización del foroe
 
Ftir Spectra Powders List
Ftir Spectra Powders ListFtir Spectra Powders List
Ftir Spectra Powders List
 
MW2010: J. Doyle + M. Doyle, Mixing Social Glue with Brick and Mortar: Experi...
MW2010: J. Doyle + M. Doyle, Mixing Social Glue with Brick and Mortar: Experi...MW2010: J. Doyle + M. Doyle, Mixing Social Glue with Brick and Mortar: Experi...
MW2010: J. Doyle + M. Doyle, Mixing Social Glue with Brick and Mortar: Experi...
 
study on strenth properties of blended cement concreate
study on strenth properties of blended cement concreatestudy on strenth properties of blended cement concreate
study on strenth properties of blended cement concreate
 
Catalog of cement silo,dry mortar plant,sand dryer etc
Catalog of cement silo,dry mortar plant,sand dryer etcCatalog of cement silo,dry mortar plant,sand dryer etc
Catalog of cement silo,dry mortar plant,sand dryer etc
 
Ultratech cement
Ultratech cementUltratech cement
Ultratech cement
 
Building products presenation (2)
Building products presenation (2)Building products presenation (2)
Building products presenation (2)
 
Cons126
Cons126Cons126
Cons126
 
walplast products pvt. limited
walplast products pvt. limitedwalplast products pvt. limited
walplast products pvt. limited
 

Similaire à Dry Mix Mortar

Presentation [AP14015]
Presentation [AP14015]Presentation [AP14015]
Presentation [AP14015]
Rahul Dasgupta
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
Minh Bui Si
 

Similaire à Dry Mix Mortar (20)

A012550107
A012550107A012550107
A012550107
 
AN EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH GGBS AND RICE HUS...
AN EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH GGBS AND RICE HUS...AN EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH GGBS AND RICE HUS...
AN EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH GGBS AND RICE HUS...
 
2 review
2 review2 review
2 review
 
Sustainable Construction: Study of Water Use, Comparing Conventional Plaster ...
Sustainable Construction: Study of Water Use, Comparing Conventional Plaster ...Sustainable Construction: Study of Water Use, Comparing Conventional Plaster ...
Sustainable Construction: Study of Water Use, Comparing Conventional Plaster ...
 
IRJET- Effect of Different Curing on Strength of Concrete
IRJET-  	  Effect of Different Curing on Strength of ConcreteIRJET-  	  Effect of Different Curing on Strength of Concrete
IRJET- Effect of Different Curing on Strength of Concrete
 
RESEARCH ON THE EFFECTS OF HYPO SLUDGE AS A PARTIAL REPLACEMENT OF CEMENT MORTAR
RESEARCH ON THE EFFECTS OF HYPO SLUDGE AS A PARTIAL REPLACEMENT OF CEMENT MORTARRESEARCH ON THE EFFECTS OF HYPO SLUDGE AS A PARTIAL REPLACEMENT OF CEMENT MORTAR
RESEARCH ON THE EFFECTS OF HYPO SLUDGE AS A PARTIAL REPLACEMENT OF CEMENT MORTAR
 
Use of Fly ash and Plastic in Paver Block
Use of Fly ash and Plastic in Paver BlockUse of Fly ash and Plastic in Paver Block
Use of Fly ash and Plastic in Paver Block
 
building products presentations part - 2
building products presentations part - 2building products presentations part - 2
building products presentations part - 2
 
Presentation [AP14015]
Presentation [AP14015]Presentation [AP14015]
Presentation [AP14015]
 
Cement based building_materials_icr_aug2020
Cement based building_materials_icr_aug2020Cement based building_materials_icr_aug2020
Cement based building_materials_icr_aug2020
 
Ppt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction SitePpt summer presentation on finishing Of Police Station Construction Site
Ppt summer presentation on finishing Of Police Station Construction Site
 
ppt on business.pptx
ppt on business.pptxppt on business.pptx
ppt on business.pptx
 
potential use of red mud
potential use of red mud potential use of red mud
potential use of red mud
 
SANDEEP PPT
SANDEEP PPTSANDEEP PPT
SANDEEP PPT
 
IRJET- Use of Waste Rubber Chips for the Production of Concrete Paver Block
IRJET- Use of Waste Rubber Chips for the Production of Concrete Paver BlockIRJET- Use of Waste Rubber Chips for the Production of Concrete Paver Block
IRJET- Use of Waste Rubber Chips for the Production of Concrete Paver Block
 
Project report on maintanace and repair work under supervisison of UP-PwD Luc...
Project report on maintanace and repair work under supervisison of UP-PwD Luc...Project report on maintanace and repair work under supervisison of UP-PwD Luc...
Project report on maintanace and repair work under supervisison of UP-PwD Luc...
 
20320130406002
2032013040600220320130406002
20320130406002
 
Method painting works emulsion paint
Method painting works   emulsion paintMethod painting works   emulsion paint
Method painting works emulsion paint
 
Cemscreed fast repair
Cemscreed fast repairCemscreed fast repair
Cemscreed fast repair
 
USE OF SAWDUST IN CONCRETE
USE OF SAWDUST IN CONCRETEUSE OF SAWDUST IN CONCRETE
USE OF SAWDUST IN CONCRETE
 

Dernier

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Dernier (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

Dry Mix Mortar

  • 1. GOVT. C.P.C. POLYTECHNIC MYSORE CIVIL DEPARTMENT PRESENTATION ON DRY MIX MORTAR TECHNIQUE
  • 2. INTRODUCTION Plastering is the method covering various components of a building with a plastic material to form a durable surface Plastering is done to achieve the following objects:  To protect the external surfaces against penetration of rain water and other atmospheric agencies.  To give smooth surface in which dust and dirt cannot lodge.  To provide an even, smooth, regular, clean and durable finished surface and thus to improve appearance.  To cover up the use of inferior quality materials and joints formed in the masonry work.  To provide satisfactory base for white washing, color washing etc.  The object of internal plastering is to protect the surface against dust and vermin nuisance.
  • 3.
  • 4.  Dry Mix Mortar Technology and Products Expo is a three day event that will be held in Shanghai in China.  In 2003, the Company established its Dry Mix Mortar Plant, the first of its kind in India, manufacturing plastering materials and tile fixing compounds required for the Housing industry.  The Plant, established in collaboration with M-tech, Germany, is located in the Kaanchipuram District of Tamil Nadu near Sriperumbdur. HISTORY
  • 5. RAW MATERIALS Dry Mix Mortar → (cement → sand → stone dust → water) Dry Mix Mortar) PREPARATION OF D.M.M.
  • 6. METHODOLGY All construction work depends on  QUALITY  TIME  ECONOMY The new technique is to adopt in plastering is DMM method.
  • 7. IMPLEMENTATION PURPOSES IF WE Implement D.M.M. METHOD, WE CAN ACHIVE plastering with  Assured Good Quality  Stipulated Time(Schedule)  Economy in Construction
  • 8. HOW ABOUT QUALITY?????  The management supplies the Materials to the contractor.  The materials which are mixed (Dry mix)is of known Proportions.  That proportions is thoroughly mixed in front of the Engineers or Supervisors.  After mixing, the dry mortar is put to gunny bags, that bags is known as DMM bags.  For contractors side workers they have only mixed Water to the given DMM bags.  There is no (minimum) Wastage of the materials.  As the Quantity of RMM bag supplied to the contractors is noted.  Hence after supply of each bag the Area of Plastered surface is Noted.  After plastering the area should be Checked & Verified. By all these factors the management knows the Quality of mixing & supplying. After supplying of each DMM bag, they know how much area to be plastered also. Hence Quality is achieved.
  • 9. HOW ABOUT TIME (SCHEDULE)???????  The Dry mortar required for plastering is mixed in machine mixer.  Mixing of mortar by labour is replaced by mixer machine.  By continuous mixing of dry mortar in a day by mixer, the time will be consumed for Contractor also.  As the mixing time is reduce for contractor they can plaster large area with their stipulated time.  Hence the Bar Chart or Gant Chart of plastering work will also be finished within the schedule.  After finishing the plastering (after curing) within the schedule the painting work also started early. Hence Time (Schedule) is achieved.
  • 10. HOW ABOUT ECONOMY???????  Supply the DMM bags to the contractor for plastering work.  The contractor side workers have only mix Water.  Hence mixing Time is reduced for the contractors they also achieve large Area in a day.  By this, the management can talked about the Revised rate for plastering with the Contractor.  By this we can reduce 0.5paisa to 1.0 rupee, after discussing with the contractor.  Before DMM method, Interior Plastering-Rs 16/ft, Exterior Plastering-Rs17/ft , Ceiling Plastering- Rs 18/ft.  After introducing DMM method, Interior Plastering-Rs 15/ft, Exterior Plastering-Rs16/ft ,Ceiling Plastering- Rs 17/ft. Hence economy is achieved.
  • 11. TESTS AND RESULTS TESTS ON CEMENT:- Fineness of cement: Percentage residue for a given sample of cement is 5.3% Specific gravity of cement: Specific gravity of cement is 2.95 Normal consistency of cement: The normal consistency of the given sample of cement is 33% of water by weight of cement Initial setting time of cement: The initial setting time of given sample of cement is 37min Storage time of cement: The strength of cement is also depends on the storage time of cement
  • 12. TESTS ON SAND:- Sieve analysis of sand: Fineness modulus of fine aggregate i.e, sand is found to be 4.67 Specific gravity of sand: The specific gravity of sand is 3.18
  • 13. TESTS ON CEMENT MORTAR: COMPRESSIVE STRENGTH TEST: The Compressive strength is the most important of all the properties. This is carried out to determine compressive strength of cement mortar by preparing standard cubes made of good Portland cement and standard sand mortar in the ratio 1:6. The size of the mould is 70.6mm x 70.6mm. After curing, cubes are tested in compression testing machine. For Freshly Prepared Mortar: SL.N O Days of curing Compressive strength of 1:6 ratio 1 3days 17.2N/mm2 2 7days 28 N/mm2 3 28days 56 N/mm2
  • 14. Mixing the water after 2hours of mixing dry mortar: SL.NO Days of curing Compressive strength of 1:6 ratio 1 3days 18.1 N/mm2 2 7days 28.1 N/mm2 3 28days 55.5 N/mm2 Mixing the water after 2days of mixing dry mortar: SL.NO Days of curing Compressive strength of 1:6 ratio 1 3days 19.2 N/mm2 2 7days 28.5 N/mm2 3 28days 56.1 N/mm2
  • 15. PREPRATION OF CONCRETE CUBES AND TESTS
  • 16. INSTRUMENTS USED FOR PREPARATION OF DRY MIX MORTAR
  • 17. CONCLUSION In the present construction system, the use of innovative methodology will be most important to complete the construction activities as early as possible. As suggested earlier the construction activities depends upon the Quality, Time Schedule & Economy in construction. The implemented technique may be more useful to high rise structures or skyscrapers. The DMM technique is to be adopted for the multi-storeyed building, apartment construction or any other high rise structures. The introduced DMM technique is more reliable to the construction, as it depends upon the Quality, Time Schedule & Economy of the construction.