EXTENET SYSTEMS - FAST FACTS
OUTDOOR
NETWORKS
Experience and Expertise – Design, Build, Operate, and Own.
DAS and Small Cell networks have been deployed by ExteNet
since 2005 as part of the Solution Network Architecture
~100 Million square feet of Operational Indoor Distributed
Networks in major MSAs like New York City, Chicago, Las Vegas,
Boston and Miami
>60 Operational Outdoor Distributed Networks in major MSAs
like New York City, Chicago, San Francisco, Las Vegas and Boston
Proven Track Record - Successful deployments and activities
with REITS and organizations like Empire State Building,
Fairmont Hotels, Barclays Center, Banner Healthcare
All US National Wireless Carriers are Satisfied Customers on our
Networks
INDOOR
NETWORKS
3© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
EMPIRE STATE BUILDING – FAST FACTS
 102 floor structure covering ~ 2.8M square feet in
Mid-town Manhattan
 Building has its own zip code
 NYC and US historic landmark
 Opened in 1931
 Ranked #1 on America’s Favorite Architecture List
 Owned by Empire State Realty Trust
 REIT owners of 8 other properties in Manhattan
 2010 - $550M+ renovation began and continues
today
 At end of 2014 ~ 86% space is leased
 Tenants include: FDIC, LinkedIn, Global Brands Group
 “TAMI” Tenants sought after by venue and carriers
 Technology – Advertising – Media - IT
 Total number of visitors each year >4M
4© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
PROJECT SCOPE AND HIGHLIGHTS
 Basic requirements for cellular coverage
 Provide 4G-LTE voice and data coverage for all 102
floors, including the observatory, office space, retail space
and the underground wind tunnel
 Coverage area is 90% of leasable space inclusive of
elevators and stair wells
 Radio/TV Broadcast floors - coverage in corridor only
 Robust distributed network that supports multi-carrier on
day 1
 Network operated by ExteNet
 ESB provides own Wi-Fi network
5© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
 Network infrastructure summary
 Equipment Head End Room – 1,000 sq ft on Concourse Level
 DAS-based Solution
 6 sectors
 41- 5 watt nodes powered from Head End
 763 antennas
 90,000 linear feet (~17+ miles) of coax cabling
 25,000 linear feet (~5 miles) fiber cabling
 Other Peripherals
 Cooling - 20 ton cooling capacity, 2 x 10 ton lead lag units installed
along with 20 ton cooling tower installed above the loading dock
 Power - 600A 208V electric service with ATS for future generator
connection
 Fire suppression FM200 primary with back up
 Solution design - forward thinking ~ 20% “buffer” built in
 Operated and Owned by ExteNet
TURNKEY SOLUTION OVERVIEW
6© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
IMPLEMENTATION CHALLENGES
 Obtaining the multiple necessary building approvals
 Ownership - ESRT requirements
 Carriers’ design/requirements (anchor vs. add-ons) (signal levels
required)
 Head End location changes
 Generator / Cooling components location
 All Tenant approvals 190 tenants!
 National historic landmark approval
 Design changes due to the changing outdoor macro
environment and carrier requirements
 Four design changes after construction began
 Scheduling
 Tenant/building coordination
 Observatory operations
7© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
IMPLEMENTATION CHALLENGES CONT’D
 Enterprise tenant coordination
 Acceptable work hours differ for each tenant – 190 tenants!
 Tenant-specific finishes
 Different aesthetic finishes for each suite
 Restoring suite to original condition at the end of each shift
 General building requirements
 Work areas and respective work hours
 Security/escorts/access to various spaces (tenant/building)
8© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
CARRIER STATUS
Operational February 2015
• LTE 2100 MHz, ….
Operational October 2014
• LTE 1800 MHz, VoLTE...
Under Planning Review
Under Planning Review
9© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY
SUMMARY – LESSONS LEARNED
 Process for engaging large and complex CRE
customers – duplicate solution models across venues
 ExteNet shows its value
 Increasing Priority for Carriers
 Design holistic solution for long term
 Multicarrier & growth
 Negotiate baseline for outside macro levels with carriers
 Managing large number of disparate enterprise tenants
 Understanding impact of existing construction status
 Plan to coordinate renovations prior to construction
 Develop three week look ahead with contingency plan
 Constant Communications before, during, and
after…many moving parts
10© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY

Contenu connexe

Tendances

Richard meier and john hejduk
Richard meier and john hejdukRichard meier and john hejduk
Richard meier and john hejduk
vikashsaini78
 
Architectural case study of IIM ahemdabad by louis i khan
Architectural case study of IIM ahemdabad by louis i khanArchitectural case study of IIM ahemdabad by louis i khan
Architectural case study of IIM ahemdabad by louis i khan
Rajat Katarne
 

Tendances (20)

Richard meier and john hejduk
Richard meier and john hejdukRichard meier and john hejduk
Richard meier and john hejduk
 
Architectural Case Study
Architectural Case StudyArchitectural Case Study
Architectural Case Study
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI AS LIVE CASE STUDY AND INDIAN HAB...
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI  AS LIVE CASE STUDY AND INDIAN HAB...CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI  AS LIVE CASE STUDY AND INDIAN HAB...
CIDCO CONVENTION CENTRE ,VASHI,NAVI MUMBAI AS LIVE CASE STUDY AND INDIAN HAB...
 
chandighar- high court and asembley
chandighar- high court and asembleychandighar- high court and asembley
chandighar- high court and asembley
 
Case study of an auditorium
Case study of an auditoriumCase study of an auditorium
Case study of an auditorium
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
 
Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
Olympiapark, munich
Olympiapark, munichOlympiapark, munich
Olympiapark, munich
 
wankhede stadium case study
wankhede stadium case studywankhede stadium case study
wankhede stadium case study
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
Architectural case study of IIM ahemdabad by louis i khan
Architectural case study of IIM ahemdabad by louis i khanArchitectural case study of IIM ahemdabad by louis i khan
Architectural case study of IIM ahemdabad by louis i khan
 
Low Cost Housing India
Low Cost Housing IndiaLow Cost Housing India
Low Cost Housing India
 
Amdavad ni Gufa / Hussain-Doshi Gufa
Amdavad ni Gufa / Hussain-Doshi GufaAmdavad ni Gufa / Hussain-Doshi Gufa
Amdavad ni Gufa / Hussain-Doshi Gufa
 
Disney Concert Hall - Frank Gehry
Disney Concert Hall - Frank GehryDisney Concert Hall - Frank Gehry
Disney Concert Hall - Frank Gehry
 
HOUSING AT PARSIK HILL
HOUSING AT PARSIK HILLHOUSING AT PARSIK HILL
HOUSING AT PARSIK HILL
 
Windflower Hill Spa resort, Kerala
Windflower Hill Spa resort, KeralaWindflower Hill Spa resort, Kerala
Windflower Hill Spa resort, Kerala
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
FRENCH INFLUENCE IN PONDICHERRY
FRENCH INFLUENCE IN PONDICHERRYFRENCH INFLUENCE IN PONDICHERRY
FRENCH INFLUENCE IN PONDICHERRY
 

En vedette

Empire state building presentation
Empire state building presentationEmpire state building presentation
Empire state building presentation
Gabriela Soto Bazán
 
Empire State Building
Empire State BuildingEmpire State Building
Empire State Building
grouse130
 
The empire state building
The empire state buildingThe empire state building
The empire state building
Haley Evans
 
Analyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryAnalyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project Delivery
Jamal Nelson, CCM
 
Empire state building
Empire state buildingEmpire state building
Empire state building
COMM 2213
 
Building the empire state building
Building the empire state buildingBuilding the empire state building
Building the empire state building
sheila bert
 
Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?
halatious
 
A Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint ActivityA Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint Activity
mcnamart
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
Municipalidad de Pirque
 

En vedette (20)

Empire state building presentation
Empire state building presentationEmpire state building presentation
Empire state building presentation
 
Empire state building.docx
Empire state building.docxEmpire state building.docx
Empire state building.docx
 
Empire State Building
Empire State BuildingEmpire State Building
Empire State Building
 
The empire state building
The empire state buildingThe empire state building
The empire state building
 
Empire state
Empire stateEmpire state
Empire state
 
Group8 empire state building
Group8 empire state buildingGroup8 empire state building
Group8 empire state building
 
Construction Photos Of Empire State Building
Construction Photos Of Empire State BuildingConstruction Photos Of Empire State Building
Construction Photos Of Empire State Building
 
Analyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project DeliveryAnalyzing Empire State Building - Lean Project Delivery
Analyzing Empire State Building - Lean Project Delivery
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
Mumbai High Rise Buildings Case studies of Kohinoor Square, Aquaria Grande, K...
 
Building the empire state building
Building the empire state buildingBuilding the empire state building
Building the empire state building
 
Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?Do Green Buildings Make Dollars & Sense?
Do Green Buildings Make Dollars & Sense?
 
Photos Of The Construction Of The Empire State Building
Photos Of The Construction Of The Empire State BuildingPhotos Of The Construction Of The Empire State Building
Photos Of The Construction Of The Empire State Building
 
A Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint ActivityA Tour of New York City - Powerpoint Activity
A Tour of New York City - Powerpoint Activity
 
Green Buildings or Green Wash in the United States
Green Buildings or Green Wash in the United StatesGreen Buildings or Green Wash in the United States
Green Buildings or Green Wash in the United States
 
Empire State Building. Estructura y proceso de Construcción.
Empire State Building. Estructura y proceso de Construcción.Empire State Building. Estructura y proceso de Construcción.
Empire State Building. Estructura y proceso de Construcción.
 
modern architecture
modern architecturemodern architecture
modern architecture
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
 
17 concepts you should know to pass the LEED v4 GA Exam
17 concepts you should know to pass the LEED v4 GA Exam17 concepts you should know to pass the LEED v4 GA Exam
17 concepts you should know to pass the LEED v4 GA Exam
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....
 

Similaire à EMPIRE STATE BUILDING CASE STUDY SUMMARY

Greg_Merriweather_5.7
Greg_Merriweather_5.7Greg_Merriweather_5.7
Greg_Merriweather_5.7
Kai El
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
minerlawrence
 
Armando Gomez Resume2016-2
Armando Gomez Resume2016-2Armando Gomez Resume2016-2
Armando Gomez Resume2016-2
Armando Gomez
 
Powernet Presentation
Powernet PresentationPowernet Presentation
Powernet Presentation
Powernet
 
MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715
David Clark
 
DavidClark1PageResume111715
DavidClark1PageResume111715DavidClark1PageResume111715
DavidClark1PageResume111715
David Clark
 
Resume for James McGarity
Resume for James McGarityResume for James McGarity
Resume for James McGarity
James McGarity
 

Similaire à EMPIRE STATE BUILDING CASE STUDY SUMMARY (20)

Spidercloud Wireless - Small Cell enterprise deployment
Spidercloud Wireless  - Small Cell enterprise deploymentSpidercloud Wireless  - Small Cell enterprise deployment
Spidercloud Wireless - Small Cell enterprise deployment
 
SpiderCloud Wireless Scaling Small Cells indoors
SpiderCloud Wireless Scaling Small Cells indoorsSpiderCloud Wireless Scaling Small Cells indoors
SpiderCloud Wireless Scaling Small Cells indoors
 
Techcv 4 3 2010 2003london
Techcv 4 3 2010 2003londonTechcv 4 3 2010 2003london
Techcv 4 3 2010 2003london
 
Greg_Merriweather_5.7
Greg_Merriweather_5.7Greg_Merriweather_5.7
Greg_Merriweather_5.7
 
Herndon's
Herndon'sHerndon's
Herndon's
 
CV-ROB
CV-ROBCV-ROB
CV-ROB
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
 
Resume_Ritesh-JGD
Resume_Ritesh-JGDResume_Ritesh-JGD
Resume_Ritesh-JGD
 
Armando Gomez Resume2016-2
Armando Gomez Resume2016-2Armando Gomez Resume2016-2
Armando Gomez Resume2016-2
 
Powernet Presentation
Powernet PresentationPowernet Presentation
Powernet Presentation
 
Powernet dossier
Powernet dossierPowernet dossier
Powernet dossier
 
MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715MasterResumeDAVIDCLARK111715
MasterResumeDAVIDCLARK111715
 
System Integrator
System IntegratorSystem Integrator
System Integrator
 
Resume Rediker 10-21-2015
Resume Rediker 10-21-2015Resume Rediker 10-21-2015
Resume Rediker 10-21-2015
 
DavidClark1PageResume111715
DavidClark1PageResume111715DavidClark1PageResume111715
DavidClark1PageResume111715
 
It managed-services
It managed-servicesIt managed-services
It managed-services
 
CV SIDDARTH
CV SIDDARTHCV SIDDARTH
CV SIDDARTH
 
9 27 16 resume
9 27 16 resume9 27 16 resume
9 27 16 resume
 
Resume for James McGarity
Resume for James McGarityResume for James McGarity
Resume for James McGarity
 
Product Management Telecommunications
Product Management   TelecommunicationsProduct Management   Telecommunications
Product Management Telecommunications
 

Plus de Sharpe Smith

Clayton funk Media Venture Partners
Clayton funk Media Venture PartnersClayton funk Media Venture Partners
Clayton funk Media Venture Partners
Sharpe Smith
 
Security 2 Q 07[1]
Security 2 Q 07[1]Security 2 Q 07[1]
Security 2 Q 07[1]
Sharpe Smith
 
Field Service Automation Main[1]
Field Service Automation Main[1]Field Service Automation Main[1]
Field Service Automation Main[1]
Sharpe Smith
 
American University
American UniversityAmerican University
American University
Sharpe Smith
 

Plus de Sharpe Smith (16)

HetNet Forum Wireless Trends
HetNet Forum Wireless TrendsHetNet Forum Wireless Trends
HetNet Forum Wireless Trends
 
Samuel Hall Fastback Networks
Samuel Hall Fastback NetworksSamuel Hall Fastback Networks
Samuel Hall Fastback Networks
 
Mike Jones Advanced RF Technologies
Mike Jones Advanced RF TechnologiesMike Jones Advanced RF Technologies
Mike Jones Advanced RF Technologies
 
Clayton funk Media Venture Partners
Clayton funk Media Venture PartnersClayton funk Media Venture Partners
Clayton funk Media Venture Partners
 
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
John Stevens Infinigy Presentation AGL Conference Denver Aug. 5, 2015
 
Public safety
Public safetyPublic safety
Public safety
 
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
Presentation by Edward Parkinson, FirstNet, at AGL Conference, June 19, Washi...
 
Collectors3
Collectors3Collectors3
Collectors3
 
Security 2 Q 07[1]
Security 2 Q 07[1]Security 2 Q 07[1]
Security 2 Q 07[1]
 
Nostalgia 2
Nostalgia 2Nostalgia 2
Nostalgia 2
 
Field Service Automation Main[1]
Field Service Automation Main[1]Field Service Automation Main[1]
Field Service Automation Main[1]
 
Blue Man Group
Blue Man GroupBlue Man Group
Blue Man Group
 
Thompson
ThompsonThompson
Thompson
 
Carnegie
CarnegieCarnegie
Carnegie
 
American University
American UniversityAmerican University
American University
 
Utility
UtilityUtility
Utility
 

Dernier

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Dernier (20)

Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 

EMPIRE STATE BUILDING CASE STUDY SUMMARY

  • 1. 1© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY EMPIRE STATE BUILDING CASE STUDY SUMMARY EXTENET SYSTEMS TONY EIGEN AUGUST 5, 2015
  • 2. 2© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY EXTENET SYSTEMS - FAST FACTS OUTDOOR NETWORKS Experience and Expertise – Design, Build, Operate, and Own. DAS and Small Cell networks have been deployed by ExteNet since 2005 as part of the Solution Network Architecture ~100 Million square feet of Operational Indoor Distributed Networks in major MSAs like New York City, Chicago, Las Vegas, Boston and Miami >60 Operational Outdoor Distributed Networks in major MSAs like New York City, Chicago, San Francisco, Las Vegas and Boston Proven Track Record - Successful deployments and activities with REITS and organizations like Empire State Building, Fairmont Hotels, Barclays Center, Banner Healthcare All US National Wireless Carriers are Satisfied Customers on our Networks INDOOR NETWORKS
  • 3. 3© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY EMPIRE STATE BUILDING – FAST FACTS  102 floor structure covering ~ 2.8M square feet in Mid-town Manhattan  Building has its own zip code  NYC and US historic landmark  Opened in 1931  Ranked #1 on America’s Favorite Architecture List  Owned by Empire State Realty Trust  REIT owners of 8 other properties in Manhattan  2010 - $550M+ renovation began and continues today  At end of 2014 ~ 86% space is leased  Tenants include: FDIC, LinkedIn, Global Brands Group  “TAMI” Tenants sought after by venue and carriers  Technology – Advertising – Media - IT  Total number of visitors each year >4M
  • 4. 4© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY PROJECT SCOPE AND HIGHLIGHTS  Basic requirements for cellular coverage  Provide 4G-LTE voice and data coverage for all 102 floors, including the observatory, office space, retail space and the underground wind tunnel  Coverage area is 90% of leasable space inclusive of elevators and stair wells  Radio/TV Broadcast floors - coverage in corridor only  Robust distributed network that supports multi-carrier on day 1  Network operated by ExteNet  ESB provides own Wi-Fi network
  • 5. 5© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY  Network infrastructure summary  Equipment Head End Room – 1,000 sq ft on Concourse Level  DAS-based Solution  6 sectors  41- 5 watt nodes powered from Head End  763 antennas  90,000 linear feet (~17+ miles) of coax cabling  25,000 linear feet (~5 miles) fiber cabling  Other Peripherals  Cooling - 20 ton cooling capacity, 2 x 10 ton lead lag units installed along with 20 ton cooling tower installed above the loading dock  Power - 600A 208V electric service with ATS for future generator connection  Fire suppression FM200 primary with back up  Solution design - forward thinking ~ 20% “buffer” built in  Operated and Owned by ExteNet TURNKEY SOLUTION OVERVIEW
  • 6. 6© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY IMPLEMENTATION CHALLENGES  Obtaining the multiple necessary building approvals  Ownership - ESRT requirements  Carriers’ design/requirements (anchor vs. add-ons) (signal levels required)  Head End location changes  Generator / Cooling components location  All Tenant approvals 190 tenants!  National historic landmark approval  Design changes due to the changing outdoor macro environment and carrier requirements  Four design changes after construction began  Scheduling  Tenant/building coordination  Observatory operations
  • 7. 7© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY IMPLEMENTATION CHALLENGES CONT’D  Enterprise tenant coordination  Acceptable work hours differ for each tenant – 190 tenants!  Tenant-specific finishes  Different aesthetic finishes for each suite  Restoring suite to original condition at the end of each shift  General building requirements  Work areas and respective work hours  Security/escorts/access to various spaces (tenant/building)
  • 8. 8© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY CARRIER STATUS Operational February 2015 • LTE 2100 MHz, …. Operational October 2014 • LTE 1800 MHz, VoLTE... Under Planning Review Under Planning Review
  • 9. 9© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY SUMMARY – LESSONS LEARNED  Process for engaging large and complex CRE customers – duplicate solution models across venues  ExteNet shows its value  Increasing Priority for Carriers  Design holistic solution for long term  Multicarrier & growth  Negotiate baseline for outside macro levels with carriers  Managing large number of disparate enterprise tenants  Understanding impact of existing construction status  Plan to coordinate renovations prior to construction  Develop three week look ahead with contingency plan  Constant Communications before, during, and after…many moving parts
  • 10. 10© 2015 EXTENET SYSTEMS, INC. CONFIDENTIAL & PROPRIETARY