1. Energi och Miljö
Slide-in
Richard Sebestyen
Volvo Group Trucks Technology
Goal
Develop and evaluate two different
electric road systems for heavy-duty
traffic on Swedish highways.
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
2. Project partners and roles
General items
Volvo/Scania – Project prerequisites
KTH - Business models investigation
LTH – ERS power load simulations
Vattenfall - Power load and grid infrastructure proposal for ERS (Stockholm-Gbg)
Trafikverket – Road and traffic, environmental information
Inductive road system, project A
Scania – Vehicle design
Bombardier – inductive ERS design
Conductive road system, project B
Volvo – Vehicle design
Alstom – conductive ERS design
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
3. Project prerequisites
Extract from project report
- Viktoria Institute assigned as editors
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
Ref. Volvo Scania
4. KTH Business models
•
How to manage the technical change in a suitable manner as a function of a
pre-selected business model framework, designed for an ERS introduction?
•
What are the roles and benefits for the sub-system providers, system
designer, and the users?
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
Ref. KTH Stefan Tongur
5. LTH (ERS power simulations)
•
A combination of traffic simulation
and power system simulation with
component temperatures
•
Asumes fully electric operation
•
Interesting results include:
– Initial verification of power
system dimensioning, voltages
and component temperatures
– Battery usage patterns
– Geographic distribution of
power ”consumption”
depending on topography
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
Ref. LTH Lars Lindgren
6. Power infrastructure
• No need for reinforcements of the 130 kV grid.
• The regional grid:
5,1 MSEK/km
+ 2,1 MSEK/km
7,2 MSEK/km
Well suited for a gradual expansion
Two redundant transformers 130/30 kV for uptime
Traction substations for 30 kV AC to 750 V DC
Adaption of the 130/30 kV grid
Estimated cost of power infrastructure between
Stockholm and Gothenburg (447 km)
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
Ref. Vattenfall, Lennart Spante, Stefan Jonrydh
7. Trafikverket (Road information)
FFI är ett samarbete mellan staten och
fordonsindustrin om att finansiera
forsknings-, innovations- och utvecklingsaktiviteter med fokus på områdena Klimat
& Miljö samt Säkerhet.
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
Ref Trafikverket Mats Andersson
8. Inductive road
• Test vehicle with installed shielding
• First test in December
• The Bombardier test track in Mannheim
• 300m with 20m highway segments
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
• Pick-up: 200kW continuous power
Ref. Håkan Gustavsson, Scania
9. Conductive road
• Volvo and Alstom have built test track for conductive road
• The test track is 435m with 22m segments.
• Two different pick-up prototypes tested at various
speeds and at different loads.
• Efficiency tests at 130kW
FFI – FORDONSSTRATEGISK FORSKNING OCH INNOVATION VINNOVA.SE/FFI
Ref. Volvo, Alstom Richard Sebestyen, J-L Hourtane
10. Next step - Phase 2
• Cost estimation for segmented and power optimized
road.
• Improved simulation model of segmented road
• Weight optimization of test vehicles
• Development of the pick-up designs
• Track development and hybridization of conductive
test vehicle