Rural Water Projects under PURA Scheme: An Assessment
Background                                                         Center: only brings in the viability gap investments of the
                                                                   projects and would invest upto 35% of the project.
Rural infrastructure would be the next driving force of
infrastructure sector, with the stage set for bringing about       Private Player: will professionally manage and in return
urbanized transformation in rural areas followed by strong         would be availing the management fee and return on
policy initiatives by the government for rural development,        investments based on revenue generated. Invests
investments in rural infrastructure projects would emerge has      establishes and operates add-on projects to increase the
the most sought after investments in coming years. The             revenue capabilities of the private players.
current PURA scheme is one of the suitable models for
                                                                   The envisaged PURA scheme needs to be developed in
bringing urban amenities in rural areas, PURA scheme which
was initially started has pilot projects in 2009-10, has           those areas / location with requires those amenities that
undergone structural changes, which now has better                 can be achieved through clustering. The location of PURA
implementation mechanism and incentives structure. The             projects should enable growth of the peripheral rural
scheme also has given more priority towards the livelihood         areas rather just having small scale infrastructure which
amenities that is required for hosting better infrastructure       only provides mere linkages. The PURA pilot projects
services rather focusing more towards connectivity. A wide         were mostly skewed towards road and connectivity
spread transformation in the infrastructure dynamics which         infrastructure, which has lead to less priority in livelihood
can attract business activities and attract investments which      amenities such as water, local market creation,
can help in urbanizing rural areas and decreasing stress on        communication services, establishment of training
                                                                   institute’s educational centers, and housing facilities. The
urban cities.
                                                                   focus is now towards creating those infrastructure
Private participation in rural infrastructure projects are         amenities which will enable livelihood amenities that can
considered to be the key for making rural projects viable and      help drive the growth of rural areas. To make projects
manageable and player with local knowledge and local               viable private participation is important with private
experience in conducting rural infrastructure projects are         players given the wide showcase of opportunities in other
preferred in the case of PURA scheme. The PURA scheme has          revenue generating opportunities PURA will make private
been considered more has a community based projects major          investments attractive and business driven.
funding from gram panchayats and the center. The
uniqueness of the scheme is roping in the private players and      Village cluster study
having them participate in Add- on projects which can yield
                                                                   Shakthi group of companies under the helm of
the desired revenues and achieving both the goals of having a
                                                                   Dr.N.Mahalingam an educationalist, philanthropist
private player and urbanized quality infrastructure in the rural
areas.
                                                                   and industrialist hails from Pollachi 40 Kms away
                                                                   from Coimbatore. An array of educational
PURA and PPP models                                                institutions under the banner NIA Educational
The current PURA model which has been reframed from the
                                                                   Institutions is a part of Sakthi Group providing
learning’s of the pilot projects has become more flexible for      yeoman service to the society. Sakthi Group of
private participation. The investment structure considered for     Companies and NIA Educational Institutions in
the PURA project includes gram panchayats, government              Pollachi has undertaken the mission of fullfilling the
funding and private players.                                       dreams of the President of India, His Excellency
                                                                   Dr.A.P.J.Abdul Kalam in Providing Urban Amenities in
The Capital structure considered includes a investment upto
                                                                   and around the Rural Areas of Pollachi through
50 % from Gram Panchayats, 20% through private players the
                                                                   Physical Connectivity, Electronic Connectivity,
remaining from the central government funding post viability
gap assessment.                                                    Knowledge Connectivity and Economic Connectivity.

Gram Panchayats: invests and monitor the facility, an              Shakthi PURA was established with objective of
independent engineer is appointed who reports the activities       creating community based rural development
of the project. The revenue billing would be collected by the      projects.
Gram Panchayats.
The Shakthi group has mapped out four village clusters
around the Pollachi district, the village cluster
considered for the Kanjampatti, Samathur, Negamam,
                                                               Project details:
Kovilpayam. The villages lack the basic necessity. The
village cluster taken up by Shakthi PURA for the                     This plan supplies 3450000Litres per day.
accelerated development of the village clusters includes:            Total Project cost is Rs 96000000.
   1.   Kanjampatti :                                                The population considered for this plan is
   2.   Samathur                                                      40000.
   3.   Negamam                                                      The debt equity ratio being 70:30 this is for
   4.   Kovilpalayam                                                  the Pvt. Player.
                                                                     The model has considered 10:30:60 ratios for
The above villager clusters come within the vicinity of
                                                                      commercial, household and stands post
Pollachi district; the project proposed has not
                                                                      connections.
considered any water projects / has any proposed water
                                                                     The Tariff considered for commercial and
project to be implemented in the village cluster. As
                                                                      domestic is Rs15 & Rs 6 per KL.
water infrastructure is a part of the PURA scheme we
propose a water project would have a greater impact in               The households that use stand posts will have
                                                                      to pay Rs35 per month.
the development of the Shakthi village cluster.
                                                                     The cost to produce 1kl of water is Rs 5.86.
Evaluation of PURA project under PPP model
                                                                     The Project is for a period of 16 years and it’s
Investment Structure                                                  feasible only if it’s for 16 years and above.

The investment structure defined for the PPP – PURA
model includes:
                                                               Assumptions for the water projects include:
Gram Panchayat: The Gram Panchyat finances the
projects up to 55% through the MoRD funding.                         A village cluster with a minimum population
                                                                      size of 25,000 and above would be viable for
Government Grant: The central government has the
                                                                      setting up a water project and then scaling it
option of funding up to 35 % of the project cost through
                                                                      based on the development and rise in
grant route, initially the capital cost of the project would
                                                                      population of that particular village cluster.
be assessed and evaluated that can help in identifying
                                                                     The total project life considered is 20 years
the right viability gap funding of the project. Projects
                                                                      with the BOT model and thereafter extension
have been initiated with the objective of sustainability
                                                                      of the project
and efficiency.
                                                                     Private Player brings in 20% of the total
Private Funding: The private players will fund the                    investments and the remaining is funded
projects up to 20% of the project cost, which can come                through Gram Panchayats and Government
in the form of Debt and Equity mix                                    grants.

The project cost for a village cluster is estimated at Rs 9,   Private player will operate and manage the plant if
60,000 to serve a village population of 40,000 and scale       required would even also take up the billing of the
it up with rise in population every year.                      services, the private player in return would be
                                                               contributed with a management fee, which will
                                                               funded from internal accruals through the revenues
                                                               earned from the project, the management fee would
                                                               be 1% of the total revenues earned for the particular
                                                               financial year.

                                                               Based on the above information water PPP project has
Scenario2
Based on the above information water PPP project has                                       When the combination of commercial, household
been evaluated on the investment structure and viability
                                                                                            and stand post connections are changed to 10%,
gap funding required in a water PPP project.
                                                                                            40% and 50%.
Projects analysis
                                                                                   Discount Rate       9%
The total project cost is estimated at Rs 12 crore, Rs 3000                                                                   16
per person is considered as the infrastructure cost for the                        Project NPV     25years   121,212,895.42   years    (7,220,994)

project for a population of 40,000 – 50,000 users of the
service. The assumptions considered requires a minimum
population of 40,000 – 50,000 for the project to be viable,                        Project IRR                      15.69%
                                                                                                                              10
the village cluster considered is Shakthi PURA established                                                                    years   (49,419,336)
PURA complex near Pollachi Tamil Nadu. The total annual
capacity of water generation is estimated 25, 00,000 kilo                         Sustainability analysis
liters which is based 120 liters per house hold. Cost per                         Groundwater used for freshwater drinking supplies can be
kilo liter is estimated at Rs 5.82 and the tariff is fixed at Rs                  easily overexploited by other competing users like
6.50 per kilo liter. The total annual revenue for water PPP                       irrigation, industry, etc. When this happens it can become
project is estimated at Rs 65 lakh per annum and annual                           contaminated with salt water, fluoride or other geogenic
increase in capacity with the rise in demand.                                     contaminants which makes it unsuitable for use. Water
                                                                                  available in rivers and lakes is sometimes polluted, making
For a Population of 40000, Commercial-10%,Household-                              it harmful to plants, animals and people. Sustainability and
                                                                                  safe sanitation practices are the forerunner for safe
30%,Standpost-60% combination, the NPV and IRR for 25                             drinking water supply.
and 16 years.
                                                                                  Source Sustainability = Ensuring availability of safe
    Discount Rate               9%                                                drinking water in adequate quantity throughout the year.
                                                          16
    Project NPV             25years     103,997,187.26    years       2,788,096   System Sustainability = Optimizing the cost of production
                                                          IRR            6.20%
                                                                                  of water, devising proper protocol for O&M, building
                                                                                  capacity etc.
    Project IRR                                17.13%
                                                          10
                                                          years    (29,452,796)
                                                                                  Financial Sustainability = Proper utilization of Finance
                                                                                  Commission and O&M funds under PURA guidelines and
                                                                                  recovering at least 50% cost through flexible methods
                         IRR
                         (16                                                      devised by the local self government and improving energy
    Equity IRR           yrs)                                                     efficiency.

                                                                                  Social and environmental Sustainability Proper reject
Scenario1                                                                         management and involvement of all key stakeholders
           When the Population is further increased to 60000
The NPV and IRR are as follows                                                    Risks associated with PURA projects

 Discount                                                                         The business risks associated for a PURA project is in
 Rate               9%                                                            identification of right investments structure which can de-
 Project
                                                                                  risk the private players and only play an operation and
 NPV          25years       158,195,671.36     16 years           5,967,032
                                                                                  capacity handling role. From the gram panchayats
                                                                      6.50%       implementing projects on time would be important and
 Project                                                                          needs to follow the stipulated project timelines else will
 IRR                                  17.27%
                                                                                  lead to increase in total project cost.
                                               10 years         (42,849,931)
Investor’s risks: Project funding, business risks and project
                                                                   The viability gap funding would help increase the
completion risk are the three broad risks faced by an investor
                                                                   sustainability and profit earning capacity of the
in a PURA project.
                                                                   project. The viability funding needs to be funded
Project Funding: Identification of the right capital               in phases based on project milestones achieved,
investments in the allotted projects would be crucial as this      incentives needs to be provided for projects
will have a direct impact on the return on investments,            completed before scheduled timeliness.
investor’s funding structure (Debt: Equity) would also impact
                                                                   Other changes required
the return on investments, lower leverage would give private
players with better opportunity to increase profit margins and     Community participation in such projects needs
higher leverage a ideal investments may lead decrease in the       to be encouraged among the locals. As
opportunity to increase revenues.                                  community participation can increase the sense
                                                                   of responsibility among the locals. A initial
Business Risk: Includes risk of delay in completion and delay
                                                                   installation fee needs to collected from every
in dispatch of funds from the government. Lack of local
                                                                   household which also contributes to the initial
people capacity to pay the monthly bills / bad debts due to
                                                                   operational requirement / working capital
which are the other business risks faced by the investors.
                                                                   requirements of the projects. The left out
Disputes in land acquisition prior to project inception / after
                                                                   collection can be invested in government based
project completion would be detrimental.
                                                                   projects.
Project Completion risk: Private Player with capability of
                                                                   Recommendations
completing project would play a crucial role as increase in the
timeliness would increase the cost of the project. For which       Based on the above analysis the following aspects
the centre and the gram panchayats have to work on hand in         are recommended for the PURA water project.
hand to deliver projects on time
                                                                         Water PPP projects needs to given
Project Implications                                                      priority under PURA scheme as it is the
                                                                          minimum and basic infrastructure
The total project life needs to be considered for a period of 15
                                                                          amenities required in rural areas.
years and extended thereafter. The total minimum
                                                                         A viability gap funding up to 25% is
population required would be 40,000 for the project to be
                                                                          estimated for water projects
viable and sustainable. With the rise in population expected a
                                                                         The water can be supplied for both
higher capacity of plant needs to be considered initially which
                                                                          commercial and residential purpose.
can stem up operations in the later years. The project IRR is
                                                                         Up to 3 standpost connection can be
estimated at 16% and Equity IRR is estimated at 13%
                                                                          considered per street.
Viability GAP Funding                                                    The project life of water PPP projects
                                                                          under PURA scheme needs to extend
The viability gap funding is not clear for the water PPP project
                                                                          from 10 years to 15 years based on the
and viability gap funding needs to be considered for the water
                                                                          scale of operations.
project, which is estimated at 25% of the project cost.
                                                                         A minimum population of 40,000 is
                                                                          required for the project to be viable and
                                                                          operating lower levels may not be
                                                                          feasible.
Table 1: Project Cost

                                                                                                                                     Final
     Particulars                      Sub head 1             Sub head 2                                          Rs in million
                                                                                                                                 Assumptions
     Population                                                                                                                       40000
     Projected population 2001                                                                                                        46400
     Rate of population growth per
                                     %             16                                                       Equity               10%
     decade
     Demand assessment per day       Ltrs                                                                   Govt. grant          35%
     Mode of supply                                                                                         GP                   55%
                                                                                                                                 100%
                                                   Commercial Connection         10            %                                 4000
                                                   House hold share of
                                     1                                           30            %                                 12000
                                                   connection
                                     2             Stand post connection share   60            %                                 24000
                                                   Demand per house hold                                    Litres per capita
                                                                                 87.5          LPCD                              1050000
                                                   connection                                               per day
                                                   Demand per stand post                                    Litres per capita
                                                                                 75            LPCD                              1800000
                                                   connection                                               per day
                                                                                 150                                             600000
                                                   Cost per house hold
                                                                                                                                 24000000
                                                   connections
                                                   Cost per person               2000                                            24000000
                                                   Cost per stand post           1000                                            8000000
                                                   Commercial Connection         15            Rs
                                                   Total cost of project                                                         56000000

                                                   Depreciation                                                                  5%
     Consumption per house hold      Ltrs



     Consumtion per person           Ltrs          70
     Total consumption per day
                                     Ltrs          87.5
     including all wastages


     Operations and Maintenance
     Cost


     Establishment charges           140000                                                                                      140000
                                                                                               conversion
     Electricity charges             HP            hrs of operations             No. of days                tariff per unit
                                                                                               rate
     Raw Water Rising Main           163           16                            365           0.746        2123862

                                     163           16                            365           0.746        2123862

                                                                                                            4247724

     Rentals                         0.878         142.675

                                     0.878         142.675
                                                   285.35                                                   171210

     Total Power cost                                                                                       4418934              4418934
Table 1: Project Cost Contd

     Repairs & Maintenance                 0.30%                                   168000         2016000          2016000

                                           Escalation        1.50%

     Consumables                                                                                                   247440

     Escalation of Tariff annually         10%                                                                     560000

     Recharge Cost

     Total cost of operations                                                                                      7382374

                                                                                                                   7382374000

                                                                                                  litres per day   3,450,000

                                                                                                                   1259250000
                                                                                   Levellised
     Cost per kilo litre                                                                          Rs               5.86
                                                                                   cost
                                                                                   Tariff
                                                             Assumed tariff                       Rs               6
                                                                                   domestic
                                                                                   Tariff stand
                                                                                                  Rs               35           4800
                                                                                   post
                                                             Escalation                           %                1.60%




       This report is based on internship projects of Swati & Meghana Paul under the guidance of Browne & Mohan
       Consultants




 Browne & Mohan insight are general in nature and does not represent any
 specific individuals or entities. While all efforts are made to ensure the
 information and status of entities in the insights is accurate, there can be no
 guarantee for freshness of information. Browne & Mohan insights are for
 information and knowledge update purpose only. Information contained in the
 report has been obtained from sources deemed reliable and no representation
 is made as to the accuracy thereof. Neither Browne & Mohan nor its affiliates,
                                                                                      © Browne & Mohan, 2011. All rights reserved
 officers, directors, employees, owners, representatives nor any of its data or
 content providers shall be liable for any errors or for any actions taken in
 reliance thereon.                                                                    Printed in India

Contenu connexe

En vedette

Family business transformation
Family business transformationFamily business transformation
Family business transformationBrowne & Mohan
 
Gaining Buy-in Commitment in Organization
Gaining Buy-in Commitment in OrganizationGaining Buy-in Commitment in Organization
Gaining Buy-in Commitment in OrganizationBrowne & Mohan
 
India prison reforms 2020 & State Industry Jail Board
India prison reforms 2020 & State Industry Jail Board India prison reforms 2020 & State Industry Jail Board
India prison reforms 2020 & State Industry Jail Board Browne & Mohan
 
Managing Your Company In Lean Times
Managing Your Company In Lean TimesManaging Your Company In Lean Times
Managing Your Company In Lean TimesBrowne & Mohan
 
Rewards & recognition alignment with Life-cycle of Employees
Rewards & recognition alignment with Life-cycle of EmployeesRewards & recognition alignment with Life-cycle of Employees
Rewards & recognition alignment with Life-cycle of EmployeesBrowne & Mohan
 
Unleashing growth in trading companies
Unleashing growth in trading companiesUnleashing growth in trading companies
Unleashing growth in trading companiesBrowne & Mohan
 
Stratgic imitation-Road to business growth
Stratgic imitation-Road to business growthStratgic imitation-Road to business growth
Stratgic imitation-Road to business growthBrowne & Mohan
 
Place where you would love to work!
Place where you would love to work!Place where you would love to work!
Place where you would love to work!Browne & Mohan
 
Resuscitating a stale service brand
Resuscitating a stale service brandResuscitating a stale service brand
Resuscitating a stale service brandBrowne & Mohan
 
Successful lateral transfers: Insights from Srishti Software Pvt Ltd
Successful lateral transfers: Insights from Srishti Software Pvt LtdSuccessful lateral transfers: Insights from Srishti Software Pvt Ltd
Successful lateral transfers: Insights from Srishti Software Pvt LtdBrowne & Mohan
 
Delivering outcome based Business Transformation
Delivering outcome based Business TransformationDelivering outcome based Business Transformation
Delivering outcome based Business TransformationBrowne & Mohan
 
Mpower: An action-learning approach to leadership development in SMB companies
Mpower: An action-learning approach to leadership development in SMB companiesMpower: An action-learning approach to leadership development in SMB companies
Mpower: An action-learning approach to leadership development in SMB companiesBrowne & Mohan
 
Building an outcome driven high ownership company
Building an outcome driven high ownership companyBuilding an outcome driven high ownership company
Building an outcome driven high ownership companyBrowne & Mohan
 
Business transformation - Building the company to Sell
Business transformation - Building the company to SellBusiness transformation - Building the company to Sell
Business transformation - Building the company to SellBrowne & Mohan
 
Transforming UAE family business
Transforming UAE family businessTransforming UAE family business
Transforming UAE family businessBrowne & Mohan
 
A Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countriesA Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countriesBrowne & Mohan
 
Governance mechanisms that work in a family business
Governance mechanisms that work in a family businessGovernance mechanisms that work in a family business
Governance mechanisms that work in a family businessBrowne & Mohan
 
The road to sales transformation
The road to sales transformationThe road to sales transformation
The road to sales transformationBrowne & Mohan
 
Align HR with Evolution of Company: An SME Perspective
Align HR with Evolution of Company: An SME PerspectiveAlign HR with Evolution of Company: An SME Perspective
Align HR with Evolution of Company: An SME PerspectiveBrowne & Mohan
 

En vedette (19)

Family business transformation
Family business transformationFamily business transformation
Family business transformation
 
Gaining Buy-in Commitment in Organization
Gaining Buy-in Commitment in OrganizationGaining Buy-in Commitment in Organization
Gaining Buy-in Commitment in Organization
 
India prison reforms 2020 & State Industry Jail Board
India prison reforms 2020 & State Industry Jail Board India prison reforms 2020 & State Industry Jail Board
India prison reforms 2020 & State Industry Jail Board
 
Managing Your Company In Lean Times
Managing Your Company In Lean TimesManaging Your Company In Lean Times
Managing Your Company In Lean Times
 
Rewards & recognition alignment with Life-cycle of Employees
Rewards & recognition alignment with Life-cycle of EmployeesRewards & recognition alignment with Life-cycle of Employees
Rewards & recognition alignment with Life-cycle of Employees
 
Unleashing growth in trading companies
Unleashing growth in trading companiesUnleashing growth in trading companies
Unleashing growth in trading companies
 
Stratgic imitation-Road to business growth
Stratgic imitation-Road to business growthStratgic imitation-Road to business growth
Stratgic imitation-Road to business growth
 
Place where you would love to work!
Place where you would love to work!Place where you would love to work!
Place where you would love to work!
 
Resuscitating a stale service brand
Resuscitating a stale service brandResuscitating a stale service brand
Resuscitating a stale service brand
 
Successful lateral transfers: Insights from Srishti Software Pvt Ltd
Successful lateral transfers: Insights from Srishti Software Pvt LtdSuccessful lateral transfers: Insights from Srishti Software Pvt Ltd
Successful lateral transfers: Insights from Srishti Software Pvt Ltd
 
Delivering outcome based Business Transformation
Delivering outcome based Business TransformationDelivering outcome based Business Transformation
Delivering outcome based Business Transformation
 
Mpower: An action-learning approach to leadership development in SMB companies
Mpower: An action-learning approach to leadership development in SMB companiesMpower: An action-learning approach to leadership development in SMB companies
Mpower: An action-learning approach to leadership development in SMB companies
 
Building an outcome driven high ownership company
Building an outcome driven high ownership companyBuilding an outcome driven high ownership company
Building an outcome driven high ownership company
 
Business transformation - Building the company to Sell
Business transformation - Building the company to SellBusiness transformation - Building the company to Sell
Business transformation - Building the company to Sell
 
Transforming UAE family business
Transforming UAE family businessTransforming UAE family business
Transforming UAE family business
 
A Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countriesA Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countries
 
Governance mechanisms that work in a family business
Governance mechanisms that work in a family businessGovernance mechanisms that work in a family business
Governance mechanisms that work in a family business
 
The road to sales transformation
The road to sales transformationThe road to sales transformation
The road to sales transformation
 
Align HR with Evolution of Company: An SME Perspective
Align HR with Evolution of Company: An SME PerspectiveAlign HR with Evolution of Company: An SME Perspective
Align HR with Evolution of Company: An SME Perspective
 

Similaire à Assessment of pura rural water scheme

Municipal Finances in India and Alternative Sources of Municipal Finance
Municipal Finances in India and Alternative Sources of Municipal FinanceMunicipal Finances in India and Alternative Sources of Municipal Finance
Municipal Finances in India and Alternative Sources of Municipal FinanceRavikant Joshi
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...sonalidalal4
 
Manual on community participation in government procurement.pptx
Manual on community participation in government procurement.pptxManual on community participation in government procurement.pptx
Manual on community participation in government procurement.pptxalvicroda2
 
Pooled Finance Development Fund
Pooled Finance Development FundPooled Finance Development Fund
Pooled Finance Development FundPrasad Thanthratey
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)zubeditufail
 
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...Medhavi Sharma
 
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of BhopalIRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of BhopalIRJET Journal
 
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
IRJET- Challenges in the Implementation of Smart City Projects in BhopalIRJET- Challenges in the Implementation of Smart City Projects in Bhopal
IRJET- Challenges in the Implementation of Smart City Projects in BhopalIRJET Journal
 
Bhopal smart city (an initiative toward the well being of society)
Bhopal smart city (an initiative toward the well being of society)Bhopal smart city (an initiative toward the well being of society)
Bhopal smart city (an initiative toward the well being of society)nanucaaspirant
 
Thesis - Urban Infrastructure Development
Thesis - Urban Infrastructure DevelopmentThesis - Urban Infrastructure Development
Thesis - Urban Infrastructure DevelopmentRakesh Sasapu
 

Similaire à Assessment of pura rural water scheme (20)

Pura presentation
Pura presentationPura presentation
Pura presentation
 
Municipal Finances in India and Alternative Sources of Municipal Finance
Municipal Finances in India and Alternative Sources of Municipal FinanceMunicipal Finances in India and Alternative Sources of Municipal Finance
Municipal Finances in India and Alternative Sources of Municipal Finance
 
PURA STATUS
PURA STATUSPURA STATUS
PURA STATUS
 
Kuidfc
KuidfcKuidfc
Kuidfc
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...
 
Manual on community participation in government procurement.pptx
Manual on community participation in government procurement.pptxManual on community participation in government procurement.pptx
Manual on community participation in government procurement.pptx
 
Pooled Finance Development Fund
Pooled Finance Development FundPooled Finance Development Fund
Pooled Finance Development Fund
 
ENHANCING THE QUALITY OF URBAN INFRASTRUCTURE INVESTMENTS
ENHANCING THE QUALITY OF URBAN INFRASTRUCTURE INVESTMENTSENHANCING THE QUALITY OF URBAN INFRASTRUCTURE INVESTMENTS
ENHANCING THE QUALITY OF URBAN INFRASTRUCTURE INVESTMENTS
 
Smart Cities (India)
Smart Cities (India)Smart Cities (India)
Smart Cities (India)
 
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
Resettlement Policy Framework - Karachi Neighborhood Improvement Project (KNIP)
 
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
FICCI Water Mission-2030 WRG - White Paper - Urban Waste Water PPPs - FINAL P...
 
Pura scheme
Pura schemePura scheme
Pura scheme
 
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of BhopalIRJET- Analysis of Affordable Urban Housing Projects of Bhopal
IRJET- Analysis of Affordable Urban Housing Projects of Bhopal
 
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
IRJET- Challenges in the Implementation of Smart City Projects in BhopalIRJET- Challenges in the Implementation of Smart City Projects in Bhopal
IRJET- Challenges in the Implementation of Smart City Projects in Bhopal
 
TeenTitans1
TeenTitans1TeenTitans1
TeenTitans1
 
Harbingers
HarbingersHarbingers
Harbingers
 
Bhopal smart city (an initiative toward the well being of society)
Bhopal smart city (an initiative toward the well being of society)Bhopal smart city (an initiative toward the well being of society)
Bhopal smart city (an initiative toward the well being of society)
 
Thesis - Urban Infrastructure Development
Thesis - Urban Infrastructure DevelopmentThesis - Urban Infrastructure Development
Thesis - Urban Infrastructure Development
 
SGGSCC1993
SGGSCC1993SGGSCC1993
SGGSCC1993
 
Reserch Proposal
Reserch Proposal Reserch Proposal
Reserch Proposal
 

Plus de Browne & Mohan

Rewiring HR for WFH, Hybrid work & Future of work
Rewiring HR for WFH, Hybrid work & Future of workRewiring HR for WFH, Hybrid work & Future of work
Rewiring HR for WFH, Hybrid work & Future of workBrowne & Mohan
 
Building resilient family business
Building resilient family businessBuilding resilient family business
Building resilient family businessBrowne & Mohan
 
Internal controls maturity and SME corporate governanance
Internal controls maturity and SME corporate governananceInternal controls maturity and SME corporate governanance
Internal controls maturity and SME corporate governananceBrowne & Mohan
 
How to transform a family business: insights from the trenches
How to transform a family business: insights from the trenches How to transform a family business: insights from the trenches
How to transform a family business: insights from the trenches Browne & Mohan
 
How to build and grow AI startups
How to build and grow AI  startupsHow to build and grow AI  startups
How to build and grow AI startupsBrowne & Mohan
 
A sumpsimus approach to Skill India
A sumpsimus approach to Skill IndiaA sumpsimus approach to Skill India
A sumpsimus approach to Skill IndiaBrowne & Mohan
 
No branding principles
No branding principlesNo branding principles
No branding principlesBrowne & Mohan
 
Making marketing work!
Making marketing work!Making marketing work!
Making marketing work!Browne & Mohan
 
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?Browne & Mohan
 
Happy Juice principles: How to create a marketing organization that informs a...
Happy Juice principles: How to create a marketing organization that informs a...Happy Juice principles: How to create a marketing organization that informs a...
Happy Juice principles: How to create a marketing organization that informs a...Browne & Mohan
 
Building a strong sales operation centre
Building a strong sales operation centreBuilding a strong sales operation centre
Building a strong sales operation centreBrowne & Mohan
 
Internal branding: have you got it right?
Internal branding: have you got it right?Internal branding: have you got it right?
Internal branding: have you got it right?Browne & Mohan
 
Rewiring marketing: a practice based approach
Rewiring marketing: a practice based approachRewiring marketing: a practice based approach
Rewiring marketing: a practice based approachBrowne & Mohan
 
Influence marketing: dynamics of influencer-brand engagement
Influence marketing: dynamics of influencer-brand engagement Influence marketing: dynamics of influencer-brand engagement
Influence marketing: dynamics of influencer-brand engagement Browne & Mohan
 
Rewiring sales organization for growth and scale
Rewiring sales organization for growth and scaleRewiring sales organization for growth and scale
Rewiring sales organization for growth and scaleBrowne & Mohan
 
Aftermarket audit to Gain Competitive leadership
Aftermarket audit to Gain Competitive leadership Aftermarket audit to Gain Competitive leadership
Aftermarket audit to Gain Competitive leadership Browne & Mohan
 
How to conduct an Aftermarket audit
How to conduct an Aftermarket auditHow to conduct an Aftermarket audit
How to conduct an Aftermarket auditBrowne & Mohan
 
Sales casualty analysis: why sales numbers do not happen and what to do to ge...
Sales casualty analysis: why sales numbers do not happen and what to do to ge...Sales casualty analysis: why sales numbers do not happen and what to do to ge...
Sales casualty analysis: why sales numbers do not happen and what to do to ge...Browne & Mohan
 
Performance measurement system for startups and scaling up
Performance measurement system for startups and scaling upPerformance measurement system for startups and scaling up
Performance measurement system for startups and scaling upBrowne & Mohan
 

Plus de Browne & Mohan (20)

Rewiring HR for WFH, Hybrid work & Future of work
Rewiring HR for WFH, Hybrid work & Future of workRewiring HR for WFH, Hybrid work & Future of work
Rewiring HR for WFH, Hybrid work & Future of work
 
Building resilient family business
Building resilient family businessBuilding resilient family business
Building resilient family business
 
Internal controls maturity and SME corporate governanance
Internal controls maturity and SME corporate governananceInternal controls maturity and SME corporate governanance
Internal controls maturity and SME corporate governanance
 
How to transform a family business: insights from the trenches
How to transform a family business: insights from the trenches How to transform a family business: insights from the trenches
How to transform a family business: insights from the trenches
 
How to build and grow AI startups
How to build and grow AI  startupsHow to build and grow AI  startups
How to build and grow AI startups
 
A sumpsimus approach to Skill India
A sumpsimus approach to Skill IndiaA sumpsimus approach to Skill India
A sumpsimus approach to Skill India
 
No branding principles
No branding principlesNo branding principles
No branding principles
 
Common hero Branding
Common hero BrandingCommon hero Branding
Common hero Branding
 
Making marketing work!
Making marketing work!Making marketing work!
Making marketing work!
 
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
Is lack of SEDEX/ WRAP/SA 8000 certification hurting your business?
 
Happy Juice principles: How to create a marketing organization that informs a...
Happy Juice principles: How to create a marketing organization that informs a...Happy Juice principles: How to create a marketing organization that informs a...
Happy Juice principles: How to create a marketing organization that informs a...
 
Building a strong sales operation centre
Building a strong sales operation centreBuilding a strong sales operation centre
Building a strong sales operation centre
 
Internal branding: have you got it right?
Internal branding: have you got it right?Internal branding: have you got it right?
Internal branding: have you got it right?
 
Rewiring marketing: a practice based approach
Rewiring marketing: a practice based approachRewiring marketing: a practice based approach
Rewiring marketing: a practice based approach
 
Influence marketing: dynamics of influencer-brand engagement
Influence marketing: dynamics of influencer-brand engagement Influence marketing: dynamics of influencer-brand engagement
Influence marketing: dynamics of influencer-brand engagement
 
Rewiring sales organization for growth and scale
Rewiring sales organization for growth and scaleRewiring sales organization for growth and scale
Rewiring sales organization for growth and scale
 
Aftermarket audit to Gain Competitive leadership
Aftermarket audit to Gain Competitive leadership Aftermarket audit to Gain Competitive leadership
Aftermarket audit to Gain Competitive leadership
 
How to conduct an Aftermarket audit
How to conduct an Aftermarket auditHow to conduct an Aftermarket audit
How to conduct an Aftermarket audit
 
Sales casualty analysis: why sales numbers do not happen and what to do to ge...
Sales casualty analysis: why sales numbers do not happen and what to do to ge...Sales casualty analysis: why sales numbers do not happen and what to do to ge...
Sales casualty analysis: why sales numbers do not happen and what to do to ge...
 
Performance measurement system for startups and scaling up
Performance measurement system for startups and scaling upPerformance measurement system for startups and scaling up
Performance measurement system for startups and scaling up
 

Dernier

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 

Dernier (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 

Assessment of pura rural water scheme

  • 1. Rural Water Projects under PURA Scheme: An Assessment
  • 2. Background Center: only brings in the viability gap investments of the projects and would invest upto 35% of the project. Rural infrastructure would be the next driving force of infrastructure sector, with the stage set for bringing about Private Player: will professionally manage and in return urbanized transformation in rural areas followed by strong would be availing the management fee and return on policy initiatives by the government for rural development, investments based on revenue generated. Invests investments in rural infrastructure projects would emerge has establishes and operates add-on projects to increase the the most sought after investments in coming years. The revenue capabilities of the private players. current PURA scheme is one of the suitable models for The envisaged PURA scheme needs to be developed in bringing urban amenities in rural areas, PURA scheme which was initially started has pilot projects in 2009-10, has those areas / location with requires those amenities that undergone structural changes, which now has better can be achieved through clustering. The location of PURA implementation mechanism and incentives structure. The projects should enable growth of the peripheral rural scheme also has given more priority towards the livelihood areas rather just having small scale infrastructure which amenities that is required for hosting better infrastructure only provides mere linkages. The PURA pilot projects services rather focusing more towards connectivity. A wide were mostly skewed towards road and connectivity spread transformation in the infrastructure dynamics which infrastructure, which has lead to less priority in livelihood can attract business activities and attract investments which amenities such as water, local market creation, can help in urbanizing rural areas and decreasing stress on communication services, establishment of training institute’s educational centers, and housing facilities. The urban cities. focus is now towards creating those infrastructure Private participation in rural infrastructure projects are amenities which will enable livelihood amenities that can considered to be the key for making rural projects viable and help drive the growth of rural areas. To make projects manageable and player with local knowledge and local viable private participation is important with private experience in conducting rural infrastructure projects are players given the wide showcase of opportunities in other preferred in the case of PURA scheme. The PURA scheme has revenue generating opportunities PURA will make private been considered more has a community based projects major investments attractive and business driven. funding from gram panchayats and the center. The uniqueness of the scheme is roping in the private players and Village cluster study having them participate in Add- on projects which can yield Shakthi group of companies under the helm of the desired revenues and achieving both the goals of having a Dr.N.Mahalingam an educationalist, philanthropist private player and urbanized quality infrastructure in the rural areas. and industrialist hails from Pollachi 40 Kms away from Coimbatore. An array of educational PURA and PPP models institutions under the banner NIA Educational The current PURA model which has been reframed from the Institutions is a part of Sakthi Group providing learning’s of the pilot projects has become more flexible for yeoman service to the society. Sakthi Group of private participation. The investment structure considered for Companies and NIA Educational Institutions in the PURA project includes gram panchayats, government Pollachi has undertaken the mission of fullfilling the funding and private players. dreams of the President of India, His Excellency Dr.A.P.J.Abdul Kalam in Providing Urban Amenities in The Capital structure considered includes a investment upto and around the Rural Areas of Pollachi through 50 % from Gram Panchayats, 20% through private players the Physical Connectivity, Electronic Connectivity, remaining from the central government funding post viability gap assessment. Knowledge Connectivity and Economic Connectivity. Gram Panchayats: invests and monitor the facility, an Shakthi PURA was established with objective of independent engineer is appointed who reports the activities creating community based rural development of the project. The revenue billing would be collected by the projects. Gram Panchayats.
  • 3. The Shakthi group has mapped out four village clusters around the Pollachi district, the village cluster considered for the Kanjampatti, Samathur, Negamam, Project details: Kovilpayam. The villages lack the basic necessity. The village cluster taken up by Shakthi PURA for the  This plan supplies 3450000Litres per day. accelerated development of the village clusters includes:  Total Project cost is Rs 96000000. 1. Kanjampatti :  The population considered for this plan is 2. Samathur 40000. 3. Negamam  The debt equity ratio being 70:30 this is for 4. Kovilpalayam the Pvt. Player.  The model has considered 10:30:60 ratios for The above villager clusters come within the vicinity of commercial, household and stands post Pollachi district; the project proposed has not connections. considered any water projects / has any proposed water  The Tariff considered for commercial and project to be implemented in the village cluster. As domestic is Rs15 & Rs 6 per KL. water infrastructure is a part of the PURA scheme we propose a water project would have a greater impact in  The households that use stand posts will have to pay Rs35 per month. the development of the Shakthi village cluster.  The cost to produce 1kl of water is Rs 5.86. Evaluation of PURA project under PPP model  The Project is for a period of 16 years and it’s Investment Structure feasible only if it’s for 16 years and above. The investment structure defined for the PPP – PURA model includes: Assumptions for the water projects include: Gram Panchayat: The Gram Panchyat finances the projects up to 55% through the MoRD funding.  A village cluster with a minimum population size of 25,000 and above would be viable for Government Grant: The central government has the setting up a water project and then scaling it option of funding up to 35 % of the project cost through based on the development and rise in grant route, initially the capital cost of the project would population of that particular village cluster. be assessed and evaluated that can help in identifying  The total project life considered is 20 years the right viability gap funding of the project. Projects with the BOT model and thereafter extension have been initiated with the objective of sustainability of the project and efficiency.  Private Player brings in 20% of the total Private Funding: The private players will fund the investments and the remaining is funded projects up to 20% of the project cost, which can come through Gram Panchayats and Government in the form of Debt and Equity mix grants. The project cost for a village cluster is estimated at Rs 9, Private player will operate and manage the plant if 60,000 to serve a village population of 40,000 and scale required would even also take up the billing of the it up with rise in population every year. services, the private player in return would be contributed with a management fee, which will funded from internal accruals through the revenues earned from the project, the management fee would be 1% of the total revenues earned for the particular financial year. Based on the above information water PPP project has
  • 4. Scenario2 Based on the above information water PPP project has  When the combination of commercial, household been evaluated on the investment structure and viability and stand post connections are changed to 10%, gap funding required in a water PPP project. 40% and 50%. Projects analysis Discount Rate 9% The total project cost is estimated at Rs 12 crore, Rs 3000 16 per person is considered as the infrastructure cost for the Project NPV 25years 121,212,895.42 years (7,220,994) project for a population of 40,000 – 50,000 users of the service. The assumptions considered requires a minimum population of 40,000 – 50,000 for the project to be viable, Project IRR 15.69% 10 the village cluster considered is Shakthi PURA established years (49,419,336) PURA complex near Pollachi Tamil Nadu. The total annual capacity of water generation is estimated 25, 00,000 kilo Sustainability analysis liters which is based 120 liters per house hold. Cost per Groundwater used for freshwater drinking supplies can be kilo liter is estimated at Rs 5.82 and the tariff is fixed at Rs easily overexploited by other competing users like 6.50 per kilo liter. The total annual revenue for water PPP irrigation, industry, etc. When this happens it can become project is estimated at Rs 65 lakh per annum and annual contaminated with salt water, fluoride or other geogenic increase in capacity with the rise in demand. contaminants which makes it unsuitable for use. Water available in rivers and lakes is sometimes polluted, making For a Population of 40000, Commercial-10%,Household- it harmful to plants, animals and people. Sustainability and safe sanitation practices are the forerunner for safe 30%,Standpost-60% combination, the NPV and IRR for 25 drinking water supply. and 16 years. Source Sustainability = Ensuring availability of safe Discount Rate 9% drinking water in adequate quantity throughout the year. 16 Project NPV 25years 103,997,187.26 years 2,788,096 System Sustainability = Optimizing the cost of production IRR 6.20% of water, devising proper protocol for O&M, building capacity etc. Project IRR 17.13% 10 years (29,452,796) Financial Sustainability = Proper utilization of Finance Commission and O&M funds under PURA guidelines and recovering at least 50% cost through flexible methods IRR (16 devised by the local self government and improving energy Equity IRR yrs) efficiency. Social and environmental Sustainability Proper reject Scenario1 management and involvement of all key stakeholders  When the Population is further increased to 60000 The NPV and IRR are as follows Risks associated with PURA projects Discount The business risks associated for a PURA project is in Rate 9% identification of right investments structure which can de- Project risk the private players and only play an operation and NPV 25years 158,195,671.36 16 years 5,967,032 capacity handling role. From the gram panchayats 6.50% implementing projects on time would be important and Project needs to follow the stipulated project timelines else will IRR 17.27% lead to increase in total project cost. 10 years (42,849,931)
  • 5. Investor’s risks: Project funding, business risks and project The viability gap funding would help increase the completion risk are the three broad risks faced by an investor sustainability and profit earning capacity of the in a PURA project. project. The viability funding needs to be funded Project Funding: Identification of the right capital in phases based on project milestones achieved, investments in the allotted projects would be crucial as this incentives needs to be provided for projects will have a direct impact on the return on investments, completed before scheduled timeliness. investor’s funding structure (Debt: Equity) would also impact Other changes required the return on investments, lower leverage would give private players with better opportunity to increase profit margins and Community participation in such projects needs higher leverage a ideal investments may lead decrease in the to be encouraged among the locals. As opportunity to increase revenues. community participation can increase the sense of responsibility among the locals. A initial Business Risk: Includes risk of delay in completion and delay installation fee needs to collected from every in dispatch of funds from the government. Lack of local household which also contributes to the initial people capacity to pay the monthly bills / bad debts due to operational requirement / working capital which are the other business risks faced by the investors. requirements of the projects. The left out Disputes in land acquisition prior to project inception / after collection can be invested in government based project completion would be detrimental. projects. Project Completion risk: Private Player with capability of Recommendations completing project would play a crucial role as increase in the timeliness would increase the cost of the project. For which Based on the above analysis the following aspects the centre and the gram panchayats have to work on hand in are recommended for the PURA water project. hand to deliver projects on time  Water PPP projects needs to given Project Implications priority under PURA scheme as it is the minimum and basic infrastructure The total project life needs to be considered for a period of 15 amenities required in rural areas. years and extended thereafter. The total minimum  A viability gap funding up to 25% is population required would be 40,000 for the project to be estimated for water projects viable and sustainable. With the rise in population expected a  The water can be supplied for both higher capacity of plant needs to be considered initially which commercial and residential purpose. can stem up operations in the later years. The project IRR is  Up to 3 standpost connection can be estimated at 16% and Equity IRR is estimated at 13% considered per street. Viability GAP Funding  The project life of water PPP projects under PURA scheme needs to extend The viability gap funding is not clear for the water PPP project from 10 years to 15 years based on the and viability gap funding needs to be considered for the water scale of operations. project, which is estimated at 25% of the project cost.  A minimum population of 40,000 is required for the project to be viable and operating lower levels may not be feasible.
  • 6. Table 1: Project Cost Final Particulars Sub head 1 Sub head 2 Rs in million Assumptions Population 40000 Projected population 2001 46400 Rate of population growth per % 16 Equity 10% decade Demand assessment per day Ltrs Govt. grant 35% Mode of supply GP 55% 100% Commercial Connection 10 % 4000 House hold share of 1 30 % 12000 connection 2 Stand post connection share 60 % 24000 Demand per house hold Litres per capita 87.5 LPCD 1050000 connection per day Demand per stand post Litres per capita 75 LPCD 1800000 connection per day 150 600000 Cost per house hold 24000000 connections Cost per person 2000 24000000 Cost per stand post 1000 8000000 Commercial Connection 15 Rs Total cost of project 56000000 Depreciation 5% Consumption per house hold Ltrs Consumtion per person Ltrs 70 Total consumption per day Ltrs 87.5 including all wastages Operations and Maintenance Cost Establishment charges 140000 140000 conversion Electricity charges HP hrs of operations No. of days tariff per unit rate Raw Water Rising Main 163 16 365 0.746 2123862 163 16 365 0.746 2123862 4247724 Rentals 0.878 142.675 0.878 142.675 285.35 171210 Total Power cost 4418934 4418934
  • 7. Table 1: Project Cost Contd Repairs & Maintenance 0.30% 168000 2016000 2016000 Escalation 1.50% Consumables 247440 Escalation of Tariff annually 10% 560000 Recharge Cost Total cost of operations 7382374 7382374000 litres per day 3,450,000 1259250000 Levellised Cost per kilo litre Rs 5.86 cost Tariff Assumed tariff Rs 6 domestic Tariff stand Rs 35 4800 post Escalation % 1.60% This report is based on internship projects of Swati & Meghana Paul under the guidance of Browne & Mohan Consultants Browne & Mohan insight are general in nature and does not represent any specific individuals or entities. While all efforts are made to ensure the information and status of entities in the insights is accurate, there can be no guarantee for freshness of information. Browne & Mohan insights are for information and knowledge update purpose only. Information contained in the report has been obtained from sources deemed reliable and no representation is made as to the accuracy thereof. Neither Browne & Mohan nor its affiliates, © Browne & Mohan, 2011. All rights reserved officers, directors, employees, owners, representatives nor any of its data or content providers shall be liable for any errors or for any actions taken in reliance thereon. Printed in India