Smart Grid Solutions


Benton Public Utility District
Reducing labor costs while improving data and efficiencies




 PROJECT AT A GLANCE
 Project Type
 Operational utility solutions

 Location
 Kennewick, WA

 Number of Customers
 47,000

 Area Served
 900 square miles

 Applications
 Provide a graphical view of a utility’s
 infrastructure and tools that support cost
                                                      Benton Public Utility District (PUD), a municipal corporation of the State of
 reduction through simplified planning, analysis
                                                      Washington headquartered in Kennewick, Washington, was established in 1946.
 and operational response times                       Today, Benton PUD supports transmission and distribution of electric energy to
                                                      more than 47,000 customers covering more than 900 square miles of service
 Software Implemented
                                                      territory. Benton PUD manages 37 substations, approximately 90 miles of 115kV
 ArcFM Enterprise GIS                                 transmission lines, 1,582 miles of distribution lines, and nearly 130 miles of fiber
 Designer                                             optic cables.

 CUSTOMER BENEFITS                                    Challenges
 • Eliminates the need to print thousands of maps,   Benton PUD had been using AutoCAD since the 1980s to create designs for its
  design packets and work order forms                 construction and maintenance projects, but later incorporated CAD-based GIS
                                                      technology to more accurately map and manage the utility’s assets. As its service
 • Saves on labor costs
                                                      area grew, the utility began to recognize its repetitive and inefficient processes for
 • Integrates each work order type and the
                                                      data entry and management.
  necessary workflow into Workflow Manager
                                                      For example, the utility was forced to access multiple Excel spreadsheets for
                                                      project costs, print pages of physical maps for engineers and redraw project
                                                      designs two or three times in order to complete day-to-day construction and
                                                      maintenance projects.




Make the most of your energy                                    SM
Smart Grid Solutions            Benton Public Utility District




     “In our design process alone, we are completing the work order lifecycle
     40 percent faster by utilizing Schneider Electric’s solutions.”
     Chris Folta, manager of GIS at Benton PUD




“Our previous design process was very labor-                  Schneider Electric worked with Benton PUD to
intensive. Work order and design information were             consolidate and convert its AutoCAD data into the
manually entered and required too much duplication,           ArcFM GIS system and integrate Designer, which is
which left a lot of room for error,” explained Chris          an extension of the ArcFM platform and streamlines
Folta, manager of GIS at Benton PUD. “Even with a             the entire design, estimating and construction
robust AutoCAD system, we needed standardized                 process.
processes, a single, multi-user enterprise database,
as opposed to having multiple single-user databases           The Designer solution provides utilities the tools to
and spreadsheets.”                                            create, control and manage multiple designs, design
                                                              versions, work orders, cost estimates and input
In addition to inefficiencies in the design process,          from multiple staff members involved in any project.
Benton PUD also lacked an enterprise work                     Within the GIS database, users may view, query and
management software system. As a result, the utility          edit designs without the need to copy files around
struggled to accurately track its various projects in         the network. This feature eliminated the need for
progress and efficiently recognize and account for            Benton PUD to manage multiple databases, print
project delays. The inability to effectively track and        physical maps or redraw the same designs in multiple
organize work order forms also made it difficult to           systems.
enforce standardized business processes to properly
complete each task included in the workflow.                  Benton PUD also took advantage of Designer’s
                                                              flexible workflow process tool called Workflow
In order to plan for utility growth, Benton PUD needed        Manager, which can operate in a standalone mode
a flexible system that could more efficiently integrate       or as the integration point to an enterprise work
GIS and design processes to eliminate redundancies,           management system.
reduce human error, and provide enterprise access
to operational information. The utility also needed           “Schneider Electric helped to convert our AutoCAD
a solution to help organize and track its multiple            data and ensure its format integrated properly with
work order types and enforce the proper business              our other utility programs,” said Folta. “At the same
standards for completing each work order.                     time, Schneider Electric assisted in customizing
                                                              Workflow Manager to track and organize all of our
Solution                                                      work order types — not just the design projects.”
In 2007, Schneider Electric partnered with Benton             Benton has seven different work order types it uses
PUD to smoothly and efficiently integrate the ArcFM™          for various operational projects, and each work
Enterprise GIS and Designer solutions.                        order type has a different workflow to complete the
                                                              project. Schneider Electric helped integrate each
ArcFM GIS is based on Esri’s ArcGIS® technology and           work order type and the necessary workflow into
is specifically designed for the utility industry, enabling   Workflow Manager, to act as Benton’s enterprise
energy companies to model, design and manage                  work management system.
critical infrastructure. By integrating utility data and
advanced geographical maps, ArcFM provides a                  The Bottom Line
graphical view of a utility’s infrastructure and tools that   Since integrating ArcFM GIS, Designer and its
support cost reduction through simplified planning,           customized Workflow Manager, Benton has been
analysis and operational response times.                      able to increase both quality and efficiency in its data
                                                              management, design processes and overall work
Smart Grid Solutions           Benton Public Utility District




management. As a result of the increased efficiencies,
the utility has been able to save on labor costs by       “We now have a rock-solid
handling a larger workload without the need for           system that meets all of our
additional engineering staff.                             business requirements, is stable
                                                          and delivers high value for our
“In our design process alone, we are completing           utility, and Schneider Electric
the work order lifecycle 40 percent faster by utilizing   provided the experienced
Schneider Electric’s solutions,” noted Folta. “So for     partnership we needed to
Benton PUD, we are able to realize significant labor      achieve these goals.”
savings by efficiently producing more accurate work       Chris Folta, manager of GIS at
with existing staff and thereby eliminating the need to   Benton PUD
hire additional resources as the utility grows. Without
the need for additional engineering resources, we
save at least $120,000 annually.”

Folta also estimates that by using Designer and
Workflow Manager on a district-wide basis, coupled
with ArcFM Viewer in the field, they have eliminated
the need to print thousands of maps, design packets
and work order forms, saving the utility approximately
$50,000 each year on paper, printing materials, and
associated labor.

“Schneider Electric was able to walk us through the
entire process at a pace that we felt was comfortable
and provided consulting as our requirements
changed,” said Folta. “We now have a rock-solid
system that meets all of our business requirements,
is stable and delivers high value for our utility,
and Schneider Electric provided the experienced
partnership we needed to achieve these goals.”
©2012 Schneider Electric. All rights reserved.




Schneider Electric USA, Inc. 4701 Royal Vista Circle, Fort Collins, CO 80528   Telephone: 1-866-537-1091   Fax: 1-970-223-5577   www.schneider-electric.com/us

                                                                                                                                                        June 2012

Contenu connexe

Tendances

Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSchneider Electric
 
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...Schneider Electric
 
Underground Self-Healing Solution
Underground Self-Healing Solution Underground Self-Healing Solution
Underground Self-Healing Solution Schneider Electric
 
Integrated Facility Sub Systems
Integrated Facility Sub SystemsIntegrated Facility Sub Systems
Integrated Facility Sub SystemsSchneider Electric
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersSchneider Electric
 
[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outagesSchneider Electric
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingSchneider Electric
 
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...Schneider Electric
 
[ArcFM™ Solution] Wavepoint
[ArcFM™ Solution] Wavepoint [ArcFM™ Solution] Wavepoint
[ArcFM™ Solution] Wavepoint Schneider Electric
 
GIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion ProjectGIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion ProjectSchneider Electric
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)Schneider Electric
 
IIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the futureIIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the futureSchneider Electric
 
The Intelligent and Connected Data Center
The Intelligent and Connected Data CenterThe Intelligent and Connected Data Center
The Intelligent and Connected Data CenterSchneider Electric
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overviewSchneider Electric
 
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...Schneider Electric
 
The Future of Machine Building is NOW!
The Future of Machine Building is NOW!The Future of Machine Building is NOW!
The Future of Machine Building is NOW!Schneider Electric
 
Maximize Your Data Center for Virtualization Initiatives
Maximize Your Data Center for Virtualization InitiativesMaximize Your Data Center for Virtualization Initiatives
Maximize Your Data Center for Virtualization InitiativesSchneider Electric
 
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site FacilitiesLeveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site FacilitiesSchneider Electric
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesSchneider Electric
 

Tendances (20)

Simplifying Data Center Design/ Build
Simplifying Data Center Design/ BuildSimplifying Data Center Design/ Build
Simplifying Data Center Design/ Build
 
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
[Case study] Eugene Water & Electric Board: Bringing together disparate legac...
 
Underground Self-Healing Solution
Underground Self-Healing Solution Underground Self-Healing Solution
Underground Self-Healing Solution
 
Integrated Facility Sub Systems
Integrated Facility Sub SystemsIntegrated Facility Sub Systems
Integrated Facility Sub Systems
 
New Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control CentersNew Approach for Intelligent Motor Control Centers
New Approach for Intelligent Motor Control Centers
 
[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages[Case study] Green Mountain Power: Reducing the duration of outages
[Case study] Green Mountain Power: Reducing the duration of outages
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handling
 
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
 
[ArcFM™ Solution] Wavepoint
[ArcFM™ Solution] Wavepoint [ArcFM™ Solution] Wavepoint
[ArcFM™ Solution] Wavepoint
 
GIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion ProjectGIS for Your Broadband Expansion Project
GIS for Your Broadband Expansion Project
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)
 
IIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the futureIIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the future
 
The Intelligent and Connected Data Center
The Intelligent and Connected Data CenterThe Intelligent and Connected Data Center
The Intelligent and Connected Data Center
 
Energy efficiency data center overview
Energy efficiency data center overviewEnergy efficiency data center overview
Energy efficiency data center overview
 
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
 
The Future of Machine Building is NOW!
The Future of Machine Building is NOW!The Future of Machine Building is NOW!
The Future of Machine Building is NOW!
 
Maximize Your Data Center for Virtualization Initiatives
Maximize Your Data Center for Virtualization InitiativesMaximize Your Data Center for Virtualization Initiatives
Maximize Your Data Center for Virtualization Initiatives
 
AspectCTRM For Fuel Marketers
AspectCTRM For Fuel MarketersAspectCTRM For Fuel Marketers
AspectCTRM For Fuel Marketers
 
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site FacilitiesLeveraging Cloud-based Building Management Systems for Multi-site Facilities
Leveraging Cloud-based Building Management Systems for Multi-site Facilities
 
Preparing for Distributed Energy Resources
Preparing for Distributed Energy ResourcesPreparing for Distributed Energy Resources
Preparing for Distributed Energy Resources
 

En vedette

Selección de Proyectos de comunicación gráfica en estrategias de marketing
Selección de Proyectos de  comunicación gráfica en estrategias de marketingSelección de Proyectos de  comunicación gráfica en estrategias de marketing
Selección de Proyectos de comunicación gráfica en estrategias de marketingSergio Escalona
 
Brand New Brands : ¿necesitamos nuevas marcas?
Brand New Brands : ¿necesitamos nuevas marcas?Brand New Brands : ¿necesitamos nuevas marcas?
Brand New Brands : ¿necesitamos nuevas marcas?Brainventures
 
Global Development Report 2015
Global Development Report 2015Global Development Report 2015
Global Development Report 2015Johanna Cosham
 
Migratie naar de Cloud (eMail)
Migratie naar de Cloud (eMail)Migratie naar de Cloud (eMail)
Migratie naar de Cloud (eMail)Edwin Kanis
 
Applied Motion Products STM integrated motor product presentation march 2009
Applied Motion Products  STM integrated motor product presentation march 2009Applied Motion Products  STM integrated motor product presentation march 2009
Applied Motion Products STM integrated motor product presentation march 2009Servo2Go.com
 
Historia De Los Ordenadores 2
Historia De Los Ordenadores 2Historia De Los Ordenadores 2
Historia De Los Ordenadores 2agustin4iscar
 
Da tela para as telas a janela que sensibiliza ou apenas emoldura o design ...
Da tela para as telas  a janela que sensibiliza ou  apenas emoldura o design ...Da tela para as telas  a janela que sensibiliza ou  apenas emoldura o design ...
Da tela para as telas a janela que sensibiliza ou apenas emoldura o design ...Graciela Campos
 
Agencia de Comunición McComunica
Agencia de Comunición McComunicaAgencia de Comunición McComunica
Agencia de Comunición McComunicaEva Marín Ortega
 
Muestreo maíz 1 hoja
Muestreo maíz 1 hojaMuestreo maíz 1 hoja
Muestreo maíz 1 hojaAnerol Mtz
 
Tips legales para un community Manager
Tips legales para un community ManagerTips legales para un community Manager
Tips legales para un community ManagerInterlat
 
Parametros 1999 2010. con vision d futuro
Parametros 1999   2010. con vision d futuroParametros 1999   2010. con vision d futuro
Parametros 1999 2010. con vision d futuroNelson Hernandez
 
51354924 apuntes-de-fisica-1
51354924 apuntes-de-fisica-151354924 apuntes-de-fisica-1
51354924 apuntes-de-fisica-1Corina Del Valle
 
Facebook Success: 7 Strategies for Nonprofits
Facebook Success: 7 Strategies for NonprofitsFacebook Success: 7 Strategies for Nonprofits
Facebook Success: 7 Strategies for NonprofitsHubSpot
 

En vedette (20)

Sulaimani dental journal vol1 issue1 2014
Sulaimani dental journal vol1 issue1 2014Sulaimani dental journal vol1 issue1 2014
Sulaimani dental journal vol1 issue1 2014
 
38th FARO - Brochure 2014
38th FARO - Brochure 201438th FARO - Brochure 2014
38th FARO - Brochure 2014
 
Curso Ventas con PNL Barcelona Talavera
Curso Ventas con PNL Barcelona TalaveraCurso Ventas con PNL Barcelona Talavera
Curso Ventas con PNL Barcelona Talavera
 
Selección de Proyectos de comunicación gráfica en estrategias de marketing
Selección de Proyectos de  comunicación gráfica en estrategias de marketingSelección de Proyectos de  comunicación gráfica en estrategias de marketing
Selección de Proyectos de comunicación gráfica en estrategias de marketing
 
Brand New Brands : ¿necesitamos nuevas marcas?
Brand New Brands : ¿necesitamos nuevas marcas?Brand New Brands : ¿necesitamos nuevas marcas?
Brand New Brands : ¿necesitamos nuevas marcas?
 
Global Development Report 2015
Global Development Report 2015Global Development Report 2015
Global Development Report 2015
 
Migratie naar de Cloud (eMail)
Migratie naar de Cloud (eMail)Migratie naar de Cloud (eMail)
Migratie naar de Cloud (eMail)
 
Applied Motion Products STM integrated motor product presentation march 2009
Applied Motion Products  STM integrated motor product presentation march 2009Applied Motion Products  STM integrated motor product presentation march 2009
Applied Motion Products STM integrated motor product presentation march 2009
 
Historia De Los Ordenadores 2
Historia De Los Ordenadores 2Historia De Los Ordenadores 2
Historia De Los Ordenadores 2
 
Da tela para as telas a janela que sensibiliza ou apenas emoldura o design ...
Da tela para as telas  a janela que sensibiliza ou  apenas emoldura o design ...Da tela para as telas  a janela que sensibiliza ou  apenas emoldura o design ...
Da tela para as telas a janela que sensibiliza ou apenas emoldura o design ...
 
Flow Fiber Ppt 2007
Flow  Fiber Ppt 2007Flow  Fiber Ppt 2007
Flow Fiber Ppt 2007
 
Agencia de Comunición McComunica
Agencia de Comunición McComunicaAgencia de Comunición McComunica
Agencia de Comunición McComunica
 
El grafeno isabel_O
El grafeno isabel_OEl grafeno isabel_O
El grafeno isabel_O
 
Muestreo maíz 1 hoja
Muestreo maíz 1 hojaMuestreo maíz 1 hoja
Muestreo maíz 1 hoja
 
Conoce a Mujeres Poetas Internacional y al Festival Grito de Mujer
Conoce a Mujeres Poetas Internacional y al Festival Grito de Mujer Conoce a Mujeres Poetas Internacional y al Festival Grito de Mujer
Conoce a Mujeres Poetas Internacional y al Festival Grito de Mujer
 
Tips legales para un community Manager
Tips legales para un community ManagerTips legales para un community Manager
Tips legales para un community Manager
 
Parametros 1999 2010. con vision d futuro
Parametros 1999   2010. con vision d futuroParametros 1999   2010. con vision d futuro
Parametros 1999 2010. con vision d futuro
 
51354924 apuntes-de-fisica-1
51354924 apuntes-de-fisica-151354924 apuntes-de-fisica-1
51354924 apuntes-de-fisica-1
 
Facebook Success: 7 Strategies for Nonprofits
Facebook Success: 7 Strategies for NonprofitsFacebook Success: 7 Strategies for Nonprofits
Facebook Success: 7 Strategies for Nonprofits
 
Web Design Trends 2011
Web Design Trends 2011Web Design Trends 2011
Web Design Trends 2011
 

Similaire à [Case study] Benton Public Utility District: Reducing labor costs while improving data and efficiencies

Improve Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationImprove Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationSafe Software
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Project Engineer
Project EngineerProject Engineer
Project EngineerCADISON
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10CADISON
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10CADISON
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designerCADISON
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designerCADISON
 
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANComputer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANIRJET Journal
 
Revit Architecture Software: Transforming Design and Collaboration in Constru...
Revit Architecture Software: Transforming Design and Collaboration in Constru...Revit Architecture Software: Transforming Design and Collaboration in Constru...
Revit Architecture Software: Transforming Design and Collaboration in Constru...amanraza23
 
Review of Development done in Computerization of Electrical Specifications fo...
Review of Development done in Computerization of Electrical Specifications fo...Review of Development done in Computerization of Electrical Specifications fo...
Review of Development done in Computerization of Electrical Specifications fo...ijsrd.com
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designerCADISON
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Collaborative Product Development with 100% Partner Connection
Collaborative Product Development with 100% Partner ConnectionCollaborative Product Development with 100% Partner Connection
Collaborative Product Development with 100% Partner ConnectionSEEBURGER
 
Software team linkedin
Software team linkedinSoftware team linkedin
Software team linkedinPrysmian Group
 
Autocad Mechanical 2011 Overview Brochure
Autocad Mechanical 2011 Overview BrochureAutocad Mechanical 2011 Overview Brochure
Autocad Mechanical 2011 Overview BrochureApplied Engineering
 
Autodesk Constructware 2010
Autodesk Constructware 2010Autodesk Constructware 2010
Autodesk Constructware 2010Serge Beckers
 

Similaire à [Case study] Benton Public Utility District: Reducing labor costs while improving data and efficiencies (20)

Improve Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data IntegrationImprove Operational Efficiency in AEC with Data Integration
Improve Operational Efficiency in AEC with Data Integration
 
Geospatial Product Watch 2015
Geospatial Product Watch 2015Geospatial Product Watch 2015
Geospatial Product Watch 2015
 
3D Modeling by GIS
3D Modeling by GIS3D Modeling by GIS
3D Modeling by GIS
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Cadison R10
Cadison  R10Cadison  R10
Cadison R10
 
Cadison r10
Cadison  r10Cadison  r10
Cadison r10
 
Software
SoftwareSoftware
Software
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designer
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designer
 
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRANComputer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
 
Revit Architecture Software: Transforming Design and Collaboration in Constru...
Revit Architecture Software: Transforming Design and Collaboration in Constru...Revit Architecture Software: Transforming Design and Collaboration in Constru...
Revit Architecture Software: Transforming Design and Collaboration in Constru...
 
Review of Development done in Computerization of Electrical Specifications fo...
Review of Development done in Computerization of Electrical Specifications fo...Review of Development done in Computerization of Electrical Specifications fo...
Review of Development done in Computerization of Electrical Specifications fo...
 
Cadison electric-designer
Cadison  electric-designerCadison  electric-designer
Cadison electric-designer
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Collaborative Product Development with 100% Partner Connection
Collaborative Product Development with 100% Partner ConnectionCollaborative Product Development with 100% Partner Connection
Collaborative Product Development with 100% Partner Connection
 
Software team linkedin
Software team linkedinSoftware team linkedin
Software team linkedin
 
Autocad Mechanical 2011 Overview Brochure
Autocad Mechanical 2011 Overview BrochureAutocad Mechanical 2011 Overview Brochure
Autocad Mechanical 2011 Overview Brochure
 
Autodesk Constructware 2010
Autodesk Constructware 2010Autodesk Constructware 2010
Autodesk Constructware 2010
 

Plus de Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

Plus de Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Dernier

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Nikki Chapple
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkPixlogix Infotech
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 

Dernier (20)

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
 
React Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App FrameworkReact Native vs Ionic - The Best Mobile App Framework
React Native vs Ionic - The Best Mobile App Framework
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 

[Case study] Benton Public Utility District: Reducing labor costs while improving data and efficiencies

  • 1. Smart Grid Solutions Benton Public Utility District Reducing labor costs while improving data and efficiencies PROJECT AT A GLANCE Project Type Operational utility solutions Location Kennewick, WA Number of Customers 47,000 Area Served 900 square miles Applications Provide a graphical view of a utility’s infrastructure and tools that support cost Benton Public Utility District (PUD), a municipal corporation of the State of reduction through simplified planning, analysis Washington headquartered in Kennewick, Washington, was established in 1946. and operational response times Today, Benton PUD supports transmission and distribution of electric energy to more than 47,000 customers covering more than 900 square miles of service Software Implemented territory. Benton PUD manages 37 substations, approximately 90 miles of 115kV ArcFM Enterprise GIS transmission lines, 1,582 miles of distribution lines, and nearly 130 miles of fiber Designer optic cables. CUSTOMER BENEFITS Challenges • Eliminates the need to print thousands of maps, Benton PUD had been using AutoCAD since the 1980s to create designs for its design packets and work order forms construction and maintenance projects, but later incorporated CAD-based GIS technology to more accurately map and manage the utility’s assets. As its service • Saves on labor costs area grew, the utility began to recognize its repetitive and inefficient processes for • Integrates each work order type and the data entry and management. necessary workflow into Workflow Manager For example, the utility was forced to access multiple Excel spreadsheets for project costs, print pages of physical maps for engineers and redraw project designs two or three times in order to complete day-to-day construction and maintenance projects. Make the most of your energy SM
  • 2. Smart Grid Solutions Benton Public Utility District “In our design process alone, we are completing the work order lifecycle 40 percent faster by utilizing Schneider Electric’s solutions.” Chris Folta, manager of GIS at Benton PUD “Our previous design process was very labor- Schneider Electric worked with Benton PUD to intensive. Work order and design information were consolidate and convert its AutoCAD data into the manually entered and required too much duplication, ArcFM GIS system and integrate Designer, which is which left a lot of room for error,” explained Chris an extension of the ArcFM platform and streamlines Folta, manager of GIS at Benton PUD. “Even with a the entire design, estimating and construction robust AutoCAD system, we needed standardized process. processes, a single, multi-user enterprise database, as opposed to having multiple single-user databases The Designer solution provides utilities the tools to and spreadsheets.” create, control and manage multiple designs, design versions, work orders, cost estimates and input In addition to inefficiencies in the design process, from multiple staff members involved in any project. Benton PUD also lacked an enterprise work Within the GIS database, users may view, query and management software system. As a result, the utility edit designs without the need to copy files around struggled to accurately track its various projects in the network. This feature eliminated the need for progress and efficiently recognize and account for Benton PUD to manage multiple databases, print project delays. The inability to effectively track and physical maps or redraw the same designs in multiple organize work order forms also made it difficult to systems. enforce standardized business processes to properly complete each task included in the workflow. Benton PUD also took advantage of Designer’s flexible workflow process tool called Workflow In order to plan for utility growth, Benton PUD needed Manager, which can operate in a standalone mode a flexible system that could more efficiently integrate or as the integration point to an enterprise work GIS and design processes to eliminate redundancies, management system. reduce human error, and provide enterprise access to operational information. The utility also needed “Schneider Electric helped to convert our AutoCAD a solution to help organize and track its multiple data and ensure its format integrated properly with work order types and enforce the proper business our other utility programs,” said Folta. “At the same standards for completing each work order. time, Schneider Electric assisted in customizing Workflow Manager to track and organize all of our Solution work order types — not just the design projects.” In 2007, Schneider Electric partnered with Benton Benton has seven different work order types it uses PUD to smoothly and efficiently integrate the ArcFM™ for various operational projects, and each work Enterprise GIS and Designer solutions. order type has a different workflow to complete the project. Schneider Electric helped integrate each ArcFM GIS is based on Esri’s ArcGIS® technology and work order type and the necessary workflow into is specifically designed for the utility industry, enabling Workflow Manager, to act as Benton’s enterprise energy companies to model, design and manage work management system. critical infrastructure. By integrating utility data and advanced geographical maps, ArcFM provides a The Bottom Line graphical view of a utility’s infrastructure and tools that Since integrating ArcFM GIS, Designer and its support cost reduction through simplified planning, customized Workflow Manager, Benton has been analysis and operational response times. able to increase both quality and efficiency in its data management, design processes and overall work
  • 3. Smart Grid Solutions Benton Public Utility District management. As a result of the increased efficiencies, the utility has been able to save on labor costs by “We now have a rock-solid handling a larger workload without the need for system that meets all of our additional engineering staff. business requirements, is stable and delivers high value for our “In our design process alone, we are completing utility, and Schneider Electric the work order lifecycle 40 percent faster by utilizing provided the experienced Schneider Electric’s solutions,” noted Folta. “So for partnership we needed to Benton PUD, we are able to realize significant labor achieve these goals.” savings by efficiently producing more accurate work Chris Folta, manager of GIS at with existing staff and thereby eliminating the need to Benton PUD hire additional resources as the utility grows. Without the need for additional engineering resources, we save at least $120,000 annually.” Folta also estimates that by using Designer and Workflow Manager on a district-wide basis, coupled with ArcFM Viewer in the field, they have eliminated the need to print thousands of maps, design packets and work order forms, saving the utility approximately $50,000 each year on paper, printing materials, and associated labor. “Schneider Electric was able to walk us through the entire process at a pace that we felt was comfortable and provided consulting as our requirements changed,” said Folta. “We now have a rock-solid system that meets all of our business requirements, is stable and delivers high value for our utility, and Schneider Electric provided the experienced partnership we needed to achieve these goals.”
  • 4. ©2012 Schneider Electric. All rights reserved. Schneider Electric USA, Inc. 4701 Royal Vista Circle, Fort Collins, CO 80528 Telephone: 1-866-537-1091 Fax: 1-970-223-5577 www.schneider-electric.com/us June 2012