SlideShare une entreprise Scribd logo
1  sur  4
CURRICULAM VITAE
N.G. RAMASUBRAMANIAM
Mobile No: Qatar--- 0097430853731 (Current location—Qatar)
India — 00919585554124,
Mail: gauthammappu@yahoo.co.in
ajaysubu06@gmail.com
------------------------------------------------------------------------------------------------------------
C A R E E R O B J E C T I V E
Seeking for a position of mechanical engineer in an organization where knowledge can be
applied and to word as an efficient team member to contribute for the development of the
organization.
A C A D E M I C Q U A L I F I C A T I O N S
Discipline : Diploma in Mechanical engineering (DR&A/C), 3years.
Year of passing : 2003
P R O F E S S I O N A L E X P E R I E N C E
MECHEL ENGINEERING WLL, (MEP) DOHA QATAR
SITE SUPERVISOR- MECHANICAL (HVAC)
September 2010 – 5 Jan 2014, (April-2015 onwards Working in Mechel (Business visa)
J O B P R O F I L E
 Analysis the nature of the jobs, work order, drawing study, material.
 Planning for execution and completion of the project in correct time.
 Day to day report to the project manager and project engineer with client side.
 Supervising and coordinating all day to day construction site activities.
 Preparing Consultant’s request for the Inspection of works completed for approval.
 Preparing queries if there is any discrepancy in the scope of work or the design.
 Preparation of shop drawing as per the construction drawings complying the standards if
not, Request information (RFI) were raised to clear the design issues.
 Preparation As built drawing.
 Co ordinate with the suppliers for some technical issues.
D U T I E S A N D R E S P O N S I B I L I T I E S
Air- Conditioning,(MEP).
1 In charge of all HVAC Works
2 Responsible for Preparing/Reviewing Shop Drawings, Coordination drawings & as
Built Drawings for HVAC services.
3 Coordination of Electro Mechanical services.
4 Installation of Chillers and Cooling Towers, Sediment separators, Air separators.
5 Installing the AHU unit, FCU unit and valve packages.
6 Testing and flushing of chill water pipes.
7 Installation of G.I, M.S, and S.S duct (According to SMACNA & DW144)
8 Installation of VAV and CAV unit as per the schedule
9 Installation of heat exchangers and its pipe work network.
10 Installation of sound attenuators.
11 Testing and Pre-commissioning, commissioning of AHU and FCU, Chiller pumps as per
the project requirements,
12 Installing the risers to high rise by using expansion joints.
13 Preparing Consultant’s request for the Inspection of works completed for approval.
14 Implementation/Supervision & Installation, of Air conditioning, works.
15 Materials take -off to assess any deviation from tender to actual quantity required.
16 Planning and producing works program, preparing weekly & monthly work
Progress charts.
17 Liaison with Consultant, contractor & other related agencies.
18 Directly responsible for Execution of work at site.
19 Air balancing of AHU &FCU’s and VAV testing.
20 BMS field device installation and testing as per project requirement,
Correspondence
Preparation of pen memos and other contractual letters for the delays, damages to the
Installations and other technical issues.
Site inspection
After completion of work taking the consultant for inspection and getting approved.
Material inspection
When the material arrived at site, inspection was raised and carried out.
Charts:
The various kinds of charts were prepared to highlight the activities such as
1) Work progress charts
2) Pre- commissioning, Testing and commissioning charts
Time sheets:
The time sheets were prepared for the variation works stating the manpower, material waste etc.
M/s.AL-GHUAIR GROUPS
From (Jan 2006 – 25.5.2010) – Mechanical supervisor (HVAC)
J O B P R O F I L E -
1 Replacing necessary existing units (Chillers/AHU/FCU) with full valve packages
& control modules.
2 Installation and maintenance of the new units required for the Building extensions
area & within the building.
3 Preparing the material Quarter year & Floating enquires for the same to the
vendors & spare parts schedule required for the every Quarter year & Floating
enquires for the same to the vendors.
4 Evaluate the quotation received from the vendors and preparing, submitting the
comparative statement to the management to finalize the order.
5. Acquiring, inspecting and accumulating the new materials & Spare parts for
Carryout the required maintenance works.
Company : Unimech Engineers (M/s. Carrier Air-Con), Chennai – INDIA.
Period : Apr 2003 – Jan 2005. (Selectedin campus interview)
Designation : Junior HVAC Supervisor.
Job Profile :
1 Installation of Chilled water HVAC operating system.
2 Installation of HVAC systems.
3 Take a lead to prepare HVAC piping & Ducting drawing.
4 Installation of chilled water layout and air distribution system (Ducting) as per
5 Testing and commissioning the entire HVAC system.
6 Preparing as built drawings and maintenance manual for the client.
7 Giving a necessary training to the client representative for operate & maintain
the entire system.
P E R S O N A L D E T A I L S
Full Name : N.G.Ramasubramaniam
Father’s Name : N.A.Govindaraja
Date of Birth : 21.3.1985
Languages Known : English, Tamil, (Hindi, and Malayalam)
Marital status : unmarried
Permanent Address : 19/106.Pudukkottai st. Sammandapurem,
Rajapalayam 626117 Tamilnadu, INDIA
Mobile no. : Qatar- 0097430853731
INDIA- 00919585554124
E-mail ID : gauthammappu@yahoo.co.in
ajaysubu06@gmail.com
PASSPORT DETAILS:
Passport no : M0577885
Issued Place : Madurai, Tamilnadu
Date of issue : 02/08/2014
Date of expiry : 01/08/2024
DRIVING LICENSE:
Issued Place : Qatar
License no : 28535628773
Validity : 24/09/2017
Declaration:
I hereby declare that all the information furnished above is true to the best of my
knowledge and belief.
Place: Yours truly
Date : (N.G.Ramasubramaniam)

Contenu connexe

Tendances (20)

DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
Sr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CVSr. Ammonia Process Engineer's CV
Sr. Ammonia Process Engineer's CV
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Resume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna PillaiResume Gopakumar Balakrishna Pillai
Resume Gopakumar Balakrishna Pillai
 
Ali Raza CV(Final)
Ali Raza CV(Final)Ali Raza CV(Final)
Ali Raza CV(Final)
 
khaled-2
khaled-2khaled-2
khaled-2
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
Madan 0816
Madan 0816Madan 0816
Madan 0816
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Instrument & Control Engineer
Instrument & Control Engineer Instrument & Control Engineer
Instrument & Control Engineer
 
1.A.RAJESH SIVAM_RESUME NEW (1)
1.A.RAJESH SIVAM_RESUME NEW (1)1.A.RAJESH SIVAM_RESUME NEW (1)
1.A.RAJESH SIVAM_RESUME NEW (1)
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)Afaq CV (April 17, 2016)
Afaq CV (April 17, 2016)
 
upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)upated c.v sa S.E.C (1)
upated c.v sa S.E.C (1)
 
adrian cv
adrian cvadrian cv
adrian cv
 
Pareman Plato Tarigan's CV
Pareman Plato Tarigan's CVPareman Plato Tarigan's CV
Pareman Plato Tarigan's CV
 

En vedette

En vedette (18)

петро ребро2
петро ребро2петро ребро2
петро ребро2
 
박홍근홈패션 2014 여름호
박홍근홈패션 2014 여름호박홍근홈패션 2014 여름호
박홍근홈패션 2014 여름호
 
петро ребро2
петро ребро2петро ребро2
петро ребро2
 
Gambling
GamblingGambling
Gambling
 
Cyber Capabilities of Iran
Cyber Capabilities of IranCyber Capabilities of Iran
Cyber Capabilities of Iran
 
09 relatorio-gerencial
09 relatorio-gerencial09 relatorio-gerencial
09 relatorio-gerencial
 
13 relatorio-gerencial
13 relatorio-gerencial13 relatorio-gerencial
13 relatorio-gerencial
 
Industry Background -Expertise- CRC-2016
Industry Background -Expertise- CRC-2016Industry Background -Expertise- CRC-2016
Industry Background -Expertise- CRC-2016
 
Поздравляю!
Поздравляю!Поздравляю!
Поздравляю!
 
Articles en therotical_reflections_5
Articles en therotical_reflections_5Articles en therotical_reflections_5
Articles en therotical_reflections_5
 
Photo
PhotoPhoto
Photo
 
Question 3
Question 3Question 3
Question 3
 
Fibre channel over ethernet
Fibre channel over ethernetFibre channel over ethernet
Fibre channel over ethernet
 
Gr4 week1
Gr4 week1Gr4 week1
Gr4 week1
 
David pilato codemotion-telaviv
David pilato codemotion-telavivDavid pilato codemotion-telaviv
David pilato codemotion-telaviv
 
Patio covers concrete
Patio covers concretePatio covers concrete
Patio covers concrete
 
Planning 10
Planning 10Planning 10
Planning 10
 
Подарок маме 1
Подарок маме 1Подарок маме 1
Подарок маме 1
 

Similaire à C.V (1)

Similaire à C.V (1) (20)

tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
SYED CV
SYED CVSYED CV
SYED CV
 
CV of Mohammed Uzair
CV of Mohammed UzairCV of Mohammed Uzair
CV of Mohammed Uzair
 
Resume with cover latter pdf
Resume with cover latter pdfResume with cover latter pdf
Resume with cover latter pdf
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
abid1
abid1abid1
abid1
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
CV
CVCV
CV
 
mechenical engineer 123
mechenical engineer 123mechenical engineer 123
mechenical engineer 123
 
CV
CVCV
CV
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Mechanical Project Enginner CV
Mechanical Project Enginner CVMechanical Project Enginner CV
Mechanical Project Enginner CV
 
Zafar
ZafarZafar
Zafar
 
Zafar
ZafarZafar
Zafar
 
Update Resume November 2016 - Faheem
Update Resume November 2016 - Faheem Update Resume November 2016 - Faheem
Update Resume November 2016 - Faheem
 
CV
CVCV
CV
 
Sachin_Kumar_CV_Instrument
Sachin_Kumar_CV_InstrumentSachin_Kumar_CV_Instrument
Sachin_Kumar_CV_Instrument
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016Ehsan New CV 17.8.2016
Ehsan New CV 17.8.2016
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 

C.V (1)

  • 1. CURRICULAM VITAE N.G. RAMASUBRAMANIAM Mobile No: Qatar--- 0097430853731 (Current location—Qatar) India — 00919585554124, Mail: gauthammappu@yahoo.co.in ajaysubu06@gmail.com ------------------------------------------------------------------------------------------------------------ C A R E E R O B J E C T I V E Seeking for a position of mechanical engineer in an organization where knowledge can be applied and to word as an efficient team member to contribute for the development of the organization. A C A D E M I C Q U A L I F I C A T I O N S Discipline : Diploma in Mechanical engineering (DR&A/C), 3years. Year of passing : 2003 P R O F E S S I O N A L E X P E R I E N C E MECHEL ENGINEERING WLL, (MEP) DOHA QATAR SITE SUPERVISOR- MECHANICAL (HVAC) September 2010 – 5 Jan 2014, (April-2015 onwards Working in Mechel (Business visa) J O B P R O F I L E  Analysis the nature of the jobs, work order, drawing study, material.  Planning for execution and completion of the project in correct time.  Day to day report to the project manager and project engineer with client side.  Supervising and coordinating all day to day construction site activities.  Preparing Consultant’s request for the Inspection of works completed for approval.  Preparing queries if there is any discrepancy in the scope of work or the design.  Preparation of shop drawing as per the construction drawings complying the standards if not, Request information (RFI) were raised to clear the design issues.  Preparation As built drawing.  Co ordinate with the suppliers for some technical issues.
  • 2. D U T I E S A N D R E S P O N S I B I L I T I E S Air- Conditioning,(MEP). 1 In charge of all HVAC Works 2 Responsible for Preparing/Reviewing Shop Drawings, Coordination drawings & as Built Drawings for HVAC services. 3 Coordination of Electro Mechanical services. 4 Installation of Chillers and Cooling Towers, Sediment separators, Air separators. 5 Installing the AHU unit, FCU unit and valve packages. 6 Testing and flushing of chill water pipes. 7 Installation of G.I, M.S, and S.S duct (According to SMACNA & DW144) 8 Installation of VAV and CAV unit as per the schedule 9 Installation of heat exchangers and its pipe work network. 10 Installation of sound attenuators. 11 Testing and Pre-commissioning, commissioning of AHU and FCU, Chiller pumps as per the project requirements, 12 Installing the risers to high rise by using expansion joints. 13 Preparing Consultant’s request for the Inspection of works completed for approval. 14 Implementation/Supervision & Installation, of Air conditioning, works. 15 Materials take -off to assess any deviation from tender to actual quantity required. 16 Planning and producing works program, preparing weekly & monthly work Progress charts. 17 Liaison with Consultant, contractor & other related agencies. 18 Directly responsible for Execution of work at site. 19 Air balancing of AHU &FCU’s and VAV testing. 20 BMS field device installation and testing as per project requirement, Correspondence Preparation of pen memos and other contractual letters for the delays, damages to the Installations and other technical issues. Site inspection After completion of work taking the consultant for inspection and getting approved. Material inspection When the material arrived at site, inspection was raised and carried out. Charts: The various kinds of charts were prepared to highlight the activities such as 1) Work progress charts 2) Pre- commissioning, Testing and commissioning charts
  • 3. Time sheets: The time sheets were prepared for the variation works stating the manpower, material waste etc. M/s.AL-GHUAIR GROUPS From (Jan 2006 – 25.5.2010) – Mechanical supervisor (HVAC) J O B P R O F I L E - 1 Replacing necessary existing units (Chillers/AHU/FCU) with full valve packages & control modules. 2 Installation and maintenance of the new units required for the Building extensions area & within the building. 3 Preparing the material Quarter year & Floating enquires for the same to the vendors & spare parts schedule required for the every Quarter year & Floating enquires for the same to the vendors. 4 Evaluate the quotation received from the vendors and preparing, submitting the comparative statement to the management to finalize the order. 5. Acquiring, inspecting and accumulating the new materials & Spare parts for Carryout the required maintenance works. Company : Unimech Engineers (M/s. Carrier Air-Con), Chennai – INDIA. Period : Apr 2003 – Jan 2005. (Selectedin campus interview) Designation : Junior HVAC Supervisor. Job Profile : 1 Installation of Chilled water HVAC operating system. 2 Installation of HVAC systems. 3 Take a lead to prepare HVAC piping & Ducting drawing. 4 Installation of chilled water layout and air distribution system (Ducting) as per 5 Testing and commissioning the entire HVAC system. 6 Preparing as built drawings and maintenance manual for the client. 7 Giving a necessary training to the client representative for operate & maintain the entire system.
  • 4. P E R S O N A L D E T A I L S Full Name : N.G.Ramasubramaniam Father’s Name : N.A.Govindaraja Date of Birth : 21.3.1985 Languages Known : English, Tamil, (Hindi, and Malayalam) Marital status : unmarried Permanent Address : 19/106.Pudukkottai st. Sammandapurem, Rajapalayam 626117 Tamilnadu, INDIA Mobile no. : Qatar- 0097430853731 INDIA- 00919585554124 E-mail ID : gauthammappu@yahoo.co.in ajaysubu06@gmail.com PASSPORT DETAILS: Passport no : M0577885 Issued Place : Madurai, Tamilnadu Date of issue : 02/08/2014 Date of expiry : 01/08/2024 DRIVING LICENSE: Issued Place : Qatar License no : 28535628773 Validity : 24/09/2017 Declaration: I hereby declare that all the information furnished above is true to the best of my knowledge and belief. Place: Yours truly Date : (N.G.Ramasubramaniam)