Chapter 3.8 Systems Development, Implementation, Management and
            Applications

3.8 (a)       Techniques for Developing Computer Systems

The figure below shows the stages involved when using Structured Systems Analysis and
Design Method (SSADM).


                                    Feasibility Study



                                 Requirements Analysis



                              Requirements Specification



                              Logical System Specification



                                    Physical Design


Data Flow Diagrams

 DFDs provide a graphic representation of information flowing through a system. The
system may be manual, computerized or a mixture of both.

The advantages of using DFDs are that it

      is a simple technique;
      is easy to understand by users, analysts and programmers;
      gives an overview of the system;
      is a good design aid;
      can act as a checking device;
      clearly specifies communications in a system;
      ensures quality.

DFDs use only four symbols. These are shown in Fig. 3.8 (a)2.




                                       6.2 - 1
Entity                Outside environment (e.g. Customer)




                                      e.g.             2      Accounts Dept


                Process                                    Produce Invoices




               Data Flow                                        Order
                                     e.g.




          D1 Data Store              e.g.                  D1 Customer Orders

                                        Fig. 3.8 (a)2

All names used should be meaningful to the users, whether they are computer literate or
not.

The steps to be taken when developing DFDs are given in Table 3.8 (a)1.

Step                                 Notes
1. Identify dataflows.               e.g. documents, VDU screens, phone messages.
2. Identify the external entities.   e.g. Customer, Supplier
3. Identify functional areas.        e.g. Departments, individuals.
4. Identify data paths.              Identify the paths taken by the dataflows identified in
                                     step 1.
5. Agree the system boundary.        What is inside the system and what is not.
6. Identify the processes.           e.g. Production of invoices, delivery notes, payroll
                                     production.
7. Identify data stores.             Determine which data are to be stored and where.
8. Identify interactions.            Identify the interaction between the data stores and the
                                     processes.
9. Validate the DFD.                 Check that meaningful names have been used.
                                     Check that all processes have data flows entering and
                                     leaving.
                                     Check with the user that the diagram represents what


                                             6.2 - 2
is happening now or what is required.
   10. Fill in the details.

                                          Table 3.8 (a)1

   Fig. 3.8 (a)3 shows the different levels that can be used in DFDs.


                                         0 Payroll System



 Level 1
  (Top        1 Get hours worked        2 Calculate wages         3 Produce wage slips
 Level)



Level 2
(Lower          2.1 Validate        2.2 Calculate          2.3 Calculate        2.4 Calculate
Level)              Data             gross wage             deductions            net wage


Level 3
 (Not
always
needed)
                                           Fig. 3.8 (a)3
   Now consider the following scenario.

   A hotel reception receives a large number enquiries each day about the availability of
   accommodation. Most of these are by telephone. It also receives confirmation of
   bookings. These are entered onto a computer database.

   While a guest is resident in the hotel, any expenses incurred by the guest are entered into
   the database by the appropriate personnel. If guests purchase items from the bar or
   restaurant, they have to sign a bill which is passed to a receptionist who enters the details
   into the database.

   When guests leave the hotel they are given an invoice detailing all expenditure. When
   they pay, the database is updated and a receipt is issued.

   The flow of data in this system is shown below:




                                             6.2 - 3
Customer
                                              Enquiry
                                                                                         Drinks Bill

                                                          Reply       Drinks Order
                  Confirmation           1    Reception                              1   Bar
                  of booking
                                             Process                                    Process
                                          bookings and                               bookings and
                      Final Bill                                  Customer's
                                            accounts                                   accounts
  Customer           Payment                                      expenditure
                      Receipt
                            Customer          Customer                                         Drinks Bill
                            Details           Details
                                                                          D2    Customer Accounts
                                   D1    Customer Details

                                                                            Food Bill

                                                             1     Restaurant

                                Food Order                       Process
                                                              bookings and
   Customer                                                     accounts

                                        Food Bill




The symbol for Customer, an external entity, has a diagonal line to indicate that it occurs
more than once. This does not mean that these symbols represent different customers. It
is simply used to make the diagram clearer. Without this, there would be too many flow
lines between this symbol and the internal processes.

Data stores may also be duplicated. This is done by having a double vertical line on the
left hand side as shown in Fig. 3.8 (a)5.


                                     M1        Customer data

                                             Fig. 3.8 (a)5

Notice this data store is numbered M1 whereas those in Fig. 3.8 (a)4 were numbered D1
and D2. In data stores, M indicates a manual store and D indicates a computer based data



                                               6.2 - 4
store. Also, there can be no data flows between an external entity and a data store. The
flow of data from, or to, an external entity must be between the external entity and a
process.
The example of the hotel system only shows one external entity, the customer. Usually
there is more than one external entity. Suppose we are dealing with a mail order
company. Clearly, one external entity is the customer. However, another is the supplier.
Note that although there are more than one customer and supplier, in the diagram they are
written in the singular.
When a major project is undertaken, there will be a number of different tasks to be
carried out. (If the project consisted of a single task it could hardly be called ‘major’).
With a number of tasks, some may be possible at the same time, while with others it
becomes important to do them in the correct order.
It may also be important to work out how long the project should take to complete.
Major projects like this can be represented graphically to show the different tasks and
how they join together, or relate to each other.
Take, as an example, the major project of building a bungalow. It can be divided into a
number of tasks.
A       Concreting the foundations                      takes 4 days
B       Building the walls                              takes 4 days
C       Making the doors and windows                    takes 7 days
D       Tiling the roof                                 takes 2 days
E       Installing the plumbing                         takes 3 days
F       Doing the interior carpentry                    takes 4 days
G       Installing the electrics                        takes 6 days
H       Decorating                                      takes 5 days

One way of deciding how long the bungalow takes to build is to add up all the separate
times, 35 days. On the other hand they are separate jobs so as long as enough people are
working, it will only take as long as the longest task, 7 days. This is silly, the decorating
can’t be done before the roof is on!
The real time for the project is somewhere between 7 and 35 days.


H
G
F
E
D
C
B
A

       4      8     12    16    20    24               No of Days

                                        Fig. 3.8 (a)6
Fig. 3.8 (a)6 shows when all the different tasks can start and when they must end.



                                           6.2 - 5
It shows which can overlap, and by how much.
Finally, it shows how long the project will take. (Your ideas of how a bungalow is built
may be different, but this is the method used by B and L Construction.)

Another type of graph might be similar to a flow diagram. The circles represent stages
and the arrows the tasks needed to reach that stage and the time, in days, needed to carry
them out.


               4
     1         A       2
                              4
                              B
                                               2
         3            7           4            D         5     6
                      C                                        G
                                                                 4
                                                         3       F                         7
                                                     E                              5
                                                                          6         H


1        Start
2        Foundations finished
3        Start making the windows and doors
4        Walls finished
5        Roof finished
6        Interior finished
7        Bungalow finished

There are many routes through the diagram. The one that gives the time taken to
complete the bungalow is

1              2              4                5             6(G)             7

A total of 21 days. This is the critical path. The bungalow cannot be built in a shorter
time.

The arrows show the order in which the tasks must be carried out, so E (the plumbing)
cannot be done before B (building the walls), but can be done at the same time as tiling
the roof (D). Each node can have an optimum time worked out. Node 6 has an optimum
time of 4+4+2+6 = 16 days. This is the time to be sure of getting to node 6 whichever
route you choose. Each node can also have a latest starting time before it holds up
another node. Node 1 must start immediately otherwise the walls (4) won’t be finished
by day 8. However, node 3 could start immediately or wait a day without affecting the
rest.




                                         6.2 - 6
Complex computing projects require effective management or they may get out of
control. Different personnel will be needed for different tasks. Their time must be
booked in advance so that they are free from working on other tasks or projects when
they are needed. This means that an accurate prediction of the start times of the various
tasks must be made. It is also necessary to assess how long the different tasks will last so
that other projects can book personnel.

There is now specialist project management software available that can take more
complex projects than the one that we were considering and produce the type of analysis
that we have been talking about. If the software is compatible with the diary software
used by a firm then it can automatically book the workers when they are needed.

3.8 (b)        The Purpose of Documentation
It is important that the design of a solution is accurate BEFORE it is implemented. For
the design to be accurate, the original specification must be accurate. This means that,
when we are asked to produce a solution, we must make sure that we thoroughly
understand the problem. This can only be achieved by checking our analysis with those
who are going to use our system. Users are not usually technical people and so we
require simple ways of showing our understanding of the problem. One of the best ways
of doing this is to use diagrams.

An E-R diagram shows the relationships between entities so that we can check these
relationships with the end user. These diagrams help us to ask questions like

      Can a customer only have one product?
      Can a customer own many products?
      Can a student borrow many books?

Thus, we can ensure that the relationships are correct. We can also ensure that we have
included all the entities.

Similarly, our Data Flow Diagrams (DFDs) show how data is moving through the
organization and we can ask questions like

      Are there any other data requirements?
      Are all data moving between the right departments?
      Are all the external entities present?
This continual validation process is essential if we are to reduce the cost of maintenance
due to errors and omissions. The careful documentation also helps to maintain a piece of
software when it is to be upgraded by adding extra facilities.




                                          6.2 - 7
User Request

                    Initial Study

                              Feasibility
                                Study

                                        Systems
                                        Analysis

                                                   Systems
                                                   Design

                                                        Implementation

                                                                 Change Over

                                                                         Evaluation
                                                                             and
                                                                         Maintenance




3.8 (d)        Appropriate Response Times

A classic example is the file of goods that needs to be accessed directly if it is to be used
at the point of sale terminal, and sequentially if the details are to be used for ordering of
replacements. The solution is to store the file in an indexed sequential format. At the
point of sale the item required is identified by a laser scanner whereas at the head office
the item name will likely be typed in at a keyboard. If a single item needs to be found
then a program can be written to find the details directly from the key field by using a
hashing algorithm, alternatively the items can be held sequentially in an index and a
program can be written to find the particular item by using a binary search of the index.
Dependent upon the method of search the data needs to be stored differently.

3.8 (e)        Implementation Techniques
    Direct Implementation
    Parallel Implementation
    Phased Implementation
3.8 (f)        Managing, Monitoring and Maintenance of Systems
    Adaptive Maintenance
    Corrective Maintenance
    Perfective Maintenance




                                             6.2 - 8
3.8    Example Questions

1.    Explain what is meant by the term entity model.                              (4)

2.    A computer system has been designed and produced for a person who works from
      home for a publisher of fiction books as a proof reader of manuscripts. Another
      system is designed for a graphic designer who sends work to clients electronically.
      Describe how the hardware specifications for the two systems would differ. (10)

3.    Describe how the forms of implementation:
      (i)     Parallel running
      (ii)    Phased
      (iii)   Direct
      are carried out. In each case describe one aspect of an application which would
      make that form of implementation appropriate in that case.

4.    Discuss the need for project management when a major project is being
      implemented.




                                         6.2 - 9

Contenu connexe

En vedette (9)

3.2
3.23.2
3.2
 
3.7
3.73.7
3.7
 
Eq v2
Eq v2Eq v2
Eq v2
 
3.9
3.93.9
3.9
 
3.10
3.103.10
3.10
 
Nov 05 P3
Nov 05 P3Nov 05 P3
Nov 05 P3
 
3.1
3.13.1
3.1
 
3.4
3.43.4
3.4
 
Nov 09 MS32
Nov 09 MS32Nov 09 MS32
Nov 09 MS32
 

Similaire à 3.8

20.project inventry management system
20.project inventry management system20.project inventry management system
20.project inventry management systemLapi Mics
 
Web Locker For Online Banking System Chapter final project Report page
Web Locker For Online Banking System  Chapter final project Report pageWeb Locker For Online Banking System  Chapter final project Report page
Web Locker For Online Banking System Chapter final project Report pageMukesh Chaudhary(L.I.O.N)
 
Data flow diagram
Data flow diagram Data flow diagram
Data flow diagram Nidhi Sharma
 
FDSeminar Reporting & controlling
FDSeminar Reporting & controllingFDSeminar Reporting & controlling
FDSeminar Reporting & controllingFDMagazine
 
A Research Paper on Credit Card Fraud Detection
A Research Paper on Credit Card Fraud DetectionA Research Paper on Credit Card Fraud Detection
A Research Paper on Credit Card Fraud DetectionIRJET Journal
 
Hickman threat modeling
Hickman threat modelingHickman threat modeling
Hickman threat modelingjonecx
 
Electronic cash controller
Electronic cash controllerElectronic cash controller
Electronic cash controllersree1185
 
JDi Data Claims Manager Overview
JDi Data Claims Manager OverviewJDi Data Claims Manager Overview
JDi Data Claims Manager Overviewjdidata
 
2012 cs-data-collection-guide
2012 cs-data-collection-guide2012 cs-data-collection-guide
2012 cs-data-collection-guidev_rajsingh
 
Telecom OSS/BSS Overview
Telecom OSS/BSS OverviewTelecom OSS/BSS Overview
Telecom OSS/BSS Overviewmagidg
 
C4INFOTECH - SMART ERP
C4INFOTECH - SMART ERPC4INFOTECH - SMART ERP
C4INFOTECH - SMART ERPSajjad Khan
 
Sample Deliverable Deliverables
Sample Deliverable   DeliverablesSample Deliverable   Deliverables
Sample Deliverable Deliverablesagc infotech
 
Stochastic Programming in Finance and Business management
Stochastic Programming in Finance and Business managementStochastic Programming in Finance and Business management
Stochastic Programming in Finance and Business managementSSA KPI
 
Bank management system PPT.pptx
Bank management system PPT.pptxBank management system PPT.pptx
Bank management system PPT.pptxRaviPatidar59
 
VoIP Billing Software
VoIP Billing SoftwareVoIP Billing Software
VoIP Billing SoftwareREVE Systems
 

Similaire à 3.8 (20)

20.project inventry management system
20.project inventry management system20.project inventry management system
20.project inventry management system
 
Data Flow Diagrams
Data Flow DiagramsData Flow Diagrams
Data Flow Diagrams
 
Utility bill
Utility billUtility bill
Utility bill
 
Web Locker For Online Banking System Chapter final project Report page
Web Locker For Online Banking System  Chapter final project Report pageWeb Locker For Online Banking System  Chapter final project Report page
Web Locker For Online Banking System Chapter final project Report page
 
Data flow diagram
Data flow diagram Data flow diagram
Data flow diagram
 
FDSeminar Reporting & controlling
FDSeminar Reporting & controllingFDSeminar Reporting & controlling
FDSeminar Reporting & controlling
 
A Research Paper on Credit Card Fraud Detection
A Research Paper on Credit Card Fraud DetectionA Research Paper on Credit Card Fraud Detection
A Research Paper on Credit Card Fraud Detection
 
Hickman threat modeling
Hickman threat modelingHickman threat modeling
Hickman threat modeling
 
Electronic cash controller
Electronic cash controllerElectronic cash controller
Electronic cash controller
 
Data flow diagrams
Data flow diagramsData flow diagrams
Data flow diagrams
 
JDi Data Claims Manager Overview
JDi Data Claims Manager OverviewJDi Data Claims Manager Overview
JDi Data Claims Manager Overview
 
Edi2
Edi2Edi2
Edi2
 
2012 cs-data-collection-guide
2012 cs-data-collection-guide2012 cs-data-collection-guide
2012 cs-data-collection-guide
 
Telecom OSS/BSS Overview
Telecom OSS/BSS OverviewTelecom OSS/BSS Overview
Telecom OSS/BSS Overview
 
C4INFOTECH - SMART ERP
C4INFOTECH - SMART ERPC4INFOTECH - SMART ERP
C4INFOTECH - SMART ERP
 
Sample Deliverable Deliverables
Sample Deliverable   DeliverablesSample Deliverable   Deliverables
Sample Deliverable Deliverables
 
Ispcms.ppt
Ispcms.pptIspcms.ppt
Ispcms.ppt
 
Stochastic Programming in Finance and Business management
Stochastic Programming in Finance and Business managementStochastic Programming in Finance and Business management
Stochastic Programming in Finance and Business management
 
Bank management system PPT.pptx
Bank management system PPT.pptxBank management system PPT.pptx
Bank management system PPT.pptx
 
VoIP Billing Software
VoIP Billing SoftwareVoIP Billing Software
VoIP Billing Software
 

Plus de Samimvez

Sql installation tutorial
Sql installation tutorialSql installation tutorial
Sql installation tutorialSamimvez
 
Coms1010 exam paper - nov10
Coms1010   exam paper - nov10Coms1010   exam paper - nov10
Coms1010 exam paper - nov10Samimvez
 
Coms1010 exam paper - may 08
Coms1010   exam paper - may 08Coms1010   exam paper - may 08
Coms1010 exam paper - may 08Samimvez
 
Labsheet 3
Labsheet 3Labsheet 3
Labsheet 3Samimvez
 
Labsheet 3,5
Labsheet 3,5Labsheet 3,5
Labsheet 3,5Samimvez
 
June 02 MS2
June 02 MS2June 02 MS2
June 02 MS2Samimvez
 
June 05 MS2
June 05 MS2June 05 MS2
June 05 MS2Samimvez
 
June 09 P1
June 09 P1June 09 P1
June 09 P1Samimvez
 
Nov 08 MS1
Nov 08 MS1Nov 08 MS1
Nov 08 MS1Samimvez
 
June 07 MS3
June 07 MS3June 07 MS3
June 07 MS3Samimvez
 
June 03 P2
June 03 P2June 03 P2
June 03 P2Samimvez
 

Plus de Samimvez (20)

Sql installation tutorial
Sql installation tutorialSql installation tutorial
Sql installation tutorial
 
Example3
Example3Example3
Example3
 
Coms1010 exam paper - nov10
Coms1010   exam paper - nov10Coms1010   exam paper - nov10
Coms1010 exam paper - nov10
 
Coms1010 exam paper - may 08
Coms1010   exam paper - may 08Coms1010   exam paper - may 08
Coms1010 exam paper - may 08
 
Example2
Example2Example2
Example2
 
Labsheet 3
Labsheet 3Labsheet 3
Labsheet 3
 
Labsheet 3,5
Labsheet 3,5Labsheet 3,5
Labsheet 3,5
 
EQ V3x
EQ V3xEQ V3x
EQ V3x
 
3.6
3.63.6
3.6
 
3.3
3.33.3
3.3
 
3.5
3.53.5
3.5
 
June 02 MS2
June 02 MS2June 02 MS2
June 02 MS2
 
June 05 MS2
June 05 MS2June 05 MS2
June 05 MS2
 
Nov 03 MS
Nov 03 MSNov 03 MS
Nov 03 MS
 
June 09 P1
June 09 P1June 09 P1
June 09 P1
 
Nov 08 MS1
Nov 08 MS1Nov 08 MS1
Nov 08 MS1
 
June 07 MS3
June 07 MS3June 07 MS3
June 07 MS3
 
June 03 P2
June 03 P2June 03 P2
June 03 P2
 
Nov 05 P2
Nov 05 P2Nov 05 P2
Nov 05 P2
 
Nov 05 P1
Nov 05 P1Nov 05 P1
Nov 05 P1
 

3.8

  • 1. Chapter 3.8 Systems Development, Implementation, Management and Applications 3.8 (a) Techniques for Developing Computer Systems The figure below shows the stages involved when using Structured Systems Analysis and Design Method (SSADM). Feasibility Study Requirements Analysis Requirements Specification Logical System Specification Physical Design Data Flow Diagrams DFDs provide a graphic representation of information flowing through a system. The system may be manual, computerized or a mixture of both. The advantages of using DFDs are that it  is a simple technique;  is easy to understand by users, analysts and programmers;  gives an overview of the system;  is a good design aid;  can act as a checking device;  clearly specifies communications in a system;  ensures quality. DFDs use only four symbols. These are shown in Fig. 3.8 (a)2. 6.2 - 1
  • 2. Entity Outside environment (e.g. Customer) e.g. 2 Accounts Dept Process Produce Invoices Data Flow Order e.g. D1 Data Store e.g. D1 Customer Orders Fig. 3.8 (a)2 All names used should be meaningful to the users, whether they are computer literate or not. The steps to be taken when developing DFDs are given in Table 3.8 (a)1. Step Notes 1. Identify dataflows. e.g. documents, VDU screens, phone messages. 2. Identify the external entities. e.g. Customer, Supplier 3. Identify functional areas. e.g. Departments, individuals. 4. Identify data paths. Identify the paths taken by the dataflows identified in step 1. 5. Agree the system boundary. What is inside the system and what is not. 6. Identify the processes. e.g. Production of invoices, delivery notes, payroll production. 7. Identify data stores. Determine which data are to be stored and where. 8. Identify interactions. Identify the interaction between the data stores and the processes. 9. Validate the DFD. Check that meaningful names have been used. Check that all processes have data flows entering and leaving. Check with the user that the diagram represents what 6.2 - 2
  • 3. is happening now or what is required. 10. Fill in the details. Table 3.8 (a)1 Fig. 3.8 (a)3 shows the different levels that can be used in DFDs. 0 Payroll System Level 1 (Top 1 Get hours worked 2 Calculate wages 3 Produce wage slips Level) Level 2 (Lower 2.1 Validate 2.2 Calculate 2.3 Calculate 2.4 Calculate Level) Data gross wage deductions net wage Level 3 (Not always needed) Fig. 3.8 (a)3 Now consider the following scenario. A hotel reception receives a large number enquiries each day about the availability of accommodation. Most of these are by telephone. It also receives confirmation of bookings. These are entered onto a computer database. While a guest is resident in the hotel, any expenses incurred by the guest are entered into the database by the appropriate personnel. If guests purchase items from the bar or restaurant, they have to sign a bill which is passed to a receptionist who enters the details into the database. When guests leave the hotel they are given an invoice detailing all expenditure. When they pay, the database is updated and a receipt is issued. The flow of data in this system is shown below: 6.2 - 3
  • 4. Customer Enquiry Drinks Bill Reply Drinks Order Confirmation 1 Reception 1 Bar of booking Process Process bookings and bookings and Final Bill Customer's accounts accounts Customer Payment expenditure Receipt Customer Customer Drinks Bill Details Details D2 Customer Accounts D1 Customer Details Food Bill 1 Restaurant Food Order Process bookings and Customer accounts Food Bill The symbol for Customer, an external entity, has a diagonal line to indicate that it occurs more than once. This does not mean that these symbols represent different customers. It is simply used to make the diagram clearer. Without this, there would be too many flow lines between this symbol and the internal processes. Data stores may also be duplicated. This is done by having a double vertical line on the left hand side as shown in Fig. 3.8 (a)5. M1 Customer data Fig. 3.8 (a)5 Notice this data store is numbered M1 whereas those in Fig. 3.8 (a)4 were numbered D1 and D2. In data stores, M indicates a manual store and D indicates a computer based data 6.2 - 4
  • 5. store. Also, there can be no data flows between an external entity and a data store. The flow of data from, or to, an external entity must be between the external entity and a process. The example of the hotel system only shows one external entity, the customer. Usually there is more than one external entity. Suppose we are dealing with a mail order company. Clearly, one external entity is the customer. However, another is the supplier. Note that although there are more than one customer and supplier, in the diagram they are written in the singular. When a major project is undertaken, there will be a number of different tasks to be carried out. (If the project consisted of a single task it could hardly be called ‘major’). With a number of tasks, some may be possible at the same time, while with others it becomes important to do them in the correct order. It may also be important to work out how long the project should take to complete. Major projects like this can be represented graphically to show the different tasks and how they join together, or relate to each other. Take, as an example, the major project of building a bungalow. It can be divided into a number of tasks. A Concreting the foundations takes 4 days B Building the walls takes 4 days C Making the doors and windows takes 7 days D Tiling the roof takes 2 days E Installing the plumbing takes 3 days F Doing the interior carpentry takes 4 days G Installing the electrics takes 6 days H Decorating takes 5 days One way of deciding how long the bungalow takes to build is to add up all the separate times, 35 days. On the other hand they are separate jobs so as long as enough people are working, it will only take as long as the longest task, 7 days. This is silly, the decorating can’t be done before the roof is on! The real time for the project is somewhere between 7 and 35 days. H G F E D C B A 4 8 12 16 20 24 No of Days Fig. 3.8 (a)6 Fig. 3.8 (a)6 shows when all the different tasks can start and when they must end. 6.2 - 5
  • 6. It shows which can overlap, and by how much. Finally, it shows how long the project will take. (Your ideas of how a bungalow is built may be different, but this is the method used by B and L Construction.) Another type of graph might be similar to a flow diagram. The circles represent stages and the arrows the tasks needed to reach that stage and the time, in days, needed to carry them out. 4 1 A 2 4 B 2 3 7 4 D 5 6 C G 4 3 F 7 E 5 6 H 1 Start 2 Foundations finished 3 Start making the windows and doors 4 Walls finished 5 Roof finished 6 Interior finished 7 Bungalow finished There are many routes through the diagram. The one that gives the time taken to complete the bungalow is 1 2 4 5 6(G) 7 A total of 21 days. This is the critical path. The bungalow cannot be built in a shorter time. The arrows show the order in which the tasks must be carried out, so E (the plumbing) cannot be done before B (building the walls), but can be done at the same time as tiling the roof (D). Each node can have an optimum time worked out. Node 6 has an optimum time of 4+4+2+6 = 16 days. This is the time to be sure of getting to node 6 whichever route you choose. Each node can also have a latest starting time before it holds up another node. Node 1 must start immediately otherwise the walls (4) won’t be finished by day 8. However, node 3 could start immediately or wait a day without affecting the rest. 6.2 - 6
  • 7. Complex computing projects require effective management or they may get out of control. Different personnel will be needed for different tasks. Their time must be booked in advance so that they are free from working on other tasks or projects when they are needed. This means that an accurate prediction of the start times of the various tasks must be made. It is also necessary to assess how long the different tasks will last so that other projects can book personnel. There is now specialist project management software available that can take more complex projects than the one that we were considering and produce the type of analysis that we have been talking about. If the software is compatible with the diary software used by a firm then it can automatically book the workers when they are needed. 3.8 (b) The Purpose of Documentation It is important that the design of a solution is accurate BEFORE it is implemented. For the design to be accurate, the original specification must be accurate. This means that, when we are asked to produce a solution, we must make sure that we thoroughly understand the problem. This can only be achieved by checking our analysis with those who are going to use our system. Users are not usually technical people and so we require simple ways of showing our understanding of the problem. One of the best ways of doing this is to use diagrams. An E-R diagram shows the relationships between entities so that we can check these relationships with the end user. These diagrams help us to ask questions like Can a customer only have one product? Can a customer own many products? Can a student borrow many books? Thus, we can ensure that the relationships are correct. We can also ensure that we have included all the entities. Similarly, our Data Flow Diagrams (DFDs) show how data is moving through the organization and we can ask questions like Are there any other data requirements? Are all data moving between the right departments? Are all the external entities present? This continual validation process is essential if we are to reduce the cost of maintenance due to errors and omissions. The careful documentation also helps to maintain a piece of software when it is to be upgraded by adding extra facilities. 6.2 - 7
  • 8. User Request Initial Study Feasibility Study Systems Analysis Systems Design Implementation Change Over Evaluation and Maintenance 3.8 (d) Appropriate Response Times A classic example is the file of goods that needs to be accessed directly if it is to be used at the point of sale terminal, and sequentially if the details are to be used for ordering of replacements. The solution is to store the file in an indexed sequential format. At the point of sale the item required is identified by a laser scanner whereas at the head office the item name will likely be typed in at a keyboard. If a single item needs to be found then a program can be written to find the details directly from the key field by using a hashing algorithm, alternatively the items can be held sequentially in an index and a program can be written to find the particular item by using a binary search of the index. Dependent upon the method of search the data needs to be stored differently. 3.8 (e) Implementation Techniques  Direct Implementation  Parallel Implementation  Phased Implementation 3.8 (f) Managing, Monitoring and Maintenance of Systems  Adaptive Maintenance  Corrective Maintenance  Perfective Maintenance 6.2 - 8
  • 9. 3.8 Example Questions 1. Explain what is meant by the term entity model. (4) 2. A computer system has been designed and produced for a person who works from home for a publisher of fiction books as a proof reader of manuscripts. Another system is designed for a graphic designer who sends work to clients electronically. Describe how the hardware specifications for the two systems would differ. (10) 3. Describe how the forms of implementation: (i) Parallel running (ii) Phased (iii) Direct are carried out. In each case describe one aspect of an application which would make that form of implementation appropriate in that case. 4. Discuss the need for project management when a major project is being implemented. 6.2 - 9