RDP Semester Review
Rotation #3
Sarah Brown, 12/07/15
Agenda
 Introduction
 Facts About the Rotation
 Projects
 Continues Improvement Initiatives
 Lessons Learned
2
Introduction
University Attended &
Majors/Minors
Indiana University – Purdue University Indianapolis (IUPUI)
Mechanical Engineering Technology
Technical Communications Certificate
Lean Six Sigma Green Belt
Organization Involvement
Society of Women Engineers
Engineers Without Borders
American Society of Mechanical Engineers
Society of Manufacturing Engineers
Engineering Technology Student Council
International Society of Automation
Engineering Technology Leadership Development Program
Study Abroad Experience
No International Experience - Yet
Travel throughout the United States with organizations:
- California, Michigan, Wisconsin, Florida, Ohio, Illinois,
Louisiana, New York
- Heard from many local engineers on their companies and
what they are doing in varying industries
Fun Facts about Yourself
- I play the violin and the piano
- I enjoy bourbon, beer, and wine tastings
- I like to cook/bake, read, draw/paint
- I love to travel & try to visit at least one new place per year
- I can speak some Spanish & Italian and am working to
become more fluent in both
3
Facts About the Rotation
Rotation # 3
Core Field Operations
Executive Mentor Eddie Millington, Continuous Improvement Director, FECT - NAO
Site Manager Steve Holley, FAS-SMV Plant Manager & Mike Boerner, FAS-SMV Quality Manager
Location / Division Faurecia Automotive Seating – Simpsonville, KY
Objectives of the
Rotation
1. Participate in a New Plant Launch
2. Review and Apply Faurecia’s Core Procedures (FCP’s)
3. Training on Quality Lab Procedures and Requirements for Seat Acceptance
4. Attend Functional Training
Next Rotation Faurecia Automotive Seating – Vigo, Spain
4
Projects
 Implementing 7 Quality Basics
 Scope
 Create necessary documentation & processes for
7QBs in the plant
 Implement & train on documentation & processes
 Actions & Results
 Poka-Yoke
 Created and implemented Poka-Yoke tags for
all lines
 Trained on PY tag use and backup modes
 OK 1st Part
 Updated & standardized OK 1st
Part check sheets for all lines
 Designated display area for
check sheet on lines
5
Projects
 Implementing 7 Quality Basics
 Self Inspection
 Created defect tally sheets w/ thresholds & missed
defect charts for stations on all lines
 Trained operators on Stop @ Defect
 Final Inspection
 Trained inspectors on final inspection process for all
lines
 Administered FI Gage R&Rs to inspectors for all
lines
 Completed 10/12 checks on FI validation form (9
needed for FES lvl3)
 Completed mirror documents/setup for TQW
 QRCI
 Set up lineside QRCI areas for all lines
 Trained personnel on lineside QRCI
6
Projects
 Implementing 7 Quality Basics
 Red Bin
 Helped order red bins for main lines
and placed/zoned
 Train line personnel on acceptable
defect identification
 Rework Under Control
 Developed rework & scrap flows for
all lines and QA cage
7
8
Projects
 Control Plan & OK 1st Piece Updates
 Updating control plan to reflect current
line setup and processes
 Standardize control plan, Poka-Yoke list,
SCCAF, OK 1st Piece and other
documentation
 Insert notes to guide those in charge of
‘official’ documentation updates
 Kamishibai Audit
 Created Quality kamishibai audit cards
based on initial items that can currently
be checked
 Usability walks scheduled this week
 149 quality kamishibai cards currently
created
9
Misc. Projects & Assignments
 SAB Disposal System Quotes
 Contacted several recycling & disposal
companies asking for quotes
 Hosted a visit to the plant to discuss
capabilities
 Lab testing for TT
 Shaker Table testing and H-Point testing
training
 Preliminary training on shaker table and
program
 Learning through testing troubleshooting
 Run@Rate Cycle Times
 Collected cycle times on specific stations as
line run@rates were scheduled
 Occur Monday-Thursday every week
 Updated times in centralized Excel sheet
 Assisted engineering in creating charts to
show needed trends
10
Misc. Projects & Assignments
 20% S/R Fasteners – Presentation & PFMEA
Review
 Chances to interchange S/R bolts and latches
in process
 Opportunity for PFMEA improvement
 Took pictures and notes, created presentation
to be distributed, and assisted in PFMEA
review meeting
 Management reviews & final seat prep for
EPT/TT seats
 Management review to look over final seat
assembly & appearance
 Prep for shipping – completing “OK to Ship”
inspection sheets, attaching necessary alert
tags & Ford “New Model” stickers, taking
pictures of completed seats, etc.
 Birth certificates for EPT & TT seats
 As seats were built, filled out “birth certificates”
w/ relevant torques and serial numbers
11
Misc. Projects & Assignments
 FES Games
 Top 5 N-1 Responsibilities
 Completed Quality KPIs
 Report out on updates, AIMs issues, QA alerts
 FUELS
 Co-coordinated w/ Chastity Mazon
 Reached 409% of goal (2,650 meals w/ goal of
648 meals)
 Material feeding for fasteners to line
 Working w/ FES and PC&L
 Idea to mimic stations from main assembly plants
 Concept created by Trilogiq
 Next steps to order a kit and test
 Building the Boundary Books & Documentation Binders
 Binders on each line that contain the Ford Boundary
Book and copies of documents needed at Final
Inspection
Continuous Improvement Initiatives
12
 Visit to Ford KTP
 Visit to Toyota Production Plant
 Visit to Corvette Production Plant
 Involvement in Top 5 & Staff Meetings
 See the application of some Plant KPIs & how they
integrate w/ other departments
 Responsible for note taking during staff meetings
 Boundary Book Documentation Instructions
 Added instruction pages for the different documents
needed at Final Inspection & TQW
 Added blanks of the documentation forms
to allow for easy copies
 Idea to use FECT HSE Startup sheet
 Easier to manage HSE Startup
 Separate instructions and sign-off sheet
to closely monitor each safety measure
 Time and work to create the FES standards usually already in place
 Setting up correct the first time will make future production run much smoother
 Opening a new plant is nerve-racking and rewarding
 Plant Opening Lessons Learned
 Line Layout and Future Seating Plants
 Line should be designed to meet local safety guidelines (line currently not OSHA compliant,
stairs not usable)
 Area for TQW/FI not built into layout
 People on inside of line (Safety & material delivery concerns)
 Line durability studies
 OHP
 1 UAP and 9 Supervisors for 459 MOD
 Plant will fail FES Audit 2.1.1 Lvl 2
 UAP max 200 & Supervisor max 25
 1 Quality Engineer and 1 Process Engineer
 Risk for high turnover and lack of development & improvement idea implementation
 PFMEA importance and impact
Lessons Learned
13
Rotation #3_Review_Sarah Brown

Contenu connexe

Tendances (17)

CV_Castillo, Jecrison D.
CV_Castillo, Jecrison D.CV_Castillo, Jecrison D.
CV_Castillo, Jecrison D.
 
Arnab_Resume
Arnab_ResumeArnab_Resume
Arnab_Resume
 
Rahul V Kundyekar
Rahul V KundyekarRahul V Kundyekar
Rahul V Kundyekar
 
abhi resume
abhi resumeabhi resume
abhi resume
 
Devakumar m d
Devakumar m dDevakumar m d
Devakumar m d
 
Rashmi Nagaraja_QA
Rashmi Nagaraja_QA Rashmi Nagaraja_QA
Rashmi Nagaraja_QA
 
Rogeliodevenencia
RogeliodevenenciaRogeliodevenencia
Rogeliodevenencia
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
ved_CV- Updated
ved_CV- Updatedved_CV- Updated
ved_CV- Updated
 
GP_RESUME
GP_RESUMEGP_RESUME
GP_RESUME
 
johndermodyresume-ATS Results
johndermodyresume-ATS Resultsjohndermodyresume-ATS Results
johndermodyresume-ATS Results
 
Vivek G
Vivek GVivek G
Vivek G
 
APQP Application
APQP ApplicationAPQP Application
APQP Application
 
Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014
 
Rahul
RahulRahul
Rahul
 
1 17 W Flynn Resume
1 17 W Flynn  Resume 1 17 W Flynn  Resume
1 17 W Flynn Resume
 
My Curriculum Vitæ
My Curriculum VitæMy Curriculum Vitæ
My Curriculum Vitæ
 

Similaire à Rotation #3_Review_Sarah Brown

1 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-151 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-15Jim Rinehart
 
Curriculum Vitae - Albert Schutzler 01-June 2015
Curriculum Vitae - Albert Schutzler  01-June 2015Curriculum Vitae - Albert Schutzler  01-June 2015
Curriculum Vitae - Albert Schutzler 01-June 2015Albert Schutzler
 
Jeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resumeJeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resumeJeremy Hallauer
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Timesheet trainingfor Project Leader FSOFT
Timesheet trainingfor Project Leader FSOFTTimesheet trainingfor Project Leader FSOFT
Timesheet trainingfor Project Leader FSOFTMobi Marketing
 
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPOREJOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPOREninermike9M malaysia
 
Ruinan Wang(Emma)_English
Ruinan Wang(Emma)_EnglishRuinan Wang(Emma)_English
Ruinan Wang(Emma)_EnglishEmma Wang
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang
 
CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2Karina Duenas
 
Polca Qrm Presentation Final
Polca Qrm Presentation FinalPolca Qrm Presentation Final
Polca Qrm Presentation FinalMark Dawson
 
SHERYL_AVILA_PEREZ-CV
SHERYL_AVILA_PEREZ-CVSHERYL_AVILA_PEREZ-CV
SHERYL_AVILA_PEREZ-CVSheryl Perez
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVsanjay kumar A M
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
 

Similaire à Rotation #3_Review_Sarah Brown (20)

1 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-151 JimRinehart ResumeQE 15 12-4-15
1 JimRinehart ResumeQE 15 12-4-15
 
Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1
 
End of term presentation
End of term presentationEnd of term presentation
End of term presentation
 
Curriculum Vitae - Albert Schutzler 01-June 2015
Curriculum Vitae - Albert Schutzler  01-June 2015Curriculum Vitae - Albert Schutzler  01-June 2015
Curriculum Vitae - Albert Schutzler 01-June 2015
 
Jeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resumeJeremy_Hallauer_s_resume
Jeremy_Hallauer_s_resume
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Timesheet trainingfor Project Leader FSOFT
Timesheet trainingfor Project Leader FSOFTTimesheet trainingfor Project Leader FSOFT
Timesheet trainingfor Project Leader FSOFT
 
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPOREJOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Static techniques
Static techniquesStatic techniques
Static techniques
 
Ruinan Wang(Emma)_English
Ruinan Wang(Emma)_EnglishRuinan Wang(Emma)_English
Ruinan Wang(Emma)_English
 
09a Resume 7.25.16
09a Resume 7.25.1609a Resume 7.25.16
09a Resume 7.25.16
 
CERTIFIED DATA CENTRE EXPERT
CERTIFIED DATA CENTRE EXPERTCERTIFIED DATA CENTRE EXPERT
CERTIFIED DATA CENTRE EXPERT
 
Sd
SdSd
Sd
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2
 
Polca Qrm Presentation Final
Polca Qrm Presentation FinalPolca Qrm Presentation Final
Polca Qrm Presentation Final
 
SHERYL_AVILA_PEREZ-CV
SHERYL_AVILA_PEREZ-CVSHERYL_AVILA_PEREZ-CV
SHERYL_AVILA_PEREZ-CV
 
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CVSanjay Kumar_Aerospace_Production Supervisor_6+_CV
Sanjay Kumar_Aerospace_Production Supervisor_6+_CV
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 

Rotation #3_Review_Sarah Brown

  • 1. RDP Semester Review Rotation #3 Sarah Brown, 12/07/15
  • 2. Agenda  Introduction  Facts About the Rotation  Projects  Continues Improvement Initiatives  Lessons Learned 2
  • 3. Introduction University Attended & Majors/Minors Indiana University – Purdue University Indianapolis (IUPUI) Mechanical Engineering Technology Technical Communications Certificate Lean Six Sigma Green Belt Organization Involvement Society of Women Engineers Engineers Without Borders American Society of Mechanical Engineers Society of Manufacturing Engineers Engineering Technology Student Council International Society of Automation Engineering Technology Leadership Development Program Study Abroad Experience No International Experience - Yet Travel throughout the United States with organizations: - California, Michigan, Wisconsin, Florida, Ohio, Illinois, Louisiana, New York - Heard from many local engineers on their companies and what they are doing in varying industries Fun Facts about Yourself - I play the violin and the piano - I enjoy bourbon, beer, and wine tastings - I like to cook/bake, read, draw/paint - I love to travel & try to visit at least one new place per year - I can speak some Spanish & Italian and am working to become more fluent in both 3
  • 4. Facts About the Rotation Rotation # 3 Core Field Operations Executive Mentor Eddie Millington, Continuous Improvement Director, FECT - NAO Site Manager Steve Holley, FAS-SMV Plant Manager & Mike Boerner, FAS-SMV Quality Manager Location / Division Faurecia Automotive Seating – Simpsonville, KY Objectives of the Rotation 1. Participate in a New Plant Launch 2. Review and Apply Faurecia’s Core Procedures (FCP’s) 3. Training on Quality Lab Procedures and Requirements for Seat Acceptance 4. Attend Functional Training Next Rotation Faurecia Automotive Seating – Vigo, Spain 4
  • 5. Projects  Implementing 7 Quality Basics  Scope  Create necessary documentation & processes for 7QBs in the plant  Implement & train on documentation & processes  Actions & Results  Poka-Yoke  Created and implemented Poka-Yoke tags for all lines  Trained on PY tag use and backup modes  OK 1st Part  Updated & standardized OK 1st Part check sheets for all lines  Designated display area for check sheet on lines 5
  • 6. Projects  Implementing 7 Quality Basics  Self Inspection  Created defect tally sheets w/ thresholds & missed defect charts for stations on all lines  Trained operators on Stop @ Defect  Final Inspection  Trained inspectors on final inspection process for all lines  Administered FI Gage R&Rs to inspectors for all lines  Completed 10/12 checks on FI validation form (9 needed for FES lvl3)  Completed mirror documents/setup for TQW  QRCI  Set up lineside QRCI areas for all lines  Trained personnel on lineside QRCI 6
  • 7. Projects  Implementing 7 Quality Basics  Red Bin  Helped order red bins for main lines and placed/zoned  Train line personnel on acceptable defect identification  Rework Under Control  Developed rework & scrap flows for all lines and QA cage 7
  • 8. 8 Projects  Control Plan & OK 1st Piece Updates  Updating control plan to reflect current line setup and processes  Standardize control plan, Poka-Yoke list, SCCAF, OK 1st Piece and other documentation  Insert notes to guide those in charge of ‘official’ documentation updates  Kamishibai Audit  Created Quality kamishibai audit cards based on initial items that can currently be checked  Usability walks scheduled this week  149 quality kamishibai cards currently created
  • 9. 9 Misc. Projects & Assignments  SAB Disposal System Quotes  Contacted several recycling & disposal companies asking for quotes  Hosted a visit to the plant to discuss capabilities  Lab testing for TT  Shaker Table testing and H-Point testing training  Preliminary training on shaker table and program  Learning through testing troubleshooting  Run@Rate Cycle Times  Collected cycle times on specific stations as line run@rates were scheduled  Occur Monday-Thursday every week  Updated times in centralized Excel sheet  Assisted engineering in creating charts to show needed trends
  • 10. 10 Misc. Projects & Assignments  20% S/R Fasteners – Presentation & PFMEA Review  Chances to interchange S/R bolts and latches in process  Opportunity for PFMEA improvement  Took pictures and notes, created presentation to be distributed, and assisted in PFMEA review meeting  Management reviews & final seat prep for EPT/TT seats  Management review to look over final seat assembly & appearance  Prep for shipping – completing “OK to Ship” inspection sheets, attaching necessary alert tags & Ford “New Model” stickers, taking pictures of completed seats, etc.  Birth certificates for EPT & TT seats  As seats were built, filled out “birth certificates” w/ relevant torques and serial numbers
  • 11. 11 Misc. Projects & Assignments  FES Games  Top 5 N-1 Responsibilities  Completed Quality KPIs  Report out on updates, AIMs issues, QA alerts  FUELS  Co-coordinated w/ Chastity Mazon  Reached 409% of goal (2,650 meals w/ goal of 648 meals)  Material feeding for fasteners to line  Working w/ FES and PC&L  Idea to mimic stations from main assembly plants  Concept created by Trilogiq  Next steps to order a kit and test  Building the Boundary Books & Documentation Binders  Binders on each line that contain the Ford Boundary Book and copies of documents needed at Final Inspection
  • 12. Continuous Improvement Initiatives 12  Visit to Ford KTP  Visit to Toyota Production Plant  Visit to Corvette Production Plant  Involvement in Top 5 & Staff Meetings  See the application of some Plant KPIs & how they integrate w/ other departments  Responsible for note taking during staff meetings  Boundary Book Documentation Instructions  Added instruction pages for the different documents needed at Final Inspection & TQW  Added blanks of the documentation forms to allow for easy copies  Idea to use FECT HSE Startup sheet  Easier to manage HSE Startup  Separate instructions and sign-off sheet to closely monitor each safety measure
  • 13.  Time and work to create the FES standards usually already in place  Setting up correct the first time will make future production run much smoother  Opening a new plant is nerve-racking and rewarding  Plant Opening Lessons Learned  Line Layout and Future Seating Plants  Line should be designed to meet local safety guidelines (line currently not OSHA compliant, stairs not usable)  Area for TQW/FI not built into layout  People on inside of line (Safety & material delivery concerns)  Line durability studies  OHP  1 UAP and 9 Supervisors for 459 MOD  Plant will fail FES Audit 2.1.1 Lvl 2  UAP max 200 & Supervisor max 25  1 Quality Engineer and 1 Process Engineer  Risk for high turnover and lack of development & improvement idea implementation  PFMEA importance and impact Lessons Learned 13