ABC By 2010




                               UTAH
                                                                                                                              ABC by 2010
                      Department of Transportation
                          ACCELERATED
                                                                                      • UDOT goals
                   BRIDGE CONSTRUCTION BY 2010                                            – Accelerated Bridge Construction
                                                                                            • Standard practice by 2010
                  How have we done?                                                   • What was needed?
                                  Fred Doehring
                                                                                          – Methods of construction
                                   UDOT Structures
                                                                                          – Standard details
                                                                                          – Commitment to a program




           Vision for “Family” of ABC Methods                                                                                ABC Phase 1
                                                                                      • Early implementation of ABC
                                    Accelerated                                           – Scanning Tours
                                      Bridge
                                    Construction                                            • Looked at what other states were doing
                                                                                          – Workshops held
                                                                                            •   Brought all stakeholders together
 Precast           Modular           Structure        Accelerated   Fast Track
Concrete
Elements
                 Construction
                  Large Prefab.
                                     Placement
                                      Methods
                                                       Geotech
                                                         Work
                                                                    Contracting
                                                                      CMGC
                                                                                            •   Identified what was needed
                  Components                                        Design/Build
Prefabricated
Components
                                       SPMT
                                       Sliding
                                                        Geofoam
                                                                                            •   Prioritized needs
                                                                                            •   Looked at several specific pilot projects




                                                     ABC Phase 1                                                  ABC Methods Used
• Results of Phase 1 work
     – Several key standards were                                                     • Precast Deck Panels
       developed                                                                      • Voided Slabs
           • Precast Full Depth Deck Panels
                                                                                      • Precast Substructures
           • Manual on Self Propelled Modular
             Transporters (SPMT’s)                                                        – Abutments and Bent Caps
           • Development of specifications                                            • Precast Superstructures
             and manuals for each
                                                                                          – Crane, Sliding, and SPMT
           • Several pilot projects initiated and
             built




                                                                                                                                            1
ABC By 2010




Precast Deck Panels - Full Depth            Precast Deck Panels - Full Depth




Precast Deck Panels - Full Depth            Precast Deck Panels - Full Depth




Precast Deck Panels - Full Depth            Precast Deck Panels - Full Depth




                                                                               2
ABC By 2010




Precast Deck Panels - Full Depth            Precast Deck Panels - Full Depth




                   Voided Slabs                                Voided Slabs




           Precast Substructure                        Precast Substructure




                                                                               3
ABC By 2010




          Precast Substructure                        Precast Substructure




Precast Superstructure - Crane              Precast Superstructure - Crane




Precast Superstructure - Sliding            Precast Superstructure - Sliding




                                                                               4
ABC By 2010




Precast Superstructure - SPMT            Precast Superstructure - SPMT




Precast Superstructure - SPMT            Precast Superstructure - SPMT




Precast Superstructure - SPMT            Precast Superstructure - SPMT




                                                                         5
ABC By 2010




     Precast Superstructure - SPMT                                   Precast Superstructure - SPMT




                     UTAH
                                                                                                          ABC Phase 2
            Department of Transportation
                                                             • Standardized the remainder of prefabricated
                  ACCELERATED                                  element types
           BRIDGE CONSTRUCTION BY 2010
                                                             • Developed details for:
                                                                 – Precast substructures
                                                                    • Piers, Abutments, walls, culverts
          Where are we going?                                    – Precast Approach slabs
                                                                 – Precast Girders
                                                                    • Pre-tensioned Bulb Tees
                   Michael Culmo
                                                                    • Post-Tensioned Bulb Tees
                   CME Associates, Inc.
                                                                    • Deck Bulb Tees
                                                             • Developed Specifications and Manuals
                                                             • Workshops were held for industry input




                                                             Connections with Grouted Splice Couplers
                                          ABC Phase 2
                                                            • Emulates a reinforcing steel lap splice
• Other work completed in Phase 2                           • Used in precast parking garages and
  – Reviewed computer monitoring data from first              stadiums and bridges
    round of SPMT bridge moves                              • New seismic research coming
  – Refined Phase 1 work based on lessons
    learned in construction
    • Deck Panel standards and specifications
    • SPMT Manuals




                                                                                                                        6
ABC By 2010




Connections with Grouted Splice Couplers
                                                                   Typical Connection Details
 Installation video on Youtube
 Search “Georgia Bridge Pier”                        Column or wall panel
                                                     to footing connection




                Typical Connection Details                                       Current Typical Details
                                                      • Single column hammerhead
Column to cap
connection                                            • Two column bent
                                                      • Three column bent




                       Current Typical Details                             Current Typical Details
 Columns                                              Footings
• Rectangular are possible,                           • Full Precast
  but not preferred
• Round columns are difficult                             – For smaller footings
  to precast
   – Must be cast vertically
• Use Hexagonal or
  octagonal shape
   – Can be cast on side
   (one side open)
                                                            Shim and grout under footing
                                                            through ports in footing




                                                                                                           7
ABC By 2010




                     Current Typical Details                             Current Typical Details
Footings                                                 Pile supported
• Partial Precast                                          footings
   – For larger footings                                 • Use corrugated
   – Precast designed to support
     DL of bridge
                                                           pipe forms
   – CIP extensions designed for                         • Used for integral
     other loads                                           abutment stems
                      Precast Portion
                                                           also
                      CIP Extension

        Shim and grout under footing
        through ports in footing




        Pretensioned Bulb Tee Girders                             Pretensioned Deck Bulb Tee Girders




                  Post-tensioned Bulb Tee Girders              Integral Abutment Details




                                                                                                       8
ABC By 2010




     Cantilever Abutments and Walls                                                    Stage 1
• Use corrugated pipes in stems to reduce weight
   – To be filled with concrete in the field
   – Reduces the number of pieces




                                                                                                                  1.   Drive Piles




Stage 2                                                                                Stage 3




                                                                                                            1.   Install pier wall panels. (day 4)
                                                                                                            2.   Connect to footing via grouted
                                           1.       Place footings over pile and set
                                                                                                                 splice couplers (day 4)
                                                    to grade and alignment (day 1)
                                                                                                            3.   Fill voids with concrete to within
                                           2.       Cast concrete in voids around
                                                                                                                 3 feet of top (day 5)
                                                    piles (day 1)
                                                                                                            4.   Install rebar cage in top of voids
                                           3.       Cast concrete between footings
                                                                                                                 extending 2 feet above (day 5)
                                                    if required (day 2)
                                                                                                            5.   Joints between may be grouted
                                                                                                                 or left dry




Stage 4                                                                                Final Construction




                                               1.   Install pier cap, set to grade
                                                    (day 6)
                                               2.   Pour concrete through ports
                                                    to fill voids and make
                                                    connection (day 7)
                                               3.   Install precast beam seats
                                                    (day 7)




                                                                                                                                                      9
ABC By 2010




                                    Box Culverts                               Tolerances
  • Precast boxes, aprons, and walls
                                                        • Tolerance details developed for all critical
                                                          elements
                                                        • Based on PCI Tolerance manual
                                                            – MNL-135-00




                  Tolerance Details                                     Tolerance Details
Splice couplers                                        Columns




      Precast Full Depth Deck Panels                        Precast Full Depth Deck Panels
  • First Generation Standards completed in              • Phase 2 Modifications
    Phase 1 UDOT ABC Program                                – Use Longitudinal Post-Tensioning to Connect Panels
                                                                 • AASHTO Code Recommendation
  • More than 15 project built to date                           • Better performance over time (no leakage through joints)

  • Costs are coming down                                   – Use multi-strand PT systems
                                                                 • Developed for slabs
  • Welded plate details are not desirable                       • More Flexible
       – Time                                               – Allow blind pockets for shear stud connection
                                                                 • Based on recent research
       – Leakage issues at joints
                                                            – Allow skewed deck panels (up to 15 degrees)
  • There is new technology in the market




                                                                                                                              10
ABC By 2010




  Precast Full Depth Deck Panels                                              Blind Pocket Project – Texas DOT

• Recommended Post-tensioning System
  –   Multi-strand deck PT systems
  –   Developed specifically for decks (thin anchorage)
  –   Used by other states
  –   Recommend the use of less than maximum amount
      of PT allowed in the ducts (4-0.5” strand)




                  UDOT Blind Pocket Details

                                                                           Schematic Construction Details
                                                                        2 Span Bridge using UDOT Standards




                                                                                                                 11
ABC By 2010




Excavate and Install Piles                                  Install Abutment Stem and Footings




                               Typical 2 Span Bridge                                              Typical 2 Span Bridge




Install Pier Columns                                        Install Pier Cap and Wingwalls
Fill Voids in Abutment Stems                                Cast Footing Closure Pour




                               Typical 2 Span Bridge                                              Typical 2 Span Bridge




Erect Girders                                               Install Backwalls and Sleeper Slabs




                               Typical 2 Span Bridge                                              Typical 2 Span Bridge




                                                                                                                          12
ABC By 2010




Install Deck Panels and Approach Slabs                                Cast Deck and Approach Slab Closure Pours




                                  Typical 2 Span Bridge                                                Typical 2 Span Bridge




Construction Roadway Approaches                                                                    Bridge Monitoring (TAC)

                                                                      • Volunteer group of key stakeholders
                                                                          – UDOT
                                                                          – Design Consultants
                                                                          – Contractors
                                                                          – Industry Representatives
                                                                      • Charged with review of data and
                                                                        recommendations for future SPMT bridge
                                                                        moves
                                                                      • Used computer monitoring data from 2008
                                  Typical 2 Span Bridge




                           Bridge Monitoring (TAC)                                              Bridge Monitoring (TAC)
• Data retrieved                                                                                                  Temperature Strain

   – Mostly strain data (deck, girders)
   – Layouts were similar on each bridge
                                                                                                       Dynamic Strain
   – Used to study the stresses within the bridge during:
       • Lifting
       • Moving
                                                                                                 Lifting Strain
       • Placement
• Utah State University (USU)
   – Brought in to analyze and disseminate the data
   – With input from the TAC                                                                           Typical Data




                                                                                                                                       13
ABC By 2010




                                      Bridge Monitoring (TAC)                                              SPMT Manual Revisions
  • Final Findings and Recommendations                                                       •   Build on knowledge gained in 2008
        – Lifting stresses are very significant
             • Supporting the deck at the lift points eliminated most deck cracking          •   No major changes
             • Lift bridge closer to ends (0.2L or less)
             • Lightweight concrete in the deck helps to reduce deck cracking, and
                                                                                             •   Define roles of project participants
               overall lift weight
                                                                                             •   Written to fit in with the UDOT Design
        – Dynamic effects can be approximated by increasing dead load
          by 15%                                                                                 Network
             • Starting and stopping of SPMT’s
             • Traversing bumps during the move
        – 3d Analysis is needed to estimate lifting stresses if a flexible
          carrying beam is used
        – Recommended future gaging locations




                                    SPMT Lifting Methods                                                                 Lessons Learned
                                                                                             • Study of Performance of ABC Bridges
                                                                                             • Bridge Types Studied
                                                                                                 – Full Depth Deck Panels with welded tie connections
                                                                                                   (6)
                                                                                                 – Full Depth Deck Panels with Post-Tensioning (2)
                                                                                                 – Precast Parapets integral with deck (5)
                                                                                                 – SPMT Bridge Moves (9)
                      • Neg. DL moment on girder      • Neg. DL moment on                        – Precast Abutments (2)
                      • May be a problem with           composite section
                        prestressed girders           • Significant deck cracking is             – Precast Piers (2)
                      • Light weight concrete could     possible
                        help                          • Light weight concrete could
                                                                                             • Inspections took place in May, 2009
                      • Little or no deck cracking      help
                      • Deck is pre-compressed in
                        final condition




                                          Lessons Learned                                                                Lessons Learned
Project locations                                                                            • Purpose of the study
Milepost 200 on Route 6
not shown                                                                                        – Investigate the performance of each
                                                                                                   component type
                                                                                                 – What is performing well and what is not
                                                                                                 – Not intended to critique past designs
                                                                                                    • Most of these bridges were designed prior to
                                                                                                      development of standards
                                                                                                    • Many were designed as short term fixes prior to full
                                                                                                      replacement in the near future (10-25 years)
                                                                                                 – Goal: Continuous Improvement of Quality




                                                                                                                                                             14
ABC By 2010




                                Lessons Learned                                   Lessons Learned
 • Welded Tie Connections                              • Welded Tie Connections
   – Joint Leakage is widespread
   – Shear transfer is still working
   – Composite connection is good




                                Lessons Learned                                   Lessons Learned
 • Welded Tie                                          • Welded Tie Connections
   Connections




                                Lessons Learned                                   Lessons Learned
• Post Tensioned Connections                          • Post Tensioned
  – 3 span continuous bridge                            Connections
                                                        – No Joint Leakage
                                                        – Even in negative
                                                          moment areas



                                                                                      Underside of deck
    I-215 at 3900 South




                                                                                                          15
ABC By 2010




   Other Long Term Performance Information                                                       Project Information
                                                              • Curved structure (straight beams)
 • I-84/Route 8 Interchange –Waterbury, CT                    • 6 Span bridge with continuous spans
                                                              • Single lane
                                                              • Prestressed transversely and post tensioned
                                                                longitudinally
                                                              • Details similar to UDOT
                                                              • 42 Day construction
                                                                   • No construction problems
                                                              • Built in 1991




            After 18 years of service                                   After 18 years of service
 • Excellent condition
 • Used membrane waterproofing and Asphalt Wearing
   surface
 • No leakage through joints




       Another long term example project                                                        Lessons Learned
Route 8 Viaduct, Seymour, CT                                   • Precast parapets integral with precast
   •   2 Curved structures                                       decks
   •   Over 50 spans (all simple spans)                            – Most are good
   •   Prestressed and post tensioned                              – Problem with panels cast with 2 parapets
   •   Weekend closures only
                                                                       • No transverse adjustment during installation
        • Old deck removed on Friday night
        • New deck erected on Saturday
          morning
        • Post tensioned on Saturday night
        • Grouting on Sunday morning
        • Open to traffic Sunday night
   • Asphalt wearing surface with
     waterproofing membrane
   • In service for 15 years
   • Excellent condition




                                                                                                                        16
ABC By 2010




Lessons Learned                                          Lessons Learned
                      • Precast Abutments
                        – Few have been built
                            • Horizontal joints (Lego bridges)
                            • None built to new standards yet
                            • There were significant fit-up
                              problems on one bridge
                                – Can be resolved with
                                  appropriate casting tolerances
                            • Performing well




Lessons Learned                                          Lessons Learned
                       • Precast Piers
                           – Few have been built
                              • None built to new standards yet
                                  – One is similar
                              • Construction went well
                              • Performing well




Lessons Learned                                          Lessons Learned
                        • SPMT Bridge Moves
                            – Deck cracking is common
                            – Exceptions:
                                • Bridges cast while supported at lift points
                                • Lightweight Concrete Deck
                            – Some leakage through cracks
                            – Performing well




                                                                                17
ABC By 2010




                   Lessons Learned                                               Lessons Learned




                   Lessons Learned                                               Lessons Learned
• Cast-in-place closure pours
  – Some have significant shrinkage
    cracks
    • Restraint of adjacent panels
    • Some leakage through cracks




                   Lessons Learned                                               Lessons Learned
                                                • Shear Connector Pockets
                                                    – Several have minor leakage
                                                      around pockets (not all)
                                                       • Shrinkage of Grout
                                                       • Blind pockets should alleviate this




                                                                                                   18
ABC By 2010




                            Lessons Learned                                                                  Lessons Learned
                                                                          • Recommendations
                                                                              – Full Depth Deck Panels
                                                                                 •   Eliminate welded tie detail
                                                                                 •   Always use post-tensioning
                                                                                 •   Use blind pocket detail for shear connectors
                                                                                 •   New Standards address these recommendations




                            Lessons Learned                                                                  Lessons Learned
• Recommendations                                                         • Recommendations
  – Precast integral parapets                                                 – Precast Abutments and Piers
    • Do not use 2 per panel                                                     • Use vertical joints in abutment stems and wall
                                                                                   stems
       – Use a longitudinal closure pour in deck to allow for
                                                                                       – Allows for easier fit-up in the field
         adjustment in the field
                                                                                 • No problems noted with pier construction
       – Cast one or both in the field behind temp. barriers
                                                                                 • New Standards address these recommendations




                            Lessons Learned                                                                  Lessons Learned
• SPMT Moves                                                              • Other general recommendations
  – TAC Committee work verifies issues found in                               – Overlays
    the field                                                                    • Consider thicker overlay with a quality
    • Pick bridges closer to ends                                                  waterproofing membrane
    • If possible, support girders at lift points during                               – European and East Coast Systems
      deck casting                                                                     – CME recommendation, not UDOT policy
    • Investigate the use of lightweight concrete to                          – Closure Pours
      reduce deck and girder stresses                                            • Use a better high early strength concrete mix
    • New SPMT Manual will address these                                               – Shrinkage compensating mixes
      recommendations                                                                  – NY State mix is being investigated




                                                                                                                                    19
ABC By 2010




                         Where are we going?                                         Where are we going?
 • UDOT Themes                                                • Implementation of Phase 2 Standards
     – Accelerate Delivery                                        – Training
        • Design and Construction                                   •   Designers
     – Decrease MOT                                                 •   Construction Inspectors
        • Reduce User Costs and impact to society                   •   Bridge Inspectors
     – Encourage Innovation                                         •   Bridge Maintenance Personnel

     – Get a good price                                           – On-call technical support




                         Where are we going?                                         Where are we going?
 • Manuals                                                    • Continue to monitor progress
     – Develop a Bridge Design Manual                             – Annual inspection of ABC Bridges
     – New SPMT design guide to be issued                         – Address issues as they arise
 • Lightweight Concrete                                       • Goal:
     – SPMT Decks (minimize deck cracking)                                  Continuous Improvement
     – Substructure Elements (reduce shipping and
       handling costs)




                     Questions?                                                 Testing data
This presentation will
be posted on the
UDOT website




                                                                                Grouted Splice coupler @ end of column




                                                                                                                         20
ABC By 2010




   Testing data




Control Column w/o Grouted Splice Coupler




                                                     21

Contenu connexe

Tendances

Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...Bala murali
 
Eurocodes design of members
Eurocodes design of membersEurocodes design of members
Eurocodes design of membersyuri30
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete BridgeShubham Das
 
Rehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatmentRehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatmentShivRam G Krishnan
 
Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structuresKarthi Kavya
 
Polymer concrete and it's types
Polymer concrete and it's typesPolymer concrete and it's types
Polymer concrete and it's typesMONISHA K Y
 
High strength concrete
High strength concreteHigh strength concrete
High strength concreteDr K M SONI
 
Self curing concrete using peg
Self curing concrete using pegSelf curing concrete using peg
Self curing concrete using pegTHOTA AKHIL
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniquesNayana 54321
 

Tendances (20)

Structural Strengthening
Structural StrengtheningStructural Strengthening
Structural Strengthening
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...Seismic Retrofitting of RC Buildingwith Jacketing and Shear Wall Seismic Ret...
Seismic Retrofitting of RC Building with Jacketing and Shear Wall Seismic Ret...
 
Prestressed composite beams
Prestressed composite beamsPrestressed composite beams
Prestressed composite beams
 
Self curing concrete
Self curing concreteSelf curing concrete
Self curing concrete
 
Eurocodes design of members
Eurocodes design of membersEurocodes design of members
Eurocodes design of members
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Pre stressed concrete Bridge
Pre stressed concrete BridgePre stressed concrete Bridge
Pre stressed concrete Bridge
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
 
Bridge rehabilitation
Bridge rehabilitationBridge rehabilitation
Bridge rehabilitation
 
Rehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatmentRehabilitation of concrete structures, surface treatment
Rehabilitation of concrete structures, surface treatment
 
Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structures
 
Polymer concrete and it's types
Polymer concrete and it's typesPolymer concrete and it's types
Polymer concrete and it's types
 
Shoring and underpinning
Shoring and underpinningShoring and underpinning
Shoring and underpinning
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
 
Curing of concrete
Curing of concreteCuring of concrete
Curing of concrete
 
Self curing concrete using peg
Self curing concrete using pegSelf curing concrete using peg
Self curing concrete using peg
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 

En vedette

Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Ralls ncc meeting-san_antonio_04-01-09
Ralls ncc meeting-san_antonio_04-01-09Ralls ncc meeting-san_antonio_04-01-09
Ralls ncc meeting-san_antonio_04-01-09zaff69
 
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaComposite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaSuhas Khedkar
 
2013 icossar sa_sm_fb_upload
2013 icossar sa_sm_fb_upload2013 icossar sa_sm_fb_upload
2013 icossar sa_sm_fb_uploadStroNGER2012
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge reportIvy Yee
 
Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Suhas Khedkar
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGEAELC
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGESTUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGEAELC
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge ReportYvonne Chin
 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)AISC/NSBA
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acpJigar Shah
 
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS IJMER
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Bridge
Bridge Bridge
Bridge illpa
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
 

En vedette (20)

Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Ralls ncc meeting-san_antonio_04-01-09
Ralls ncc meeting-san_antonio_04-01-09Ralls ncc meeting-san_antonio_04-01-09
Ralls ncc meeting-san_antonio_04-01-09
 
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaComposite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
 
2013 icossar sa_sm_fb_upload
2013 icossar sa_sm_fb_upload2013 icossar sa_sm_fb_upload
2013 icossar sa_sm_fb_upload
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
 
Bridges construction
Bridges constructionBridges construction
Bridges construction
 
Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1Steel Composite Bridge Construction R1
Steel Composite Bridge Construction R1
 
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE4.	STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
4. STUDY ONVARIATION OF JOINT FORCES IN STEEL TRUSS BRIDGE
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGESTUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
STUDY ON VARIATION OF JOINT FORCES IN STIFFENING TRUSS OF CABLE-STAYED BRIDGE
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
 
Cable stayed bridge
Cable stayed bridgeCable stayed bridge
Cable stayed bridge
 
Cable stayed ppt acp
Cable stayed ppt acpCable stayed ppt acp
Cable stayed ppt acp
 
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS Advanced Cable Stayed Bridge Construction Process Analysis  with ANSYS
Advanced Cable Stayed Bridge Construction Process Analysis with ANSYS
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
Bridge
Bridge Bridge
Bridge
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 

Plus de State of Utah, Salt Lake City

Health Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseHealth Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseState of Utah, Salt Lake City
 
Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019State of Utah, Salt Lake City
 
The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...State of Utah, Salt Lake City
 
Utah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureUtah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureState of Utah, Salt Lake City
 
Utah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsUtah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsState of Utah, Salt Lake City
 
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSFourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSState of Utah, Salt Lake City
 
Transportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsTransportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsState of Utah, Salt Lake City
 

Plus de State of Utah, Salt Lake City (20)

Utah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic LaboratoryUtah Veterinary Diagnostic Laboratory
Utah Veterinary Diagnostic Laboratory
 
Health Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims DatabaseHealth Data Transparency: Utah’s All Payer Claims Database
Health Data Transparency: Utah’s All Payer Claims Database
 
Utah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice ServicesUtah Division of Juvenile and Justice Services
Utah Division of Juvenile and Justice Services
 
Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019Health Disparities by Utah Legislative District 2019
Health Disparities by Utah Legislative District 2019
 
Localscapes
LocalscapesLocalscapes
Localscapes
 
Status of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest UtahStatus of Translocated Tortoises in Southwest Utah
Status of Translocated Tortoises in Southwest Utah
 
The Logan River Observatory
The Logan River ObservatoryThe Logan River Observatory
The Logan River Observatory
 
Utah Strategic Workforce Presentation
Utah Strategic Workforce PresentationUtah Strategic Workforce Presentation
Utah Strategic Workforce Presentation
 
The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...The Utah Geological Survey provides timely scientific information about Utah’...
The Utah Geological Survey provides timely scientific information about Utah’...
 
Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019Utah Forestry, Fire and State Lands 2019
Utah Forestry, Fire and State Lands 2019
 
Utah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 LegislatureUtah Division of Wildlife Resources Presentation to 2019 Legislature
Utah Division of Wildlife Resources Presentation to 2019 Legislature
 
UDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 LegislatureUDOT Presentation to 2019 Legislature
UDOT Presentation to 2019 Legislature
 
Utah System of Technical Colleges
Utah System of Technical CollegesUtah System of Technical Colleges
Utah System of Technical Colleges
 
Public Water System Identification in Utah
Public Water System Identification in UtahPublic Water System Identification in Utah
Public Water System Identification in Utah
 
State of Utah Suicide Prevention
State of Utah Suicide PreventionState of Utah Suicide Prevention
State of Utah Suicide Prevention
 
Utah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and AccomplishmentsUtah Division of Aeronautics Annual Needs and Accomplishments
Utah Division of Aeronautics Annual Needs and Accomplishments
 
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFSFourth Quarter FY2018 Quarterly Report from Utah DCFS
Fourth Quarter FY2018 Quarterly Report from Utah DCFS
 
Update on FirstNet in Utah
Update on FirstNet in UtahUpdate on FirstNet in Utah
Update on FirstNet in Utah
 
Energy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 AuditEnergy Incentives in Utah - 2018 Audit
Energy Incentives in Utah - 2018 Audit
 
Transportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging TrendsTransportation Policy and Funding: Historical and Emerging Trends
Transportation Policy and Funding: Historical and Emerging Trends
 

Dernier

Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreForth
 
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsMastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsRowlett Motorwerks
 
Lighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light ServiceLighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light ServiceImport Car Center
 
Welcome to Auto Know University Orientation
Welcome to Auto Know University OrientationWelcome to Auto Know University Orientation
Welcome to Auto Know University Orientationxlr8sales
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hhmhamadhawlery16
 
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESsriharshaganjam1
 
Control-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGControl-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGVikrantPawar37
 
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Mint Automotive
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdfkushkruthik555
 
A Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel EnginesA Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel EnginesROJANE BERNAS, PhD.
 
Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxjennifermiller8137
 
Human Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfHuman Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfAditiMishra247289
 

Dernier (12)

Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget GilmoreBuilding a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
Building a Future Where Everyone Can Ride and Drive Electric by Bridget Gilmore
 
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsMastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
 
Lighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light ServiceLighting the Way Understanding Jaguar Car Check Engine Light Service
Lighting the Way Understanding Jaguar Car Check Engine Light Service
 
Welcome to Auto Know University Orientation
Welcome to Auto Know University OrientationWelcome to Auto Know University Orientation
Welcome to Auto Know University Orientation
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh
 
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
 
Control-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAGControl-Plan-Training.pptx for the Automotive standard AIAG
Control-Plan-Training.pptx for the Automotive standard AIAG
 
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
 
A Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel EnginesA Comprehensive Exploration of the Components and Parts Found in Diesel Engines
A Comprehensive Exploration of the Components and Parts Found in Diesel Engines
 
Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptx
 
Human Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfHuman Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdf
 

Accelerated Bridge Construction

  • 1. ABC By 2010 UTAH ABC by 2010 Department of Transportation ACCELERATED • UDOT goals BRIDGE CONSTRUCTION BY 2010 – Accelerated Bridge Construction • Standard practice by 2010 How have we done? • What was needed? Fred Doehring – Methods of construction UDOT Structures – Standard details – Commitment to a program Vision for “Family” of ABC Methods ABC Phase 1 • Early implementation of ABC Accelerated – Scanning Tours Bridge Construction • Looked at what other states were doing – Workshops held • Brought all stakeholders together Precast Modular Structure Accelerated Fast Track Concrete Elements Construction Large Prefab. Placement Methods Geotech Work Contracting CMGC • Identified what was needed Components Design/Build Prefabricated Components SPMT Sliding Geofoam • Prioritized needs • Looked at several specific pilot projects ABC Phase 1 ABC Methods Used • Results of Phase 1 work – Several key standards were • Precast Deck Panels developed • Voided Slabs • Precast Full Depth Deck Panels • Precast Substructures • Manual on Self Propelled Modular Transporters (SPMT’s) – Abutments and Bent Caps • Development of specifications • Precast Superstructures and manuals for each – Crane, Sliding, and SPMT • Several pilot projects initiated and built 1
  • 2. ABC By 2010 Precast Deck Panels - Full Depth Precast Deck Panels - Full Depth Precast Deck Panels - Full Depth Precast Deck Panels - Full Depth Precast Deck Panels - Full Depth Precast Deck Panels - Full Depth 2
  • 3. ABC By 2010 Precast Deck Panels - Full Depth Precast Deck Panels - Full Depth Voided Slabs Voided Slabs Precast Substructure Precast Substructure 3
  • 4. ABC By 2010 Precast Substructure Precast Substructure Precast Superstructure - Crane Precast Superstructure - Crane Precast Superstructure - Sliding Precast Superstructure - Sliding 4
  • 5. ABC By 2010 Precast Superstructure - SPMT Precast Superstructure - SPMT Precast Superstructure - SPMT Precast Superstructure - SPMT Precast Superstructure - SPMT Precast Superstructure - SPMT 5
  • 6. ABC By 2010 Precast Superstructure - SPMT Precast Superstructure - SPMT UTAH ABC Phase 2 Department of Transportation • Standardized the remainder of prefabricated ACCELERATED element types BRIDGE CONSTRUCTION BY 2010 • Developed details for: – Precast substructures • Piers, Abutments, walls, culverts Where are we going? – Precast Approach slabs – Precast Girders • Pre-tensioned Bulb Tees Michael Culmo • Post-Tensioned Bulb Tees CME Associates, Inc. • Deck Bulb Tees • Developed Specifications and Manuals • Workshops were held for industry input Connections with Grouted Splice Couplers ABC Phase 2 • Emulates a reinforcing steel lap splice • Other work completed in Phase 2 • Used in precast parking garages and – Reviewed computer monitoring data from first stadiums and bridges round of SPMT bridge moves • New seismic research coming – Refined Phase 1 work based on lessons learned in construction • Deck Panel standards and specifications • SPMT Manuals 6
  • 7. ABC By 2010 Connections with Grouted Splice Couplers Typical Connection Details Installation video on Youtube Search “Georgia Bridge Pier” Column or wall panel to footing connection Typical Connection Details Current Typical Details • Single column hammerhead Column to cap connection • Two column bent • Three column bent Current Typical Details Current Typical Details Columns Footings • Rectangular are possible, • Full Precast but not preferred • Round columns are difficult – For smaller footings to precast – Must be cast vertically • Use Hexagonal or octagonal shape – Can be cast on side (one side open) Shim and grout under footing through ports in footing 7
  • 8. ABC By 2010 Current Typical Details Current Typical Details Footings Pile supported • Partial Precast footings – For larger footings • Use corrugated – Precast designed to support DL of bridge pipe forms – CIP extensions designed for • Used for integral other loads abutment stems Precast Portion also CIP Extension Shim and grout under footing through ports in footing Pretensioned Bulb Tee Girders Pretensioned Deck Bulb Tee Girders Post-tensioned Bulb Tee Girders Integral Abutment Details 8
  • 9. ABC By 2010 Cantilever Abutments and Walls Stage 1 • Use corrugated pipes in stems to reduce weight – To be filled with concrete in the field – Reduces the number of pieces 1. Drive Piles Stage 2 Stage 3 1. Install pier wall panels. (day 4) 2. Connect to footing via grouted 1. Place footings over pile and set splice couplers (day 4) to grade and alignment (day 1) 3. Fill voids with concrete to within 2. Cast concrete in voids around 3 feet of top (day 5) piles (day 1) 4. Install rebar cage in top of voids 3. Cast concrete between footings extending 2 feet above (day 5) if required (day 2) 5. Joints between may be grouted or left dry Stage 4 Final Construction 1. Install pier cap, set to grade (day 6) 2. Pour concrete through ports to fill voids and make connection (day 7) 3. Install precast beam seats (day 7) 9
  • 10. ABC By 2010 Box Culverts Tolerances • Precast boxes, aprons, and walls • Tolerance details developed for all critical elements • Based on PCI Tolerance manual – MNL-135-00 Tolerance Details Tolerance Details Splice couplers Columns Precast Full Depth Deck Panels Precast Full Depth Deck Panels • First Generation Standards completed in • Phase 2 Modifications Phase 1 UDOT ABC Program – Use Longitudinal Post-Tensioning to Connect Panels • AASHTO Code Recommendation • More than 15 project built to date • Better performance over time (no leakage through joints) • Costs are coming down – Use multi-strand PT systems • Developed for slabs • Welded plate details are not desirable • More Flexible – Time – Allow blind pockets for shear stud connection • Based on recent research – Leakage issues at joints – Allow skewed deck panels (up to 15 degrees) • There is new technology in the market 10
  • 11. ABC By 2010 Precast Full Depth Deck Panels Blind Pocket Project – Texas DOT • Recommended Post-tensioning System – Multi-strand deck PT systems – Developed specifically for decks (thin anchorage) – Used by other states – Recommend the use of less than maximum amount of PT allowed in the ducts (4-0.5” strand) UDOT Blind Pocket Details Schematic Construction Details 2 Span Bridge using UDOT Standards 11
  • 12. ABC By 2010 Excavate and Install Piles Install Abutment Stem and Footings Typical 2 Span Bridge Typical 2 Span Bridge Install Pier Columns Install Pier Cap and Wingwalls Fill Voids in Abutment Stems Cast Footing Closure Pour Typical 2 Span Bridge Typical 2 Span Bridge Erect Girders Install Backwalls and Sleeper Slabs Typical 2 Span Bridge Typical 2 Span Bridge 12
  • 13. ABC By 2010 Install Deck Panels and Approach Slabs Cast Deck and Approach Slab Closure Pours Typical 2 Span Bridge Typical 2 Span Bridge Construction Roadway Approaches Bridge Monitoring (TAC) • Volunteer group of key stakeholders – UDOT – Design Consultants – Contractors – Industry Representatives • Charged with review of data and recommendations for future SPMT bridge moves • Used computer monitoring data from 2008 Typical 2 Span Bridge Bridge Monitoring (TAC) Bridge Monitoring (TAC) • Data retrieved Temperature Strain – Mostly strain data (deck, girders) – Layouts were similar on each bridge Dynamic Strain – Used to study the stresses within the bridge during: • Lifting • Moving Lifting Strain • Placement • Utah State University (USU) – Brought in to analyze and disseminate the data – With input from the TAC Typical Data 13
  • 14. ABC By 2010 Bridge Monitoring (TAC) SPMT Manual Revisions • Final Findings and Recommendations • Build on knowledge gained in 2008 – Lifting stresses are very significant • Supporting the deck at the lift points eliminated most deck cracking • No major changes • Lift bridge closer to ends (0.2L or less) • Lightweight concrete in the deck helps to reduce deck cracking, and • Define roles of project participants overall lift weight • Written to fit in with the UDOT Design – Dynamic effects can be approximated by increasing dead load by 15% Network • Starting and stopping of SPMT’s • Traversing bumps during the move – 3d Analysis is needed to estimate lifting stresses if a flexible carrying beam is used – Recommended future gaging locations SPMT Lifting Methods Lessons Learned • Study of Performance of ABC Bridges • Bridge Types Studied – Full Depth Deck Panels with welded tie connections (6) – Full Depth Deck Panels with Post-Tensioning (2) – Precast Parapets integral with deck (5) – SPMT Bridge Moves (9) • Neg. DL moment on girder • Neg. DL moment on – Precast Abutments (2) • May be a problem with composite section prestressed girders • Significant deck cracking is – Precast Piers (2) • Light weight concrete could possible help • Light weight concrete could • Inspections took place in May, 2009 • Little or no deck cracking help • Deck is pre-compressed in final condition Lessons Learned Lessons Learned Project locations • Purpose of the study Milepost 200 on Route 6 not shown – Investigate the performance of each component type – What is performing well and what is not – Not intended to critique past designs • Most of these bridges were designed prior to development of standards • Many were designed as short term fixes prior to full replacement in the near future (10-25 years) – Goal: Continuous Improvement of Quality 14
  • 15. ABC By 2010 Lessons Learned Lessons Learned • Welded Tie Connections • Welded Tie Connections – Joint Leakage is widespread – Shear transfer is still working – Composite connection is good Lessons Learned Lessons Learned • Welded Tie • Welded Tie Connections Connections Lessons Learned Lessons Learned • Post Tensioned Connections • Post Tensioned – 3 span continuous bridge Connections – No Joint Leakage – Even in negative moment areas Underside of deck I-215 at 3900 South 15
  • 16. ABC By 2010 Other Long Term Performance Information Project Information • Curved structure (straight beams) • I-84/Route 8 Interchange –Waterbury, CT • 6 Span bridge with continuous spans • Single lane • Prestressed transversely and post tensioned longitudinally • Details similar to UDOT • 42 Day construction • No construction problems • Built in 1991 After 18 years of service After 18 years of service • Excellent condition • Used membrane waterproofing and Asphalt Wearing surface • No leakage through joints Another long term example project Lessons Learned Route 8 Viaduct, Seymour, CT • Precast parapets integral with precast • 2 Curved structures decks • Over 50 spans (all simple spans) – Most are good • Prestressed and post tensioned – Problem with panels cast with 2 parapets • Weekend closures only • No transverse adjustment during installation • Old deck removed on Friday night • New deck erected on Saturday morning • Post tensioned on Saturday night • Grouting on Sunday morning • Open to traffic Sunday night • Asphalt wearing surface with waterproofing membrane • In service for 15 years • Excellent condition 16
  • 17. ABC By 2010 Lessons Learned Lessons Learned • Precast Abutments – Few have been built • Horizontal joints (Lego bridges) • None built to new standards yet • There were significant fit-up problems on one bridge – Can be resolved with appropriate casting tolerances • Performing well Lessons Learned Lessons Learned • Precast Piers – Few have been built • None built to new standards yet – One is similar • Construction went well • Performing well Lessons Learned Lessons Learned • SPMT Bridge Moves – Deck cracking is common – Exceptions: • Bridges cast while supported at lift points • Lightweight Concrete Deck – Some leakage through cracks – Performing well 17
  • 18. ABC By 2010 Lessons Learned Lessons Learned Lessons Learned Lessons Learned • Cast-in-place closure pours – Some have significant shrinkage cracks • Restraint of adjacent panels • Some leakage through cracks Lessons Learned Lessons Learned • Shear Connector Pockets – Several have minor leakage around pockets (not all) • Shrinkage of Grout • Blind pockets should alleviate this 18
  • 19. ABC By 2010 Lessons Learned Lessons Learned • Recommendations – Full Depth Deck Panels • Eliminate welded tie detail • Always use post-tensioning • Use blind pocket detail for shear connectors • New Standards address these recommendations Lessons Learned Lessons Learned • Recommendations • Recommendations – Precast integral parapets – Precast Abutments and Piers • Do not use 2 per panel • Use vertical joints in abutment stems and wall stems – Use a longitudinal closure pour in deck to allow for – Allows for easier fit-up in the field adjustment in the field • No problems noted with pier construction – Cast one or both in the field behind temp. barriers • New Standards address these recommendations Lessons Learned Lessons Learned • SPMT Moves • Other general recommendations – TAC Committee work verifies issues found in – Overlays the field • Consider thicker overlay with a quality • Pick bridges closer to ends waterproofing membrane • If possible, support girders at lift points during – European and East Coast Systems deck casting – CME recommendation, not UDOT policy • Investigate the use of lightweight concrete to – Closure Pours reduce deck and girder stresses • Use a better high early strength concrete mix • New SPMT Manual will address these – Shrinkage compensating mixes recommendations – NY State mix is being investigated 19
  • 20. ABC By 2010 Where are we going? Where are we going? • UDOT Themes • Implementation of Phase 2 Standards – Accelerate Delivery – Training • Design and Construction • Designers – Decrease MOT • Construction Inspectors • Reduce User Costs and impact to society • Bridge Inspectors – Encourage Innovation • Bridge Maintenance Personnel – Get a good price – On-call technical support Where are we going? Where are we going? • Manuals • Continue to monitor progress – Develop a Bridge Design Manual – Annual inspection of ABC Bridges – New SPMT design guide to be issued – Address issues as they arise • Lightweight Concrete • Goal: – SPMT Decks (minimize deck cracking) Continuous Improvement – Substructure Elements (reduce shipping and handling costs) Questions? Testing data This presentation will be posted on the UDOT website Grouted Splice coupler @ end of column 20
  • 21. ABC By 2010 Testing data Control Column w/o Grouted Splice Coupler 21