Corporate Presentation
September 9, 2013
CAUTIONARY STATEMENT
Forward Looking Information
This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation
Reform Act of 1995. Forward-looking information may include, but is not limited to, information with respect to the anticipated production and developments in our operations
in future periods, our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral resources, realization of mineral resource
estimates, costs and timing of development of the projects we currently intend to acquire (the “Projects”), costs and timing of future exploration, results of future exploration and
drilling, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of
directors and committees, and adequacy of financial resources. Wherever possible, words such as ‘‘plans’’, ‘‘expects’’ or ‘‘does not expect’’, ‘‘budget’’, ‘‘scheduled’’, ‘‘estimates’’,
‘‘forecasts’’, ‘‘anticipate’’ or ‘‘does not anticipate’’, ‘‘believe’’, ‘‘intend’’ and similar expressions or statements that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’,
‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, have been used to identify forward-looking information. Statements concerning mineral resource estimates may also be deemed
to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that
express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always,
using words or phrases such as ‘‘expects’’, ‘‘anticipates’’, ‘‘plans’’, ‘‘projects’’, ‘‘estimates’’, ‘‘assumes’’, ‘‘intends’’, ‘‘strategy’’, ‘‘goals’’, ‘‘objectives’’, ‘‘potential’’ or variations
thereof, or stating that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, or the negative of any of these terms and
similar expressions) are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown
risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information. Many of these risks
are listed and described in our final short-form prospectus dated March 19, 2012 (the “Prospectus”), which is available for review on SEDAR at www.sedar.com under our profile.
Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be
other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and
future events could differ materially from those anticipated in such information. Forward-looking information involves statements about the future and is inherently uncertain,
and our actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks,
uncertainties and other factors, including, without limitation, those referred to in the Prospectus under the heading ‘‘Risk Factors’’. Our forward-looking information is based on
the beliefs, expectations and opinions of management on the date the statements are made, and we do not assume any obligation to update forward-looking information, whether
as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue
reliance on forward-looking information.
National Instrument 43-101
Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”)
“Mineral Resources Update Technical Report” dated November 20, 2012 and “Feasibility Study and Technical Report on the Brucejack Project, Stewart, BC” dated June 21, 2013.
We have filed the Reports under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under
the supervision of Mr. Kenneth C. McNaughton, an independent “qualified person” under NI 43-101.
This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by
Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do
not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political,
marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves.
In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an
inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre
feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred
resource exists, or is economically or legally mineable.
Currency
Unless otherwise indicated, all dollar values herein are in Canadian $.
2
3
 High-grade gold Reserves:
Probable Reserves for Valley of the Kings:
6.6 Million oz gold (15.1 Mt @ 13.6 g/t gold)
 Robust Feasibility Study for underground mine
 Located in British Columbia, Canada
 Commercial production target early 2016
An investment in Gold
Kirkland Lake Mine
(Kirkland Lake)
Kensington Mine
(Coeur)
Casa Berardi
(Hecla)
El Penon Mine
(Yamana)
Red Lake Mine
(Goldcorp)
Pogo Mine
(Sumitomo)
Valley of the Kings
F2 Deposit
(Rubicon)
Buritica
(Continental)
Cerro Negro
(Goldcorp)
Eleonore
(Goldcorp)
Cerro Moro
(Yamana)
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
M&I+InferredGoldGrade(g/t)
M&I + Inferred Gold Resources (mm oz)
HIGH-GRADE GOLD RESOURCE WITH SIZE
4November 2012 Valley of the Kings High-Grade Gold Mineral Resource based on a cut-off grade of 5.0 grams of gold-equivalent/tonne.
Data sources: Companies
Indicated Gold:
8.5 mm oz @ 16.4 g/t Au
Inferred Gold:
2.9 mm oz @ 17.0 g/t Au
5
BRUCEJACK PROJECT LOCATION
220km
Terrace
EXPLORATION AND OWNERSHIP HISTORY
1960-1980
1980-1985
1986-1989
1990
1993
1999-2000
2009
2010
2011-2012
2013
Exploration by
various
companies
West Zone discovery
and definition
by Newhawk
5.3 km
underground
development of
West Zone
West Zone
Feasibility Study
completed
Acquisition by
Silver Standard
Resources Inc.
Exploration resumes.
Discovery of Valley of
the Kings Zone
Acquisition by
Pretivm
Extensive exploration
program, high-grade
resource, exploration road
Mine Development
Certificate issued
Completed feasibility study,
Valley of the Kings underground
bulk sample program
6
BRUCEJACK GEOLOGY/DRILLING
7
Meters
500
Valley of the Kings
West Zone
DEFORMED STOCKWORK MINERALIZATION
8
9
HIGH-GRADE GOLD RESERVES(1,2)
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Probable 15.1 13.6 11.0 6.6 5.3
Valley of the Kings Mineral Reserve Estimate –
May 16, 2013
(1) Rounding of some figures may lead to minor discrepancies in totals
(2) Based on C$180/t cutoff grade, US$1350/oz Au price, US$22/oz Ag price, C$/US$ exchange rate = 1.0
Category Tonnes
(mil)
Gold
(g/t)
Silver
(g/t)
Contained
Gold
(mil oz)
Silver
(mil oz)
Proven 2.0 5.7 309 0.4 19.9
Probable 1.8 5.8 172 0.3 10.1
Total P&P 3.8 5.8 243 0.7 30.0
West Zone Mineral Reserve Estimate –
May 16, 2013
SU-452
SU-266
VALLEY OF THE KINGS INDICATED RESOURCE
Northing
(± 25 m)
Ind.Gold*
(Oz.)
6258225 230,900
6258175 484,000
6258125 703,100
6258075 336,600
6258025 1,951,100
6257975 2,365,900
6257925 1,021,000
6257875 513,600
6257825 687,500
6257775 176,400 Valley of the Kings
Indicated Mineral Resource:
8.5 Moz. Au @ 5.0 g/t AuEq.
(16.1 Mt @ 16.4 g/t Au)
*Nov. 2012 Indicated Mineral
Resource; ≥5.0 g/t AuEq.
10
1,092,100 1,776,900 1,467,600 2,185,800 1,391,000 380,100 192,900 Ind. Au* (Oz.)
Surface projection of November 2012 Mineral Resource estimate, with total ounces per 100 m Easting and 50 m Northing strips
MINERAL RESOURCE CONTINUITY
11
Total Ounces* per 10 x 100 m N-S corridor – 6257800 N Long SectionLevel (m) Ind. Gold (Oz)*
1540-1570 116,300
1510-1540 499,700
1480-1510 734,800
1450-1480 510,400
1420-1450 365,450
1390-1420 566,700
1360-1390 631,700
1330-1360 364,800
1300-1330 527,400
1270-1300 992,000
1240-1270 998,200
1210-1240 521,950
1180-1210 213,050
1150-1180 246,800
1120-1150 294,600
1090-1120 393,900
1060-1090 317,600
W E
100 m
4,000-6,000
6,000-7,000
7,000-8,000
>10,000
Key (Oz. Au)
3,000-4,000
1,000-3,000
<1,000
8,000-10,000
Total Ounces per level
(Valley of Kings Zone)
*Nov. 2012 Indicated Mineral Resource;
≥5.0 g/t AuEq.
0.5-5.0 g/t AuEq
5.0-15.0 g/t AuEq
>15.0 g/t AuEq
Assay Intervals Key
12
BULK SAMPLE LOCATION
N S
West Zone
Underground
Development
Valley of the
Kings Bulk
Sample
200 m
546 m
100 m 200 m 300 m
400 m
500 m
 10,000 tonne bulk sample from Valley of the Kings completed
13
BULK SAMPLE LOCATION
0.5-5.0 g/t Au
5.0-15.0 g/t Au
>15.0 g/t Au
Key
Assay Intervals
VOK Bulk
Sample
Domain 17
Domain 11
200 m
N S
Domain 20
VOK Access
Ramp
HIGH GRADE RESOURCE BLOCKS
14
Indicated and Inferred blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
Valley of the Kings block model – 426550E section view (50m wide)
5-15
15-30
30-60
>60
Key (g/t AuEq)
N S
HIGH GRADE RESOURCE BLOCKS
15
Valley of the Kings block model – 426600E section view (50m wide)
5-15
15-30
30-60
>60
Key (g/t AuEq)
N S
Indicated and Inferred blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
BULK SAMPLE REPRESENTIVITY
16
Drilling Density
100 m
Drillhole
Trace
Indicated
Blocks
Bulk
Sample
Area
N
Vertical viewing window ±8.5 m
Indicated blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
BULK SAMPLE LOCATION
17
1345 m Level
Polylithic Conglomerate
Fragmental
Volcanic Rocks
Intensely
Silicified
Conglomerate
Hbl-phyric
Latite Flow
Siltstone, litharenite,
pebble conglomerate
5-15
15-30
30-60
>60
Cleopatra Vein
Key (g/t Au)
Block Grades
Vertical viewing window ±8.5 m
Indicated blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
BULK SAMPLE LOCATION
18
1345 m Level
<0.5
0.5-1.0
1.0-5.0
>20
Key (g/t Au)
Assay intervals
5.0-20.0
Cleopatra Vein
Vertical viewing window ±30 m
Surface drilling from 2012. Projection of Cleopatra Vein.
Fragmental
Volcanic Rocks
Volcanic
Sediment
Silicified
Conglomerate
426600E
25 m
585E
615E
645E
555E
N
Viewing Window
±15m
6258015N
Cleopatra Vein
(solid where mapped in drift)
1345M LEVEL PLAN - EXCAVATION
Completed Underground
Development
Completed Bulk Sample
Legend
<0.5
0.5-1.0
1.0-5.0
>20
5.0-20.0
Key (g/t Au)
Assay intervals
Cleopatra Vein
(solid where mapped in drift)
DEFORMED N-S FLUID CONDUITS
20
S N
S N
426615E Back
426615E Back
DEFORMED N-S FLUID CONDUITS
21
UNDERGROUND DRILLING - PROGRESS
22
1345 m Level Oblique View
Siltstone,
litharenite,
pebble
conglomerate
Intensely
Silicified
Conglomerate
Fragmental
Volcanic Rocks
Office
Phyric Flow
Bridge Zone
Phyric Flow
Cleopatra
Structure
COMPOSITE E-W VEIN BRECCIAS
23
S
N
660N crosscut – Domain 20
~0.5 m
COMPOSITE E-W VEIN BRECCIAS
24
Vn1b
vein
breccia
Vn1c
vein
Vn1c
vein
breccia
Vn1b
vein
breccia
~0.5 m
S N
Vn1b
vein
breccia
Vn1b
vein
breccia
Vn1b
vein
breccia
Electrum
S N
Fragmental
Volcanic Rocks
Volcanic
Sediment
50 m
N
Viewing Window
±100m centered at 1250m
PLAN VIEW: VU-136
Volcanic Flows
13.46m @ 54.99
ppm Au
16.26m @
21.45 ppm
Au
SU-526
1.16m @
4194.5
ppm Au
0.5m @ 211
ppm Au
1.5m @ 52.4
ppm Au
0.5m @ 1,100
ppm au
0.5m @ 559
0.5m @ 81.5
ppm Au
<0.5
0.5-1.0
1.0-5.0
>20
Key (g/t Au)
Assay intervals
5.0-20.0
High Grade
Intervals
Cleopatra Vein
(solid where mapped in drift)
BULK SAMPLE: SAMPLE TOWER OPERATION
26
100 tonne sample rounds
Jaw crusher and screen plant
100% passing 2 cm
Sample cutters in tower
800 kg split
Cone crusher
Size reduction to 1 cm
Rotary splitter
2 x 30 kg samples
Rejects
Rejects
Rejects run through tower for multiple
subsequent passes and sampled
Remainder to mill
BULK SAMPLE TOWER
27
2828
 Corridors of high-grade visible
gold seams within lower grade
(5g/t to 20g/t) gold quartz
stockwork
 Steeply dipping ore body
 Competent ground conditions
 Stope widths (15m wide X 30m
high) appropriate both for
transverse and longitudinal
layouts
 Cost effective
Valley of the Kings ramp
Long hole stoping mining method:
MINING METHOD FOR STOCKWORK
PROPOSED MINE DEVELOPMENT
29
Oblique View of Mining Stopes, Valley of the Kings
S
N
100 m
West-Zone
(late mine life)Valley of the Kings
BRUCEJACK MINE SITE: SURFACE LAYOUT
30
Camp
Mill
Portals
Development Rock
Disposal
West Zone
Portal
Water
Treatment
Substation
Laydown &
Fuel Storage
BRUCEJACK PROJECT ECONOMICS
31
(1) Source: Feasibility Study and Technical Report on the Brucejack Project, dated June 21, 2013
(2) Base case metals prices of US$1,350 /oz gold and US$20/oz silver
(3) Includes by-product cash costs, sustaining capital, exploration expense and reclamation cost accretion
June 2013 Feasibility Study Highlights(1,2) :
Processing rate 2,700 tonnes per day
Mine life 22 years
Total gold production 7.1 million oz
Average annual gold production 425,700 ounces (years 1-10)
321,500 ounces (life of mine)
Average gold grade 14.2 g/t (years 1-10)
12.0 g/t (life of mine)
All-in sustaining cash cost per oz(3) $508/oz
Capex (including contingencies) US$663.5 million
Total operating costs C$156.46/t milled
Internal Rate of Return 42.9% (pre-tax)
35.7% (post-tax)
Net Present Value
(5% discount)
US$2.69 billion (pre-tax)
US$1.76 billion (post-tax)
2013 BRUCEJACK PROJECT PLANS
32
H2 2013
 Complete Valley of the Kings bulk
sample excavation and sampling
 Process bulk sample
 Complete bulk sample report
 Additional Valley of the Kings
drilling
 Advance mine engineering
 Advance permitting
 File Environmental Assessment
Certificate Application
 Resource update
BRUCEJACK PHOTOS
33
Recently-completed bridge Access road
Camp Bulk sample/portal area
COMMUNITY ENGAGEMENT
34
 Pretivm’s management team has been
cooperatively engaging with First Nations
and local community leaders in the
Stewart, BC region for over 10 years
 We work to ensure that our
communication about the progress of the
Brucejack Project is open and continuous
 Commercial relationships with local First
Nations developed during the exploration
phase at Brucejack have been mutually
successful
 We will continue to extend both
commercial contract and employment
opportunities to locals whenever possible
Stewart warehouse constructed by development
corporation of Skii km Lax Ha First Nation
BRUCEJACK PERMITTING
35
1986
1989
1993
1998
1999
2006
2011-2012
2013
2014
2015
2016
Reclamation
Permit
Mine Development
Certificate issued
April 15, 1993
Project Assessment
Certificate
Permitted for
exploration and
exploration road
Project Assessment
Certificate allowed to
expire
Approval in principle
for development of a
mine at West Zone
Reclamation
Completion
Project Description
under review for
underground mine at
Brucejack’s Valley of
the Kings
Anticipate
Environmental
Assessment Certificate
Construction,
commissioning
Commercial
production target
 Brucejack Lake is not fish habitat
 Nearest fish 20 km away
 Waterfalls and Sulphurets Glacier
impede fish migration
 Brucejack Lake is 100 meters deep
 Up to 50% of tailings to be deposited in
the Lake, with total volume of tailings
stored in bottom 30 meters
 Focus on minimizing potential for
suspended solids to discharge from
Brucejack Lake
 50% or more of tailings to be used for
paste backfill and deposited underground
PRETIVM MANAGEMENT
36
Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc.
President & Chief Executive Officer,
Director
Peter de Visser, CA
Chief Financial Officer
Joseph Ovsenek, B.A. Sc., P.Eng., LLB
Vice President & Chief Development Officer,
Director
Ken McNaughton, M.A. Sc., P.Eng.
Vice President & Chief Exploration Officer
Ian I Chang, M.A. Sc., P.Eng.
Vice President, Project Development
Michelle Romero, B.A., M.L.S.
Vice President, Corporate Relations
Kevin Torpy, B.Sc.
Director, Mine Engineering
Warwick Board, Ph.D., P.Geo.
Chief Geologist
Max Holtby, B.Sc., P. Geo.
Director, Permitting
Andrew Saltis, I.Eng.
Site Project Manager, Mine Manager
SHAREHOLDING & ANALYST COVERAGE
37
Institutions,
53%
Retail, 23%
Management,
5%
Silver
Standard,
19%
Capital Structure(1)
Public Float 86.0
Silver Standard Shares 19.0
Total Issued & Outstanding Shares 105.0
Incentive Options 8.7
Total Fully Diluted Shares 113.7
Market Capitalization C$865 million
Working Capital (at June 30, 2013) C$37.9 million
Gross proceeds from September 2013
private placements (3)
C$27.3 million
(1) As of September 6, 2013; ownership calculated on an undiluted basis.
(2) As of September 6, 2013. Source: IPREO, SEDI
(3) See news releases dated September 5, 2013 and September 6, 2013
(shares in millions)
Top Shareholders(2)
(shares in millions)
Silver Standard Resources 18.986
Royce & Associates 9.057
Liberty Metals & Mining 6.850
Passport Capital 3.443
Robert Quartermain 2.853
Sun Valley Gold LLC 2.611
TD Asset Management 1.983
Sprott Asset Management 1.739
Schroder Inv. Mgmt. (N.A) 1.532
Wellington Management 1.223
Analyst Coverage
BMO John Hayes
CIBC Jeff Killeen
Citibank Alex Hacking
Cormark Securities Richard Gray
Cowen Securities Adam Graf
GMP Securities George Albino
RBC Dan Rollins
Salman Partners Ash Guglani
Scotiabank Ovais Habib
Very Independent Research John Tumazos
PVG SHARE PERFORMANCE
38
XAU Index (%) PVG (%)
Gold Price ($US) (%)
Relative Performance: PVG, Gold, and XAU Index:
January 1, 2011 to September 3, 2013 (weekly,%)
Gold price ($US)
HIGH-GRADE GOLD PRODUCTION
39
MeadowBank
(Agnico Eagle)
Laronde
(Agnico Eagle)
Hycroft (Allied Nevada)
Kemess (Aurico)
Casa Berardi Mine
(Hecla)
Ruby Hill (Barrick)
Round Mountain
(Barrick/Kinross)
Turqouise Ridge
(Barrick/Newmont)
Red Lake
(Goldcorp)
Musselwhite
(Goldcorp)
Marigold Mine
(GoldCorp/Barrick)
Fort Knox (Kinross)
Kirkland Lake
(Kirkland Lake Gold)
Mesquite (NewGold)
Carlin (Newmont)
Canadian Malartic
(Osisko)
Valley of the Kings
(Pretium)
Detour Lake Mine
(Detour Gold)
0
100
200
300
400
500
600
700
0 2 4 6 8 10 12 14 16 18
AnnualGoldProduction(Koz/year)
Grade (g/t)
Average gold production vs. grade for various North American
producing mines with >2Moz Au in resources
Data sources: Companies, NRH.
Production target:
425,700 oz/year (yrs 1-10)
@ 14.2g/t head grade
CONTACT
Phone: 604-558-1784
Fax: 604-558-4784
Toll-free: 1-877-558-1784
invest@pretivm.com
www.pretivm.com
HEAD OFFICE
Pretium Resources Inc.
570 Granville St.
Suite 1600
Vancouver, BC
Canada V6C 3P1
COMMON SHARES
TSX/NYSE:PVG
Issued: 102 million
Fully diluted: 110.8 million
52-week hi/low: $14.93/$5.53
Market cap: $865 million
(at September 6, 2013)
Advancing a major high-grade gold resource in Canada

Contenu connexe

Tendances

Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014PretiumR
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017PretiumR
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016PretiumR
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016PretiumR
 
Technical session presentation toronto
Technical session presentation torontoTechnical session presentation toronto
Technical session presentation torontoPretiumR
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 finalPretiumR
 
NOVAGOLD Corporate Presentation – October 2016
NOVAGOLD Corporate Presentation – October 2016NOVAGOLD Corporate Presentation – October 2016
NOVAGOLD Corporate Presentation – October 2016NOVAGOLD
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold
 
Solaris Resources - August 2021 Presentation
Solaris Resources  - August 2021 PresentationSolaris Resources  - August 2021 Presentation
Solaris Resources - August 2021 PresentationJacquelineWagenaar1
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)PretiumR
 
Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)Neil Novak
 
Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015PretiumR
 
Casey Research 2015 Summit
Casey Research 2015 SummitCasey Research 2015 Summit
Casey Research 2015 SummitPretiumR
 
Solaris Resources - November 2021
Solaris Resources  - November 2021Solaris Resources  - November 2021
Solaris Resources - November 2021JacquelineWagenaar1
 
Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017DalradianResource
 
ASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_PresentationASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_PresentationDonna Louw
 
Ssr mining corp. pres. 081717
Ssr mining corp. pres.   081717Ssr mining corp. pres.   081717
Ssr mining corp. pres. 081717SilverStandard
 
Desjardins 2012 Mines & Metals Day
Desjardins 2012 Mines & Metals DayDesjardins 2012 Mines & Metals Day
Desjardins 2012 Mines & Metals DayHudbayMinerals
 

Tendances (19)

Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014Corporate Presentation May 23, 2014
Corporate Presentation May 23, 2014
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016
 
A fund presentation oct 25 2016
A fund presentation oct 25 2016A fund presentation oct 25 2016
A fund presentation oct 25 2016
 
Technical session presentation toronto
Technical session presentation torontoTechnical session presentation toronto
Technical session presentation toronto
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 
NOVAGOLD Corporate Presentation – October 2016
NOVAGOLD Corporate Presentation – October 2016NOVAGOLD Corporate Presentation – October 2016
NOVAGOLD Corporate Presentation – October 2016
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014
 
Solaris Resources - August 2021 Presentation
Solaris Resources  - August 2021 PresentationSolaris Resources  - August 2021 Presentation
Solaris Resources - August 2021 Presentation
 
Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)Denver Gold Forum Sep 21, 2015 final(2)
Denver Gold Forum Sep 21, 2015 final(2)
 
Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)Black Widow Resources Presentation (October, 2013)
Black Widow Resources Presentation (October, 2013)
 
Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015Denver Gold Forum Sep 21, 2015
Denver Gold Forum Sep 21, 2015
 
Casey Research 2015 Summit
Casey Research 2015 SummitCasey Research 2015 Summit
Casey Research 2015 Summit
 
Solaris Resources - November 2021
Solaris Resources  - November 2021Solaris Resources  - November 2021
Solaris Resources - November 2021
 
Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017Dalradian Corporate Presentation February 2017
Dalradian Corporate Presentation February 2017
 
ASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_PresentationASX20140515_Prominent_Hill_Analyst_Visit_Presentation
ASX20140515_Prominent_Hill_Analyst_Visit_Presentation
 
Ssr mining corp. pres. 081717
Ssr mining corp. pres.   081717Ssr mining corp. pres.   081717
Ssr mining corp. pres. 081717
 
Desjardins 2012 Mines & Metals Day
Desjardins 2012 Mines & Metals DayDesjardins 2012 Mines & Metals Day
Desjardins 2012 Mines & Metals Day
 

Similaire à September 9 2013 corp web

Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014PretiumR
 
NOVAGOLD 2013 Annual General and Special Meeting of Shareholders
NOVAGOLD 2013 Annual General and Special Meeting of ShareholdersNOVAGOLD 2013 Annual General and Special Meeting of Shareholders
NOVAGOLD 2013 Annual General and Special Meeting of ShareholdersNOVAGOLD
 
ROTH PRESENTATION
ROTH PRESENTATIONROTH PRESENTATION
ROTH PRESENTATIONPretiumR
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014PretiumR
 
Corporate Presentation June 2011
Corporate Presentation June 2011Corporate Presentation June 2011
Corporate Presentation June 2011PretiumR
 
Q3 2013 presentation final
Q3 2013 presentation finalQ3 2013 presentation final
Q3 2013 presentation finalprimero_mining
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015PretiumR
 
Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015PretiumR
 
Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015PretiumR
 
TNR Gold Shotgun Gold Project Presentation September 2018
TNR Gold Shotgun Gold Project Presentation September 2018TNR Gold Shotgun Gold Project Presentation September 2018
TNR Gold Shotgun Gold Project Presentation September 2018Kirill Klip
 
Solaris Resources - September 2021
Solaris Resources - September 2021Solaris Resources - September 2021
Solaris Resources - September 2021JacquelineWagenaar1
 
Solaris Resources - October 2021
Solaris Resources - October 2021Solaris Resources - October 2021
Solaris Resources - October 2021JacquelineWagenaar1
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015PretiumR
 
Solaris Resources - September 2022
Solaris Resources - September 2022Solaris Resources - September 2022
Solaris Resources - September 2022JacquelineWagenaar1
 
2013 Precious Metals Summit, Zurich
2013 Precious Metals Summit, Zurich 2013 Precious Metals Summit, Zurich
2013 Precious Metals Summit, Zurich NOVAGOLD
 
NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013Company Spotlight
 
Solaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate PresentationSolaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate PresentationJacquelineWagenaar1
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationPretiumR
 

Similaire à September 9 2013 corp web (20)

Corp presmay23 2014
Corp presmay23 2014Corp presmay23 2014
Corp presmay23 2014
 
NOVAGOLD 2013 Annual General and Special Meeting of Shareholders
NOVAGOLD 2013 Annual General and Special Meeting of ShareholdersNOVAGOLD 2013 Annual General and Special Meeting of Shareholders
NOVAGOLD 2013 Annual General and Special Meeting of Shareholders
 
ROTH PRESENTATION
ROTH PRESENTATIONROTH PRESENTATION
ROTH PRESENTATION
 
Corporate Presentation Sept 2014
Corporate Presentation Sept 2014Corporate Presentation Sept 2014
Corporate Presentation Sept 2014
 
Corporate Presentation June 2011
Corporate Presentation June 2011Corporate Presentation June 2011
Corporate Presentation June 2011
 
Q3 2013 presentation final
Q3 2013 presentation finalQ3 2013 presentation final
Q3 2013 presentation final
 
Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015Corporate Presentation Aug 6, 2015
Corporate Presentation Aug 6, 2015
 
Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015Corporate Presentation - Aug 6, 2015
Corporate Presentation - Aug 6, 2015
 
Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015Arizona Capital Conference Apr 25, 2015
Arizona Capital Conference Apr 25, 2015
 
TNR Gold Shotgun Gold Project Presentation September 2018
TNR Gold Shotgun Gold Project Presentation September 2018TNR Gold Shotgun Gold Project Presentation September 2018
TNR Gold Shotgun Gold Project Presentation September 2018
 
Solaris Resources - September 2021
Solaris Resources - September 2021Solaris Resources - September 2021
Solaris Resources - September 2021
 
Solaris Resources - October 2021
Solaris Resources - October 2021Solaris Resources - October 2021
Solaris Resources - October 2021
 
Corporate Presentation December 2015
Corporate Presentation December 2015Corporate Presentation December 2015
Corporate Presentation December 2015
 
Solaris Resources - September 2022
Solaris Resources - September 2022Solaris Resources - September 2022
Solaris Resources - September 2022
 
2013 Precious Metals Summit, Zurich
2013 Precious Metals Summit, Zurich 2013 Precious Metals Summit, Zurich
2013 Precious Metals Summit, Zurich
 
NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013NOVAGold Corporate Presentation Nov 2013
NOVAGold Corporate Presentation Nov 2013
 
Solaris Resources - Nov 2021
Solaris Resources - Nov 2021Solaris Resources - Nov 2021
Solaris Resources - Nov 2021
 
Solaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate PresentationSolaris Resources - Nov 2021 Corporate Presentation
Solaris Resources - Nov 2021 Corporate Presentation
 
Solaris Resources - August 2022
Solaris Resources - August 2022Solaris Resources - August 2022
Solaris Resources - August 2022
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
 

Plus de PretiumR

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019PretiumR
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day PresentationPretiumR
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019PretiumR
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferencePretiumR
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018PretiumR
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018PretiumR
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallPretiumR
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018PretiumR
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferencePretiumR
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018PretiumR
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018PretiumR
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferencePretiumR
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...PretiumR
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017PretiumR
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017PretiumR
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretiumR
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)PretiumR
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretiumR
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017PretiumR
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 finalPretiumR
 

Plus de PretiumR (20)

AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019AFund Natural Resource Symposium Luncheon 2019
AFund Natural Resource Symposium Luncheon 2019
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
Pretium resources q1 2018 conference call may 11 , 2018
Pretium resources   q1 2018 conference call may 11 , 2018Pretium resources   q1 2018 conference call may 11 , 2018
Pretium resources q1 2018 conference call may 11 , 2018
 
Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018Pvg investors day presentation april 11 2018
Pvg investors day presentation april 11 2018
 
Fourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference CallFourth Quarter 2017 Financial Results Webcast and Conference Call
Fourth Quarter 2017 Financial Results Webcast and Conference Call
 
Bmo conf feb26-2018
Bmo conf feb26-2018Bmo conf feb26-2018
Bmo conf feb26-2018
 
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets ConferenceRamping Up Brucejack - Presented at the BMO Capital Markets Conference
Ramping Up Brucejack - Presented at the BMO Capital Markets Conference
 
Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018Pretium corporate-presentation-feb-16-2018
Pretium corporate-presentation-feb-16-2018
 
Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018Corporate Presentation Feb 16, 2018
Corporate Presentation Feb 16, 2018
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
Pretium a fund oct 25 2017
Pretium a fund oct 25 2017Pretium a fund oct 25 2017
Pretium a fund oct 25 2017
 
Denver Gold Forum 2017
Denver Gold Forum 2017Denver Gold Forum 2017
Denver Gold Forum 2017
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)Brucejack tour august 2017 (web)
Brucejack tour august 2017 (web)
 
Pretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-webPretium rbc-metals-presentation-june-13-2017-web
Pretium rbc-metals-presentation-june-13-2017-web
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 
Minerals north apr 2017 final
Minerals north apr 2017 finalMinerals north apr 2017 final
Minerals north apr 2017 final
 

Dernier

NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 

Dernier (20)

NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 

September 9 2013 corp web

  • 2. CAUTIONARY STATEMENT Forward Looking Information This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-looking information may include, but is not limited to, information with respect to the anticipated production and developments in our operations in future periods, our planned exploration and development activities, the adequacy of our financial resources, the estimation of mineral resources, realization of mineral resource estimates, costs and timing of development of the projects we currently intend to acquire (the “Projects”), costs and timing of future exploration, results of future exploration and drilling, timing and receipt of approvals, consents and permits under applicable legislation, our executive compensation approach and practice, the composition of our board of directors and committees, and adequacy of financial resources. Wherever possible, words such as ‘‘plans’’, ‘‘expects’’ or ‘‘does not expect’’, ‘‘budget’’, ‘‘scheduled’’, ‘‘estimates’’, ‘‘forecasts’’, ‘‘anticipate’’ or ‘‘does not anticipate’’, ‘‘believe’’, ‘‘intend’’ and similar expressions or statements that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, have been used to identify forward-looking information. Statements concerning mineral resource estimates may also be deemed to constitute forward-looking information to the extent that they involve estimates of the mineralization that will be encountered if the property is developed. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as ‘‘expects’’, ‘‘anticipates’’, ‘‘plans’’, ‘‘projects’’, ‘‘estimates’’, ‘‘assumes’’, ‘‘intends’’, ‘‘strategy’’, ‘‘goals’’, ‘‘objectives’’, ‘‘potential’’ or variations thereof, or stating that certain actions, events or results ‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘might’’ or ‘‘will’’ be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking information. Forward-looking information is subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by the forward-looking information. Many of these risks are listed and described in our final short-form prospectus dated March 19, 2012 (the “Prospectus”), which is available for review on SEDAR at www.sedar.com under our profile. Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Forward-looking information involves statements about the future and is inherently uncertain, and our actual achievements or other future events or conditions may differ materially from those reflected in the forward-looking information due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Prospectus under the heading ‘‘Risk Factors’’. Our forward-looking information is based on the beliefs, expectations and opinions of management on the date the statements are made, and we do not assume any obligation to update forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable law. For the reasons set forth above, prospective investors should not place undue reliance on forward-looking information. National Instrument 43-101 Technical and scientific information contained herein relating to the Projects is derived from National Instrument 43-101 (“NI 43-101”) compliant technical reports (“Reports”) “Mineral Resources Update Technical Report” dated November 20, 2012 and “Feasibility Study and Technical Report on the Brucejack Project, Stewart, BC” dated June 21, 2013. We have filed the Reports under our profile at www.sedar.com. Technical and scientific information not contained within the Reports for the Projects have been prepared under the supervision of Mr. Kenneth C. McNaughton, an independent “qualified person” under NI 43-101. This presentation uses the terms “measured resources”, “indicated resources” (together “M&I”) and “inferred resources”. Although these terms are recognized and required by Canadian regulations (under NI 43-101), the United States Securities and Exchange Commission does not recognize them. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. There is no guarantee that all or any part of the mineral resource will be converted into mineral reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre feasibility studies, or economic studies, except for a Preliminary Assessment as defined under NI 43-101. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Currency Unless otherwise indicated, all dollar values herein are in Canadian $. 2
  • 3. 3  High-grade gold Reserves: Probable Reserves for Valley of the Kings: 6.6 Million oz gold (15.1 Mt @ 13.6 g/t gold)  Robust Feasibility Study for underground mine  Located in British Columbia, Canada  Commercial production target early 2016 An investment in Gold
  • 4. Kirkland Lake Mine (Kirkland Lake) Kensington Mine (Coeur) Casa Berardi (Hecla) El Penon Mine (Yamana) Red Lake Mine (Goldcorp) Pogo Mine (Sumitomo) Valley of the Kings F2 Deposit (Rubicon) Buritica (Continental) Cerro Negro (Goldcorp) Eleonore (Goldcorp) Cerro Moro (Yamana) 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 M&I+InferredGoldGrade(g/t) M&I + Inferred Gold Resources (mm oz) HIGH-GRADE GOLD RESOURCE WITH SIZE 4November 2012 Valley of the Kings High-Grade Gold Mineral Resource based on a cut-off grade of 5.0 grams of gold-equivalent/tonne. Data sources: Companies Indicated Gold: 8.5 mm oz @ 16.4 g/t Au Inferred Gold: 2.9 mm oz @ 17.0 g/t Au
  • 6. EXPLORATION AND OWNERSHIP HISTORY 1960-1980 1980-1985 1986-1989 1990 1993 1999-2000 2009 2010 2011-2012 2013 Exploration by various companies West Zone discovery and definition by Newhawk 5.3 km underground development of West Zone West Zone Feasibility Study completed Acquisition by Silver Standard Resources Inc. Exploration resumes. Discovery of Valley of the Kings Zone Acquisition by Pretivm Extensive exploration program, high-grade resource, exploration road Mine Development Certificate issued Completed feasibility study, Valley of the Kings underground bulk sample program 6
  • 9. 9 HIGH-GRADE GOLD RESERVES(1,2) Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Probable 15.1 13.6 11.0 6.6 5.3 Valley of the Kings Mineral Reserve Estimate – May 16, 2013 (1) Rounding of some figures may lead to minor discrepancies in totals (2) Based on C$180/t cutoff grade, US$1350/oz Au price, US$22/oz Ag price, C$/US$ exchange rate = 1.0 Category Tonnes (mil) Gold (g/t) Silver (g/t) Contained Gold (mil oz) Silver (mil oz) Proven 2.0 5.7 309 0.4 19.9 Probable 1.8 5.8 172 0.3 10.1 Total P&P 3.8 5.8 243 0.7 30.0 West Zone Mineral Reserve Estimate – May 16, 2013 SU-452 SU-266
  • 10. VALLEY OF THE KINGS INDICATED RESOURCE Northing (± 25 m) Ind.Gold* (Oz.) 6258225 230,900 6258175 484,000 6258125 703,100 6258075 336,600 6258025 1,951,100 6257975 2,365,900 6257925 1,021,000 6257875 513,600 6257825 687,500 6257775 176,400 Valley of the Kings Indicated Mineral Resource: 8.5 Moz. Au @ 5.0 g/t AuEq. (16.1 Mt @ 16.4 g/t Au) *Nov. 2012 Indicated Mineral Resource; ≥5.0 g/t AuEq. 10 1,092,100 1,776,900 1,467,600 2,185,800 1,391,000 380,100 192,900 Ind. Au* (Oz.) Surface projection of November 2012 Mineral Resource estimate, with total ounces per 100 m Easting and 50 m Northing strips
  • 11. MINERAL RESOURCE CONTINUITY 11 Total Ounces* per 10 x 100 m N-S corridor – 6257800 N Long SectionLevel (m) Ind. Gold (Oz)* 1540-1570 116,300 1510-1540 499,700 1480-1510 734,800 1450-1480 510,400 1420-1450 365,450 1390-1420 566,700 1360-1390 631,700 1330-1360 364,800 1300-1330 527,400 1270-1300 992,000 1240-1270 998,200 1210-1240 521,950 1180-1210 213,050 1150-1180 246,800 1120-1150 294,600 1090-1120 393,900 1060-1090 317,600 W E 100 m 4,000-6,000 6,000-7,000 7,000-8,000 >10,000 Key (Oz. Au) 3,000-4,000 1,000-3,000 <1,000 8,000-10,000 Total Ounces per level (Valley of Kings Zone) *Nov. 2012 Indicated Mineral Resource; ≥5.0 g/t AuEq.
  • 12. 0.5-5.0 g/t AuEq 5.0-15.0 g/t AuEq >15.0 g/t AuEq Assay Intervals Key 12 BULK SAMPLE LOCATION N S West Zone Underground Development Valley of the Kings Bulk Sample 200 m 546 m 100 m 200 m 300 m 400 m 500 m  10,000 tonne bulk sample from Valley of the Kings completed
  • 13. 13 BULK SAMPLE LOCATION 0.5-5.0 g/t Au 5.0-15.0 g/t Au >15.0 g/t Au Key Assay Intervals VOK Bulk Sample Domain 17 Domain 11 200 m N S Domain 20 VOK Access Ramp
  • 14. HIGH GRADE RESOURCE BLOCKS 14 Indicated and Inferred blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate Valley of the Kings block model – 426550E section view (50m wide) 5-15 15-30 30-60 >60 Key (g/t AuEq) N S
  • 15. HIGH GRADE RESOURCE BLOCKS 15 Valley of the Kings block model – 426600E section view (50m wide) 5-15 15-30 30-60 >60 Key (g/t AuEq) N S Indicated and Inferred blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
  • 16. BULK SAMPLE REPRESENTIVITY 16 Drilling Density 100 m Drillhole Trace Indicated Blocks Bulk Sample Area N Vertical viewing window ±8.5 m Indicated blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
  • 17. BULK SAMPLE LOCATION 17 1345 m Level Polylithic Conglomerate Fragmental Volcanic Rocks Intensely Silicified Conglomerate Hbl-phyric Latite Flow Siltstone, litharenite, pebble conglomerate 5-15 15-30 30-60 >60 Cleopatra Vein Key (g/t Au) Block Grades Vertical viewing window ±8.5 m Indicated blocks greater than 5 g/t AuEq shown from November 2012 Mineral Resource estimate
  • 18. BULK SAMPLE LOCATION 18 1345 m Level <0.5 0.5-1.0 1.0-5.0 >20 Key (g/t Au) Assay intervals 5.0-20.0 Cleopatra Vein Vertical viewing window ±30 m Surface drilling from 2012. Projection of Cleopatra Vein.
  • 19. Fragmental Volcanic Rocks Volcanic Sediment Silicified Conglomerate 426600E 25 m 585E 615E 645E 555E N Viewing Window ±15m 6258015N Cleopatra Vein (solid where mapped in drift) 1345M LEVEL PLAN - EXCAVATION Completed Underground Development Completed Bulk Sample Legend <0.5 0.5-1.0 1.0-5.0 >20 5.0-20.0 Key (g/t Au) Assay intervals Cleopatra Vein (solid where mapped in drift)
  • 20. DEFORMED N-S FLUID CONDUITS 20 S N S N 426615E Back 426615E Back
  • 21. DEFORMED N-S FLUID CONDUITS 21
  • 22. UNDERGROUND DRILLING - PROGRESS 22 1345 m Level Oblique View Siltstone, litharenite, pebble conglomerate Intensely Silicified Conglomerate Fragmental Volcanic Rocks Office Phyric Flow Bridge Zone Phyric Flow Cleopatra Structure
  • 23. COMPOSITE E-W VEIN BRECCIAS 23 S N 660N crosscut – Domain 20 ~0.5 m
  • 24. COMPOSITE E-W VEIN BRECCIAS 24 Vn1b vein breccia Vn1c vein Vn1c vein breccia Vn1b vein breccia ~0.5 m S N Vn1b vein breccia Vn1b vein breccia Vn1b vein breccia Electrum S N
  • 25. Fragmental Volcanic Rocks Volcanic Sediment 50 m N Viewing Window ±100m centered at 1250m PLAN VIEW: VU-136 Volcanic Flows 13.46m @ 54.99 ppm Au 16.26m @ 21.45 ppm Au SU-526 1.16m @ 4194.5 ppm Au 0.5m @ 211 ppm Au 1.5m @ 52.4 ppm Au 0.5m @ 1,100 ppm au 0.5m @ 559 0.5m @ 81.5 ppm Au <0.5 0.5-1.0 1.0-5.0 >20 Key (g/t Au) Assay intervals 5.0-20.0 High Grade Intervals Cleopatra Vein (solid where mapped in drift)
  • 26. BULK SAMPLE: SAMPLE TOWER OPERATION 26 100 tonne sample rounds Jaw crusher and screen plant 100% passing 2 cm Sample cutters in tower 800 kg split Cone crusher Size reduction to 1 cm Rotary splitter 2 x 30 kg samples Rejects Rejects Rejects run through tower for multiple subsequent passes and sampled Remainder to mill
  • 28. 2828  Corridors of high-grade visible gold seams within lower grade (5g/t to 20g/t) gold quartz stockwork  Steeply dipping ore body  Competent ground conditions  Stope widths (15m wide X 30m high) appropriate both for transverse and longitudinal layouts  Cost effective Valley of the Kings ramp Long hole stoping mining method: MINING METHOD FOR STOCKWORK
  • 29. PROPOSED MINE DEVELOPMENT 29 Oblique View of Mining Stopes, Valley of the Kings S N 100 m West-Zone (late mine life)Valley of the Kings
  • 30. BRUCEJACK MINE SITE: SURFACE LAYOUT 30 Camp Mill Portals Development Rock Disposal West Zone Portal Water Treatment Substation Laydown & Fuel Storage
  • 31. BRUCEJACK PROJECT ECONOMICS 31 (1) Source: Feasibility Study and Technical Report on the Brucejack Project, dated June 21, 2013 (2) Base case metals prices of US$1,350 /oz gold and US$20/oz silver (3) Includes by-product cash costs, sustaining capital, exploration expense and reclamation cost accretion June 2013 Feasibility Study Highlights(1,2) : Processing rate 2,700 tonnes per day Mine life 22 years Total gold production 7.1 million oz Average annual gold production 425,700 ounces (years 1-10) 321,500 ounces (life of mine) Average gold grade 14.2 g/t (years 1-10) 12.0 g/t (life of mine) All-in sustaining cash cost per oz(3) $508/oz Capex (including contingencies) US$663.5 million Total operating costs C$156.46/t milled Internal Rate of Return 42.9% (pre-tax) 35.7% (post-tax) Net Present Value (5% discount) US$2.69 billion (pre-tax) US$1.76 billion (post-tax)
  • 32. 2013 BRUCEJACK PROJECT PLANS 32 H2 2013  Complete Valley of the Kings bulk sample excavation and sampling  Process bulk sample  Complete bulk sample report  Additional Valley of the Kings drilling  Advance mine engineering  Advance permitting  File Environmental Assessment Certificate Application  Resource update
  • 33. BRUCEJACK PHOTOS 33 Recently-completed bridge Access road Camp Bulk sample/portal area
  • 34. COMMUNITY ENGAGEMENT 34  Pretivm’s management team has been cooperatively engaging with First Nations and local community leaders in the Stewart, BC region for over 10 years  We work to ensure that our communication about the progress of the Brucejack Project is open and continuous  Commercial relationships with local First Nations developed during the exploration phase at Brucejack have been mutually successful  We will continue to extend both commercial contract and employment opportunities to locals whenever possible Stewart warehouse constructed by development corporation of Skii km Lax Ha First Nation
  • 35. BRUCEJACK PERMITTING 35 1986 1989 1993 1998 1999 2006 2011-2012 2013 2014 2015 2016 Reclamation Permit Mine Development Certificate issued April 15, 1993 Project Assessment Certificate Permitted for exploration and exploration road Project Assessment Certificate allowed to expire Approval in principle for development of a mine at West Zone Reclamation Completion Project Description under review for underground mine at Brucejack’s Valley of the Kings Anticipate Environmental Assessment Certificate Construction, commissioning Commercial production target  Brucejack Lake is not fish habitat  Nearest fish 20 km away  Waterfalls and Sulphurets Glacier impede fish migration  Brucejack Lake is 100 meters deep  Up to 50% of tailings to be deposited in the Lake, with total volume of tailings stored in bottom 30 meters  Focus on minimizing potential for suspended solids to discharge from Brucejack Lake  50% or more of tailings to be used for paste backfill and deposited underground
  • 36. PRETIVM MANAGEMENT 36 Robert Quartermain, B.Sc., M.Sc., P.Geo, D.Sc. President & Chief Executive Officer, Director Peter de Visser, CA Chief Financial Officer Joseph Ovsenek, B.A. Sc., P.Eng., LLB Vice President & Chief Development Officer, Director Ken McNaughton, M.A. Sc., P.Eng. Vice President & Chief Exploration Officer Ian I Chang, M.A. Sc., P.Eng. Vice President, Project Development Michelle Romero, B.A., M.L.S. Vice President, Corporate Relations Kevin Torpy, B.Sc. Director, Mine Engineering Warwick Board, Ph.D., P.Geo. Chief Geologist Max Holtby, B.Sc., P. Geo. Director, Permitting Andrew Saltis, I.Eng. Site Project Manager, Mine Manager
  • 37. SHAREHOLDING & ANALYST COVERAGE 37 Institutions, 53% Retail, 23% Management, 5% Silver Standard, 19% Capital Structure(1) Public Float 86.0 Silver Standard Shares 19.0 Total Issued & Outstanding Shares 105.0 Incentive Options 8.7 Total Fully Diluted Shares 113.7 Market Capitalization C$865 million Working Capital (at June 30, 2013) C$37.9 million Gross proceeds from September 2013 private placements (3) C$27.3 million (1) As of September 6, 2013; ownership calculated on an undiluted basis. (2) As of September 6, 2013. Source: IPREO, SEDI (3) See news releases dated September 5, 2013 and September 6, 2013 (shares in millions) Top Shareholders(2) (shares in millions) Silver Standard Resources 18.986 Royce & Associates 9.057 Liberty Metals & Mining 6.850 Passport Capital 3.443 Robert Quartermain 2.853 Sun Valley Gold LLC 2.611 TD Asset Management 1.983 Sprott Asset Management 1.739 Schroder Inv. Mgmt. (N.A) 1.532 Wellington Management 1.223 Analyst Coverage BMO John Hayes CIBC Jeff Killeen Citibank Alex Hacking Cormark Securities Richard Gray Cowen Securities Adam Graf GMP Securities George Albino RBC Dan Rollins Salman Partners Ash Guglani Scotiabank Ovais Habib Very Independent Research John Tumazos
  • 38. PVG SHARE PERFORMANCE 38 XAU Index (%) PVG (%) Gold Price ($US) (%) Relative Performance: PVG, Gold, and XAU Index: January 1, 2011 to September 3, 2013 (weekly,%) Gold price ($US)
  • 39. HIGH-GRADE GOLD PRODUCTION 39 MeadowBank (Agnico Eagle) Laronde (Agnico Eagle) Hycroft (Allied Nevada) Kemess (Aurico) Casa Berardi Mine (Hecla) Ruby Hill (Barrick) Round Mountain (Barrick/Kinross) Turqouise Ridge (Barrick/Newmont) Red Lake (Goldcorp) Musselwhite (Goldcorp) Marigold Mine (GoldCorp/Barrick) Fort Knox (Kinross) Kirkland Lake (Kirkland Lake Gold) Mesquite (NewGold) Carlin (Newmont) Canadian Malartic (Osisko) Valley of the Kings (Pretium) Detour Lake Mine (Detour Gold) 0 100 200 300 400 500 600 700 0 2 4 6 8 10 12 14 16 18 AnnualGoldProduction(Koz/year) Grade (g/t) Average gold production vs. grade for various North American producing mines with >2Moz Au in resources Data sources: Companies, NRH. Production target: 425,700 oz/year (yrs 1-10) @ 14.2g/t head grade
  • 40. CONTACT Phone: 604-558-1784 Fax: 604-558-4784 Toll-free: 1-877-558-1784 invest@pretivm.com www.pretivm.com HEAD OFFICE Pretium Resources Inc. 570 Granville St. Suite 1600 Vancouver, BC Canada V6C 3P1 COMMON SHARES TSX/NYSE:PVG Issued: 102 million Fully diluted: 110.8 million 52-week hi/low: $14.93/$5.53 Market cap: $865 million (at September 6, 2013) Advancing a major high-grade gold resource in Canada