SlideShare a Scribd company logo
1 of 21
Heap Leach Facility
For the Rosemont Copper Project




By Joel Carrasco
Outline

 § General Facility Arrangement
 § Design Criteria
 § Laboratory Tests
 § Items in Progress
 § Conclusions




                        Heap Leach Facility
Heap Leach Facility Arrangement




                  Heap Leach Facility
Design Criteria




Pertinent design criteria, along with the approach for the final design of
 the Rosemont Copper heap leach facility




                          Heap Leach Facility
Heap Leach Pad

 § Start-up pad at 65 million dry tons with an additional 10 million dry
    tons.
 § Phase 1 Pad capacity of 40 million dry tons.
 § Phase 2 Pad capacity of 35 million dry tons.
 § 300-foot maximum design height (truck stacked individual ore lifts at
    natural angle-of-repose between benches).
 § 2H:1V overall slopes with benches.




                          Heap Leach Facility
Heap Leach Liner System

 § Geosynthethic clay liner (GCL) – equivalent to
    12 inches of compacted soil with a saturated hydraulic
    conductivity of < 10-6 cm/sec.
 § 60 mil smooth/double textured sheet Low Liner Density
    Polyethylene (LLDPE) geomembrane liner.
 § 3-foot minimum thickness of drain cover fill (minus 1.5-inch
    crushed ore).




                       Heap Leach Facility
Heap Leach Liner System




                 Heap Leach Facility
Heap Leach Drain Pipe System

 § Drain pipes spaced as necessary to handle the solution
    application flows plus estimated 100-yr, 24-hr design
    storm event
 § 4-inch diameter corrugated and perforated dual-wall
    N-12 PE lateral pipes placed in a herringbone fashion
 § 8-inch diameter corrugated and perforated dual-wall
    N-12 PE collector pipes
 § 18-inch diameter corrugated and perforated dual-wall
    N-12 PE header pipes located at the downhill collection
    ditch to route flows to pregnant leach solution pond.



                     Heap Leach Facility
Heap Leach Drain Pipe System




                  Heap Leach Facility
Heap Leach Drain Pipe System




                  Heap Leach Facility
Solution Collection Channel

 § The solution collection channel will contain the leach
    pad drain pipes and convey solutions to the pregnant
    solution pond.
 § Channel will be lined for double containment of the
    pipelines.
 § 80 mil High Density Polyethylene Liner (HDPE)
 § Geosynthethic clay liner




                     Heap Leach Facility
Solution Collection Channel




                   Heap Leach Facility
Solution Process Ponds

 § The solution collection ponds will collect and store 100
    percent of the operational solutions.
 § Ponds will contain any temporary drain down and 100-yr
    24-hr design storm flows within the lined leach pad area.
 § Ponds include a double-lined Pregnant Leach Solution
    pond, double-lined Raffinate pond and a single-lined
    Stormwater pond.




                     Heap Leach Facility
Double-Lined
Pond Parameters
§  25-foot maximum depth
§  3-foot minimum freeboard
§  2.5H:1V maximum lined
    interior slope
§  80 mil High Density
    Polyethylene top Liner
§  Geonet between liners
§  60 mil Low Liner Density
    Polyethylene top Liner
§  Geosynthethic clay liner
§  Leak Collection and
    Removal System




                               Heap Leach Facility
Single-Lined
  Pond Parameters
§ 25-foot maximum depth
§ 3-foot minimum freeboard
§ 2.5H:1V maximum lined
   interior slope
§ 80 mil High Density
   Polyethylene Liner
§ Geosynthethic clay liner




                              Heap Leach Facility
Heap Leach Stability




The heap will be evaluated and designed to provide stability of the heap
 under static and potential seismic loading conditions.




                         Heap Leach Facility
Stability

 § Minimum static factor of safety of 1.5
 § Minimum pseudo-static factor of safety of 1.1




                      Heap Leach Facility
Laboratory Testing
                                 § Screened Arkose material through
§ Large Scale Interface            1 ½ inch sieve
   direct Shear                  § Smooth 60 mil LLDPE Liner
§ Liner Puncture Test           § GCL
§ Alternative materials will    § Loaded to load equivalent to heap
   collected and tested for         height of 450 feet (390 psi)
   liner puncture pending        § Load maintained to a minimum of
   final drain cover selection      48 hours
                                 § Results reveled indentation on liner
                                    but no pinholes, vacuum tested for
                                    verification




                            Heap Leach Facility
Liner Puncture Apparatus




                  Heap Leach Facility
Final Design Items in Progress

 § Finalize detail leach pad grading.
 § Optimize size and location of process ponds.
 § Possible liner puncture test for alternative drain cover
    material.
 § Optimized ore
   stacking plan




                      Heap Leach Facility
Questions

Joel Carrasco
joel.carrasco@tetratech.com
520.297.7723




                      Heap Leach Facility

More Related Content

What's hot

Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsAFATous
 
Design of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdfDesign of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdfAl AYAn University
 
SLB Well Integrity final
SLB Well Integrity finalSLB Well Integrity final
SLB Well Integrity finalMohamed Elsadek
 
Rock Compressibility
Rock CompressibilityRock Compressibility
Rock CompressibilityM.T.H Group
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig componentsElsayed Amer
 
Mud loggingh (2)
Mud loggingh (2)Mud loggingh (2)
Mud loggingh (2)Ahmed Hamza
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnentsRIZWAN KHAN
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)IshaneeSharma
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigsAli Trichelli
 
Inundation
InundationInundation
InundationVR M
 
Q913 re1 w1 lec 2
Q913 re1 w1 lec 2Q913 re1 w1 lec 2
Q913 re1 w1 lec 2AFATous
 

What's hot (20)

1.1 Introduction to Art.lift.ppt
1.1  Introduction  to Art.lift.ppt1.1  Introduction  to Art.lift.ppt
1.1 Introduction to Art.lift.ppt
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation Systems
 
Design of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdfDesign of Gas and Oil Separator 2023.pdf
Design of Gas and Oil Separator 2023.pdf
 
SLB Well Integrity final
SLB Well Integrity finalSLB Well Integrity final
SLB Well Integrity final
 
Rock Compressibility
Rock CompressibilityRock Compressibility
Rock Compressibility
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 
Gas lift design
Gas lift designGas lift design
Gas lift design
 
Separator
SeparatorSeparator
Separator
 
Mud loggingh (2)
Mud loggingh (2)Mud loggingh (2)
Mud loggingh (2)
 
Cut and Fill mining
Cut and Fill miningCut and Fill mining
Cut and Fill mining
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
 
Reservoir rock & fluid
Reservoir rock & fluidReservoir rock & fluid
Reservoir rock & fluid
 
cement plug job
cement plug jobcement plug job
cement plug job
 
Topic 7-mining methods-part iii -surface mining- placer mining
Topic 7-mining methods-part iii -surface mining- placer miningTopic 7-mining methods-part iii -surface mining- placer mining
Topic 7-mining methods-part iii -surface mining- placer mining
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Solution mining
Solution miningSolution mining
Solution mining
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigs
 
Inundation
InundationInundation
Inundation
 
Q913 re1 w1 lec 2
Q913 re1 w1 lec 2Q913 re1 w1 lec 2
Q913 re1 w1 lec 2
 

Similar to Heap Leach Facilities

Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
Diseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvDiseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvUAEhighstreet.com
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond ConstructionGrant Schultz
 
BECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste managementBECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste managementBECM, RUET, Bangladesh
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tankkalyanmaji
 
Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Chris Eberly, PE
 
Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewaterArpit Budania
 
NEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line CardNEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line CardColin Linn
 
03 Conventional Biological Treatments
03 Conventional Biological Treatments03 Conventional Biological Treatments
03 Conventional Biological Treatmentsakashpadole
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05htrdano
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05htrdano
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Mazen Alqadi
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small fileMark Neal
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small fileMatt Drew
 
koyesha hydropower.pptx
koyesha hydropower.pptxkoyesha hydropower.pptx
koyesha hydropower.pptxYonatanFikadu
 

Similar to Heap Leach Facilities (20)

Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
Diseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvDiseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesv
 
NRCS Pond Construction
NRCS Pond ConstructionNRCS Pond Construction
NRCS Pond Construction
 
BECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste managementBECM 4103: Lecture 2 On site human waste management
BECM 4103: Lecture 2 On site human waste management
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
 
Dewatering containers v7 small rev1
Dewatering containers v7 small rev1Dewatering containers v7 small rev1
Dewatering containers v7 small rev1
 
Well Hydraulics
Well HydraulicsWell Hydraulics
Well Hydraulics
 
MBBR PRESENTATION
MBBR PRESENTATIONMBBR PRESENTATION
MBBR PRESENTATION
 
Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewater
 
NEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line CardNEW BakerCorp Tank Line Card
NEW BakerCorp Tank Line Card
 
Rain gardens and bio retention
Rain gardens and bio retentionRain gardens and bio retention
Rain gardens and bio retention
 
03 Conventional Biological Treatments
03 Conventional Biological Treatments03 Conventional Biological Treatments
03 Conventional Biological Treatments
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05
 
Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05Nilex ec seminars 1 18-05
Nilex ec seminars 1 18-05
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
 
Low Cost Sanitation Systems
Low Cost Sanitation SystemsLow Cost Sanitation Systems
Low Cost Sanitation Systems
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small file
 
Bulk Solids Brochure Small file
Bulk Solids Brochure Small fileBulk Solids Brochure Small file
Bulk Solids Brochure Small file
 
koyesha hydropower.pptx
koyesha hydropower.pptxkoyesha hydropower.pptx
koyesha hydropower.pptx
 

More from Hudbay Minerals Inc.

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationHudbay Minerals Inc.
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Hudbay Minerals Inc.
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockHudbay Minerals Inc.
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Hudbay Minerals Inc.
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Hudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and AfterHudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelHudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering PresentationHudbay Minerals Inc.
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont MineHudbay Minerals Inc.
 

More from Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 

Recently uploaded

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 

Recently uploaded (20)

Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 

Heap Leach Facilities

  • 1. Heap Leach Facility For the Rosemont Copper Project By Joel Carrasco
  • 2. Outline § General Facility Arrangement § Design Criteria § Laboratory Tests § Items in Progress § Conclusions Heap Leach Facility
  • 3. Heap Leach Facility Arrangement Heap Leach Facility
  • 4. Design Criteria Pertinent design criteria, along with the approach for the final design of the Rosemont Copper heap leach facility Heap Leach Facility
  • 5. Heap Leach Pad § Start-up pad at 65 million dry tons with an additional 10 million dry tons. § Phase 1 Pad capacity of 40 million dry tons. § Phase 2 Pad capacity of 35 million dry tons. § 300-foot maximum design height (truck stacked individual ore lifts at natural angle-of-repose between benches). § 2H:1V overall slopes with benches. Heap Leach Facility
  • 6. Heap Leach Liner System § Geosynthethic clay liner (GCL) – equivalent to 12 inches of compacted soil with a saturated hydraulic conductivity of < 10-6 cm/sec. § 60 mil smooth/double textured sheet Low Liner Density Polyethylene (LLDPE) geomembrane liner. § 3-foot minimum thickness of drain cover fill (minus 1.5-inch crushed ore). Heap Leach Facility
  • 7. Heap Leach Liner System Heap Leach Facility
  • 8. Heap Leach Drain Pipe System § Drain pipes spaced as necessary to handle the solution application flows plus estimated 100-yr, 24-hr design storm event § 4-inch diameter corrugated and perforated dual-wall N-12 PE lateral pipes placed in a herringbone fashion § 8-inch diameter corrugated and perforated dual-wall N-12 PE collector pipes § 18-inch diameter corrugated and perforated dual-wall N-12 PE header pipes located at the downhill collection ditch to route flows to pregnant leach solution pond. Heap Leach Facility
  • 9. Heap Leach Drain Pipe System Heap Leach Facility
  • 10. Heap Leach Drain Pipe System Heap Leach Facility
  • 11. Solution Collection Channel § The solution collection channel will contain the leach pad drain pipes and convey solutions to the pregnant solution pond. § Channel will be lined for double containment of the pipelines. § 80 mil High Density Polyethylene Liner (HDPE) § Geosynthethic clay liner Heap Leach Facility
  • 12. Solution Collection Channel Heap Leach Facility
  • 13. Solution Process Ponds § The solution collection ponds will collect and store 100 percent of the operational solutions. § Ponds will contain any temporary drain down and 100-yr 24-hr design storm flows within the lined leach pad area. § Ponds include a double-lined Pregnant Leach Solution pond, double-lined Raffinate pond and a single-lined Stormwater pond. Heap Leach Facility
  • 14. Double-Lined Pond Parameters §  25-foot maximum depth §  3-foot minimum freeboard §  2.5H:1V maximum lined interior slope §  80 mil High Density Polyethylene top Liner §  Geonet between liners §  60 mil Low Liner Density Polyethylene top Liner §  Geosynthethic clay liner §  Leak Collection and Removal System Heap Leach Facility
  • 15. Single-Lined Pond Parameters § 25-foot maximum depth § 3-foot minimum freeboard § 2.5H:1V maximum lined interior slope § 80 mil High Density Polyethylene Liner § Geosynthethic clay liner Heap Leach Facility
  • 16. Heap Leach Stability The heap will be evaluated and designed to provide stability of the heap under static and potential seismic loading conditions. Heap Leach Facility
  • 17. Stability § Minimum static factor of safety of 1.5 § Minimum pseudo-static factor of safety of 1.1 Heap Leach Facility
  • 18. Laboratory Testing § Screened Arkose material through § Large Scale Interface 1 ½ inch sieve direct Shear § Smooth 60 mil LLDPE Liner § Liner Puncture Test § GCL § Alternative materials will § Loaded to load equivalent to heap collected and tested for height of 450 feet (390 psi) liner puncture pending § Load maintained to a minimum of final drain cover selection 48 hours § Results reveled indentation on liner but no pinholes, vacuum tested for verification Heap Leach Facility
  • 19. Liner Puncture Apparatus Heap Leach Facility
  • 20. Final Design Items in Progress § Finalize detail leach pad grading. § Optimize size and location of process ponds. § Possible liner puncture test for alternative drain cover material. § Optimized ore stacking plan Heap Leach Facility