1
 Introduction
 Problem Statement
 Aim & Objectives
 Literature Review
 Research Methodology
 Method of Analysis
 Results & Discussions
 Conclusions
 References
CONTENTS:
2
Introduction
• Construction Industry contribution to Country Economic Growth
• India ( ) position in Asian Market
• Construction industry current status compared to other sectors
 Poor workmanship
 Non Standardization
 Environmental Impacts
• Obstacles faced by construction industry
 Extensive delays
 Exceeding cost
 Workmanship quality
(Because of nature of operation is complicated)
• QMS Implementation in the past decade
3
 Indian Construction industry
Vs
International Construction industry
 Below Client’s Expectation
 Problems & issues while implementation
Problem Statement:
4
Aim: To study the potential applying of Quality Management System (QMS)
Objectives:
 To investigate the current status of the QMS being implemented by Indian
construction companies.
 To find out problems and issues on the implementation of QMS in construction
projects.
 To determine the factors impelling effective and continuous improvement of
Indian construction industries QMS’s.
Aim & Objectives study :
5
Introduction Quality Management System:
 Significance of construction – three fold in construction
 Increase in demand towards high quality
 Quality implementation through out the life cycle
 Eliminating Lean Construction
LITERATURE REVIEW:
6
Quality Management History & Gurus:
 Start to finish by the same team to meet quality criteria
 Taylor established Quality Departments
• Ensure quality production
• Rectifying errors
 Ford emphasized standardization of design & components
 As a result of world war, statistical control was introduced
 Joseph Juran, W Edwards Deming, Philip Crosby
7
Basic concept Quality & Quality Dimensions and
Parameters:
 Definitions by various people
 Five perspective of quality
 According to DCQI
• For an owner
• For a designer
• For a contractor
• From the operational and management point view
 Doing the job right first time can save 24% of total cost of construction
8
Total Quality Management:
 TQM is a way of managing for the future
than its application assuring product or
service quality
 To ensure complete customer satisfaction
at every stage
 The TQM core is customer supplier
interfaces internally and externally right at
every interfaces there are processes and
systems The Relationship of TQM core
9
Problems and Issues on implementation of QMS:
 QMS as Marketing Tool
 Knowledge and experience
 Motivation
 Training
 Quality Audit
10
Factors Impelling Effective and Continuous
Improvement:
 Employees Empowerment
 Continuous Training
 Process Management
 Work Environment and Culture
11
Selection of Research Methods:
 A Questionnaire survey method was adopted
• Quantitative data
 A survey regarded as appropriate to answer the “what?” type of
research questions.
RESEARCH METHODOLOGY:
12
Phase Research Objectives
Research Methods
Expected Outcomes
Data Collection Data Analysis
1 To identify quality management systems (QMSs) issues in
construction projects and organisations in both international
and Indian contexts, identify gaps and problems of issues
particularly in the Indonesian case
Literature review - Theoretical framework
2 To develop a draft research instrument (questionnaire) Literature review - Draft questionnaire and
variables
3 To confirm the selected variables for the study, and shape the
final questionnaire with necessary modification
Preliminary
Studies
Qualitative Final questionnaire
instrument
4 To examine the effectiveness of the QMSs being operated in
Indian construction companies, including the identification of
current problems within the systems, and examine the
companies performance while implementing QMSs
Questionnaire Quantitative Level of QMSs
implementation, QMS
improvement elements
variables and statistical
relationships between
these variables
5 To design and develop a draft of QMS
improvement implementation framework, to enable Indian
construction companies to effectively implement QMS
- - A framework to improve
QMS implementation
6 To refine and finalize the culture-based QMS improvement
implementation framework
- - Valuable implications for
construction industry and
practitioners in India
Integration of Research Methods and Research Objectives with Expected Outcomes13
 Purpose : To evaluate the respondent’s perception towards the
concept of quality management
 Limitation : Respondent’s willingness and cooperation
 Scale : As most of the questions sought opinions or a subjective
measurement, the format is based on an unbalanced
itemized rating scale
Questionnaire survey:
SAMPLE QUESTIONS:
1) The use of consultant and their portion of role and involvement in setting up QMS
4 3 2 1
2) The way the fundamental QMS documentation was developed
4 3 2 1
3) Length of time from the start of preparation to the achievement of ISO 9001 certification
4 3 2 1
4) Motives for developing QMS
4 3 2 1
14
Questionnaire survey:
Design of questionnaire sheet that essentially consists of
o Current status of QMSs implementation in Indian construction companies
o Implementation of ISO 9001 principles and elements
o Problems influencing effective QMS implementation
o Company performance in terms of major achievements during
the implementation of QMS
15
 Primary Analysis
 A Descriptive statistical analysis
• Measurement of central tendency (Mean, Median, Mode)
• Measurement of variation (Standard deviation)
 Secondary Analysis
 ANOVA Test
• To check whether different profiles of organisational culture variables
have different influence on the QMS variable.
Method of Analysis:
16
 43 questionnaire booklets were filled by 37 companies located across India.
 These Companies include L&T, AFCONS, Gammon India, NCC, Shapoorji
Pallonji, SEW, GMR, Bharathi reality, Aarvee Associates etc..
 The Respondents can be classified into three groups:
Quality Management Representatives (QMRs) - high level
Managers (MRs) - middle level
Project/Site Engineers (SEs) - Basic level
Data Collection:
17
12%
39%
49%
QMRs - 5
Managers - 17
Engineers - 21
Profiles of Respondents:
Total = 43
Individual Respondents Levels by Percentage 18
Profiles of Respondents:
Total = 43
Individual Respondents Work Experience
High Level Middle Level Low level
< 5 Years 1 6 11
5 -10 Years 2 8 8
10-15 Years 0 2 2
15-20 Years 2 0 0
> 20 Years 0 1 0
0
2
4
6
8
10
12
19
Profiles of Respondents:
Total = 37
Age of the Company
19%
57%
24%
< 10 Years - 7
10-20 Years - 21
> 20 Years - 9
20
Current Status of QMS Implementation:
1. During Development of QMS
0
5
10
15
20
25
30
Yes No
Consultant assistance
Respondents
VH % H % FH % NH %
7 21.88 19 59.38 5 15.62 1 3.12
<25% % 25-50% % 51-75% % 76-100% %
5 15.62 17 53.13 8 25 2 6.25
Opinions of Consultant Roles
Level of Consultant Roles
Consultant services during the ISO 9001 registration process
21
Development of quality management systems documentation
Development of QMS documentation
No of
Respondents
%
QA team and the consultant developed the
document
𝟕 16.28
The consultant developed the document 𝟒 9.30
QA team developed the Document 𝟏𝟕 39.53
Every division prepared a draft of the document 𝟏𝟓 34.88
Total 43 100
1. During Development of QMS
22
Length of Time for ISO 9001 Certification
Period No of Respondents %
< 6 Months 18 41.86
6 – 12 Months 15 34.88
13 – 18 Months 6 13.95
19 – 24 Months 4 9.30
Total 43 100
1. During Development of QMS
23
Rank Motives driven the development of company’s QMS under ISO 9001 Mode Median Mean SD
1st To effectively and efficiently control project activities 1 2 2.24324 1.40249
1st To minimise poor quality of construction processes and products 2 2 2.48649 3.53553
2nd For the betterment of the company’s overall management system 3 3 3.91892 2.24076
3rd To fulfill clients’ requests as part of the bidding process 5 5 5.10811 1.62931
3rd To improve business performance 6 5 5.16216 1.46275
4th To improve the company’s prestige (e.g. image, reputation) 8 5 5.43243 2.08887
4th To enter the international construction market 4 5 5.51351 2.25612
4th As a requirement from the Ministry of Public Works 6 6 6.13514 1.60143
Initial Motivation of Companies in Applying for ISO 9001 Certification
1. During Development of QMS
24
2. Levels of quality management system implementation
Rank QMS-ISO 9001 Principles Mean SD LoI
1 Customer focus (1st P) 3.628 0.536 4
2 Mutually beneficial supplier relationships (8th P) 3.163 0.785 3
3 Leadership (2nd P) 3.140 0.743 3
4 Continual improvement (6th P) 3.116 0.879 3
5 Process approach (4th P) 3.093 0.648 3
6 People involvement (3rd P) 3.047 0.653 3
7 Factual approach to decision making (7th P) 2.767 0.868 3
8 Systems approach (5th P) 2.744 0.978 3
Total QMS-ISO 9001 Principles 3.087 0.807 3
Company Implementation Levels of ISO 9001 Principles
25
Sum of
Squares
df Mean Square F P-value
First QMS principle
Between Groups
Within Groups
Total
1.643
10.403
12.047
2.00
40.00
42.00
0.822
0.260 3.159 0.053
Second QMS principle
Between Groups
Within Groups
Total
1.912
21.250
23.163
2.00
40.00
42.00
0.956
0.531 1.800 0.179
Third QMS principle
Between Groups
Within Groups
Total
1.990
15.917
17.907
2.00
40.00
42.00
0.995
0.398 2.500 0.095
Fourth QMS principle
Between Groups
Within Groups
Total
0.618
17.010
17.628
2.00
40.00
42.00
0.309
0.425 0.727 0.490
Fifth QMS principle
Between Groups
Within Groups
Total
4.465
35.721
40.186
2.00
40.00
42.00
2.233
0.893 2.500 0.095
Sixth QMS principle
Between Groups
Within Groups
Total
1.706
30.713
32.419
2.00
40.00
42.00
0.853
0.768 1.111 0.339
Seventh QMS principle
Between Groups
Within Groups
Total
1.149
30.526
31.675
2.00
40.00
42.00
0.575
0.763 0.753 0.478
Eighth QMS principle
Between Groups
Within Groups
Total
2.229
23.632
25.861
2.00
40.00
42.00
1.115
0.591 1.887 0.165
ANOVA Table for QMS Principles
2. Levels of quality management system implementation
26
2. Levels of quality management system implementation
Rank QMS-ISO 9001 Elements Mean SD LoI
1 Process control (9th E) 3.488 0.593 3
2 Control of a nonconforming product (13th E) 3.349 0.686 3
3 Contract review (3rd E) 3.326 0.566 3
4 Inspection, measuring and test equipment (11th E) 3.279 0.934 3
5 Purchasing (6th E) 3.256 0.621 3
6 Inspection and testing (10th E) 3.256 0.693 3
7 Design control (4th E) 3.256 0.727 3
8 Document and data control (5th E) 3.233 0.751 3
9 Management responsibility (1st E) 3.209 0.675 3
10 Inspection and test status (12th E) 3.209 0.804 3
Company Implementation Levels of ISO 9001 Elements
27
2. Levels of quality management system implementation
Rank QMS-ISO 9001 Elements Mean SD LoI
11 Control of customer-supplied product (7th E) 3.186 0.764 3
12 Corrective and preventive action (14th E) 3.116 0.731 3
13 Product identification and traceability (8th E) 3.116 0.763 3
14 Control of quality records (16th E) 3.116 0.879 3
15 Quality system (2nd E) 3.023 0.740 3
16 Servicing (19th E) 2.930 0.910 3
17 Handling, storage, packaging, preservation and
delivery (15th E)
2.907 0.718 3
18 Training (18th E) 2.814 0.795 3
19 Internal quality audits (17th E) 2.814 0.907 3
20 Statistical techniques (20th E) 2.767 0.718 3
Total QMS-ISO 9001 Elements 3.133 0.778 3
Company Implementation Levels of ISO 9001 Elements
28
Sum of
Squares
df
Mean
Square
F P-value
QMS element 5
Between Groups
Within Groups
Total
3.663
20.011
23.674
2.00
40.00
42.00
1.832
0.500 3.661 0.035
QMS element 14
Between Groups
Within Groups
Total
4.145
18.273
22.418
2.00
40.00
42.00
2.073
0.457 4.537 0.017
QMS element 17
Between Groups
Within Groups
Total
10.443
24.068
34.511
2.00
40.00
42.00
5.221
0.602 8.678 0.001
ANOVA Table for QMS Elements
2. Levels of quality management system implementation
29
2. Levels of quality management system implementation
Position of Respondent QMS element 5 QMS element 14 QMS element 17
High Level Mean
Std. Deviation
4
0
3.2
0.7
3.6
0.8
Middle Level Mean
Std. Deviation
3.253
0.441
3.471
0.265
2.235
0.691
Low Level Mean
Std. Deviation
3.048
0.648
2.810
0.562
3.095
0.491
Total Mean
Std. Deviation
3.233
0.751
3.116
0.731
2.814
0.907
Report ANOVA for the QMS Elements
30
Rank Barriers Mean SD LoB
1 Lack of a well-design reward system (B9) 2.674 0.778 3
2 Misleading QMS purposes (B1) 2.442 0.666 2
3 Uncertainty with sub-contractors and supplier quality
systems (B12)
2.233 0.782 2
4 Lack of effective internal communication (B10) 2.209 0.833 2
5 ISO 9001is a matter of fulfilling audit requirements (B7) 2.186 0.907 2
6 Lack of effective management response (B5) 2.140 0.676 2
7 Lack of strong motivation (B4) 2.116 0.625 2
8 Lack of corporate commitment (B3) 2.070 0.856 2
9 Resistance to QMS implementation (B13) 2 0.756 2
10 Failure in disseminating ISO 9001-QMS (B8) 1.977 0.707 2
11 Lack of funding for QMS implementation (B14) 1.977 0.740 2
12 ISO 9001 is a documentation matter instead of
opportunity to make a change (B2)
1.907 0.684 2
13 Difficulty in understanding ISO 9001 terminology (B6) 1.884 0.586 2
14 Poor external communication (B11) 1.884 0.731 2
Total Barriers 2.121 0.766 2
3. Problems affecting effective QMS implementation
Barriers to the Effective Quality Management System Practices
31
Rank Key Performance Indicators Mean SD LoKPI
1 Quality of services and products (KPI5) 3.186 0.588 3
2 Sales growth for the preceding two years (KPI2) 3.023 0.707 3
3
Sustainable construction products (KPI6) 3 0.577 3
4 Profitability for the preceding two years (KPI1) 2.907 0.684 3
5 New product innovation and development (KPI7) 2.837 0.754 3
6 Market shares for the most recent year (KPI3) 2.791 0.709 3
7 Generating employee satisfaction (KPI8) 2.628 0.618 3
8 Global market contracts acquired (KPI4) 1.954 0.575 2
Total Barriers 2.791 0.738 3
4. Key performance indicators
Contractors’ Key Performance Indicators
32
Results and Discussion:
 Most local construction companies took less than six months to achieve ISO 9001
certification, while national contractors took between six and 12 months.
 The common motives that least drives Indian construction companies to apply for ISO
9001 certification is ‘as a requirement from the Ministry of Public Works’ and ‘to enter
the international construction market’
The Indian contractors appear to still doubt the many advantages associated with
implementing the system
Result in having low competitiveness
33
 The findings indicate a lack of use of ‘cause and effect diagrams’ and ‘statistical process
control’ as typical tools.
 Some studies report that effective decisions on quality processes are made mainly on the
use of data analysis and information with the assistance of some statistical tools.
 Construction industry efforts to improve quality have been slow and fragmented as well
as being fraught with difficulties in implementing ISO 9001
 This also due to the characteristics of the construction industry and its dynamic project
processes. For QMS implementation and an approach such as ISO 9001 to be a real
solution, all levels of a company’s structure need to be bound by a strong commitment
towards it.
Results and Discussion:
34
 The results of this study show that apparently Indian construction companies do not
often experience problems with implementing ISO 9001.
 However there were some misunderstandings from the managers surveyed regarding the
purpose for obtaining the ISO 9001 certification.
 People concede the purpose of implementation of TQM in construction companies must
be in line with the company’s Organisational culture.
 Other researchers in the construction quality systems and Organisational culture area
endorse this view by revealing that quality culture and corporate culture are considered
to be determinant factors in contributing to the successful or unsuccessful
implementation and maintenance of an ISO 9001 quality system.
 Studies examining the effects of QMS implementation in the construction industry show
that not only do customers benefit substantially from it, but so does the construction
company.
Results and Discussion:
35
 The aim was achieved through the collection and analysis of data, combined with the
incorporation of extant literature to address issues relating to the effectiveness and
continual improvement of the implementation of quality management systems, within the
context of the Indian construction.
 This study provides empirical evidence in support of the notion that problematic issues
associated with the implementation of QMS-ISO 9001 can have an impact on the
effective implementation of the QMS.
 Within Indian context, the study provides empirical evidence to conclude that the status
of having high business performance of the ISO 9001 certified construction companies
cannot be directly attributed to the possession of ISO 9001 certification.
 One-Way Analysis of Variance (ANOVA) analysis in this study provided a valuable
understanding of the influence of different profiles on QMS-ISO 9001 standard
implementation by Indian construction companies.
Conclusions:
36
The research contributions can be viewed from three different perspectives:
Research Contributions:
1. A contribution to the
body of knowledge
•Due to the lack of the
research in this area, there is
a scarcity of literature on the
Competing Values and QMS-
ISO 9001 implementation, the
results reported contribute to
and enrich the literature in
this area.
2. A contribution to the
construction industry
•Generally, they accept the fact
that quality is the basis for
moving companies forward,
both in relation to satisfying
clients and in the attainment
of a sustainable competitive
advantage. The result
potentially fit all grades in the
large-scale Indian construction
industry, enabling them to
develop strong motives in
order to successfully achieve
effective quality management
practices and quality
deliverables in infrastructure
project delivery.
3. A contribution for
policy
•The research findings will
provide a future reference for
facilitating consultation and
communication among the
construction services
providers, construction
companies associations and
the Government, in defining
and determining policy for
more widespread promotion
and implementation of QMSs,
in the Indian construction
industry.
37
Limitations
• Current conditions
• Not able to explore the
implementation within construction
companies.
• Lack of involvement of certain
external respondents
Recommendations
• Future implementation within
large-scale construction
companies.
• Sampled construction
organisations, which are willing to
be pilot-projects for the
implementation.
• Large number of respondents
including the external respondents
Limitation and Recommendations:
38
 Abdul Hakim bin Mohammed dan Mat Naim bin Abdullah, Asmoni (2006), “Quality Management
System in Construction”, International Conference on Construction Industry-2006.
 Debby Willar (2012), “Improving Quality Management System Implementation in Indonesian
Construction companies”. Queensland University of Technology.
 Ilias Said, Abd Rahman Ayub, Arman Abd Razaki & Tee Kuan Kooi (2011), “Factors affecting
Construction Organisation Quality Management System in The Malaysian Construction Industry”.
 Jerald L. Rounds and Nai-Yuan Chi (1985), “Total Quality Management for construction”, Journal of
Construction Engineering and Management, ASCE, Vol. 111, No. 2, pp.117-128
 Juran, J.M. (1998) Juran’s Quality Handbook, 5th Edition, McGraw Hill, New York.
 Lydia Nyomek (2010), “The Integration of Quality Management in Construction Industry”,
University Technology Malaysia.
 Peter Hoonakker, Pascale Carayon and Todd Loushine (2010), “Barriers and benefits of quality
management in the construction industry: An empirical study”, Taylor & Francis, Vol. 21, No. 9,
2010, pp.953-969.
References:
39
40

Contenu connexe

Tendances

Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all ANUPAM RAY
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industryMohammed Faazil
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONSANJEEV Wazir
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Qms awareness training
Qms awareness trainingQms awareness training
Qms awareness trainingshree
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentationImran Jamil
 
Total construction quality management by mobile technology mtech
Total construction quality management by mobile technology   mtechTotal construction quality management by mobile technology   mtech
Total construction quality management by mobile technology mtechStephen Au
 
Quality management for civil engineering
Quality management for civil engineeringQuality management for civil engineering
Quality management for civil engineeringJayanta Sen
 
Iso 9001 internal audit tips
Iso 9001 internal audit tipsIso 9001 internal audit tips
Iso 9001 internal audit tipsBaptist Molai
 
Project Quality Control
Project Quality ControlProject Quality Control
Project Quality ControlSheetal Narkar
 
Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides SlideTeam
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpointDjamadaMuhamedKAGUSU
 
Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planningAmartya Talukdar
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Jayson Narito
 
Quality Assurance vs. Quality Control in Manufacturing
Quality Assurance vs. Quality Control in ManufacturingQuality Assurance vs. Quality Control in Manufacturing
Quality Assurance vs. Quality Control in ManufacturingMonarch Metal
 

Tendances (20)

Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industry
 
Total Quality Management In Construction
Total Quality Management In ConstructionTotal Quality Management In Construction
Total Quality Management In Construction
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTION
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Qms awareness training
Qms awareness trainingQms awareness training
Qms awareness training
 
Role of qa&qc in manufacturing presentation
Role of qa&qc in manufacturing   presentationRole of qa&qc in manufacturing   presentation
Role of qa&qc in manufacturing presentation
 
Quality management
Quality managementQuality management
Quality management
 
Total construction quality management by mobile technology mtech
Total construction quality management by mobile technology   mtechTotal construction quality management by mobile technology   mtech
Total construction quality management by mobile technology mtech
 
Quality management for civil engineering
Quality management for civil engineeringQuality management for civil engineering
Quality management for civil engineering
 
Iso 9001 internal audit tips
Iso 9001 internal audit tipsIso 9001 internal audit tips
Iso 9001 internal audit tips
 
Project Quality Control
Project Quality ControlProject Quality Control
Project Quality Control
 
Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides
 
ISO lead auditor Training
ISO lead auditor TrainingISO lead auditor Training
ISO lead auditor Training
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
Quality management and quality planning
Quality management and quality planningQuality management and quality planning
Quality management and quality planning
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
Internal audit training
Internal audit trainingInternal audit training
Internal audit training
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Quality Assurance vs. Quality Control in Manufacturing
Quality Assurance vs. Quality Control in ManufacturingQuality Assurance vs. Quality Control in Manufacturing
Quality Assurance vs. Quality Control in Manufacturing
 

Similaire à Analysis of Quality Management System Implementation in Indian Construction Industry

Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Critical success factors in construction projects
Critical success factors in construction projectsCritical success factors in construction projects
Critical success factors in construction projectsnamra mubarak
 
Pm0017 summer-2016
Pm0017 summer-2016Pm0017 summer-2016
Pm0017 summer-2016smumbahelp
 
Implementing total quality management to improve facilities
Implementing total quality management to improve facilitiesImplementing total quality management to improve facilities
Implementing total quality management to improve facilitiesLaukik Raut
 
Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012RLLRichmond
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control ReportEzevillo Zim
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management Aneel Raza
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management SystemDhawal_Raghuvanshi
 
Total quality management practices in construction companies kerala
Total quality management practices in  construction companies keralaTotal quality management practices in  construction companies kerala
Total quality management practices in construction companies keralaIAEME Publication
 
IRJET- Study on Quality Control of Project Management System
IRJET-  	  Study on Quality Control of Project Management SystemIRJET-  	  Study on Quality Control of Project Management System
IRJET- Study on Quality Control of Project Management SystemIRJET Journal
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality ManagementSAJJAD KHUDHUR ABBAS
 
Total Quality Management, BIS certification in construction
Total Quality Management, BIS certification in constructionTotal Quality Management, BIS certification in construction
Total Quality Management, BIS certification in constructionsudhak28
 
Interactive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitezInteractive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitezPriscila Montesdeoca
 
Total Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca BenitezTotal Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca BenitezPriscila Montesdeoca
 
Qa 3 best practices
Qa 3 best practicesQa 3 best practices
Qa 3 best practicesJorge Boria
 
ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?PECB
 
Total Quality Management Benefits and Barriers in Construction Industry
Total Quality Management Benefits and Barriers in Construction IndustryTotal Quality Management Benefits and Barriers in Construction Industry
Total Quality Management Benefits and Barriers in Construction IndustryDr. Amarjeet Singh
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 

Similaire à Analysis of Quality Management System Implementation in Indian Construction Industry (20)

Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Critical success factors in construction projects
Critical success factors in construction projectsCritical success factors in construction projects
Critical success factors in construction projects
 
Pm0017 summer-2016
Pm0017 summer-2016Pm0017 summer-2016
Pm0017 summer-2016
 
Implementing total quality management to improve facilities
Implementing total quality management to improve facilitiesImplementing total quality management to improve facilities
Implementing total quality management to improve facilities
 
Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012
 
Quality Control Report
Quality Control ReportQuality Control Report
Quality Control Report
 
Total Quality Management
Total Quality Management Total Quality Management
Total Quality Management
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
Total quality management practices in construction companies kerala
Total quality management practices in  construction companies keralaTotal quality management practices in  construction companies kerala
Total quality management practices in construction companies kerala
 
IRJET- Study on Quality Control of Project Management System
IRJET-  	  Study on Quality Control of Project Management SystemIRJET-  	  Study on Quality Control of Project Management System
IRJET- Study on Quality Control of Project Management System
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Total Quality Management, BIS certification in construction
Total Quality Management, BIS certification in constructionTotal Quality Management, BIS certification in construction
Total Quality Management, BIS certification in construction
 
Interactive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitezInteractive activity1 tqm_diana priscila montesdeoca benitez
Interactive activity1 tqm_diana priscila montesdeoca benitez
 
Total Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca BenitezTotal Quality Management - Diana Priscila Montesdeoca Benitez
Total Quality Management - Diana Priscila Montesdeoca Benitez
 
Qa 3 best practices
Qa 3 best practicesQa 3 best practices
Qa 3 best practices
 
ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?ISO 9001:2015 What Are the Main Changes?
ISO 9001:2015 What Are the Main Changes?
 
Total Quality Management Benefits and Barriers in Construction Industry
Total Quality Management Benefits and Barriers in Construction IndustryTotal Quality Management Benefits and Barriers in Construction Industry
Total Quality Management Benefits and Barriers in Construction Industry
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 

Plus de Raghavendra Rachamadugu

PORTER’s five forces model for MARUTI SUZUKI
PORTER’s five forces model for MARUTI SUZUKIPORTER’s five forces model for MARUTI SUZUKI
PORTER’s five forces model for MARUTI SUZUKIRaghavendra Rachamadugu
 
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...Raghavendra Rachamadugu
 
Designing buildings to meet climate change challenges
Designing buildings to meet climate change challengesDesigning buildings to meet climate change challenges
Designing buildings to meet climate change challengesRaghavendra Rachamadugu
 
Case study of G+2 Structure located at railway quarters, warangal
Case study of G+2 Structure located at railway quarters, warangalCase study of G+2 Structure located at railway quarters, warangal
Case study of G+2 Structure located at railway quarters, warangalRaghavendra Rachamadugu
 
Presentation on using industrial waste water in making of plain concrete @ in...
Presentation on using industrial waste water in making of plain concrete @ in...Presentation on using industrial waste water in making of plain concrete @ in...
Presentation on using industrial waste water in making of plain concrete @ in...Raghavendra Rachamadugu
 
Presentation on liquefation @ pvkk by raghavendra
Presentation on liquefation @ pvkk by raghavendraPresentation on liquefation @ pvkk by raghavendra
Presentation on liquefation @ pvkk by raghavendraRaghavendra Rachamadugu
 
Presentation on robosand @ crit by raghavendra
Presentation on robosand @ crit by raghavendraPresentation on robosand @ crit by raghavendra
Presentation on robosand @ crit by raghavendraRaghavendra Rachamadugu
 
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendraPresentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendraRaghavendra Rachamadugu
 

Plus de Raghavendra Rachamadugu (13)

PORTER’s five forces model for MARUTI SUZUKI
PORTER’s five forces model for MARUTI SUZUKIPORTER’s five forces model for MARUTI SUZUKI
PORTER’s five forces model for MARUTI SUZUKI
 
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
GREEN BUILDING STRATEGIES & PROJECT MANAGEMENT PRACTICES FOR A SUSTAINABLE FU...
 
Designing buildings to meet climate change challenges
Designing buildings to meet climate change challengesDesigning buildings to meet climate change challenges
Designing buildings to meet climate change challenges
 
Case study of G+2 Structure located at railway quarters, warangal
Case study of G+2 Structure located at railway quarters, warangalCase study of G+2 Structure located at railway quarters, warangal
Case study of G+2 Structure located at railway quarters, warangal
 
CASE STUDY OF WAKOTA BRIDGE
CASE STUDY OF WAKOTA BRIDGECASE STUDY OF WAKOTA BRIDGE
CASE STUDY OF WAKOTA BRIDGE
 
Presentation on using industrial waste water in making of plain concrete @ in...
Presentation on using industrial waste water in making of plain concrete @ in...Presentation on using industrial waste water in making of plain concrete @ in...
Presentation on using industrial waste water in making of plain concrete @ in...
 
Jump Formwork
Jump FormworkJump Formwork
Jump Formwork
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Emmar
EmmarEmmar
Emmar
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
Presentation on liquefation @ pvkk by raghavendra
Presentation on liquefation @ pvkk by raghavendraPresentation on liquefation @ pvkk by raghavendra
Presentation on liquefation @ pvkk by raghavendra
 
Presentation on robosand @ crit by raghavendra
Presentation on robosand @ crit by raghavendraPresentation on robosand @ crit by raghavendra
Presentation on robosand @ crit by raghavendra
 
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendraPresentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
 

Dernier

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 

Dernier (16)

Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 

Analysis of Quality Management System Implementation in Indian Construction Industry

  • 1. 1
  • 2.  Introduction  Problem Statement  Aim & Objectives  Literature Review  Research Methodology  Method of Analysis  Results & Discussions  Conclusions  References CONTENTS: 2
  • 3. Introduction • Construction Industry contribution to Country Economic Growth • India ( ) position in Asian Market • Construction industry current status compared to other sectors  Poor workmanship  Non Standardization  Environmental Impacts • Obstacles faced by construction industry  Extensive delays  Exceeding cost  Workmanship quality (Because of nature of operation is complicated) • QMS Implementation in the past decade 3
  • 4.  Indian Construction industry Vs International Construction industry  Below Client’s Expectation  Problems & issues while implementation Problem Statement: 4
  • 5. Aim: To study the potential applying of Quality Management System (QMS) Objectives:  To investigate the current status of the QMS being implemented by Indian construction companies.  To find out problems and issues on the implementation of QMS in construction projects.  To determine the factors impelling effective and continuous improvement of Indian construction industries QMS’s. Aim & Objectives study : 5
  • 6. Introduction Quality Management System:  Significance of construction – three fold in construction  Increase in demand towards high quality  Quality implementation through out the life cycle  Eliminating Lean Construction LITERATURE REVIEW: 6
  • 7. Quality Management History & Gurus:  Start to finish by the same team to meet quality criteria  Taylor established Quality Departments • Ensure quality production • Rectifying errors  Ford emphasized standardization of design & components  As a result of world war, statistical control was introduced  Joseph Juran, W Edwards Deming, Philip Crosby 7
  • 8. Basic concept Quality & Quality Dimensions and Parameters:  Definitions by various people  Five perspective of quality  According to DCQI • For an owner • For a designer • For a contractor • From the operational and management point view  Doing the job right first time can save 24% of total cost of construction 8
  • 9. Total Quality Management:  TQM is a way of managing for the future than its application assuring product or service quality  To ensure complete customer satisfaction at every stage  The TQM core is customer supplier interfaces internally and externally right at every interfaces there are processes and systems The Relationship of TQM core 9
  • 10. Problems and Issues on implementation of QMS:  QMS as Marketing Tool  Knowledge and experience  Motivation  Training  Quality Audit 10
  • 11. Factors Impelling Effective and Continuous Improvement:  Employees Empowerment  Continuous Training  Process Management  Work Environment and Culture 11
  • 12. Selection of Research Methods:  A Questionnaire survey method was adopted • Quantitative data  A survey regarded as appropriate to answer the “what?” type of research questions. RESEARCH METHODOLOGY: 12
  • 13. Phase Research Objectives Research Methods Expected Outcomes Data Collection Data Analysis 1 To identify quality management systems (QMSs) issues in construction projects and organisations in both international and Indian contexts, identify gaps and problems of issues particularly in the Indonesian case Literature review - Theoretical framework 2 To develop a draft research instrument (questionnaire) Literature review - Draft questionnaire and variables 3 To confirm the selected variables for the study, and shape the final questionnaire with necessary modification Preliminary Studies Qualitative Final questionnaire instrument 4 To examine the effectiveness of the QMSs being operated in Indian construction companies, including the identification of current problems within the systems, and examine the companies performance while implementing QMSs Questionnaire Quantitative Level of QMSs implementation, QMS improvement elements variables and statistical relationships between these variables 5 To design and develop a draft of QMS improvement implementation framework, to enable Indian construction companies to effectively implement QMS - - A framework to improve QMS implementation 6 To refine and finalize the culture-based QMS improvement implementation framework - - Valuable implications for construction industry and practitioners in India Integration of Research Methods and Research Objectives with Expected Outcomes13
  • 14.  Purpose : To evaluate the respondent’s perception towards the concept of quality management  Limitation : Respondent’s willingness and cooperation  Scale : As most of the questions sought opinions or a subjective measurement, the format is based on an unbalanced itemized rating scale Questionnaire survey: SAMPLE QUESTIONS: 1) The use of consultant and their portion of role and involvement in setting up QMS 4 3 2 1 2) The way the fundamental QMS documentation was developed 4 3 2 1 3) Length of time from the start of preparation to the achievement of ISO 9001 certification 4 3 2 1 4) Motives for developing QMS 4 3 2 1 14
  • 15. Questionnaire survey: Design of questionnaire sheet that essentially consists of o Current status of QMSs implementation in Indian construction companies o Implementation of ISO 9001 principles and elements o Problems influencing effective QMS implementation o Company performance in terms of major achievements during the implementation of QMS 15
  • 16.  Primary Analysis  A Descriptive statistical analysis • Measurement of central tendency (Mean, Median, Mode) • Measurement of variation (Standard deviation)  Secondary Analysis  ANOVA Test • To check whether different profiles of organisational culture variables have different influence on the QMS variable. Method of Analysis: 16
  • 17.  43 questionnaire booklets were filled by 37 companies located across India.  These Companies include L&T, AFCONS, Gammon India, NCC, Shapoorji Pallonji, SEW, GMR, Bharathi reality, Aarvee Associates etc..  The Respondents can be classified into three groups: Quality Management Representatives (QMRs) - high level Managers (MRs) - middle level Project/Site Engineers (SEs) - Basic level Data Collection: 17
  • 18. 12% 39% 49% QMRs - 5 Managers - 17 Engineers - 21 Profiles of Respondents: Total = 43 Individual Respondents Levels by Percentage 18
  • 19. Profiles of Respondents: Total = 43 Individual Respondents Work Experience High Level Middle Level Low level < 5 Years 1 6 11 5 -10 Years 2 8 8 10-15 Years 0 2 2 15-20 Years 2 0 0 > 20 Years 0 1 0 0 2 4 6 8 10 12 19
  • 20. Profiles of Respondents: Total = 37 Age of the Company 19% 57% 24% < 10 Years - 7 10-20 Years - 21 > 20 Years - 9 20
  • 21. Current Status of QMS Implementation: 1. During Development of QMS 0 5 10 15 20 25 30 Yes No Consultant assistance Respondents VH % H % FH % NH % 7 21.88 19 59.38 5 15.62 1 3.12 <25% % 25-50% % 51-75% % 76-100% % 5 15.62 17 53.13 8 25 2 6.25 Opinions of Consultant Roles Level of Consultant Roles Consultant services during the ISO 9001 registration process 21
  • 22. Development of quality management systems documentation Development of QMS documentation No of Respondents % QA team and the consultant developed the document 𝟕 16.28 The consultant developed the document 𝟒 9.30 QA team developed the Document 𝟏𝟕 39.53 Every division prepared a draft of the document 𝟏𝟓 34.88 Total 43 100 1. During Development of QMS 22
  • 23. Length of Time for ISO 9001 Certification Period No of Respondents % < 6 Months 18 41.86 6 – 12 Months 15 34.88 13 – 18 Months 6 13.95 19 – 24 Months 4 9.30 Total 43 100 1. During Development of QMS 23
  • 24. Rank Motives driven the development of company’s QMS under ISO 9001 Mode Median Mean SD 1st To effectively and efficiently control project activities 1 2 2.24324 1.40249 1st To minimise poor quality of construction processes and products 2 2 2.48649 3.53553 2nd For the betterment of the company’s overall management system 3 3 3.91892 2.24076 3rd To fulfill clients’ requests as part of the bidding process 5 5 5.10811 1.62931 3rd To improve business performance 6 5 5.16216 1.46275 4th To improve the company’s prestige (e.g. image, reputation) 8 5 5.43243 2.08887 4th To enter the international construction market 4 5 5.51351 2.25612 4th As a requirement from the Ministry of Public Works 6 6 6.13514 1.60143 Initial Motivation of Companies in Applying for ISO 9001 Certification 1. During Development of QMS 24
  • 25. 2. Levels of quality management system implementation Rank QMS-ISO 9001 Principles Mean SD LoI 1 Customer focus (1st P) 3.628 0.536 4 2 Mutually beneficial supplier relationships (8th P) 3.163 0.785 3 3 Leadership (2nd P) 3.140 0.743 3 4 Continual improvement (6th P) 3.116 0.879 3 5 Process approach (4th P) 3.093 0.648 3 6 People involvement (3rd P) 3.047 0.653 3 7 Factual approach to decision making (7th P) 2.767 0.868 3 8 Systems approach (5th P) 2.744 0.978 3 Total QMS-ISO 9001 Principles 3.087 0.807 3 Company Implementation Levels of ISO 9001 Principles 25
  • 26. Sum of Squares df Mean Square F P-value First QMS principle Between Groups Within Groups Total 1.643 10.403 12.047 2.00 40.00 42.00 0.822 0.260 3.159 0.053 Second QMS principle Between Groups Within Groups Total 1.912 21.250 23.163 2.00 40.00 42.00 0.956 0.531 1.800 0.179 Third QMS principle Between Groups Within Groups Total 1.990 15.917 17.907 2.00 40.00 42.00 0.995 0.398 2.500 0.095 Fourth QMS principle Between Groups Within Groups Total 0.618 17.010 17.628 2.00 40.00 42.00 0.309 0.425 0.727 0.490 Fifth QMS principle Between Groups Within Groups Total 4.465 35.721 40.186 2.00 40.00 42.00 2.233 0.893 2.500 0.095 Sixth QMS principle Between Groups Within Groups Total 1.706 30.713 32.419 2.00 40.00 42.00 0.853 0.768 1.111 0.339 Seventh QMS principle Between Groups Within Groups Total 1.149 30.526 31.675 2.00 40.00 42.00 0.575 0.763 0.753 0.478 Eighth QMS principle Between Groups Within Groups Total 2.229 23.632 25.861 2.00 40.00 42.00 1.115 0.591 1.887 0.165 ANOVA Table for QMS Principles 2. Levels of quality management system implementation 26
  • 27. 2. Levels of quality management system implementation Rank QMS-ISO 9001 Elements Mean SD LoI 1 Process control (9th E) 3.488 0.593 3 2 Control of a nonconforming product (13th E) 3.349 0.686 3 3 Contract review (3rd E) 3.326 0.566 3 4 Inspection, measuring and test equipment (11th E) 3.279 0.934 3 5 Purchasing (6th E) 3.256 0.621 3 6 Inspection and testing (10th E) 3.256 0.693 3 7 Design control (4th E) 3.256 0.727 3 8 Document and data control (5th E) 3.233 0.751 3 9 Management responsibility (1st E) 3.209 0.675 3 10 Inspection and test status (12th E) 3.209 0.804 3 Company Implementation Levels of ISO 9001 Elements 27
  • 28. 2. Levels of quality management system implementation Rank QMS-ISO 9001 Elements Mean SD LoI 11 Control of customer-supplied product (7th E) 3.186 0.764 3 12 Corrective and preventive action (14th E) 3.116 0.731 3 13 Product identification and traceability (8th E) 3.116 0.763 3 14 Control of quality records (16th E) 3.116 0.879 3 15 Quality system (2nd E) 3.023 0.740 3 16 Servicing (19th E) 2.930 0.910 3 17 Handling, storage, packaging, preservation and delivery (15th E) 2.907 0.718 3 18 Training (18th E) 2.814 0.795 3 19 Internal quality audits (17th E) 2.814 0.907 3 20 Statistical techniques (20th E) 2.767 0.718 3 Total QMS-ISO 9001 Elements 3.133 0.778 3 Company Implementation Levels of ISO 9001 Elements 28
  • 29. Sum of Squares df Mean Square F P-value QMS element 5 Between Groups Within Groups Total 3.663 20.011 23.674 2.00 40.00 42.00 1.832 0.500 3.661 0.035 QMS element 14 Between Groups Within Groups Total 4.145 18.273 22.418 2.00 40.00 42.00 2.073 0.457 4.537 0.017 QMS element 17 Between Groups Within Groups Total 10.443 24.068 34.511 2.00 40.00 42.00 5.221 0.602 8.678 0.001 ANOVA Table for QMS Elements 2. Levels of quality management system implementation 29
  • 30. 2. Levels of quality management system implementation Position of Respondent QMS element 5 QMS element 14 QMS element 17 High Level Mean Std. Deviation 4 0 3.2 0.7 3.6 0.8 Middle Level Mean Std. Deviation 3.253 0.441 3.471 0.265 2.235 0.691 Low Level Mean Std. Deviation 3.048 0.648 2.810 0.562 3.095 0.491 Total Mean Std. Deviation 3.233 0.751 3.116 0.731 2.814 0.907 Report ANOVA for the QMS Elements 30
  • 31. Rank Barriers Mean SD LoB 1 Lack of a well-design reward system (B9) 2.674 0.778 3 2 Misleading QMS purposes (B1) 2.442 0.666 2 3 Uncertainty with sub-contractors and supplier quality systems (B12) 2.233 0.782 2 4 Lack of effective internal communication (B10) 2.209 0.833 2 5 ISO 9001is a matter of fulfilling audit requirements (B7) 2.186 0.907 2 6 Lack of effective management response (B5) 2.140 0.676 2 7 Lack of strong motivation (B4) 2.116 0.625 2 8 Lack of corporate commitment (B3) 2.070 0.856 2 9 Resistance to QMS implementation (B13) 2 0.756 2 10 Failure in disseminating ISO 9001-QMS (B8) 1.977 0.707 2 11 Lack of funding for QMS implementation (B14) 1.977 0.740 2 12 ISO 9001 is a documentation matter instead of opportunity to make a change (B2) 1.907 0.684 2 13 Difficulty in understanding ISO 9001 terminology (B6) 1.884 0.586 2 14 Poor external communication (B11) 1.884 0.731 2 Total Barriers 2.121 0.766 2 3. Problems affecting effective QMS implementation Barriers to the Effective Quality Management System Practices 31
  • 32. Rank Key Performance Indicators Mean SD LoKPI 1 Quality of services and products (KPI5) 3.186 0.588 3 2 Sales growth for the preceding two years (KPI2) 3.023 0.707 3 3 Sustainable construction products (KPI6) 3 0.577 3 4 Profitability for the preceding two years (KPI1) 2.907 0.684 3 5 New product innovation and development (KPI7) 2.837 0.754 3 6 Market shares for the most recent year (KPI3) 2.791 0.709 3 7 Generating employee satisfaction (KPI8) 2.628 0.618 3 8 Global market contracts acquired (KPI4) 1.954 0.575 2 Total Barriers 2.791 0.738 3 4. Key performance indicators Contractors’ Key Performance Indicators 32
  • 33. Results and Discussion:  Most local construction companies took less than six months to achieve ISO 9001 certification, while national contractors took between six and 12 months.  The common motives that least drives Indian construction companies to apply for ISO 9001 certification is ‘as a requirement from the Ministry of Public Works’ and ‘to enter the international construction market’ The Indian contractors appear to still doubt the many advantages associated with implementing the system Result in having low competitiveness 33
  • 34.  The findings indicate a lack of use of ‘cause and effect diagrams’ and ‘statistical process control’ as typical tools.  Some studies report that effective decisions on quality processes are made mainly on the use of data analysis and information with the assistance of some statistical tools.  Construction industry efforts to improve quality have been slow and fragmented as well as being fraught with difficulties in implementing ISO 9001  This also due to the characteristics of the construction industry and its dynamic project processes. For QMS implementation and an approach such as ISO 9001 to be a real solution, all levels of a company’s structure need to be bound by a strong commitment towards it. Results and Discussion: 34
  • 35.  The results of this study show that apparently Indian construction companies do not often experience problems with implementing ISO 9001.  However there were some misunderstandings from the managers surveyed regarding the purpose for obtaining the ISO 9001 certification.  People concede the purpose of implementation of TQM in construction companies must be in line with the company’s Organisational culture.  Other researchers in the construction quality systems and Organisational culture area endorse this view by revealing that quality culture and corporate culture are considered to be determinant factors in contributing to the successful or unsuccessful implementation and maintenance of an ISO 9001 quality system.  Studies examining the effects of QMS implementation in the construction industry show that not only do customers benefit substantially from it, but so does the construction company. Results and Discussion: 35
  • 36.  The aim was achieved through the collection and analysis of data, combined with the incorporation of extant literature to address issues relating to the effectiveness and continual improvement of the implementation of quality management systems, within the context of the Indian construction.  This study provides empirical evidence in support of the notion that problematic issues associated with the implementation of QMS-ISO 9001 can have an impact on the effective implementation of the QMS.  Within Indian context, the study provides empirical evidence to conclude that the status of having high business performance of the ISO 9001 certified construction companies cannot be directly attributed to the possession of ISO 9001 certification.  One-Way Analysis of Variance (ANOVA) analysis in this study provided a valuable understanding of the influence of different profiles on QMS-ISO 9001 standard implementation by Indian construction companies. Conclusions: 36
  • 37. The research contributions can be viewed from three different perspectives: Research Contributions: 1. A contribution to the body of knowledge •Due to the lack of the research in this area, there is a scarcity of literature on the Competing Values and QMS- ISO 9001 implementation, the results reported contribute to and enrich the literature in this area. 2. A contribution to the construction industry •Generally, they accept the fact that quality is the basis for moving companies forward, both in relation to satisfying clients and in the attainment of a sustainable competitive advantage. The result potentially fit all grades in the large-scale Indian construction industry, enabling them to develop strong motives in order to successfully achieve effective quality management practices and quality deliverables in infrastructure project delivery. 3. A contribution for policy •The research findings will provide a future reference for facilitating consultation and communication among the construction services providers, construction companies associations and the Government, in defining and determining policy for more widespread promotion and implementation of QMSs, in the Indian construction industry. 37
  • 38. Limitations • Current conditions • Not able to explore the implementation within construction companies. • Lack of involvement of certain external respondents Recommendations • Future implementation within large-scale construction companies. • Sampled construction organisations, which are willing to be pilot-projects for the implementation. • Large number of respondents including the external respondents Limitation and Recommendations: 38
  • 39.  Abdul Hakim bin Mohammed dan Mat Naim bin Abdullah, Asmoni (2006), “Quality Management System in Construction”, International Conference on Construction Industry-2006.  Debby Willar (2012), “Improving Quality Management System Implementation in Indonesian Construction companies”. Queensland University of Technology.  Ilias Said, Abd Rahman Ayub, Arman Abd Razaki & Tee Kuan Kooi (2011), “Factors affecting Construction Organisation Quality Management System in The Malaysian Construction Industry”.  Jerald L. Rounds and Nai-Yuan Chi (1985), “Total Quality Management for construction”, Journal of Construction Engineering and Management, ASCE, Vol. 111, No. 2, pp.117-128  Juran, J.M. (1998) Juran’s Quality Handbook, 5th Edition, McGraw Hill, New York.  Lydia Nyomek (2010), “The Integration of Quality Management in Construction Industry”, University Technology Malaysia.  Peter Hoonakker, Pascale Carayon and Todd Loushine (2010), “Barriers and benefits of quality management in the construction industry: An empirical study”, Taylor & Francis, Vol. 21, No. 9, 2010, pp.953-969. References: 39
  • 40. 40