COCOMO MODEL
Presented By: Nandu
091GCMA110
COCOMO model (Constructive cost model) was proposed by Boehm.
This model estimates the total effort in terms of “person-months” of the
technical project staff.
Boehm introduces three forms of cocomo.
It can be applied in three classes of software project:
1. Organic mode : Relatively simple , small projects with a small team are
handled . Such a team should have good application experience to less
rigid requirements.
2. Semidetached mode:
For intermediate software projects(little complex compared to organic
mode projects in terms of size). Projects may have a mix of rigid and less
than rigid requirements.
3.Embedded mode:
When the software project must be developed within a tight set of
hardware and software operational constraints.
Ex of complex project:
Air traffic control system
Forms of cocomo model are:
1.Basic cocomo:
Computes software development effort and cost as a function of programme size
expressed in terms of lines of code(LOC).
The basic cocomo model takes the following form:
E=ab (KLOC)Exp(bb) persons-months
D=cb(E)Exp(db)months
Where E- Stands for the effort applied in terms of person months
D-Development time in chronological months
KLOC-Kilo lines of code of the project
Ab,bb,cb,db are the co-efficients for the three modes are given below:
From E & D we can compute the no: of people required to accomplish the project as
N=E/D
The coefficients of ab,bb,cb,db for the three modes are:
Software
projects
ab bb cb db
Organic 2.4 1.05 2.5 0.38
Semi-
Detach
-ed
3.0 1.12 2.5 0.35
Embedd-
ed
3.6 1.20 2.5 0.32
Merits of Basic Cocomo model:
Basic cocomo model is good for quick, early,rough order of magnitude
estimates of software project.
Limitations :
1.The accuracy of this model is limited because it does not consider
certain factors for cost estimation of software. These factors are
hardware constraints, personal quality and experiences, modern
techniques and tools.
2. The estimates of Cocomo model are within a factor of 1.3 only 29% of
the time and within the factor of 2 only 60% of time.
Example: consider a software project using semi-detached mode with
30,000 lines of code . We will obtain estimation for this project as follows:
(1)Effort estimation
E= ab(KLOC)Exp(bb)person-months
E=3.0(30)1.12
where lines of code=30000=30 KLOC
E=135 person-month
(2) Duration estimation
D=cb(E)Exp(db)months
=2.5(135)0.35
D=14 months
(3)Person estimation
N=E/D
=135/14
N=10 persons approx.
2. Intermediate COCOMO:
Computes effort as a function as a function of programme size and a lot of cost
drivers that includes subjective assessment of product attributes,hardware attributes
, personal attributes and project attributes.
The basic model is extended to consider a set of cost driver attributes grouped into
4 categories(Intermediate Cocomo)
(1)Product Attributes:
(a) Required software reliability
(b) Size of application software
(c) Complexity of the product
(2) Hardware Attributes:
(a) Run-time performance constraints
(b) Memory constraints
(c) Required turn around time
(d) Volatility of virtual machine
(3)Personal attributes:
(a) Analyst capability
(b) Software Engineer Capability
(c) Applications Experience
(d) Programming language experience
(e) Virtual machine Experience
(4)Project Attributes:
(a) Use of software tools
(b) Required development schedule
(c) Application of software engineering methods
Now these 15 attributes get a 6-point scale ranging from “very low” to “extra
high”.These ratings can be viewed as:
Very Low Nominal High Very high Extra high
L ow
Based on the rating effort multipliers is determined.The product of all effort
Multipliers result in “effort adjustment factor” (EAF).
The intermediate Cocomo takes the form.
E=ai(KLOC)bi*EAF where
E:Effort applied in terms of person-months
KLOC : Kilo lines of code for the project
EAF : It is the effort adjustment factor
The values of ai and bi for various class of software projects are:
Software projects ai bi
Organic 3.2 1.05
Semi-detached 3.0 1.12
Embedded 2.8 1.20
The duration and person estimate is same as in basic Cocomo model
i.e;
D=cb(E)Exp (db) months i.e; use values of cb and db coefficients
N=E/D persons
Merits:
1.This model can be applied to almost entire software product for easy and
rough cost estimation during early stage.
2.It can also be applied at the software product component level for obtaining
more accurate cost estimation.
Limitations:
1.The effort multipliers are not dependent on phases.
2. A product with many components is difficult to estimate.
Example:
Consider a project having 30,000 lines of code which in an embedded software
with critical area hence reliability is high.The estimation can be
E=ai(KLOC)bi
*(EAF)
As reliability is high EAF=1.15(product attribute)
ai=2.8
bi=1.20 for embedded software
E=2.8(30)1.20
*1.15
=191 person month
D=cb(E)db=2.5(191)0.32
=13 months approximately
N=E/D
=191/13
N=15 persons approx.
Thank You

Contenu connexe

Tendances

Planning the development process
Planning the development processPlanning the development process
Planning the development processSiva Priya
 
Software project estimation
Software project estimationSoftware project estimation
Software project estimationinayat khan
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation TechniquesSanthi thi
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)MuskanSony
 
COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED NA000000
 
Defining the Problem - Goals and requirements
Defining the Problem - Goals and requirementsDefining the Problem - Goals and requirements
Defining the Problem - Goals and requirementsStephennancy
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)AmanSharma1172
 
Quality and productivity factors
Quality and productivity factorsQuality and productivity factors
Quality and productivity factorsNancyBeaulah_R
 
Software Engineering : Requirement Analysis & Specification
Software Engineering : Requirement Analysis & SpecificationSoftware Engineering : Requirement Analysis & Specification
Software Engineering : Requirement Analysis & SpecificationAjit Nayak
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 
Programming team structure
Programming team structureProgramming team structure
Programming team structureNancyBeaulah_R
 
Putnam Resource allocation model.ppt
Putnam Resource allocation model.pptPutnam Resource allocation model.ppt
Putnam Resource allocation model.pptAnupamaSharma80
 
Chapter 1 2 - some size factors
Chapter 1   2 - some size factorsChapter 1   2 - some size factors
Chapter 1 2 - some size factorsNancyBeaulah_R
 
Delphi cost estimation model
Delphi cost estimation modelDelphi cost estimation model
Delphi cost estimation modelShashwat Shriparv
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniqueskamal
 

Tendances (20)

Planning the development process
Planning the development processPlanning the development process
Planning the development process
 
Software project estimation
Software project estimationSoftware project estimation
Software project estimation
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)
 
Staffing level estimation
Staffing level estimation Staffing level estimation
Staffing level estimation
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED COCOMO Modal In Software Engineering By NADEEM AHMED
COCOMO Modal In Software Engineering By NADEEM AHMED
 
Defining the Problem - Goals and requirements
Defining the Problem - Goals and requirementsDefining the Problem - Goals and requirements
Defining the Problem - Goals and requirements
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)
 
Quality and productivity factors
Quality and productivity factorsQuality and productivity factors
Quality and productivity factors
 
Software Engineering : Requirement Analysis & Specification
Software Engineering : Requirement Analysis & SpecificationSoftware Engineering : Requirement Analysis & Specification
Software Engineering : Requirement Analysis & Specification
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Programming team structure
Programming team structureProgramming team structure
Programming team structure
 
COCOMO Model
COCOMO ModelCOCOMO Model
COCOMO Model
 
Putnam Resource allocation model.ppt
Putnam Resource allocation model.pptPutnam Resource allocation model.ppt
Putnam Resource allocation model.ppt
 
Chapter 1 2 - some size factors
Chapter 1   2 - some size factorsChapter 1   2 - some size factors
Chapter 1 2 - some size factors
 
Delphi cost estimation model
Delphi cost estimation modelDelphi cost estimation model
Delphi cost estimation model
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 

En vedette

software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo modelREHMAT ULLAH
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23koolkampus
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software EngineeringFáber D. Giraldo
 
Cocomo II
Cocomo IICocomo II
Cocomo IIActimel
 

En vedette (8)

Cocomo
CocomoCocomo
Cocomo
 
software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo model
 
COCOMO MODEL
COCOMO MODELCOCOMO MODEL
COCOMO MODEL
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Cocomo II
Cocomo IICocomo II
Cocomo II
 
Cocomo II
Cocomo IICocomo II
Cocomo II
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 

Similaire à Cocomo model

COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimationPramod Parajuli
 
Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxYagnaGummadi
 
Software Estimation Part II
Software Estimation Part IISoftware Estimation Part II
Software Estimation Part IIsslovepk
 
Cost estimation using cocomo model
Cost estimation using cocomo modelCost estimation using cocomo model
Cost estimation using cocomo modelNitesh Bichwani
 
Effort estimation( software Engineering)
Effort estimation( software Engineering)Effort estimation( software Engineering)
Effort estimation( software Engineering)kiran Patel
 
cocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdfcocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdfssuser2d043c
 
Software Project Planning 1
Software Project Planning 1Software Project Planning 1
Software Project Planning 1Gagan Deep
 
COCOMO Model.pptx
COCOMO Model.pptxCOCOMO Model.pptx
COCOMO Model.pptxsuchi70
 
SE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfSE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfDISHANTBALOTRA
 
COCOMO Model For Effort Estimation
COCOMO Model For Effort EstimationCOCOMO Model For Effort Estimation
COCOMO Model For Effort Estimationgrandhiprasuna
 
LatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxLatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxaditiibaghla16
 

Similaire à Cocomo model (20)

COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimation
 
COCOMO Model By Dr. B. J. Mohite
COCOMO Model By Dr. B. J. MohiteCOCOMO Model By Dr. B. J. Mohite
COCOMO Model By Dr. B. J. Mohite
 
Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptx
 
Software Estimation Part II
Software Estimation Part IISoftware Estimation Part II
Software Estimation Part II
 
Aa03101540158
Aa03101540158Aa03101540158
Aa03101540158
 
5. COCOMO.pdf
5. COCOMO.pdf5. COCOMO.pdf
5. COCOMO.pdf
 
1sqa25.pptx
1sqa25.pptx1sqa25.pptx
1sqa25.pptx
 
Cost estimation using cocomo model
Cost estimation using cocomo modelCost estimation using cocomo model
Cost estimation using cocomo model
 
Effort estimation( software Engineering)
Effort estimation( software Engineering)Effort estimation( software Engineering)
Effort estimation( software Engineering)
 
cocomo.pptx
cocomo.pptxcocomo.pptx
cocomo.pptx
 
COCOMO (Software Engineering)
COCOMO (Software Engineering)COCOMO (Software Engineering)
COCOMO (Software Engineering)
 
cocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdfcocomo-220726173706-141e0dsdsd8f0 (1).pdf
cocomo-220726173706-141e0dsdsd8f0 (1).pdf
 
Software Project Planning 1
Software Project Planning 1Software Project Planning 1
Software Project Planning 1
 
Cocomomodel
CocomomodelCocomomodel
Cocomomodel
 
COCOMO Model.pptx
COCOMO Model.pptxCOCOMO Model.pptx
COCOMO Model.pptx
 
SE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfSE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdf
 
COCOMO Model For Effort Estimation
COCOMO Model For Effort EstimationCOCOMO Model For Effort Estimation
COCOMO Model For Effort Estimation
 
LatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxLatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptx
 
LECT9.ppt
LECT9.pptLECT9.ppt
LECT9.ppt
 
COCOMO.pptx
COCOMO.pptxCOCOMO.pptx
COCOMO.pptx
 

Dernier

Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsPooky Knightsmith
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 

Dernier (20)

Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young minds
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 

Cocomo model

  • 1. COCOMO MODEL Presented By: Nandu 091GCMA110
  • 2. COCOMO model (Constructive cost model) was proposed by Boehm. This model estimates the total effort in terms of “person-months” of the technical project staff. Boehm introduces three forms of cocomo. It can be applied in three classes of software project: 1. Organic mode : Relatively simple , small projects with a small team are handled . Such a team should have good application experience to less rigid requirements. 2. Semidetached mode: For intermediate software projects(little complex compared to organic mode projects in terms of size). Projects may have a mix of rigid and less than rigid requirements. 3.Embedded mode: When the software project must be developed within a tight set of hardware and software operational constraints. Ex of complex project: Air traffic control system
  • 3. Forms of cocomo model are: 1.Basic cocomo: Computes software development effort and cost as a function of programme size expressed in terms of lines of code(LOC). The basic cocomo model takes the following form: E=ab (KLOC)Exp(bb) persons-months D=cb(E)Exp(db)months Where E- Stands for the effort applied in terms of person months D-Development time in chronological months KLOC-Kilo lines of code of the project Ab,bb,cb,db are the co-efficients for the three modes are given below: From E & D we can compute the no: of people required to accomplish the project as N=E/D
  • 4. The coefficients of ab,bb,cb,db for the three modes are: Software projects ab bb cb db Organic 2.4 1.05 2.5 0.38 Semi- Detach -ed 3.0 1.12 2.5 0.35 Embedd- ed 3.6 1.20 2.5 0.32
  • 5. Merits of Basic Cocomo model: Basic cocomo model is good for quick, early,rough order of magnitude estimates of software project. Limitations : 1.The accuracy of this model is limited because it does not consider certain factors for cost estimation of software. These factors are hardware constraints, personal quality and experiences, modern techniques and tools. 2. The estimates of Cocomo model are within a factor of 1.3 only 29% of the time and within the factor of 2 only 60% of time. Example: consider a software project using semi-detached mode with 30,000 lines of code . We will obtain estimation for this project as follows: (1)Effort estimation E= ab(KLOC)Exp(bb)person-months E=3.0(30)1.12 where lines of code=30000=30 KLOC E=135 person-month
  • 6. (2) Duration estimation D=cb(E)Exp(db)months =2.5(135)0.35 D=14 months (3)Person estimation N=E/D =135/14 N=10 persons approx. 2. Intermediate COCOMO: Computes effort as a function as a function of programme size and a lot of cost drivers that includes subjective assessment of product attributes,hardware attributes , personal attributes and project attributes. The basic model is extended to consider a set of cost driver attributes grouped into 4 categories(Intermediate Cocomo) (1)Product Attributes: (a) Required software reliability (b) Size of application software (c) Complexity of the product
  • 7. (2) Hardware Attributes: (a) Run-time performance constraints (b) Memory constraints (c) Required turn around time (d) Volatility of virtual machine (3)Personal attributes: (a) Analyst capability (b) Software Engineer Capability (c) Applications Experience (d) Programming language experience (e) Virtual machine Experience (4)Project Attributes: (a) Use of software tools (b) Required development schedule (c) Application of software engineering methods Now these 15 attributes get a 6-point scale ranging from “very low” to “extra high”.These ratings can be viewed as: Very Low Nominal High Very high Extra high L ow
  • 8. Based on the rating effort multipliers is determined.The product of all effort Multipliers result in “effort adjustment factor” (EAF). The intermediate Cocomo takes the form. E=ai(KLOC)bi*EAF where E:Effort applied in terms of person-months KLOC : Kilo lines of code for the project EAF : It is the effort adjustment factor The values of ai and bi for various class of software projects are: Software projects ai bi Organic 3.2 1.05 Semi-detached 3.0 1.12 Embedded 2.8 1.20
  • 9. The duration and person estimate is same as in basic Cocomo model i.e; D=cb(E)Exp (db) months i.e; use values of cb and db coefficients N=E/D persons Merits: 1.This model can be applied to almost entire software product for easy and rough cost estimation during early stage. 2.It can also be applied at the software product component level for obtaining more accurate cost estimation. Limitations: 1.The effort multipliers are not dependent on phases. 2. A product with many components is difficult to estimate.
  • 10. Example: Consider a project having 30,000 lines of code which in an embedded software with critical area hence reliability is high.The estimation can be E=ai(KLOC)bi *(EAF) As reliability is high EAF=1.15(product attribute) ai=2.8 bi=1.20 for embedded software E=2.8(30)1.20 *1.15 =191 person month D=cb(E)db=2.5(191)0.32 =13 months approximately N=E/D =191/13 N=15 persons approx.