16. 修正プログラム
--snip--
Comment to PT-SOL-2014001:
The upload path has been changed. It is still possible to upload files, but they
can't overwrite system critical parts any more.
Comment to PT-SOL-2014002:
The system backup is created in a randomly chosen path an deleted afterwards.
Therefore an unauthorized access is made much more difficult and very unlikely.
Second comment to PT-SOL-2014002:
In order to compensate the weak encryption in the configuration file, the whole
configuration file is now encrypted via the new HTTP transmission.
--snip--
73. Kagoshima plant diagram
• SUNNY CENTRAL 500CP-JP
• The 70-megawatt system in Kagoshima is a good example of how important it
is to have the right service partner at your side - someone with broad
experience, who can respond to unexpected events in a flexible manner.
http://www.sma.de/en/products/references/kagoshima.html