SlideShare une entreprise Scribd logo
1  sur  17
How to Submit a Proposal
2 Basic Procedures ,[object Object],[object Object],[object Object],[object Object]
Sealed Bidding ,[object Object],[object Object],[object Object],[object Object]
Pre-Award Survey (Responsibility Check) ,[object Object],[object Object],[object Object],[object Object]
Certificate of Competency ,[object Object],[object Object],[object Object]
Competitive Proposals ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Technically Accepted Lowest Price ,[object Object],[object Object],[object Object],[object Object],[object Object]
The Trade Off Process ,[object Object],[object Object],[object Object],[object Object],[object Object]
Example of a Factor ,[object Object],[object Object],[object Object],[object Object]
Past Performance ,[object Object],[object Object],[object Object],[object Object]
What is looked for in Past Performance? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
More on evaluation factors ,[object Object],[object Object],[object Object],[object Object]
Elimination from competition ,[object Object],[object Object],[object Object],[object Object]
Debriefing ,[object Object],[object Object],[object Object],[object Object],[object Object]
Do ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Don’t ,[object Object],[object Object],[object Object]
Questions?

Contenu connexe

Tendances

Vendor Management: How Well Are You Managing Your Consultants and Appraisers?
Vendor Management: How Well Are You Managing Your Consultants and Appraisers?Vendor Management: How Well Are You Managing Your Consultants and Appraisers?
Vendor Management: How Well Are You Managing Your Consultants and Appraisers?EDR
 
The Vendor Selection Guide - How to on Assessing Vendor Viability
The Vendor Selection Guide - How to on Assessing Vendor ViabilityThe Vendor Selection Guide - How to on Assessing Vendor Viability
The Vendor Selection Guide - How to on Assessing Vendor ViabilityProformative, Inc.
 
483f1 Types Of Risks And Rbs
483f1 Types Of Risks And Rbs483f1 Types Of Risks And Rbs
483f1 Types Of Risks And RbsGOEL'S WORLD
 
Third sector commissioning & Procurement
Third sector commissioning & ProcurementThird sector commissioning & Procurement
Third sector commissioning & ProcurementDr Gordon Murray
 
Vendor Selection Best Practices - Crowe Mead
Vendor Selection Best Practices - Crowe MeadVendor Selection Best Practices - Crowe Mead
Vendor Selection Best Practices - Crowe MeadBetterLeadershipBlog
 
Creditrating-vcssgoc
Creditrating-vcssgocCreditrating-vcssgoc
Creditrating-vcssgocvinay verma
 
Outsourcing -- A Providers Perspective
Outsourcing -- A Providers PerspectiveOutsourcing -- A Providers Perspective
Outsourcing -- A Providers Perspectivejamesrwells
 
The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...Dr Rupert Booth
 

Tendances (10)

Vendor Management: How Well Are You Managing Your Consultants and Appraisers?
Vendor Management: How Well Are You Managing Your Consultants and Appraisers?Vendor Management: How Well Are You Managing Your Consultants and Appraisers?
Vendor Management: How Well Are You Managing Your Consultants and Appraisers?
 
The Vendor Selection Guide - How to on Assessing Vendor Viability
The Vendor Selection Guide - How to on Assessing Vendor ViabilityThe Vendor Selection Guide - How to on Assessing Vendor Viability
The Vendor Selection Guide - How to on Assessing Vendor Viability
 
483f1 Types Of Risks And Rbs
483f1 Types Of Risks And Rbs483f1 Types Of Risks And Rbs
483f1 Types Of Risks And Rbs
 
Third sector commissioning & Procurement
Third sector commissioning & ProcurementThird sector commissioning & Procurement
Third sector commissioning & Procurement
 
Vendor Selection Best Practices - Crowe Mead
Vendor Selection Best Practices - Crowe MeadVendor Selection Best Practices - Crowe Mead
Vendor Selection Best Practices - Crowe Mead
 
LCC Supplier Mgt
LCC Supplier MgtLCC Supplier Mgt
LCC Supplier Mgt
 
Antoine's Resume
Antoine's ResumeAntoine's Resume
Antoine's Resume
 
Creditrating-vcssgoc
Creditrating-vcssgocCreditrating-vcssgoc
Creditrating-vcssgoc
 
Outsourcing -- A Providers Perspective
Outsourcing -- A Providers PerspectiveOutsourcing -- A Providers Perspective
Outsourcing -- A Providers Perspective
 
The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...
 

Similaire à Submitting A Bid

Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1SacramentoNCMA Gold Rush
 
5. source selection_101
5. source selection_1015. source selection_101
5. source selection_101Colorado PTAC
 
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_PublicChanmo James Choi
 
How to tender
How to tenderHow to tender
How to tenderlvalvano1
 
How To Tender
How To TenderHow To Tender
How To Tenderlvalvano1
 
Request for-proposals-fundamentals4957
Request for-proposals-fundamentals4957Request for-proposals-fundamentals4957
Request for-proposals-fundamentals49570607ashley
 
Effective Specification Writing
Effective Specification WritingEffective Specification Writing
Effective Specification WritingDr Gordon Murray
 
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_PublicChanmo James Choi
 
2024: The FAR, Federal Acquisition Regulations - Part 15
2024: The FAR, Federal Acquisition Regulations - Part 152024: The FAR, Federal Acquisition Regulations - Part 15
2024: The FAR, Federal Acquisition Regulations - Part 15JSchaus & Associates
 
Proposals that Create High Impact
Proposals that Create High Impact Proposals that Create High Impact
Proposals that Create High Impact Amit Kumar Das
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONChester, Ryan Bourne MSc., MBA, PMP
 
Best Practices in the Public Relations RFP Process
Best Practices in the Public Relations RFP ProcessBest Practices in the Public Relations RFP Process
Best Practices in the Public Relations RFP ProcessRobert Udowitz
 
Establishing manufacturing management strategies
Establishing manufacturing management strategiesEstablishing manufacturing management strategies
Establishing manufacturing management strategieseyalsron
 
Selecting CRM Software
Selecting CRM SoftwareSelecting CRM Software
Selecting CRM Softwaresbeshuk
 
Asset finance systems projects guide 101
Asset finance systems projects guide 101Asset finance systems projects guide 101
Asset finance systems projects guide 101David Pedreno
 
Equipment finance projects
Equipment finance projectsEquipment finance projects
Equipment finance projectsDavid Pedreno
 
Equipment Finance Projects
Equipment Finance ProjectsEquipment Finance Projects
Equipment Finance ProjectsDavid Pedreno
 

Similaire à Submitting A Bid (20)

Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1Best practices for a far 15 procurement part 1
Best practices for a far 15 procurement part 1
 
5. source selection_101
5. source selection_1015. source selection_101
5. source selection_101
 
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
 
How to tender
How to tenderHow to tender
How to tender
 
How To Tender
How To TenderHow To Tender
How To Tender
 
Request for-proposals-fundamentals4957
Request for-proposals-fundamentals4957Request for-proposals-fundamentals4957
Request for-proposals-fundamentals4957
 
Effective Specification Writing
Effective Specification WritingEffective Specification Writing
Effective Specification Writing
 
Current Trend in HR Outsourcing
Current Trend in HR OutsourcingCurrent Trend in HR Outsourcing
Current Trend in HR Outsourcing
 
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
2016_10_10_APPePN_Korea-e_Evaluation_Final_Public
 
2024: The FAR, Federal Acquisition Regulations - Part 15
2024: The FAR, Federal Acquisition Regulations - Part 152024: The FAR, Federal Acquisition Regulations - Part 15
2024: The FAR, Federal Acquisition Regulations - Part 15
 
Proposals that Create High Impact
Proposals that Create High Impact Proposals that Create High Impact
Proposals that Create High Impact
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
 
Best Practices in the Public Relations RFP Process
Best Practices in the Public Relations RFP ProcessBest Practices in the Public Relations RFP Process
Best Practices in the Public Relations RFP Process
 
Establishing manufacturing management strategies
Establishing manufacturing management strategiesEstablishing manufacturing management strategies
Establishing manufacturing management strategies
 
Selecting CRM Software
Selecting CRM SoftwareSelecting CRM Software
Selecting CRM Software
 
Asset finance systems projects guide 101
Asset finance systems projects guide 101Asset finance systems projects guide 101
Asset finance systems projects guide 101
 
Quality Proposal
Quality ProposalQuality Proposal
Quality Proposal
 
Final ang
Final angFinal ang
Final ang
 
Equipment finance projects
Equipment finance projectsEquipment finance projects
Equipment finance projects
 
Equipment Finance Projects
Equipment Finance ProjectsEquipment Finance Projects
Equipment Finance Projects
 

Submitting A Bid

Notes de l'éditeur

  1. I’m going to discuss the basic procurement methods GSA uses for its construction projects and discuss some of the things we look for when evaluating proposals.
  2. There are two basic procedures for competitive solicitations issued by Federal agencies and GSA in particular. They are Sealed Bidding and Competitive Proposals. I will discuss Sealed Bidding first since that’s the simpler of the two competitive acquisition procedures. Although sealed bidding is the least used method these days.
  3. GSA uses the Sealed Bidding method when the award can be based on price and discussions with bidders aren’t necessary. In plain terms that means the specifications are straight forward and precise and can be performed by any competent responsible contractor and the only “variable” is the price. GSA issues an Invitation for Bids (IFB) which includes all the terms, conditions, regulations and specifications and drawings describing the specific work and requests a bid price. Sealed Bids are publicly opened revealing everyone’s prices to all other bidders and the public in general. That being said, although IFB’s are based on low price – the Government doesn’t base the award decision on price alone. We perform a pre award survey or responsibility check to determine whether the low bidder is a responsible contractor.
  4. SBA requests information from small business concern (the low bidder) SBA reviews all and makes determination Affirmative - Issues certificate of Competency Negative - Does not issue certificate A Certificate of Competency (COC) is the certificate issued by the Small Business Administration (SBA) stating that the holder is responsible (with respect to all elements of responsibility, including, but not limited to, capability, competency, capacity, credit, integrity, perseverance, tenacity, and limitations on subcontracting) for the purpose of receiving and performing a specific Government contract.
  5. Soliciting Competitive Proposals is the second acquisition procedure and is the more complicated of the two and these days it is the most frequently used procedure by most Federal Agencies. When GSA feels it cannot meet its needs through sealed bidding a decision is made is issue a Request for Proposals (RFP) instead of an Invitation for Bids. RFP’s are used when the Government feels selection of a contractor should not be based on price alone and they are looking for the “Best Value” to the Government and factors other than price are considered important. Whereas under sealed bidding the responsible bidder offering the lowest price is selected, under the competitive proposal procedures the Government may conduct negotiations and have discussions with all offerors and may award to other than the lowest price. There are two basic procurement methods for competitive proposals. Technically acceptable lowest price Trade Off Process
  6. Again I’ll discuss technically acceptable lowest price first since it’s the simpler of the two methods. Technically acceptable lowest price is somewhat a reverse of the sealed bid procedure. It is conducted in two steps. First step - GSA issues the solicitation requesting a technical proposal responding to several specific technical factors and then evaluates each proposal received based on the offeror’s responses to each factor. Just a note that under sealed bidding contractors are called bidders and under competitive proposals they are now called offerors. Each of the proposals is then determined to be technically acceptable or not technically acceptable. Technical proposals are not ranked under this method. It’s either go or no go. You are either technically acceptable or not. Those considered technically acceptable are then requested to submit a price proposal and award is made to the lowest priced technically acceptable offeror. Notice this method refers to lowest price rather than low bid. That is because the Government may negotiate price with each offeror. For example if all prices come in too high rather than cancelling the solicitation as would be required under sealed bidding we can hold discussions with all offerors and request revised price proposals.
  7. The second method is the tricky one. The Trade Off Process. There are many different ways to use this process but basically this method allows the Government a great deal of latitude in selecting a contractor. The Government can make a “trade off” between price and technical factors meaning we can award to other than the lowest price or other than the highest ranked technical proposal. Notice in this method technical proposals are ranked. Obviously the optimum situation for an offeror is to have the highest technically ranked lowest priced proposal. The evaluation process is based solely on the factors in the solicitation. The proposals are not compared to each other. They are ranked individually based on a specific evaluation system that is established for that particular project. This is the method I believe you all want to know about. “What are the important key points to focus on when preparing a proposal.” The solicitation will contain several technical factors tailored to the project at hand and geared towards getting the best value for the Government. Offerors are required to submit detailed responses to each of the technical factors. Here’s a generic sample of an evaluation factor.
  8. The factor asks specifically for certain information: Square footage of building; Dollar size of project; Two pages of Photograghs Provide the information requested. Don’t be too elaborate. Don’t give drawings, sketches, etc. unless they are asked for. The evaluators aren’t going to look through documents they didn’t request and you may have included some valuable information in those extra documents which may or may not be reviewed. Not to say that you shouldn’t add an interesting fact or two that would enhance your proposal. But be brief and place it within the document that was requested. Read the factor carefully. Make sure you include all information that is requested and only information that is requested. Many solicitations request information on Key Personnel - Who will be your Project Manager, your superintendent, etc. And be aware that if you are awarded the project those personnel that were evaluated will be expected to perform that specific function. If you need to substitute a person, you will need to have the replacement person evaluated and accepted by the Government. Again, be sure to include all the information requested for each proposed team member.
  9. Next Past Performance is always considered in a solicitation whether it is an evaluation factor or not. When responding to this item – what we will be looking for is any problems encountered on your previous projects. We expect to receive names, titles and telephone numbers for reliable references who can specifically rate your performance. It should be a person who is willing to discuss your performance with us. Be sure the phone number and all information is current because we will not spend too much time trying to contact people over and over again. Sometimes we include a past performance questionnaire in the solicitation package and request that the offeror has the reference party complete it and mail it directly to us. Even when we do this we will still call the reference to speak to them so having current contact information is important. Of course, we are always allowed to get past performance information from anyone and anywhere we deem necessary. We are not limited to the names you give us. Usually the past performance is related to the same projects listed in the similar experience factor. Note that similar experience and past performance are different factors. Sometimes an offeror may think we are asking for the same thing twice.
  10. We also may ask the offeror to provide additional information concerning their past performance. Many times offerors forget to respond to this part of the past performance factor and only return the questionnaires. Here’s a sample. For each project submitted the offeror shall address the following items in a narrative format: Timeliness, Cost Control, Administration, Quality Product, Business Relations, Safety History, and Continuity of Personnel. Information shall not exceed three (3) typewritten pages per project. Again, be sure to read the solicitation and particularly the factors carefully. COC procedures not applicable – you are not being found non responsible only less responsible.
  11. These are just examples of evaluation factors other may include facators related to a firm’s technical excellence (your techniques, processes); management plan, etc. In most cases the Government states in the solicitation that it intends to hold discussions with offerors but sometimes the initial intention is not to hold discussions so be sure to read the package carefully because if it states the Government does not intend to hold discussions then whatever you proposed may be evaluated “as is”. Thus, when submitting your price proposal, keep in mind that there may not be negotiations. **The solicitation will almost always state the relative importance of the factors such as technical factors are much more important than price or vice vera. Or it may make a statement that the factors are listed in the order of their relative importance….. This way you can make a smart business decision whether you have the expertise to perform the work or not.
  12. You won’t necessarily be eliminated automatically if your responses don’t exactly meet the criteria but that will be reflected in your score and since you don’t know who the other offerors are or what they submitted you would have to make a business decision as to whether you wish to continue. Sometimes the Government makes that decision for you. The evaluation team is allowed to reduce the number of proposals it evaluates for a particular project. What happens is that the evaluators perform an initial evaluation of all the proposals that are submitted and ranks them. Then they establish a competitive range eliminating those proposals that don’t have a reasonable chance of being awarded a contract. The evaluators may further reduce the number of proposals in the competitive range in order to conduct an efficient competition. Meaning they can reduce the number of proposals to include in the competitive range to the most highly rated in order to perform a thorough and complete evaluation within the timeframe allotted. This reduction can only be done if the solicitation made a statement to that effect.
  13. All offerors eliminated will receive a notice stating that their proposal has been eliminated and advised that they may request a debriefing. This is an interview either in person or by phone where the offeror is advised of the rationale for eliminating their proposal and information concerning the evaluation of significant elements of their proposal. The debriefing does not reveal any information about any other offerors proposals or what was better or worse in one proposal or another. Remember proposals are not compared to each other.
  14. PBS hold pre-proposal conferences which are advertised on FBO.gov where they discuss a project before it is posted on fedbizopps. Also, attend any networking events you can. If contracting officers receive no response for sources sought, they don’t set it aside to small biz. CO’s conduct Market Research to determine small business participation. If you are 8a, HUBZone, or SDVOSB, you may get a set-aside and should market yourself to contracting staff. Do not bid on projects you can’t handle. Bid on projects, and when you don’t win a contract, find out why. You are entitled to a debriefing. In every advertisement, there is a POC listed. Ambiguous information in the Offer/Proposal should be directed to the Contracting Officer. Vendors should submit questions in writing to clarify contract requirements. RFI, Request for Information, might be implemented to extend the bid. Technical questions must be submitted in writing. Find a firm that complement your own. A joint venture may benefit you in many ways; if you require bonding or any other resources you do not have. The JV must be formed before the initial bid.
  15. The vendor should just submit the proposal, nothing fancy, no binders, etc. Large black binders clip are fine. Businesses should only submit what is required in the solicitation package and respond to what GSA is asking for. The idea that submitting more is better is not true. A paginated proposal makes it easier for contracting officials to find requested information. Also, vendors should submit multiple copies of offer. The technical evaluation team may need more copies. In some cases, the solicitation requests a lump sum; but when it doesn’t, break it down. This will add validity to the amount you’re bidding because the CO can clearly see how you arrived at that figure. According to the contract, businesses should submit a breakdown of amounts and line items. You may be eligible for any number of programs, such as 8(a) or HUBZone. Meet with the SBA to determine your eligibility.