3. Introduction
University Attended &
Majors/Minors
Indiana University – Purdue University Indianapolis (IUPUI)
Mechanical Engineering Technology
Technical Communications Certificate
Lean Six Sigma Green Belt
Organization Involvement
Society of Women Engineers
Engineers Without Borders
American Society of Mechanical Engineers
Society of Manufacturing Engineers
Engineering Technology Student Council
International Society of Automation
Engineering Technology Leadership Development Program
Study Abroad Experience
No International Experience - Yet
Travel throughout the United States with organizations:
- California, Michigan, Wisconsin, Florida, Ohio, Illinois,
Louisiana, New York
- Heard from many local engineers on their companies and
what they are doing in varying industries
Fun Facts about Yourself
- I play the violin and the piano
- I enjoy bourbon, beer, and wine tastings
- I like to cook/bake, read, draw/paint
- I love to travel & try to visit at least one new place per year
- I can speak some Spanish & Italian and am working to
become more fluent in both
3
4. Facts About the Rotation
Rotation # 3
Core Field Operations
Executive Mentor Eddie Millington, Continuous Improvement Director, FECT - NAO
Site Manager Steve Holley, FAS-SMV Plant Manager & Mike Boerner, FAS-SMV Quality Manager
Location / Division Faurecia Automotive Seating – Simpsonville, KY
Objectives of the
Rotation
1. Participate in a New Plant Launch
2. Review and Apply Faurecia’s Core Procedures (FCP’s)
3. Training on Quality Lab Procedures and Requirements for Seat Acceptance
4. Attend Functional Training
Next Rotation Faurecia Automotive Seating – Vigo, Spain
4
5. Projects
Implementing 7 Quality Basics
Scope
Create necessary documentation & processes for
7QBs in the plant
Implement & train on documentation & processes
Actions & Results
Poka-Yoke
Created and implemented Poka-Yoke tags for
all lines
Trained on PY tag use and backup modes
OK 1st Part
Updated & standardized OK 1st
Part check sheets for all lines
Designated display area for
check sheet on lines
5
6. Projects
Implementing 7 Quality Basics
Self Inspection
Created defect tally sheets w/ thresholds & missed
defect charts for stations on all lines
Trained operators on Stop @ Defect
Final Inspection
Trained inspectors on final inspection process for all
lines
Administered FI Gage R&Rs to inspectors for all
lines
Completed 10/12 checks on FI validation form (9
needed for FES lvl3)
Completed mirror documents/setup for TQW
QRCI
Set up lineside QRCI areas for all lines
Trained personnel on lineside QRCI
6
7. Projects
Implementing 7 Quality Basics
Red Bin
Helped order red bins for main lines
and placed/zoned
Train line personnel on acceptable
defect identification
Rework Under Control
Developed rework & scrap flows for
all lines and QA cage
7
8. 8
Projects
Control Plan & OK 1st Piece Updates
Updating control plan to reflect current
line setup and processes
Standardize control plan, Poka-Yoke list,
SCCAF, OK 1st Piece and other
documentation
Insert notes to guide those in charge of
‘official’ documentation updates
Kamishibai Audit
Created Quality kamishibai audit cards
based on initial items that can currently
be checked
Usability walks scheduled this week
149 quality kamishibai cards currently
created
9. 9
Misc. Projects & Assignments
SAB Disposal System Quotes
Contacted several recycling & disposal
companies asking for quotes
Hosted a visit to the plant to discuss
capabilities
Lab testing for TT
Shaker Table testing and H-Point testing
training
Preliminary training on shaker table and
program
Learning through testing troubleshooting
Run@Rate Cycle Times
Collected cycle times on specific stations as
line run@rates were scheduled
Occur Monday-Thursday every week
Updated times in centralized Excel sheet
Assisted engineering in creating charts to
show needed trends
10. 10
Misc. Projects & Assignments
20% S/R Fasteners – Presentation & PFMEA
Review
Chances to interchange S/R bolts and latches
in process
Opportunity for PFMEA improvement
Took pictures and notes, created presentation
to be distributed, and assisted in PFMEA
review meeting
Management reviews & final seat prep for
EPT/TT seats
Management review to look over final seat
assembly & appearance
Prep for shipping – completing “OK to Ship”
inspection sheets, attaching necessary alert
tags & Ford “New Model” stickers, taking
pictures of completed seats, etc.
Birth certificates for EPT & TT seats
As seats were built, filled out “birth certificates”
w/ relevant torques and serial numbers
11. 11
Misc. Projects & Assignments
FES Games
Top 5 N-1 Responsibilities
Completed Quality KPIs
Report out on updates, AIMs issues, QA alerts
FUELS
Co-coordinated w/ Chastity Mazon
Reached 409% of goal (2,650 meals w/ goal of
648 meals)
Material feeding for fasteners to line
Working w/ FES and PC&L
Idea to mimic stations from main assembly plants
Concept created by Trilogiq
Next steps to order a kit and test
Building the Boundary Books & Documentation Binders
Binders on each line that contain the Ford Boundary
Book and copies of documents needed at Final
Inspection
12. Continuous Improvement Initiatives
12
Visit to Ford KTP
Visit to Toyota Production Plant
Visit to Corvette Production Plant
Involvement in Top 5 & Staff Meetings
See the application of some Plant KPIs & how they
integrate w/ other departments
Responsible for note taking during staff meetings
Boundary Book Documentation Instructions
Added instruction pages for the different documents
needed at Final Inspection & TQW
Added blanks of the documentation forms
to allow for easy copies
Idea to use FECT HSE Startup sheet
Easier to manage HSE Startup
Separate instructions and sign-off sheet
to closely monitor each safety measure
13. Time and work to create the FES standards usually already in place
Setting up correct the first time will make future production run much smoother
Opening a new plant is nerve-racking and rewarding
Plant Opening Lessons Learned
Line Layout and Future Seating Plants
Line should be designed to meet local safety guidelines (line currently not OSHA compliant,
stairs not usable)
Area for TQW/FI not built into layout
People on inside of line (Safety & material delivery concerns)
Line durability studies
OHP
1 UAP and 9 Supervisors for 459 MOD
Plant will fail FES Audit 2.1.1 Lvl 2
UAP max 200 & Supervisor max 25
1 Quality Engineer and 1 Process Engineer
Risk for high turnover and lack of development & improvement idea implementation
PFMEA importance and impact
Lessons Learned
13