      Analysis of Casing Connections Subjected to
                 Thermal Cycle Loading
                                  Jueren Xie and Gang Tao
                        C-FER Technologies, Edmonton, Alberta, Canada
Production of heavy oil and bitumen, which is increasing around the world as conventional oil
resources are depleted, often uses thermal well technologies such as Cyclic Steam Stimulation
(CSS) and Steam Assisted Gravity Drainage (SAGD). Casing connections are one of the most
critical components in thermal wells. Historically, the literature shows that over 80% of reported
uphole casing failures experienced in thermal wells occurred at connections. Typical connection
failure mechanisms include structural damages, such as parting, thread rupture, and shoulder
plasticity, and serviceability damages, such as leakage. One of the critical load conditions
causing casing and casing connection failures is the thermal cycle loading, with high peak
temperatures typically in excess of 200°C, which can cause the well casing and casing
connections to deform plastically.

There are generally three types of connections used in intermediate or production casing of
thermal wells: API (American Petroleum Institute) round, API buttress and proprietary premium
connections. This paper presents finite element analysis of these three types of casing connections
subjected to thermal cycle loading. Based on analysis results, this paper demonstrates that the
premium connection, which has a metal-to-metal seal region, is the most suitable of these three
connection designs for the use in thermal wells, in terms of structural integrity and sealability.
This paper also presents recommendations for casing connection design for successful service in
thermal well applications.

Keywords: Casing, Connection, Cyclic Steam Stimulation (CSS), Sealing, Steam Assisted Gravity
Drainage (SAGD), Strength, Structural Integrity, Thermal Cycles, Thermal Wells.

1. Introduction
Thermal well technologies, such as Cyclic Steam Stimulation (CSS) and Steam Assisted Gravity
Drainage (SAGD), have been widely used in the production of heavy oil and bitumen. Their use
continues to increase as the worldwide production of oil continues to evolve from depleting
conventional light oil to more viscous heavy oil and bitumen resources. In the CSS recovery
process, high pressure, high temperature steam (330°C-350°C) is injected into the reservoir,
followed by a soaking period to allow the thermal energy of the injected steam to disperse into the
reservoir, heat the oil and thereby significantly reduce its viscosity, and the heated oil is then
produced to the surface from the same well. The SAGD process typically utilizes two parallel
horizontal wells positioned above one another and spaced several meters apart. High temperature
steam (200°C -275°C) is continuously injected into the upper injection well to heat the reservoir.
The hot fluids produced (oil, condensate and formation water) then drain into the lower production
well by gravity and are produced to surface by natural steam lift or various artificial lift


2010 SIMULIA Customer Conference                                                                1




             Visit the SIMULIA Resource Center for more customer examples.
techniques. Shutdowns due to facility disruptions or wellbore services, such as to replace failed
artificial lift systems, and the associated cooling and reheating on restart result in cyclic thermal
loading in SAGD wells.
The casing strings in thermal wells typically consist of many steel casing joints (usually 10 - 13 m
in length) joined by threaded connections and are cemented over the entire wellbore length to
provide structural support and hydraulic isolation to the wellbore, and as such the casing strings
and in particular the casing connections are one of the most critical components in thermal wells
(Xie, 2006). Payne and Schwind (1999) noted that, based on industry estimates, connection
failures account for 85% - 95% of all oilfield tubular failures. For thermal well applications in
Western Canada, the Canadian Association of Petroleum Producers (CAPP, 1992) reported that
more than 80% of the uphole casing failures experienced in thermal wells occurred at connections,
and the recently published casing failure occurrence data for thermal operations in Alberta (i.e.
since 2000) suggests this trend has continued.
In thermal wells, investigation indicates that a large portion of these casing string and connection
failures can be attributed to the severe loading conditions of these applications. A common feature
for thermal wells is the cyclic thermal loading with high peak temperatures that may result in high
thermally-induced stresses, which typically exceed the elastic limit of the material and cause the
casing and connection to deform plastically. In addition, curvature loading resulting from casing
buckling and formation shear movement is also a critical load condition for thermal well casing
and casing connection integrity (Smith, 2001). Connection fatigue failures can also occur during
casing installation rotations and during thermal cycles. Therefore, ensuring adequate structural
integrity and sealability of the connections over the full service life of a thermal well is a
significant challenge. Proper casing design, including material selection and connection design,
plays an important role in achieving the long term structural and hydraulic integrity and
minimizing the risk of casing failure in these applications.
This paper presents discussions on design requirements for casing connections in thermal wells.
There are three basic types of casing connections used in oil wells: standard API (American
Petroleum Institute) round, API buttress (and oversized buttress) and proprietary premium
connections. This paper focuses on the finite element analyses of these three types of connections
subjected to thermal cycle loading representative of CSS well operating conditions. The analysis
results provide a comparative assessment of their relative structural integrity and sealability
performance under thermal cycle loading conditions representative of these applications.

2. Connection design requirements
Two of the primary functions of casing connections are adequate structural integrity and hydraulic
integrity or sealability. Various guidelines for connection designs have been established by
industry over the years. For example, the Alberta Industry Recommended Practice (IRP, 2002)
outlines the following general recommendations for casing connections in thermal wells:
    •    The connections should have a joint axial load carrying capacity greater than, or equal to,
         the pipe body yield strength;
    •    The casing connections should provide adequate sealing under the anticipated thermal
         operating conditions; and


2                                                               2010 SIMULIA Customer Conference
•   The selection of a suitable thread compound is an integral part of casing connection
        design and should be properly matched with the type of connection selected.
The casing connections of oil country tubular goods (OCTG) can be classified into three types:
API round, API buttress (and oversized buttress), and proprietary premium connections. These
connections, the general forms of which are shown in Figure 1, have the following features:
    •   API round threads are of two forms: API long threaded and coupled (LTC) and short
        threaded and coupled (STC). The sloped profile and tolerance of the API round thread
        design, in conjunction with the appropriate thread compound, provide the structural and
        sealing capabilities of these connections (Figure 1a).
    •   API buttress threaded and coupled connections (BTC) have a more square thread profile
        which provides the structural function and some degree of sealability (i.e. by the
        combination of the action of a thread compound and the helical leak path of the buttress
        thread section) (Figure 1b).
    •   Premium connections typically use buttress-type threads for the structural function and a
        metal-to-metal radial contact seal section for sealability. Many premium connections
        also include an axial metal-to-metal shoulder next to the seal region of the pipe body and
        coupling design to control makeup and, in some designs, to gain additional sealability.
        Figure 1c shows a generic premium connection which employs buttress threads, a metal-
        to-metal radial seal and a pin-to-coupling shoulder.




  (a) API round thread connection                    (b) API buttress thread connection
                                        coupling
                                                             metal-to-metal
                                                   threads       seal


                                  pin




                                                         shoulders


                                   (c) A generic premium connection
  Figure 1. Schematics of (a) an API round thread connection; (b) an API buttress
             thread connection; and (c) a generic premium connection


2010 SIMULIA Customer Conference                                                                 3
3. Finite element model
3.1      Modeling of casing connections
The analysis examples presented in this paper consider a 177.8 mm outer diameter (OD),
34.2 kg/m weight, Grade 80 steel alloy casing material with API STC, API BTC and generic
premium connection designs. As shown in Figure 2, an axially symmetric section including one
half of a connection and one half of a typical casing joint (e.g. 10 m in length) were considered in
the model. A finite element model of the half coupling and casing section was created using
axisymmetric solid elements CAX4 in Abaqus. The geometries of API STC and BTC connections
were developed based on nominal dimensions as per API Specifications 5CT (2005) and
5B (2008). The generic premium connection model included the basic features common to the
premium connections currently used in thermal well applications (e.g. buttress threads, axial
torque shoulders, and radial metal-to-metal seals) such that the analysis results were representative
of such connections. Note that the generic premium connection model presented here should not
be taken as being representative of any specific commercially available connection product. It is
also important to note, however, that premium connection designs must be modeled based on the
proprietary design details of the connection.
This paper focuses on simulating the response of the connections under axisymmetric loading,
such as makeup, axial tensile and compressive loading, and thermal cycle loading representative
of CSS well operating conditions (e.g. thermal cycle with peak temperature of 350ºC). In the
analyses, symmetric boundary conditions were assumed for both ends of the models, and the
casing OD was constrained radially to represent radial confinement provided by the cement sheath
and formation surrounding the casing. For connections subjected to non-axisymmetric loads, such
as those resulting from bending induced by wellbore curvature, casing bucking and formation
shear movement, axisymmetric elements with nonlinear asymmetric deformation (e.g. Abaqus
CAXA4N elements) can be used (Xie, 2007).




       center of coupling              center of casing joint


             Figure 2. Section of coupling and casing pipe body modeled


3.2      Modeling of casing materials
The Grade 80 (i.e. nominal minimum yield strength of 80 ksi (552 MPa)) material of casing
connection (i.e. pipe body and coupling) response was modeled using an elastic-plastic, combined
kinematic hardening constitutive relationship. The initial yield stress at room temperature was
assumed to be 570 MPa, which is representative of such commercial Grade 80 casing materials,
and the Young’s modulus was assumed to be 200 GPa. The material model also takes into
consideration of temperature- and time-dependence effects. These modeling considerations were

4                                                               2010 SIMULIA Customer Conference
required to capture material property variations with temperature, stress relaxation behavior and
Bauschinger effect (i.e. reduced yield stress upon load reversal after plastic deformation has
occurred during the initial loading) (Dowling, 1998). Additional discussions of the material
modeling approach for thermal cycle loading analysis were presented by Xie (2008b).
3.3        Modeling of loading conditions
The following is a brief description of three loading conditions that each of the connection designs
was analyzed.
Connection makeup
The initial state of the three models of the connections was obtained by engaging the threaded
casing pin end into the coupling to the nominal makeup position by resolving overclosure
interference between the threads of the pin and box, as well as in the radial seal and axial shoulder
regions for the premium connection. The connection makeup was assumed to occur at a low
ambient temperature of 20°C. This load scenario simulates connection makeup in the fabrication
facility and in the field.
Axial loadings
For assessment of the structural capacities of the three connection designs, axial tensile and
compressive loads were applied along the axis of the connection models after makeup. This load
scenario was used to assess the relative structural and sealing capacities of different types of
connections.
Thermal cycles
To investigate the performance of the three connections under loading conditions representative of
a CSS operation, the thermal cycle loading was simulated by subjecting the connection models to
temperature variations equivalent to one thermal cycle. Through this thermal cycle loading, the
ends of the model were constrained axially to represent the casing cemented to the formation in
the wellbore. Note that multiple cyclic loading analysis may also be conducted with a suitable
casing material model (Xie, 2008b).
To model a single thermal cycle, the temperature of the casing joint and coupling was gradually
increased from the initial temperature, here assumed to be 20°C, to the maximum operating
temperature, assumed here for the CSS scenarios to be 350°C.
To illustrate the key features of the thermal cycle loading, Figure 3 presents the relationship
between the casing axial stress and temperature for the Grade 80 casing pipe-body over the
temperature cycle from 20°C to 350°C and back to 20°C. The thermal cycle consists of three
loading stages:
      1.   The “Heating” load stage occurs as the temperature increases from the initial value of
           20°C to the peak temperature of 350°C. Since the casing string is constrained axially
           (e.g. cemented), axial compressive stress develops which ultimately exceed the material
           yield capacity in compression, in this case at a temperature of approximately 210°C;
      2.   The “Hot-hold” stage is where the temperature is held at the peak value for a period of
           time (e.g. hours or days). Stress relaxation occurs with a significant reduction in axial
           compressive stress; and



2010 SIMULIA Customer Conference                                                                       5
3.   The “Cooling” load stage occurs when the temperature is decreased from the peak
           “hot-hold” value of 350°C, to the initial ambient temperature of 20°C, causing the
           constrained casing to contract and the axial load to gradually change from compressive to
           tensile loading. In high temperature applications, such as CSS operations, and depending
           on the properties of the material and the peak temperature range, the casing pipe body
           material could reach yield in tension at the end of a thermal cycle, as shown in Figure 3.
                                        600
                                                   End of a Thermal Cycle

                                        400
                   Axial Stress (MPa)




                                        200

                                                                                     Cooling
                                          0


                                        -200

                                                                                                           Hot-
                                        -400                 Heating                                       Hold

                                        -600
                                               0       50     100      150    200     250      300   350          400
                                                                        Temperature (°C)

    Figure 3. Axial stress and temperature relationship for a Grade 80 casing string
                     under thermal cycle loading from 20°C to 350°C



4. Analysis results
The following section describes the results of the axial loading and the thermal cycle loading
scenarios on the three connection designs. The makeup loading results are not presented in detail
since this loading scenario was merely completed to obtain the initial conditions for the axial and
thermal load scenarios.
4.1        API STC and API BTC connections under axial loading
Structural capacities
The structural response of the API STC and BTC connections under axial loading scenarios was
assessed by applying the tensile and compressive loads along the axis of the connection models
after makeup. Figure 4 presents the axial force response to average axial strain within the API
STC and BTC connections under tensile load. The analysis results show that the BTC connection
has axial load carrying capacity greater than the pipe body yield strength. The STC connection,
however, shows lower axial load carrying capacity than the yield strength mainly due to reduced
cross section of the unengaged thread section of the pin. Initiation of thread jump-out was
predicted under a relatively low axial tensile load (i.e. less than half of the pipe body yield load).


6                                                                                          2010 SIMULIA Customer Conference
Note that thread jump-out is a potential connection failure mechanism which occurs when threads
on the pin jump over one or more thread grooves of the coupling axially outward under axial
tensile loading. This is in contrast to thread jump-in which occurs when threads on the pin of a
connection jump by one or more thread grooves axially inward relative to the coupling under
compressive loading. As the tensile load increases beyond the jump-out initiation, separation of
the flanks between coupling and pin threads becomes significant, as shown in Figure 5.


                                             3,000

                                                        Pipe Body Yield Strength
                                             2,500
                  Axial Tensile Force (kN)




                                             2,000


                                             1,500


                                             1,000

                                                                                             STC Connection
                                                                  Initiation of
                                              500
                                                               Thread Jump-out               BTC Connection

                                                0
                                                 0.0%     0.1%        0.2%         0.3%     0.4%       0.5%   0.6%
                                                              Average Tensile Axial Strain in Connection

 Figure 4. Axial force vs average axial strain of 177.8 mm, 34.2 kg/m Grade 80 API
                  STC and BTC connections under tensile loading


                                                                      coupling

                                                                           pin



      Figure 5. Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API STC
    connection under tensile loading (showing development of thread jump-out)
Figure 6 presents the axial force response of the API STC and BTC connections under
compressive loading. The analysis results show that BTC connection also provides higher axial
load carrying capacity than the pipe body yield strength under compressive loading. For the STC
connection, the compressive load carrying capacity was shown to be lower than pipe body yield
strength. Initiation of thread jump-in was observed under an axial load level significantly below
the pipe body yield load. Due to the taper angle of the pitch line of the STC connection threads in
the pin and coupling, the results show that thread jump-in requires a higher applied load (or
energy) than that required for thread jump-out under tensile loading. Figure 7 shows the
deformation in the STC connection with development of thread jump-in evident by the inward
deformation within the unengaged thread region of the pin portion of the connection.



2010 SIMULIA Customer Conference                                                                                     7
Based on the analysis results of this illustrative example, the API STC connection with the
assumed Grade 80 material properties did not satisfy the suggested guidelines of the Alberta IRP
that the connections should have a joint axial load carrying capacity greater than or equal to the
pipe body yield strength. On the other hand, the analyzed API BTC connection (i.e. with the same
casing pipe body and material grade) showed sufficient axial load carrying capacity to satisfy the
Alberta IRP guidelines.
                                                3,000

                                                        Pipe Body Yield Strength
                                                2,500
                 Axial Compressive Force (kN)




                                                2,000


                                                1,500


                                                1,000
                                                                         Initiation of
                                                                       Thread Jump-in
                                                                                                   STC Connection
                                                 500
                                                                                                   BTC Connection

                                                   0
                                                    0.0%       0.1%        0.2%          0.3%     0.4%     0.5%     0.6%
                                                                Average Compressive Axial Strain in Connection

    Figure 6. Axial force vs average axial strain of 177.8 mm, 34.2 kg/m Grade 80 API
                 STC and BTC connections under compressive loading


                                                                                    coupling

                                                                                            pin


        Figure 7. Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API STC
    connection under compressive loading (showing development of thread jump-in)


4.2       API STC and API BTC connections under thermal cycle loading
Structural capacities
Figures 8a and 8b present the axial stress distribution for the API STC connection after makeup at
room temperature (i.e. 20°C) and after axially constrained thermal loading to 350°C, respectively.
Figure 8b shows the development of thread jump-in and excessive plastic deformation in the
critical section of the unengaged threads of the pin. Figure 9 presents the axial stress distributions
for an API BTC connection after makeup and during thermal cycle loading over the same
temperature range. The analysis shows that the API BTC connection maintained structural
integrity during the imposed thermal cycle, and no thread jump-in or jump-out was observed for
the modeled API BTC connection.


8                                                                                                   2010 SIMULIA Customer Conference
(a) at makeup




                                                (b) at 350ºC during heating

      Figure 8. Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API STC
                      connection subjected to thermal loading




                                 (a) at makeup (20ºC)




                                 (b) at end of heating phase (350ºC)




                                 (c) at end of holding phase (350ºC)




                                 (d) at end of thermal cycle (20ºC)

Figure 9 Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API BTC connection
                        subjected to thermal cycle loading
Sealing integrity
In addition to the structural capacity guideline, the Alberta IRP (2002) also indicates that the
casing connections should provide adequate sealing under the anticipated thermal operating
conditions. For API round connections, the sealing capacity usually depends on three factors:
(1) contact pressure between threads of the coupling and pin; (2) the geometry of the leakage path
(i.e. the length and cross-section area), and (3) the property of the thread compound occupying in
the leakage path. After connection makeup, contact is established on both the stabbing flank and


2010 SIMULIA Customer Conference                                                                9
the loading flank of the round threads of the pin (Figure 10b). As noted by Teodoriu (2009), if the
contact pressure is higher than the pressure to be sealed, the only potential leak paths in API round
connections are the spiral paths between the thread crests and roots. Figure 10a presents the
average contact stress on the loading flank next to the entry plane as a function of temperature for
the API STC connection. As shown in Figure 10a, as the STC connection was heated, the contact
pressure decreased with increasing temperature and eventually dropped to zero at around 153°C,
leading to loss of contact pressure between the threads. However, due to the combined effects and
variability in material properties and connection tolerances, it is important to note that finite
element analysis is not generally sufficient on its own to determine the seal performance of API
round thread connections, and physical testing should be used in conjunction with numerical
simulation to assess the connection sealing performance.
                          500
                          450
                          400
 Contact Pressure (MPa)




                                                    heating
                          350                                                                                 coupling
                          300
                          250
                          200
                                                                                                                      pin
                          150
                          100
                          50
                           0
                                0   50   100     150     200      250   300   350
                                                                                         loading flank of   stabbing flank of
                                               Temperature (ºC)                                pin                 pin
(a) Contact pressure as a function of temperature                                        (b) API STC thread design
Figure 10. Predicted contact pressure on the critical loading flank as a function of
       temperature for a 177.8 mm, 34.2 kg/m Grade 80 API STC connection
In contrast to API round connections, according to API specification 5B (2008), the API buttress
threads leave a nominal 0.025 mm (0.001”) gap between the thread flanks of the coupling and the
pin for 177.8 mm (7”) connections. The thread manufacturing tolerance allowed for 177.8 mm
(7”) API buttress connections is 0 to -0.076 mm (-0.003”) for both pin and coupling threads along
the axial direction of the connection. Therefore, the maximum gap between the threads of the pin
and coupling can be as large as 0.178 mm (0.007”). Therefore, the sealing performance of the API
buttress connection relies on the combined effects of contact pressure between the threads, the
leakage path geometry and the thread compound properties. As indicated in the Alberta IRP
(2002), API buttress connections require a high concentration of solids in a high temperature
thermal lubricating compound to improve sealability once the connection is made-up. The solids
and lubricant fill gaps in the pin-box thread form that otherwise might allow fluids to seep through
the connection. Full-scale testing has confirmed that, in most cases, a buttress connection does not
provide the same degree of seal integrity as does a premium connection. In some cases, buttress
connection specimens have exhibited leakage rates several orders of magnitude higher than
premium connections under the same conditions (Maruyama, 1990). For these considerations,



10                                                                                  2010 SIMULIA Customer Conference
buttress connections are often considered not suitable for the demanding conditions of the
intermediate or production casing strings in high-temperature thermal well applications.
4.3      Premium connection under thermal cycle loading
Structural capacities
Premium connections are commonly designed to have the buttress type threads for structural
capacity and a metal-to-metal seal section for sealing. Therefore, one would expect premium
connections to have similar load carrying capacity to that of API buttress connections and should
therefore, have sufficient structural capacity for thermal well applications.
Figure 11 presents the axial stress contours for a generic premium connection at makeup, and at
the end of the hot-hold and cooling stages of a thermal cycle. The red color represents areas with
high tensile stress and the blue color is for areas with high compressive stress. As shown in this
figure, regions of the connection are subjected to high compressive loading (blue color) at makeup
and during the hot-hold period due to connection shoulder engagement and material thermal
expansion, respectively, and to high tensile stress (orange to red color) as it is cooled down due to
material thermal contraction. For many premium connections, thermal cycle loading does not
cause a significant structural concern in the thread roots due to the generally low magnitude of the
associated plastic strains. However, under such conditions, the excessive compressive loading on
the pin/coupling shoulders may cause some concerns for structural failure as these regions may be
subjected to excessive shear deformations. Note that the plastic strain value in the torque shoulder
regions can be significantly larger during heating as compared to that at makeup.




       (a) Makeup                      (b) Hot-hold                (c) End of a thermal cycle
Figure 11. Axial stress distribution of a generic premium connection subjected to
                                  thermal loading


Sealing integrity
The sealing capacity for a premium connection is generally provided by the metal-to-metal contact
stress over the effective seal region (Xie, 2009), as shown in Figure 12. Since the purpose of the
examples presented in this paper is to demonstrate typical connection deformation mechanisms,
connection seal contact forces are presented on a relative performance scale to that of the
connection makeup condition. Figure 13 shows the variation in the seal contact intensity
(integration of the seal contact stress profile over the effective seal length) of the generic premium
connection from make-up through the thermal cycle. The figure shows that the seal contact
intensity (i.e. relative to makeup) varies during the thermal cycle, with a significant reduction of
about 38% during the hot-hold period as a result of the stress relaxation of the material. At the


2010 SIMULIA Customer Conference                                                                   11
end of the thermal cycle, the seal contact intensity was further reduced to only about 42% as
compared to that of the made-up condition, due to the effect of thermal tensile loading. Note that
the seal contact stress must be significantly higher than the oil/gas/steam pressure in order to
maintain sealability.
                                                                                                                 oil/gas
                                                              contact stress                                     pressure




                                                                            pin
                                                                            Pin
                                                                                            coupling
                                                                                            Coupling




        Figure 12. Illustration of seal contact stress in a premium connection
                                                       150%


                                                                                       Heating
                    (vs Contact Intensity at Makeup)




                                                                     Makeup
                         Seal Contact Intensity




                                                       100%

                                                                                                                 Hot-hold



                                                       50%

                                                                  End of Cycle                         Cooling




                                                        0%
                                                              0                  100             200               300      400

                                                                                       Temperature (°C)


 Figure 13. Changing of seal contact intensity for a 177.8 mm, 34.2 kg/m Grade 80
               generic premium connection over a thermal cycle
Based on the analysis of the Grade 80 generic premium connection, the results indicate that while
the considered thermal cycle loading did not appear to cause a significant concern for the
structural performance in threads of this generic premium connection design over the make-up and
thermal cycle considered, an over-loaded shoulder condition could potentially cause structural
damage in the shoulder region of the connection. The results also show that the premium
connection sealing capacity can change significantly over thermal cycle loading. It has been
shown that significant reduction in seal contact intensity can occur due to stress relaxation during
the hot-hold stage, and due to axial tensile loading introduced during cooling. As such, the results
of this analysis show that the seal contact condition is generally at its lowest and most critical
value at the end of a thermal cycle in such high temperature application.


12                                                                                                           2010 SIMULIA Customer Conference
It is important to reiterate that the specific behavior of a connection is a function of its design,
manufacturing (tolerance), make-up and load history. Therefore, each connection and load
scenario must be evaluated for the conditions of the application.

5. Material impacts on connection performance
The numerical evaluation of connection performance in a thermal well application is often
challenging because the long-term material behavior is affected by the load and environmental
history, which may also be influenced by the cyclic high temperature effects, plastic deformations,
and fatigue loading conditions in thermal wells. One important issue raised by Xie (2008a) is that
the casing design should take into consideration the potential effects of material degradation in
thermal wells. Xie suggested that the effects of strain-hardening, strain-ageing, and corrosion can
contribute to material degradation over thermal cycles. These effects are discussed further below
with reference to their impact on connection performance in thermal wells.
5.1      Strain-hardening
Strain-hardening (also often termed “cold working”) of steel materials is the strengthening
resulting from an increase in the material’s dislocation density by plastic deformation. Material
strain-hardening often results in some beneficial effects for casing and liner designs in thermal
well completions, as it generally increases casing/liner resistance to strain localization, buckling
and shear deformation. In addition, strain-hardening is also favourable in terms of reducing
localized plastic strain accumulation in connection threads. Xie (2008a) demonstrated the
relationship between plastic strain and temperature for both the casing pipe body and premium
connection thread root during a thermal cycle, as shown in Figure 14. It is interesting to note that
the development of plastic strain in the connection thread root approaches a plateau value soon
after the pipe body reaches yield during both the heating and cooling periods. Yield of the casing
pipe body significantly reduces the severity of strain localization in the connection threads and
therefore allows incremental plastic strain to be more evenly distributed throughout the casing
string. A higher strain-hardening rate would lead to less plastic strain accumulation in the thread
root before the pipe body yields and, as a result, would reduce the failure potential in the thread
region of the connection. The Alberta IRP (2002) indicates that the Y/T (yield strength to tensile
strength) ratio of casing material should be less than or equal to 0.9 for the intermediate or
production casing to ensure that the API buttress and premium connections have sufficient
structural capacities for application in high temperature thermal wells.
The development of strain-hardening, however, often causes a reduction in the material’s ductility,
and that may cause the material to be more susceptible to different forms of corrosion. Physical
coupon tests have shown that there is more than 10% reduction in material ductility as a result of
strain-hardening induced in the specimen from one thermal cycle (Xie, 2008a). However, the tests
also show that such reductions appear to stabilize with further cycles. The reduction in material
ductility due to strain-hardening is not typically considered to be the primary reason for casing
failures since the main impact of strain-hardening on ductility occurs during the first thermal
cycle. Experience has nevertheless shown that most thermal well failures tend to occur after
several thermal cycles (Wu, 2008), suggesting that further investigation of the potential impacts
that mechanisms such as strain-hardening might have on casing failures appears to be warranted.



2010 SIMULIA Customer Conference                                                                       13
Seal and
                                  1.0%
                                                                                                          Shoulder



                                  0.8%                               Thread Root



                 Plastic Strain   0.6%
                                             End of a Cycle


                                  0.4%

                                                              Pipe-Body

                                  0.2%

                                                Start of a Cycle


                                  0.0%
                                         0                     100                 200          300         400
                                                                                         o
                                                                           Temperature ( C)


 Figure 14. Relationship between plastic strain and temperature for casing pipe
 body and a premium connection thread root (including plastic strain contour for
           connection - red represents high plastic strain) (Xie, 2008a)


5.2      Strain-ageing
Strain-ageing for carbon steels mainly involves the interaction of dislocations with interstitial
elements, such as carbon and nitrogen, or interstitial-substitutional solute pairs. This interaction
stabilizes mobile dislocations and therefore an incrementally larger stress is required to continue to
move the dislocations to result in incremental plastic deformations (Xie, 2008a). Usually, a slow
strain rate and a relatively high temperature (150 – 250°C) are required to achieve strain-ageing of
casing materials, both of which tend to exist in many thermal wells. Strain-ageing can cause a
significant reduction in material ductility, and therefore may impact the connection performance.
Xie (2008a) suggested that, given the nature of strain-ageing, it can be postulated that casing
material strain-ageing may occur in thermal wells, especially in CSS wells where the cooling
phase may occur over a relatively long time period (e.g. several weeks or months during the
production stage). As was shown in the finite element analysis of the generic premium connection
subjected to thermal cycle loading, the connection thread roots can start to yield at around
150-200°C during the cooling phase. Therefore, it is possible that material strain-ageing may
occur in areas of high strain, such as in the thread roots of casing connections. Development of
strain ageing may significantly reduce the casing material ductility, and consequently reduces the
connection capacity to sustain thermal loads.
5.3      Corrosion
Connection performance may also be significantly affected by a number of possible material
corrosion mechanisms. Thermal wells are often exposed to corrosive environments, including
carbon dioxide (CO 2 ) and hydrogen sulfide (H 2 S) generated by aqua-thermolysis of the heavy oil
in the presence of water at high temperatures. The severe loading conditions present during
thermal operation will likely increase the casing material’s susceptibility to corrosion induced


14                                                                                            2010 SIMULIA Customer Conference
degradation, such as stress corrosion cracking (SCC). As noted by Xie (2008a), further study is
required to define the impact of material corrosion and the combined and potentially synergistic
effects of the temperature variations, plastic deformation and corrosion on connection performance
in thermal wells.

6. Conclusions
This paper presents an overview on a number of key connection design requirements for thermal
well applications, in particular related to those of the main roles of the connections in maintaining
the structural and hydraulic integrity of the wells. Based on the finite element analysis of three
types of connections (i.e. API round, API buttress and a generic premium connection), this paper
demonstrated the relative structural and seal performance of these connections under thermal cycle
loading conditions representative to typical high temperature thermal well (e.g. CSS) applications.
Note this paper focused on connection performance under thermal cycle loading. It is important to
note that, in addition to thermal loading, curvature loading resulting from wellbore curvature,
casing buckling and formation shear movement can also contribute to casing connection failures in
thermal wells, and should also be considered.
Based on discussions and analyses presented in this paper, the following conclusions and
recommendations are made:
    •    API round thread connections, such as the STC and LTC designs, do not provide
         adequate axial load carrying capacity which is recommended to be greater than pipe body
         yield strength according to industry guidelines such as the Alberta IRP (2002).
         Therefore, they are generally not suitable connection designs for most of high
         temperature thermal well applications.
    •    API buttress connection appears to have sufficient structural capacity for intermediate or
         production casing of many thermal well applications. However, the API buttress
         connections rely on thread compound to provide sealing which may not be sufficient
         under thermal well conditions. Therefore, API buttress connections are generally not
         recommended for the intermediate or production casing of most of high temperature
         thermal well applications.
    •    Premium connections usually provide both sufficient structural capacity and sealability
         for the conditions of most of high temperature thermal well operations (e.g. up to 350ºC).
         Therefore, they are generally preferred for the intermediate or production casing in
         thermal wells. However, a combination of both suitable and representative physical and
         numerical evaluation (or qualification) programs are generally required to properly assess
         the structural and sealability performance of premium connections in such demanding
         conditions as those of CSS and SAGD applications.
    •    Further investigation is necessary to expand the understanding of material degradation
         effects on the long term connection performance in thermal well applications, such as
         strain-hardening, strain-ageing and corrosion.




2010 SIMULIA Customer Conference                                                                  15
7. References
1.    API Specification 5B, Specification for Threading, Gauging and Thread Inspection of Casing,
      Tubing, and Line Pipe Threads, 5th Edition, 2008.
2.    API Specification 5CT, Specification for Casing and Tubing, 8th Edition, 2005.
3.    CAPP. Thermal Well Casing Risk Assessment, Canadian Petroleum Association, Thermal
      Well Casing Risk Subcommittee, 1992-0017, pp. 116. Canadian Association of Petroleum
      Producers.
4.    Dowling, N.E. Mechanical Behavior of Materials – Engineering Methods for Deformation,
      Fracture, and Fatigue, 2nd edition, Prentice Hall, New Jersey, 1998.
5.    Industry Recommended Practices for Heavy Oil and Oil Sands Operations (IRP), Vol.3, 2002.
6.    Maruyama, K., Tsuru, E., Ogasawara, M., Yasusuke, I. and Peters, E.J. An Experimental
      Study of Casing Performance under Thermal Cycling Conditions. SPE Drilling Engineering,
      5(2), pp. 156-164, 1990.
7.    Payne, M.L., Schwind, B.E. A New International Standard for Casing/Tubing Connection
      Testing. SPE/IADC 52846. Presented at the SPE/IADC Drilling Conference, Amsterdam,
      Holland, March 9-11, 1999.
8.    Smith, R. J., Bacon, R. M., Boone, T. J. and Kry, P. R. Cyclic Steam Stimulation below a
      Known Hydraulically Induced Shale Fracture. Canadian International Petroleum Conference,
      Calgary, Alberta, Canada, June 12 – 14, 2001.
9.    Teodoriu, C. and Badicioiu, M. Sealing Capacity of API Connections – Theoretical and
      Experimental Results. SPE Drilling and Completion, March, pp. 96-103, 2009.
10.   Wu, J., Knauss, M.E. and Kritzler, T. Casing Failures in Cyclic Steam Injection Wells.
      IADC/SPE 114231, Asia Pacific Drilling Technology Conference and Exhibition, Jakarta,
      Indonesia, August 2008.
11.   Xie, J. Casing Design and Analysis for Heavy Oil Wells, Paper 2006-415, World Heavy Oil
      Conference, Beijing, China, November 2006.
12.   Xie, J. Analysis of Oil Well Casing Connections Subjected to Non-axisymmetric Loads,
      Abaqus Users’ Conference, Paris, France, May 2007, pp. 634-646.
13.   Xie, J. A Study of Strain-based Design Criteria for Thermal Well Casing, Paper 2008-388,
      World Heavy Oil Congress, Edmonton, Canada, March 2008a.
14.   Xie, J. and Liu, Y. Analysis of Casing Deformations in Thermal Wells, Abaqus Users’
      Conference, Newport, Rhode Island, USA, May 2008b, pp. 542-553.
15.   Xie, J. Investigation of Casing Connection Failure Mechanisms in Thermal Wells, Paper
      2009-353, World Heavy Oil Congress, Puerto La Cruz, Venezuela, November 2009.

8. Acknowledgement

The work summarized and the preparation of this paper was supported by C-FER Technologies,
Canada. The authors would like to sincerely acknowledge Mr. Todd. A. Zahacy, Senior
Engineering Advisor, Exploration and Production, C-FER Technologies, for his technical advice
and assistance in preparing and reviewing this paper.


16                                                          2010 SIMULIA Customer Conference




              Visit the SIMULIA Resource Center for more customer examples.

Contenu connexe

Tendances

Trsv overview external
Trsv overview externalTrsv overview external
Trsv overview externalManuel Coxe
 
Sewer pipes-and-fittings
Sewer pipes-and-fittingsSewer pipes-and-fittings
Sewer pipes-and-fittingsthanhuce
 
Pipe & its wall thickness calculation
Pipe & its wall thickness calculationPipe & its wall thickness calculation
Pipe & its wall thickness calculationsandeepkrish2712
 
Mud loss or lost circulation
Mud loss or lost circulationMud loss or lost circulation
Mud loss or lost circulationSYED NAWAZ
 
API 12F Shop Welded Tank Pressure Analysis
API 12F Shop Welded Tank Pressure AnalysisAPI 12F Shop Welded Tank Pressure Analysis
API 12F Shop Welded Tank Pressure AnalysisKieran Claffey
 
Training material heat exchangers
Training material   heat exchangersTraining material   heat exchangers
Training material heat exchangersKrishna Raj
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design141jdf
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursRafik Guerbous
 
Impact of new codes in silos design
Impact of new codes in silos designImpact of new codes in silos design
Impact of new codes in silos designKhaled Eid
 

Tendances (16)

Question bank
Question bankQuestion bank
Question bank
 
Trsv overview external
Trsv overview externalTrsv overview external
Trsv overview external
 
Sewer pipes-and-fittings
Sewer pipes-and-fittingsSewer pipes-and-fittings
Sewer pipes-and-fittings
 
Pipe & its wall thickness calculation
Pipe & its wall thickness calculationPipe & its wall thickness calculation
Pipe & its wall thickness calculation
 
Mud loss or lost circulation
Mud loss or lost circulationMud loss or lost circulation
Mud loss or lost circulation
 
API 12F Shop Welded Tank Pressure Analysis
API 12F Shop Welded Tank Pressure AnalysisAPI 12F Shop Welded Tank Pressure Analysis
API 12F Shop Welded Tank Pressure Analysis
 
Training material heat exchangers
Training material   heat exchangersTraining material   heat exchangers
Training material heat exchangers
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
Sewer joint
Sewer jointSewer joint
Sewer joint
 
Branch connections
Branch connectionsBranch connections
Branch connections
 
Intze ppt
Intze pptIntze ppt
Intze ppt
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
 
Impact of new codes in silos design
Impact of new codes in silos designImpact of new codes in silos design
Impact of new codes in silos design
 
Riser Design Overview
Riser Design  OverviewRiser Design  Overview
Riser Design Overview
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
CMP Solutions by Contech
CMP Solutions by ContechCMP Solutions by Contech
CMP Solutions by Contech
 

En vedette

Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...Baker Hughes
 
Versa flex podcast
Versa flex podcastVersa flex podcast
Versa flex podcastccyzh
 
Tech data handbook_electronic
Tech data handbook_electronicTech data handbook_electronic
Tech data handbook_electronicDayna Rodriguez
 
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...Franco Bontempi
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am newAhmed Radwan
 
Connector and Tubing Technical Guide | Instrument Products Division - Parker ...
Connector and Tubing Technical Guide | Instrument Products Division - Parker ...Connector and Tubing Technical Guide | Instrument Products Division - Parker ...
Connector and Tubing Technical Guide | Instrument Products Division - Parker ...Parker Hannifin Corporation
 
FEA Based Design Optimization to Mitigate Anchor Cage Impact Damage Risk
FEA Based Design Optimization to Mitigate Anchor Cage Impact Damage RiskFEA Based Design Optimization to Mitigate Anchor Cage Impact Damage Risk
FEA Based Design Optimization to Mitigate Anchor Cage Impact Damage RiskAltair
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction iYalçın Dalgıç
 
Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3Aijaz Ali Mooro
 
Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1Aijaz Ali Mooro
 
Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Aijaz Ali Mooro
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Aijaz Ali Mooro
 
Thermal Properties of Matter
Thermal Properties of MatterThermal Properties of Matter
Thermal Properties of MatterShafie Sofian
 

En vedette (20)

Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...Expandable liner hanger and packer exceed expectations for first deepwater we...
Expandable liner hanger and packer exceed expectations for first deepwater we...
 
Versa flex podcast
Versa flex podcastVersa flex podcast
Versa flex podcast
 
MontanaTech
MontanaTechMontanaTech
MontanaTech
 
Tech data handbook_electronic
Tech data handbook_electronicTech data handbook_electronic
Tech data handbook_electronic
 
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
FINITE ELEMENT ANALYSIS OF INNOVATIVE SOLUTIONS OF PRECAST CONCRETE BEAM-COLU...
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
B3 Gunnar Skúlason Kaldal
B3 Gunnar Skúlason KaldalB3 Gunnar Skúlason Kaldal
B3 Gunnar Skúlason Kaldal
 
Liner hanger systems
Liner hanger systemsLiner hanger systems
Liner hanger systems
 
Connector and Tubing Technical Guide | Instrument Products Division - Parker ...
Connector and Tubing Technical Guide | Instrument Products Division - Parker ...Connector and Tubing Technical Guide | Instrument Products Division - Parker ...
Connector and Tubing Technical Guide | Instrument Products Division - Parker ...
 
FEA Based Design Optimization to Mitigate Anchor Cage Impact Damage Risk
FEA Based Design Optimization to Mitigate Anchor Cage Impact Damage RiskFEA Based Design Optimization to Mitigate Anchor Cage Impact Damage Risk
FEA Based Design Optimization to Mitigate Anchor Cage Impact Damage Risk
 
Thermal Expansion & Heat Transfer
Thermal Expansion & Heat TransferThermal Expansion & Heat Transfer
Thermal Expansion & Heat Transfer
 
B3 Magnús Þór Jónsson
B3 Magnús Þór Jónsson B3 Magnús Þór Jónsson
B3 Magnús Þór Jónsson
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Thermal expansion
Thermal expansionThermal expansion
Thermal expansion
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction i
 
Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3Fundamentals of Petroleum Engineering Module 3
Fundamentals of Petroleum Engineering Module 3
 
Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1
 
Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
 
Thermal Properties of Matter
Thermal Properties of MatterThermal Properties of Matter
Thermal Properties of Matter
 

Similaire à Analysis of Casing Connections Subjected to Thermal Cycle Loading

Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...
Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...
Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...CSCJournals
 
Evaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304L
Evaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304LEvaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304L
Evaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304LIRJET Journal
 
DOT International 2010, Titanium Shrink-Fit
DOT International 2010, Titanium Shrink-FitDOT International 2010, Titanium Shrink-Fit
DOT International 2010, Titanium Shrink-FitPaul Brett
 
Performance of Armor Steel Gas Metal Arc Welded Joints
Performance of Armor Steel Gas Metal Arc Welded JointsPerformance of Armor Steel Gas Metal Arc Welded Joints
Performance of Armor Steel Gas Metal Arc Welded JointsIRJET Journal
 
How clean are your bearing steels
How clean are your bearing steelsHow clean are your bearing steels
How clean are your bearing steelsMike Lewis
 
Steel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notesSteel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notesNick Wang
 
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...Fluxtrol Inc.
 
Thermal Energy Transfer of Steel Framing
Thermal Energy Transfer of Steel Framing Thermal Energy Transfer of Steel Framing
Thermal Energy Transfer of Steel Framing J. Patrick Lucas
 
IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...
IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...
IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...IRJET Journal
 
IRJET- Sandwich Plate System in Bridge Deck – A Review
IRJET-  	  Sandwich Plate System in Bridge Deck – A ReviewIRJET-  	  Sandwich Plate System in Bridge Deck – A Review
IRJET- Sandwich Plate System in Bridge Deck – A ReviewIRJET Journal
 
Presentation "Use of coupler Splices for Reinforcement"
Presentation "Use of coupler Splices for Reinforcement"Presentation "Use of coupler Splices for Reinforcement"
Presentation "Use of coupler Splices for Reinforcement"Pralhad Kore
 
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronicsTesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronicssystem_plus
 
Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...
Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...
Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...Fluxtrol Inc.
 
IRJET- Study of Loading Conditions for Three Plate Lap Welded Specimen us...
IRJET-  	  Study of Loading Conditions for Three Plate Lap Welded Specimen us...IRJET-  	  Study of Loading Conditions for Three Plate Lap Welded Specimen us...
IRJET- Study of Loading Conditions for Three Plate Lap Welded Specimen us...IRJET Journal
 
The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​
The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​
The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​ctcglobal
 
SNAME Greig and Ludwig RFW-GMAW Cladding Paper
SNAME Greig and Ludwig RFW-GMAW Cladding PaperSNAME Greig and Ludwig RFW-GMAW Cladding Paper
SNAME Greig and Ludwig RFW-GMAW Cladding PaperAndrew Greig
 
IRJET-Cyclic Response of Perforated Beam in Steel Column Joints
IRJET-Cyclic Response of Perforated Beam in Steel Column JointsIRJET-Cyclic Response of Perforated Beam in Steel Column Joints
IRJET-Cyclic Response of Perforated Beam in Steel Column JointsIRJET Journal
 
Ethylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaEthylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaAbdelhakAbdouKermad
 
A Review on Optimization of the Process Parameters in Friction Stir Welding o...
A Review on Optimization of the Process Parameters in Friction Stir Welding o...A Review on Optimization of the Process Parameters in Friction Stir Welding o...
A Review on Optimization of the Process Parameters in Friction Stir Welding o...IJAEMSJORNAL
 

Similaire à Analysis of Casing Connections Subjected to Thermal Cycle Loading (20)

Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...
Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...
Erosion and Cavitation Tests Applied to Coating Welded with Blends of Stainle...
 
Evaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304L
Evaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304LEvaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304L
Evaluation of Hardness of Bimetallic Weld joint between SA-508Gr3 and SS-304L
 
DOT International 2010, Titanium Shrink-Fit
DOT International 2010, Titanium Shrink-FitDOT International 2010, Titanium Shrink-Fit
DOT International 2010, Titanium Shrink-Fit
 
Performance of Armor Steel Gas Metal Arc Welded Joints
Performance of Armor Steel Gas Metal Arc Welded JointsPerformance of Armor Steel Gas Metal Arc Welded Joints
Performance of Armor Steel Gas Metal Arc Welded Joints
 
How clean are your bearing steels
How clean are your bearing steelsHow clean are your bearing steels
How clean are your bearing steels
 
Steel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notesSteel grounding-design-guide-and-application-notes
Steel grounding-design-guide-and-application-notes
 
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
 
Mig welding
Mig weldingMig welding
Mig welding
 
Thermal Energy Transfer of Steel Framing
Thermal Energy Transfer of Steel Framing Thermal Energy Transfer of Steel Framing
Thermal Energy Transfer of Steel Framing
 
IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...
IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...
IRJET- Review on Various Practices on Fatigue Analysis of Nuclear Power Plant...
 
IRJET- Sandwich Plate System in Bridge Deck – A Review
IRJET-  	  Sandwich Plate System in Bridge Deck – A ReviewIRJET-  	  Sandwich Plate System in Bridge Deck – A Review
IRJET- Sandwich Plate System in Bridge Deck – A Review
 
Presentation "Use of coupler Splices for Reinforcement"
Presentation "Use of coupler Splices for Reinforcement"Presentation "Use of coupler Splices for Reinforcement"
Presentation "Use of coupler Splices for Reinforcement"
 
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronicsTesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronics
 
Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...
Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...
Fluxtrol's "Best Practice for Design and Manufacturing of Heat Treating Induc...
 
IRJET- Study of Loading Conditions for Three Plate Lap Welded Specimen us...
IRJET-  	  Study of Loading Conditions for Three Plate Lap Welded Specimen us...IRJET-  	  Study of Loading Conditions for Three Plate Lap Welded Specimen us...
IRJET- Study of Loading Conditions for Three Plate Lap Welded Specimen us...
 
The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​
The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​
The Importance of the ASTM B-987 Standard for Carbon Fiber Core Conductors​
 
SNAME Greig and Ludwig RFW-GMAW Cladding Paper
SNAME Greig and Ludwig RFW-GMAW Cladding PaperSNAME Greig and Ludwig RFW-GMAW Cladding Paper
SNAME Greig and Ludwig RFW-GMAW Cladding Paper
 
IRJET-Cyclic Response of Perforated Beam in Steel Column Joints
IRJET-Cyclic Response of Perforated Beam in Steel Column JointsIRJET-Cyclic Response of Perforated Beam in Steel Column Joints
IRJET-Cyclic Response of Perforated Beam in Steel Column Joints
 
Ethylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper chinaEthylene oxide reactor failure pvp 2011 paper china
Ethylene oxide reactor failure pvp 2011 paper china
 
A Review on Optimization of the Process Parameters in Friction Stir Welding o...
A Review on Optimization of the Process Parameters in Friction Stir Welding o...A Review on Optimization of the Process Parameters in Friction Stir Welding o...
A Review on Optimization of the Process Parameters in Friction Stir Welding o...
 

Plus de SIMULIA

Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...
Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...
Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...SIMULIA
 
Welding Simulation with Abaqus
Welding Simulation with AbaqusWelding Simulation with Abaqus
Welding Simulation with AbaqusSIMULIA
 
Determination of Critical Flaw Size in Gun Launched 40mm Grenade
Determination of Critical Flaw Size in Gun Launched 40mm GrenadeDetermination of Critical Flaw Size in Gun Launched 40mm Grenade
Determination of Critical Flaw Size in Gun Launched 40mm GrenadeSIMULIA
 
Design of Different Types of Corrugated Board Packages Using Finite Element T...
Design of Different Types of Corrugated Board Packages Using Finite Element T...Design of Different Types of Corrugated Board Packages Using Finite Element T...
Design of Different Types of Corrugated Board Packages Using Finite Element T...SIMULIA
 
Earth Penetration Simulation using Coupled Eulerian-Lagrangian Analysis
Earth Penetration Simulation using Coupled Eulerian-Lagrangian AnalysisEarth Penetration Simulation using Coupled Eulerian-Lagrangian Analysis
Earth Penetration Simulation using Coupled Eulerian-Lagrangian AnalysisSIMULIA
 
Warping and Residual Stress Analysis using the Abaqus Interface for Moldflow
Warping and Residual Stress Analysis using the Abaqus Interface for MoldflowWarping and Residual Stress Analysis using the Abaqus Interface for Moldflow
Warping and Residual Stress Analysis using the Abaqus Interface for MoldflowSIMULIA
 
Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...
Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...
Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...SIMULIA
 
Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...
Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...
Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...SIMULIA
 
Achieving a more Accurate Prediction of a Polymer Snap Deformation Pattern
Achieving a more Accurate Prediction of a Polymer Snap Deformation PatternAchieving a more Accurate Prediction of a Polymer Snap Deformation Pattern
Achieving a more Accurate Prediction of a Polymer Snap Deformation PatternSIMULIA
 
Optimisation of Welds with Manufacturing Considerations
Optimisation of Welds with Manufacturing ConsiderationsOptimisation of Welds with Manufacturing Considerations
Optimisation of Welds with Manufacturing ConsiderationsSIMULIA
 

Plus de SIMULIA (10)

Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...
Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...
Multi-Physics Analysis of a Refractory Metal ACOperated High Temperature Heat...
 
Welding Simulation with Abaqus
Welding Simulation with AbaqusWelding Simulation with Abaqus
Welding Simulation with Abaqus
 
Determination of Critical Flaw Size in Gun Launched 40mm Grenade
Determination of Critical Flaw Size in Gun Launched 40mm GrenadeDetermination of Critical Flaw Size in Gun Launched 40mm Grenade
Determination of Critical Flaw Size in Gun Launched 40mm Grenade
 
Design of Different Types of Corrugated Board Packages Using Finite Element T...
Design of Different Types of Corrugated Board Packages Using Finite Element T...Design of Different Types of Corrugated Board Packages Using Finite Element T...
Design of Different Types of Corrugated Board Packages Using Finite Element T...
 
Earth Penetration Simulation using Coupled Eulerian-Lagrangian Analysis
Earth Penetration Simulation using Coupled Eulerian-Lagrangian AnalysisEarth Penetration Simulation using Coupled Eulerian-Lagrangian Analysis
Earth Penetration Simulation using Coupled Eulerian-Lagrangian Analysis
 
Warping and Residual Stress Analysis using the Abaqus Interface for Moldflow
Warping and Residual Stress Analysis using the Abaqus Interface for MoldflowWarping and Residual Stress Analysis using the Abaqus Interface for Moldflow
Warping and Residual Stress Analysis using the Abaqus Interface for Moldflow
 
Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...
Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...
Coupled Euler Lagrangian Approach Using Abaqus /Explicit in the Bird Strike A...
 
Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...
Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...
Simulation of Airbag Deployment Using the Coupled Eulerian-Lagrangian Method ...
 
Achieving a more Accurate Prediction of a Polymer Snap Deformation Pattern
Achieving a more Accurate Prediction of a Polymer Snap Deformation PatternAchieving a more Accurate Prediction of a Polymer Snap Deformation Pattern
Achieving a more Accurate Prediction of a Polymer Snap Deformation Pattern
 
Optimisation of Welds with Manufacturing Considerations
Optimisation of Welds with Manufacturing ConsiderationsOptimisation of Welds with Manufacturing Considerations
Optimisation of Welds with Manufacturing Considerations
 

Dernier

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 

Dernier (20)

Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Analysis of Casing Connections Subjected to Thermal Cycle Loading

  • 1. Visit the SIMULIA Resource Center for more customer examples. Analysis of Casing Connections Subjected to Thermal Cycle Loading Jueren Xie and Gang Tao C-FER Technologies, Edmonton, Alberta, Canada Production of heavy oil and bitumen, which is increasing around the world as conventional oil resources are depleted, often uses thermal well technologies such as Cyclic Steam Stimulation (CSS) and Steam Assisted Gravity Drainage (SAGD). Casing connections are one of the most critical components in thermal wells. Historically, the literature shows that over 80% of reported uphole casing failures experienced in thermal wells occurred at connections. Typical connection failure mechanisms include structural damages, such as parting, thread rupture, and shoulder plasticity, and serviceability damages, such as leakage. One of the critical load conditions causing casing and casing connection failures is the thermal cycle loading, with high peak temperatures typically in excess of 200°C, which can cause the well casing and casing connections to deform plastically. There are generally three types of connections used in intermediate or production casing of thermal wells: API (American Petroleum Institute) round, API buttress and proprietary premium connections. This paper presents finite element analysis of these three types of casing connections subjected to thermal cycle loading. Based on analysis results, this paper demonstrates that the premium connection, which has a metal-to-metal seal region, is the most suitable of these three connection designs for the use in thermal wells, in terms of structural integrity and sealability. This paper also presents recommendations for casing connection design for successful service in thermal well applications. Keywords: Casing, Connection, Cyclic Steam Stimulation (CSS), Sealing, Steam Assisted Gravity Drainage (SAGD), Strength, Structural Integrity, Thermal Cycles, Thermal Wells. 1. Introduction Thermal well technologies, such as Cyclic Steam Stimulation (CSS) and Steam Assisted Gravity Drainage (SAGD), have been widely used in the production of heavy oil and bitumen. Their use continues to increase as the worldwide production of oil continues to evolve from depleting conventional light oil to more viscous heavy oil and bitumen resources. In the CSS recovery process, high pressure, high temperature steam (330°C-350°C) is injected into the reservoir, followed by a soaking period to allow the thermal energy of the injected steam to disperse into the reservoir, heat the oil and thereby significantly reduce its viscosity, and the heated oil is then produced to the surface from the same well. The SAGD process typically utilizes two parallel horizontal wells positioned above one another and spaced several meters apart. High temperature steam (200°C -275°C) is continuously injected into the upper injection well to heat the reservoir. The hot fluids produced (oil, condensate and formation water) then drain into the lower production well by gravity and are produced to surface by natural steam lift or various artificial lift 2010 SIMULIA Customer Conference 1 Visit the SIMULIA Resource Center for more customer examples.
  • 2. techniques. Shutdowns due to facility disruptions or wellbore services, such as to replace failed artificial lift systems, and the associated cooling and reheating on restart result in cyclic thermal loading in SAGD wells. The casing strings in thermal wells typically consist of many steel casing joints (usually 10 - 13 m in length) joined by threaded connections and are cemented over the entire wellbore length to provide structural support and hydraulic isolation to the wellbore, and as such the casing strings and in particular the casing connections are one of the most critical components in thermal wells (Xie, 2006). Payne and Schwind (1999) noted that, based on industry estimates, connection failures account for 85% - 95% of all oilfield tubular failures. For thermal well applications in Western Canada, the Canadian Association of Petroleum Producers (CAPP, 1992) reported that more than 80% of the uphole casing failures experienced in thermal wells occurred at connections, and the recently published casing failure occurrence data for thermal operations in Alberta (i.e. since 2000) suggests this trend has continued. In thermal wells, investigation indicates that a large portion of these casing string and connection failures can be attributed to the severe loading conditions of these applications. A common feature for thermal wells is the cyclic thermal loading with high peak temperatures that may result in high thermally-induced stresses, which typically exceed the elastic limit of the material and cause the casing and connection to deform plastically. In addition, curvature loading resulting from casing buckling and formation shear movement is also a critical load condition for thermal well casing and casing connection integrity (Smith, 2001). Connection fatigue failures can also occur during casing installation rotations and during thermal cycles. Therefore, ensuring adequate structural integrity and sealability of the connections over the full service life of a thermal well is a significant challenge. Proper casing design, including material selection and connection design, plays an important role in achieving the long term structural and hydraulic integrity and minimizing the risk of casing failure in these applications. This paper presents discussions on design requirements for casing connections in thermal wells. There are three basic types of casing connections used in oil wells: standard API (American Petroleum Institute) round, API buttress (and oversized buttress) and proprietary premium connections. This paper focuses on the finite element analyses of these three types of connections subjected to thermal cycle loading representative of CSS well operating conditions. The analysis results provide a comparative assessment of their relative structural integrity and sealability performance under thermal cycle loading conditions representative of these applications. 2. Connection design requirements Two of the primary functions of casing connections are adequate structural integrity and hydraulic integrity or sealability. Various guidelines for connection designs have been established by industry over the years. For example, the Alberta Industry Recommended Practice (IRP, 2002) outlines the following general recommendations for casing connections in thermal wells: • The connections should have a joint axial load carrying capacity greater than, or equal to, the pipe body yield strength; • The casing connections should provide adequate sealing under the anticipated thermal operating conditions; and 2 2010 SIMULIA Customer Conference
  • 3. The selection of a suitable thread compound is an integral part of casing connection design and should be properly matched with the type of connection selected. The casing connections of oil country tubular goods (OCTG) can be classified into three types: API round, API buttress (and oversized buttress), and proprietary premium connections. These connections, the general forms of which are shown in Figure 1, have the following features: • API round threads are of two forms: API long threaded and coupled (LTC) and short threaded and coupled (STC). The sloped profile and tolerance of the API round thread design, in conjunction with the appropriate thread compound, provide the structural and sealing capabilities of these connections (Figure 1a). • API buttress threaded and coupled connections (BTC) have a more square thread profile which provides the structural function and some degree of sealability (i.e. by the combination of the action of a thread compound and the helical leak path of the buttress thread section) (Figure 1b). • Premium connections typically use buttress-type threads for the structural function and a metal-to-metal radial contact seal section for sealability. Many premium connections also include an axial metal-to-metal shoulder next to the seal region of the pipe body and coupling design to control makeup and, in some designs, to gain additional sealability. Figure 1c shows a generic premium connection which employs buttress threads, a metal- to-metal radial seal and a pin-to-coupling shoulder. (a) API round thread connection (b) API buttress thread connection coupling metal-to-metal threads seal pin shoulders (c) A generic premium connection Figure 1. Schematics of (a) an API round thread connection; (b) an API buttress thread connection; and (c) a generic premium connection 2010 SIMULIA Customer Conference 3
  • 4. 3. Finite element model 3.1 Modeling of casing connections The analysis examples presented in this paper consider a 177.8 mm outer diameter (OD), 34.2 kg/m weight, Grade 80 steel alloy casing material with API STC, API BTC and generic premium connection designs. As shown in Figure 2, an axially symmetric section including one half of a connection and one half of a typical casing joint (e.g. 10 m in length) were considered in the model. A finite element model of the half coupling and casing section was created using axisymmetric solid elements CAX4 in Abaqus. The geometries of API STC and BTC connections were developed based on nominal dimensions as per API Specifications 5CT (2005) and 5B (2008). The generic premium connection model included the basic features common to the premium connections currently used in thermal well applications (e.g. buttress threads, axial torque shoulders, and radial metal-to-metal seals) such that the analysis results were representative of such connections. Note that the generic premium connection model presented here should not be taken as being representative of any specific commercially available connection product. It is also important to note, however, that premium connection designs must be modeled based on the proprietary design details of the connection. This paper focuses on simulating the response of the connections under axisymmetric loading, such as makeup, axial tensile and compressive loading, and thermal cycle loading representative of CSS well operating conditions (e.g. thermal cycle with peak temperature of 350ºC). In the analyses, symmetric boundary conditions were assumed for both ends of the models, and the casing OD was constrained radially to represent radial confinement provided by the cement sheath and formation surrounding the casing. For connections subjected to non-axisymmetric loads, such as those resulting from bending induced by wellbore curvature, casing bucking and formation shear movement, axisymmetric elements with nonlinear asymmetric deformation (e.g. Abaqus CAXA4N elements) can be used (Xie, 2007). center of coupling center of casing joint Figure 2. Section of coupling and casing pipe body modeled 3.2 Modeling of casing materials The Grade 80 (i.e. nominal minimum yield strength of 80 ksi (552 MPa)) material of casing connection (i.e. pipe body and coupling) response was modeled using an elastic-plastic, combined kinematic hardening constitutive relationship. The initial yield stress at room temperature was assumed to be 570 MPa, which is representative of such commercial Grade 80 casing materials, and the Young’s modulus was assumed to be 200 GPa. The material model also takes into consideration of temperature- and time-dependence effects. These modeling considerations were 4 2010 SIMULIA Customer Conference
  • 5. required to capture material property variations with temperature, stress relaxation behavior and Bauschinger effect (i.e. reduced yield stress upon load reversal after plastic deformation has occurred during the initial loading) (Dowling, 1998). Additional discussions of the material modeling approach for thermal cycle loading analysis were presented by Xie (2008b). 3.3 Modeling of loading conditions The following is a brief description of three loading conditions that each of the connection designs was analyzed. Connection makeup The initial state of the three models of the connections was obtained by engaging the threaded casing pin end into the coupling to the nominal makeup position by resolving overclosure interference between the threads of the pin and box, as well as in the radial seal and axial shoulder regions for the premium connection. The connection makeup was assumed to occur at a low ambient temperature of 20°C. This load scenario simulates connection makeup in the fabrication facility and in the field. Axial loadings For assessment of the structural capacities of the three connection designs, axial tensile and compressive loads were applied along the axis of the connection models after makeup. This load scenario was used to assess the relative structural and sealing capacities of different types of connections. Thermal cycles To investigate the performance of the three connections under loading conditions representative of a CSS operation, the thermal cycle loading was simulated by subjecting the connection models to temperature variations equivalent to one thermal cycle. Through this thermal cycle loading, the ends of the model were constrained axially to represent the casing cemented to the formation in the wellbore. Note that multiple cyclic loading analysis may also be conducted with a suitable casing material model (Xie, 2008b). To model a single thermal cycle, the temperature of the casing joint and coupling was gradually increased from the initial temperature, here assumed to be 20°C, to the maximum operating temperature, assumed here for the CSS scenarios to be 350°C. To illustrate the key features of the thermal cycle loading, Figure 3 presents the relationship between the casing axial stress and temperature for the Grade 80 casing pipe-body over the temperature cycle from 20°C to 350°C and back to 20°C. The thermal cycle consists of three loading stages: 1. The “Heating” load stage occurs as the temperature increases from the initial value of 20°C to the peak temperature of 350°C. Since the casing string is constrained axially (e.g. cemented), axial compressive stress develops which ultimately exceed the material yield capacity in compression, in this case at a temperature of approximately 210°C; 2. The “Hot-hold” stage is where the temperature is held at the peak value for a period of time (e.g. hours or days). Stress relaxation occurs with a significant reduction in axial compressive stress; and 2010 SIMULIA Customer Conference 5
  • 6. 3. The “Cooling” load stage occurs when the temperature is decreased from the peak “hot-hold” value of 350°C, to the initial ambient temperature of 20°C, causing the constrained casing to contract and the axial load to gradually change from compressive to tensile loading. In high temperature applications, such as CSS operations, and depending on the properties of the material and the peak temperature range, the casing pipe body material could reach yield in tension at the end of a thermal cycle, as shown in Figure 3. 600 End of a Thermal Cycle 400 Axial Stress (MPa) 200 Cooling 0 -200 Hot- -400 Heating Hold -600 0 50 100 150 200 250 300 350 400 Temperature (°C) Figure 3. Axial stress and temperature relationship for a Grade 80 casing string under thermal cycle loading from 20°C to 350°C 4. Analysis results The following section describes the results of the axial loading and the thermal cycle loading scenarios on the three connection designs. The makeup loading results are not presented in detail since this loading scenario was merely completed to obtain the initial conditions for the axial and thermal load scenarios. 4.1 API STC and API BTC connections under axial loading Structural capacities The structural response of the API STC and BTC connections under axial loading scenarios was assessed by applying the tensile and compressive loads along the axis of the connection models after makeup. Figure 4 presents the axial force response to average axial strain within the API STC and BTC connections under tensile load. The analysis results show that the BTC connection has axial load carrying capacity greater than the pipe body yield strength. The STC connection, however, shows lower axial load carrying capacity than the yield strength mainly due to reduced cross section of the unengaged thread section of the pin. Initiation of thread jump-out was predicted under a relatively low axial tensile load (i.e. less than half of the pipe body yield load). 6 2010 SIMULIA Customer Conference
  • 7. Note that thread jump-out is a potential connection failure mechanism which occurs when threads on the pin jump over one or more thread grooves of the coupling axially outward under axial tensile loading. This is in contrast to thread jump-in which occurs when threads on the pin of a connection jump by one or more thread grooves axially inward relative to the coupling under compressive loading. As the tensile load increases beyond the jump-out initiation, separation of the flanks between coupling and pin threads becomes significant, as shown in Figure 5. 3,000 Pipe Body Yield Strength 2,500 Axial Tensile Force (kN) 2,000 1,500 1,000 STC Connection Initiation of 500 Thread Jump-out BTC Connection 0 0.0% 0.1% 0.2% 0.3% 0.4% 0.5% 0.6% Average Tensile Axial Strain in Connection Figure 4. Axial force vs average axial strain of 177.8 mm, 34.2 kg/m Grade 80 API STC and BTC connections under tensile loading coupling pin Figure 5. Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API STC connection under tensile loading (showing development of thread jump-out) Figure 6 presents the axial force response of the API STC and BTC connections under compressive loading. The analysis results show that BTC connection also provides higher axial load carrying capacity than the pipe body yield strength under compressive loading. For the STC connection, the compressive load carrying capacity was shown to be lower than pipe body yield strength. Initiation of thread jump-in was observed under an axial load level significantly below the pipe body yield load. Due to the taper angle of the pitch line of the STC connection threads in the pin and coupling, the results show that thread jump-in requires a higher applied load (or energy) than that required for thread jump-out under tensile loading. Figure 7 shows the deformation in the STC connection with development of thread jump-in evident by the inward deformation within the unengaged thread region of the pin portion of the connection. 2010 SIMULIA Customer Conference 7
  • 8. Based on the analysis results of this illustrative example, the API STC connection with the assumed Grade 80 material properties did not satisfy the suggested guidelines of the Alberta IRP that the connections should have a joint axial load carrying capacity greater than or equal to the pipe body yield strength. On the other hand, the analyzed API BTC connection (i.e. with the same casing pipe body and material grade) showed sufficient axial load carrying capacity to satisfy the Alberta IRP guidelines. 3,000 Pipe Body Yield Strength 2,500 Axial Compressive Force (kN) 2,000 1,500 1,000 Initiation of Thread Jump-in STC Connection 500 BTC Connection 0 0.0% 0.1% 0.2% 0.3% 0.4% 0.5% 0.6% Average Compressive Axial Strain in Connection Figure 6. Axial force vs average axial strain of 177.8 mm, 34.2 kg/m Grade 80 API STC and BTC connections under compressive loading coupling pin Figure 7. Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API STC connection under compressive loading (showing development of thread jump-in) 4.2 API STC and API BTC connections under thermal cycle loading Structural capacities Figures 8a and 8b present the axial stress distribution for the API STC connection after makeup at room temperature (i.e. 20°C) and after axially constrained thermal loading to 350°C, respectively. Figure 8b shows the development of thread jump-in and excessive plastic deformation in the critical section of the unengaged threads of the pin. Figure 9 presents the axial stress distributions for an API BTC connection after makeup and during thermal cycle loading over the same temperature range. The analysis shows that the API BTC connection maintained structural integrity during the imposed thermal cycle, and no thread jump-in or jump-out was observed for the modeled API BTC connection. 8 2010 SIMULIA Customer Conference
  • 9. (a) at makeup (b) at 350ºC during heating Figure 8. Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API STC connection subjected to thermal loading (a) at makeup (20ºC) (b) at end of heating phase (350ºC) (c) at end of holding phase (350ºC) (d) at end of thermal cycle (20ºC) Figure 9 Axial stress (MPa) of a 177.8 mm, 34.2 kg/m Grade 80 API BTC connection subjected to thermal cycle loading Sealing integrity In addition to the structural capacity guideline, the Alberta IRP (2002) also indicates that the casing connections should provide adequate sealing under the anticipated thermal operating conditions. For API round connections, the sealing capacity usually depends on three factors: (1) contact pressure between threads of the coupling and pin; (2) the geometry of the leakage path (i.e. the length and cross-section area), and (3) the property of the thread compound occupying in the leakage path. After connection makeup, contact is established on both the stabbing flank and 2010 SIMULIA Customer Conference 9
  • 10. the loading flank of the round threads of the pin (Figure 10b). As noted by Teodoriu (2009), if the contact pressure is higher than the pressure to be sealed, the only potential leak paths in API round connections are the spiral paths between the thread crests and roots. Figure 10a presents the average contact stress on the loading flank next to the entry plane as a function of temperature for the API STC connection. As shown in Figure 10a, as the STC connection was heated, the contact pressure decreased with increasing temperature and eventually dropped to zero at around 153°C, leading to loss of contact pressure between the threads. However, due to the combined effects and variability in material properties and connection tolerances, it is important to note that finite element analysis is not generally sufficient on its own to determine the seal performance of API round thread connections, and physical testing should be used in conjunction with numerical simulation to assess the connection sealing performance. 500 450 400 Contact Pressure (MPa) heating 350 coupling 300 250 200 pin 150 100 50 0 0 50 100 150 200 250 300 350 loading flank of stabbing flank of Temperature (ºC) pin pin (a) Contact pressure as a function of temperature (b) API STC thread design Figure 10. Predicted contact pressure on the critical loading flank as a function of temperature for a 177.8 mm, 34.2 kg/m Grade 80 API STC connection In contrast to API round connections, according to API specification 5B (2008), the API buttress threads leave a nominal 0.025 mm (0.001”) gap between the thread flanks of the coupling and the pin for 177.8 mm (7”) connections. The thread manufacturing tolerance allowed for 177.8 mm (7”) API buttress connections is 0 to -0.076 mm (-0.003”) for both pin and coupling threads along the axial direction of the connection. Therefore, the maximum gap between the threads of the pin and coupling can be as large as 0.178 mm (0.007”). Therefore, the sealing performance of the API buttress connection relies on the combined effects of contact pressure between the threads, the leakage path geometry and the thread compound properties. As indicated in the Alberta IRP (2002), API buttress connections require a high concentration of solids in a high temperature thermal lubricating compound to improve sealability once the connection is made-up. The solids and lubricant fill gaps in the pin-box thread form that otherwise might allow fluids to seep through the connection. Full-scale testing has confirmed that, in most cases, a buttress connection does not provide the same degree of seal integrity as does a premium connection. In some cases, buttress connection specimens have exhibited leakage rates several orders of magnitude higher than premium connections under the same conditions (Maruyama, 1990). For these considerations, 10 2010 SIMULIA Customer Conference
  • 11. buttress connections are often considered not suitable for the demanding conditions of the intermediate or production casing strings in high-temperature thermal well applications. 4.3 Premium connection under thermal cycle loading Structural capacities Premium connections are commonly designed to have the buttress type threads for structural capacity and a metal-to-metal seal section for sealing. Therefore, one would expect premium connections to have similar load carrying capacity to that of API buttress connections and should therefore, have sufficient structural capacity for thermal well applications. Figure 11 presents the axial stress contours for a generic premium connection at makeup, and at the end of the hot-hold and cooling stages of a thermal cycle. The red color represents areas with high tensile stress and the blue color is for areas with high compressive stress. As shown in this figure, regions of the connection are subjected to high compressive loading (blue color) at makeup and during the hot-hold period due to connection shoulder engagement and material thermal expansion, respectively, and to high tensile stress (orange to red color) as it is cooled down due to material thermal contraction. For many premium connections, thermal cycle loading does not cause a significant structural concern in the thread roots due to the generally low magnitude of the associated plastic strains. However, under such conditions, the excessive compressive loading on the pin/coupling shoulders may cause some concerns for structural failure as these regions may be subjected to excessive shear deformations. Note that the plastic strain value in the torque shoulder regions can be significantly larger during heating as compared to that at makeup. (a) Makeup (b) Hot-hold (c) End of a thermal cycle Figure 11. Axial stress distribution of a generic premium connection subjected to thermal loading Sealing integrity The sealing capacity for a premium connection is generally provided by the metal-to-metal contact stress over the effective seal region (Xie, 2009), as shown in Figure 12. Since the purpose of the examples presented in this paper is to demonstrate typical connection deformation mechanisms, connection seal contact forces are presented on a relative performance scale to that of the connection makeup condition. Figure 13 shows the variation in the seal contact intensity (integration of the seal contact stress profile over the effective seal length) of the generic premium connection from make-up through the thermal cycle. The figure shows that the seal contact intensity (i.e. relative to makeup) varies during the thermal cycle, with a significant reduction of about 38% during the hot-hold period as a result of the stress relaxation of the material. At the 2010 SIMULIA Customer Conference 11
  • 12. end of the thermal cycle, the seal contact intensity was further reduced to only about 42% as compared to that of the made-up condition, due to the effect of thermal tensile loading. Note that the seal contact stress must be significantly higher than the oil/gas/steam pressure in order to maintain sealability. oil/gas contact stress pressure pin Pin coupling Coupling Figure 12. Illustration of seal contact stress in a premium connection 150% Heating (vs Contact Intensity at Makeup) Makeup Seal Contact Intensity 100% Hot-hold 50% End of Cycle Cooling 0% 0 100 200 300 400 Temperature (°C) Figure 13. Changing of seal contact intensity for a 177.8 mm, 34.2 kg/m Grade 80 generic premium connection over a thermal cycle Based on the analysis of the Grade 80 generic premium connection, the results indicate that while the considered thermal cycle loading did not appear to cause a significant concern for the structural performance in threads of this generic premium connection design over the make-up and thermal cycle considered, an over-loaded shoulder condition could potentially cause structural damage in the shoulder region of the connection. The results also show that the premium connection sealing capacity can change significantly over thermal cycle loading. It has been shown that significant reduction in seal contact intensity can occur due to stress relaxation during the hot-hold stage, and due to axial tensile loading introduced during cooling. As such, the results of this analysis show that the seal contact condition is generally at its lowest and most critical value at the end of a thermal cycle in such high temperature application. 12 2010 SIMULIA Customer Conference
  • 13. It is important to reiterate that the specific behavior of a connection is a function of its design, manufacturing (tolerance), make-up and load history. Therefore, each connection and load scenario must be evaluated for the conditions of the application. 5. Material impacts on connection performance The numerical evaluation of connection performance in a thermal well application is often challenging because the long-term material behavior is affected by the load and environmental history, which may also be influenced by the cyclic high temperature effects, plastic deformations, and fatigue loading conditions in thermal wells. One important issue raised by Xie (2008a) is that the casing design should take into consideration the potential effects of material degradation in thermal wells. Xie suggested that the effects of strain-hardening, strain-ageing, and corrosion can contribute to material degradation over thermal cycles. These effects are discussed further below with reference to their impact on connection performance in thermal wells. 5.1 Strain-hardening Strain-hardening (also often termed “cold working”) of steel materials is the strengthening resulting from an increase in the material’s dislocation density by plastic deformation. Material strain-hardening often results in some beneficial effects for casing and liner designs in thermal well completions, as it generally increases casing/liner resistance to strain localization, buckling and shear deformation. In addition, strain-hardening is also favourable in terms of reducing localized plastic strain accumulation in connection threads. Xie (2008a) demonstrated the relationship between plastic strain and temperature for both the casing pipe body and premium connection thread root during a thermal cycle, as shown in Figure 14. It is interesting to note that the development of plastic strain in the connection thread root approaches a plateau value soon after the pipe body reaches yield during both the heating and cooling periods. Yield of the casing pipe body significantly reduces the severity of strain localization in the connection threads and therefore allows incremental plastic strain to be more evenly distributed throughout the casing string. A higher strain-hardening rate would lead to less plastic strain accumulation in the thread root before the pipe body yields and, as a result, would reduce the failure potential in the thread region of the connection. The Alberta IRP (2002) indicates that the Y/T (yield strength to tensile strength) ratio of casing material should be less than or equal to 0.9 for the intermediate or production casing to ensure that the API buttress and premium connections have sufficient structural capacities for application in high temperature thermal wells. The development of strain-hardening, however, often causes a reduction in the material’s ductility, and that may cause the material to be more susceptible to different forms of corrosion. Physical coupon tests have shown that there is more than 10% reduction in material ductility as a result of strain-hardening induced in the specimen from one thermal cycle (Xie, 2008a). However, the tests also show that such reductions appear to stabilize with further cycles. The reduction in material ductility due to strain-hardening is not typically considered to be the primary reason for casing failures since the main impact of strain-hardening on ductility occurs during the first thermal cycle. Experience has nevertheless shown that most thermal well failures tend to occur after several thermal cycles (Wu, 2008), suggesting that further investigation of the potential impacts that mechanisms such as strain-hardening might have on casing failures appears to be warranted. 2010 SIMULIA Customer Conference 13
  • 14. Seal and 1.0% Shoulder 0.8% Thread Root Plastic Strain 0.6% End of a Cycle 0.4% Pipe-Body 0.2% Start of a Cycle 0.0% 0 100 200 300 400 o Temperature ( C) Figure 14. Relationship between plastic strain and temperature for casing pipe body and a premium connection thread root (including plastic strain contour for connection - red represents high plastic strain) (Xie, 2008a) 5.2 Strain-ageing Strain-ageing for carbon steels mainly involves the interaction of dislocations with interstitial elements, such as carbon and nitrogen, or interstitial-substitutional solute pairs. This interaction stabilizes mobile dislocations and therefore an incrementally larger stress is required to continue to move the dislocations to result in incremental plastic deformations (Xie, 2008a). Usually, a slow strain rate and a relatively high temperature (150 – 250°C) are required to achieve strain-ageing of casing materials, both of which tend to exist in many thermal wells. Strain-ageing can cause a significant reduction in material ductility, and therefore may impact the connection performance. Xie (2008a) suggested that, given the nature of strain-ageing, it can be postulated that casing material strain-ageing may occur in thermal wells, especially in CSS wells where the cooling phase may occur over a relatively long time period (e.g. several weeks or months during the production stage). As was shown in the finite element analysis of the generic premium connection subjected to thermal cycle loading, the connection thread roots can start to yield at around 150-200°C during the cooling phase. Therefore, it is possible that material strain-ageing may occur in areas of high strain, such as in the thread roots of casing connections. Development of strain ageing may significantly reduce the casing material ductility, and consequently reduces the connection capacity to sustain thermal loads. 5.3 Corrosion Connection performance may also be significantly affected by a number of possible material corrosion mechanisms. Thermal wells are often exposed to corrosive environments, including carbon dioxide (CO 2 ) and hydrogen sulfide (H 2 S) generated by aqua-thermolysis of the heavy oil in the presence of water at high temperatures. The severe loading conditions present during thermal operation will likely increase the casing material’s susceptibility to corrosion induced 14 2010 SIMULIA Customer Conference
  • 15. degradation, such as stress corrosion cracking (SCC). As noted by Xie (2008a), further study is required to define the impact of material corrosion and the combined and potentially synergistic effects of the temperature variations, plastic deformation and corrosion on connection performance in thermal wells. 6. Conclusions This paper presents an overview on a number of key connection design requirements for thermal well applications, in particular related to those of the main roles of the connections in maintaining the structural and hydraulic integrity of the wells. Based on the finite element analysis of three types of connections (i.e. API round, API buttress and a generic premium connection), this paper demonstrated the relative structural and seal performance of these connections under thermal cycle loading conditions representative to typical high temperature thermal well (e.g. CSS) applications. Note this paper focused on connection performance under thermal cycle loading. It is important to note that, in addition to thermal loading, curvature loading resulting from wellbore curvature, casing buckling and formation shear movement can also contribute to casing connection failures in thermal wells, and should also be considered. Based on discussions and analyses presented in this paper, the following conclusions and recommendations are made: • API round thread connections, such as the STC and LTC designs, do not provide adequate axial load carrying capacity which is recommended to be greater than pipe body yield strength according to industry guidelines such as the Alberta IRP (2002). Therefore, they are generally not suitable connection designs for most of high temperature thermal well applications. • API buttress connection appears to have sufficient structural capacity for intermediate or production casing of many thermal well applications. However, the API buttress connections rely on thread compound to provide sealing which may not be sufficient under thermal well conditions. Therefore, API buttress connections are generally not recommended for the intermediate or production casing of most of high temperature thermal well applications. • Premium connections usually provide both sufficient structural capacity and sealability for the conditions of most of high temperature thermal well operations (e.g. up to 350ºC). Therefore, they are generally preferred for the intermediate or production casing in thermal wells. However, a combination of both suitable and representative physical and numerical evaluation (or qualification) programs are generally required to properly assess the structural and sealability performance of premium connections in such demanding conditions as those of CSS and SAGD applications. • Further investigation is necessary to expand the understanding of material degradation effects on the long term connection performance in thermal well applications, such as strain-hardening, strain-ageing and corrosion. 2010 SIMULIA Customer Conference 15
  • 16. 7. References 1. API Specification 5B, Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads, 5th Edition, 2008. 2. API Specification 5CT, Specification for Casing and Tubing, 8th Edition, 2005. 3. CAPP. Thermal Well Casing Risk Assessment, Canadian Petroleum Association, Thermal Well Casing Risk Subcommittee, 1992-0017, pp. 116. Canadian Association of Petroleum Producers. 4. Dowling, N.E. Mechanical Behavior of Materials – Engineering Methods for Deformation, Fracture, and Fatigue, 2nd edition, Prentice Hall, New Jersey, 1998. 5. Industry Recommended Practices for Heavy Oil and Oil Sands Operations (IRP), Vol.3, 2002. 6. Maruyama, K., Tsuru, E., Ogasawara, M., Yasusuke, I. and Peters, E.J. An Experimental Study of Casing Performance under Thermal Cycling Conditions. SPE Drilling Engineering, 5(2), pp. 156-164, 1990. 7. Payne, M.L., Schwind, B.E. A New International Standard for Casing/Tubing Connection Testing. SPE/IADC 52846. Presented at the SPE/IADC Drilling Conference, Amsterdam, Holland, March 9-11, 1999. 8. Smith, R. J., Bacon, R. M., Boone, T. J. and Kry, P. R. Cyclic Steam Stimulation below a Known Hydraulically Induced Shale Fracture. Canadian International Petroleum Conference, Calgary, Alberta, Canada, June 12 – 14, 2001. 9. Teodoriu, C. and Badicioiu, M. Sealing Capacity of API Connections – Theoretical and Experimental Results. SPE Drilling and Completion, March, pp. 96-103, 2009. 10. Wu, J., Knauss, M.E. and Kritzler, T. Casing Failures in Cyclic Steam Injection Wells. IADC/SPE 114231, Asia Pacific Drilling Technology Conference and Exhibition, Jakarta, Indonesia, August 2008. 11. Xie, J. Casing Design and Analysis for Heavy Oil Wells, Paper 2006-415, World Heavy Oil Conference, Beijing, China, November 2006. 12. Xie, J. Analysis of Oil Well Casing Connections Subjected to Non-axisymmetric Loads, Abaqus Users’ Conference, Paris, France, May 2007, pp. 634-646. 13. Xie, J. A Study of Strain-based Design Criteria for Thermal Well Casing, Paper 2008-388, World Heavy Oil Congress, Edmonton, Canada, March 2008a. 14. Xie, J. and Liu, Y. Analysis of Casing Deformations in Thermal Wells, Abaqus Users’ Conference, Newport, Rhode Island, USA, May 2008b, pp. 542-553. 15. Xie, J. Investigation of Casing Connection Failure Mechanisms in Thermal Wells, Paper 2009-353, World Heavy Oil Congress, Puerto La Cruz, Venezuela, November 2009. 8. Acknowledgement The work summarized and the preparation of this paper was supported by C-FER Technologies, Canada. The authors would like to sincerely acknowledge Mr. Todd. A. Zahacy, Senior Engineering Advisor, Exploration and Production, C-FER Technologies, for his technical advice and assistance in preparing and reviewing this paper. 16 2010 SIMULIA Customer Conference Visit the SIMULIA Resource Center for more customer examples.