Time Management

    •   Figuring out work
    •   Priorities the work
    •   Judge complexity
    •   Judge resources you have / Skills
    •   Estimate the efforts
    •   Assign resource and time
    •   Controlling schedule




http://www.radiantminds.co.in
Exercise

    • Arrange this in proper order

        1)   Schedule Control
        2)   Activity Duration Estimating
        3)   Schedule Development
        4)   Activity Sequencing
        5)   Activity Definition
        6)   Activity Resource Estimating




http://www.radiantminds.co.in
Exercise – Proper Sequence

    1)   Activity List
    2)   Activity Sequencing
    3)   Activity Resource Estimating
    4)   Activity Duration Estimation
    5)   Schedule Development
    6)   Schedule Control




http://www.radiantminds.co.in
Activity Planning (WBS)

    • Activity List (lower level WBS)

    • Activity Attributes (Predecessor, Successor,
      Constraints)

    • Identify Milestones (IMP Checkpoint)

    • Request Change (Internal)




http://www.radiantminds.co.in
Activity Sequencing

    • Wedding Planning - Activities

        –   Booking
        –   Food
        –   Invitations
        –   Purchases




http://www.radiantminds.co.in
Activity Planning
    START


    Hall Booking      Food            Invitations        Purchases


    Location          Find Caterer    Guest List         Readymade


    Parking           Finalize Menu   Print              Tailoring
                                      Invitations

    Cost              # of guests     Mail Invitations   Gifts
    (Constraints)     (Constraints)

    (Finalize)        Reception ?     Wait for RSVP      Guest List
                                                         (Constraints)
http://www.radiantminds.co.in
Activity Sequencing

    •   Exercise ->

        –   Finish to Start
        –   Start to Start
        –   Start to Finish
        –   Finish to Finish


    •   Lead Time & Lag Time

    • Gantt Chart



http://www.radiantminds.co.in
How long project will take

    •   Activity list
    •   Activity attributes
    •   Resource Calendar
    •   Resource Requirements
    •   Project scope statement
    •   Activity duration estimate




http://www.radiantminds.co.in
Estimation Techniques

    • Expert Judgment

    • Function Point Analysis

    •   Cocomo

    • Delphi




http://www.radiantminds.co.in
Critical Path Method

    • It is string of activities that will delay the whole
      project if anyone of them gets delayed
        1)   Create a guest list
        2)   Print invitations
        3)   Mail invitations
        4)   Wait for RSVP
        5)   Finalize the Menu
        6)   Cater the wedding




http://www.radiantminds.co.in
Network Diagram

                                Act-C
                   Act-A
                                2
                   4

     Start
                                Act-B   Finish
     0
                                7


                   Act-D
                                Act-E
                   3
                                5



http://www.radiantminds.co.in
Network Diagram

    • How to Find Critical Path

    • Start->A ->C -> Finish
    • Start->A ->B -> Finish
    • Start->D ->E -> Finish

    • Add Durations (Time) for each




http://www.radiantminds.co.in
Critical Path

    •    Critical Path is the one with longest duration (Ex.
        11 in above diagram)

    •   Finding Float / Slack time for each activity

    •    Shows – how much play you have in your
        schedule without affecting the end date




http://www.radiantminds.co.in
Critical Path

    • Float for any activity on the critical path is zero

    • We are not covering –
        – Early start / Early Finish
        – Late start / Late Finish
        – Lead and Lag time




http://www.radiantminds.co.in
C
                B
        A               7
                1
        3

Start                       Finish

 0                  E
        D
                    3
        4


                        G
            F
                        2
            2
Float for an activity

    •   Start – A – B – C – Finish = 11

    •   Start – D – E – Finish = 7

    •   Start - D – F – G – Finish = 8

    • Critical path = duration 11




http://www.radiantminds.co.in
Float for an activity

    •  Float for each of the activity on critical path is
      zero
    • For A, B, C Float = 0

    • Find the next longest path
    • D-F-G = 8
    • Subtract its duration from the duration of critical
      path (11-8 = 3)
    • Float for D, F, G is 3



http://www.radiantminds.co.in
Float for an activity

    • Do the same for the next longest path

    • Float for activity D is 3 and E is 4




http://www.radiantminds.co.in

More Related Content

Viewers also liked

Viewers also liked (6)

Pm 2 planning
Pm 2 planningPm 2 planning
Pm 2 planning
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
 
E business cms
E business cmsE business cms
E business cms
 
Pm 9 quality
Pm 9 qualityPm 9 quality
Pm 9 quality
 
ISM 2
ISM 2ISM 2
ISM 2
 
ISM-1
ISM-1ISM-1
ISM-1
 

Similar to Pm 5 time

Project Management 3.1 time
Project Management 3.1 timeProject Management 3.1 time
Project Management 3.1 timeElodieDescharmes
 
Test folder.pptx
Test folder.pptxTest folder.pptx
Test folder.pptxCons11
 
Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every TimeStanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every TimeSuzanne Aldrich
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagementDhamo daran
 
ABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesYousef Abugosh, PMP, MA
 
Al Nelson on Project Management for Game Developers
Al Nelson on Project Management for Game DevelopersAl Nelson on Project Management for Game Developers
Al Nelson on Project Management for Game DevelopersAndrew Greenberg
 
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile TeamsScrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile TeamsBelatrix Software
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingChris Carson
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptxMaulikVasani1
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
Scrum Process For Offshore Team
Scrum Process For Offshore TeamScrum Process For Offshore Team
Scrum Process For Offshore TeamPaul Nguyen
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfssuser8babb7
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management UploadBhuWan Khadka
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTsalsa moyara
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf
 

Similar to Pm 5 time (20)

Project Management 3.1 time
Project Management 3.1 timeProject Management 3.1 time
Project Management 3.1 time
 
Test folder.pptx
Test folder.pptxTest folder.pptx
Test folder.pptx
 
Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every TimeStanford DrupalCamp 2014 - A Perfect Launch, Every Time
Stanford DrupalCamp 2014 - A Perfect Launch, Every Time
 
06 projecttimemanagement
06 projecttimemanagement06 projecttimemanagement
06 projecttimemanagement
 
ABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning Slides
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
Al Nelson on Project Management for Game Developers
Al Nelson on Project Management for Game DevelopersAl Nelson on Project Management for Game Developers
Al Nelson on Project Management for Game Developers
 
Pmp time chapter 6
Pmp time chapter 6Pmp time chapter 6
Pmp time chapter 6
 
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile TeamsScrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
Scrum Scalability: Advanced Techniques for Managing Distributed Agile Teams
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptx
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
Scrum Process For Offshore Team
Scrum Process For Offshore TeamScrum Process For Offshore Team
Scrum Process For Offshore Team
 
C03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdfC03.05-Scheduling.key.pdf
C03.05-Scheduling.key.pdf
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
 
Ch09 (1).pptx
Ch09 (1).pptxCh09 (1).pptx
Ch09 (1).pptx
 
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptxAminullah Assagaf_P7-Ch.9_Project management-32.pptx
Aminullah Assagaf_P7-Ch.9_Project management-32.pptx
 

More from Radiant Minds

More from Radiant Minds (20)

Corona virus and mental health
Corona virus and mental healthCorona virus and mental health
Corona virus and mental health
 
Campus 2 Corporate
Campus 2 CorporateCampus 2 Corporate
Campus 2 Corporate
 
E business scm_crm
E business scm_crmE business scm_crm
E business scm_crm
 
E business n_tier_arch
E business n_tier_archE business n_tier_arch
E business n_tier_arch
 
E business edi_vads
E business edi_vadsE business edi_vads
E business edi_vads
 
E business edi_messaging
E business edi_messagingE business edi_messaging
E business edi_messaging
 
E business edi_basics
E business edi_basicsE business edi_basics
E business edi_basics
 
E business internet fraud
E business internet fraudE business internet fraud
E business internet fraud
 
E business intro_toseo
E business intro_toseoE business intro_toseo
E business intro_toseo
 
E business internet_basics
E business internet_basicsE business internet_basics
E business internet_basics
 
E business case-studies
E business case-studiesE business case-studies
E business case-studies
 
Ism 4
Ism 4Ism 4
Ism 4
 
Ism 3
Ism 3Ism 3
Ism 3
 
Pm 3 approach
Pm 3 approachPm 3 approach
Pm 3 approach
 
Pm 4 scope
Pm 4 scopePm 4 scope
Pm 4 scope
 
Pm 6 testing
Pm 6 testingPm 6 testing
Pm 6 testing
 
Pm 7 risk-man
Pm 7 risk-manPm 7 risk-man
Pm 7 risk-man
 
Pm 10 procurement
Pm 10 procurementPm 10 procurement
Pm 10 procurement
 
Pm 9 quality
Pm 9 qualityPm 9 quality
Pm 9 quality
 
Pm 8 cost_management
Pm 8 cost_managementPm 8 cost_management
Pm 8 cost_management
 

Recently uploaded

4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 

Recently uploaded (20)

4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 

Pm 5 time

  • 1. Project Mgmt. Time Management (Getting it done on Time)
  • 2. Time Management • Figuring out work • Priorities the work • Judge complexity • Judge resources you have / Skills • Estimate the efforts • Assign resource and time • Controlling schedule http://www.radiantminds.co.in
  • 3. Exercise • Arrange this in proper order 1) Schedule Control 2) Activity Duration Estimating 3) Schedule Development 4) Activity Sequencing 5) Activity Definition 6) Activity Resource Estimating http://www.radiantminds.co.in
  • 4. Exercise – Proper Sequence 1) Activity List 2) Activity Sequencing 3) Activity Resource Estimating 4) Activity Duration Estimation 5) Schedule Development 6) Schedule Control http://www.radiantminds.co.in
  • 5. Activity Planning (WBS) • Activity List (lower level WBS) • Activity Attributes (Predecessor, Successor, Constraints) • Identify Milestones (IMP Checkpoint) • Request Change (Internal) http://www.radiantminds.co.in
  • 6. Activity Sequencing • Wedding Planning - Activities – Booking – Food – Invitations – Purchases http://www.radiantminds.co.in
  • 7. Activity Planning START Hall Booking Food Invitations Purchases Location Find Caterer Guest List Readymade Parking Finalize Menu Print Tailoring Invitations Cost # of guests Mail Invitations Gifts (Constraints) (Constraints) (Finalize) Reception ? Wait for RSVP Guest List (Constraints) http://www.radiantminds.co.in
  • 8. Activity Sequencing • Exercise -> – Finish to Start – Start to Start – Start to Finish – Finish to Finish • Lead Time & Lag Time • Gantt Chart http://www.radiantminds.co.in
  • 9. How long project will take • Activity list • Activity attributes • Resource Calendar • Resource Requirements • Project scope statement • Activity duration estimate http://www.radiantminds.co.in
  • 10. Estimation Techniques • Expert Judgment • Function Point Analysis • Cocomo • Delphi http://www.radiantminds.co.in
  • 11. Critical Path Method • It is string of activities that will delay the whole project if anyone of them gets delayed 1) Create a guest list 2) Print invitations 3) Mail invitations 4) Wait for RSVP 5) Finalize the Menu 6) Cater the wedding http://www.radiantminds.co.in
  • 12. Network Diagram Act-C Act-A 2 4 Start Act-B Finish 0 7 Act-D Act-E 3 5 http://www.radiantminds.co.in
  • 13. Network Diagram • How to Find Critical Path • Start->A ->C -> Finish • Start->A ->B -> Finish • Start->D ->E -> Finish • Add Durations (Time) for each http://www.radiantminds.co.in
  • 14. Critical Path • Critical Path is the one with longest duration (Ex. 11 in above diagram) • Finding Float / Slack time for each activity • Shows – how much play you have in your schedule without affecting the end date http://www.radiantminds.co.in
  • 15. Critical Path • Float for any activity on the critical path is zero • We are not covering – – Early start / Early Finish – Late start / Late Finish – Lead and Lag time http://www.radiantminds.co.in
  • 16. C B A 7 1 3 Start Finish 0 E D 3 4 G F 2 2
  • 17. Float for an activity • Start – A – B – C – Finish = 11 • Start – D – E – Finish = 7 • Start - D – F – G – Finish = 8 • Critical path = duration 11 http://www.radiantminds.co.in
  • 18. Float for an activity • Float for each of the activity on critical path is zero • For A, B, C Float = 0 • Find the next longest path • D-F-G = 8 • Subtract its duration from the duration of critical path (11-8 = 3) • Float for D, F, G is 3 http://www.radiantminds.co.in
  • 19. Float for an activity • Do the same for the next longest path • Float for activity D is 3 and E is 4 http://www.radiantminds.co.in