SlideShare une entreprise Scribd logo
1  sur  19
Subsea well intervention; Learning from the past – planning for the future UTC 2010 Trond Inge Ramsnes
Beautiful but demanding
Optimising reservoir recovery from subsea fields ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Ambition :  increase subsea recovery  Cost effective drainage & well intervention
Cumulative wells – Statoil NCS 0 100 200 300 400 500 600 700 1980 1990 2000 2010 Dry trees Wet trees
Learning from the past – planning for the future RLWI Cat B TT riser 2 ⅞ ” CT ,[object Object],[object Object],[object Object],TT Drill TTML ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],2000 2002 2003 2004 2009 2013
Impact of well intervention – mature asset 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Oil Sm 3  / D No activity Drill New Maintenance
Addressing challenges – realising opportunities Milling or high pressure jetting to remove scale Straddles or patches to repair tubing Wellbore cleanout, fill removal with long or reverse circulation Selective zonal isolation, mechanical or chemical Heavy duty fishing with simultaneous removal of fill Wellbore unloading with nitrogen Formation matrix or fracture stimulation Milling and underreaming to remove wellbore scale Perforating long sections Scale build-up in the upper completion Equipment problems SCSSV Access problems Restricted production Water influx Wellbore scaling Access problems Restricted production Formation damage (scale, fines, etc.) Restricted production “ Fishes” Access problems Restricted production Water holdup Wellbore sanding Access problems Restricted production Completion integrity issues
Category A RLWI Category B Full range intervention & TTD Category C Drilling and completion • Wireline /  tractor only • Limited  bha length • Full range of  through  tubing  services • Limited live  well through  tubing  services High pressure  light weight  riser (8 - 5/8 ” ) Low pressure  marine riser  (21 ” ) standard HP concentric  riser and SSTT  required for  live well  intervention
Cat B – fit for purpose concept Lightweight HP riser system (through tubing) Full DP or mooring assisted station keeping options Topside system sized for through tubing operations (2⅞” & 3 ½” drillpipe) Integrated high capacity coiled tubing package (2 ⅞” / 3 ½”)   Full handling of live well returns Semi-submersible rig hull type
LRP/EDP stack on BOP carrier SBOP In rack-back area Key components in riser system
Operational Limitations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Experience with TT Riser System ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Protecting Horizontal XT (HXT) – used on all pipe runs  - Classification: Internal  2010-04-12 HORIZONTAL XMAS TREE PIGGY BACK WEAR SLEEVE TUBING HANGER NIPPLE PROTECTOR
Through Tubing Drilling (TTD) drilling through existing tubing (completion) Existing production tubing Production packer Whipstock Through Tubing Sidetrack Production from ’motherbore and new sidetrack simultaneously Reservoir SSD CHOKE
Operational experience Åsgard P-4 < 300  kSm3 < 100  kSm3 < 50 kSm3 Decreasing target volume Increasing target count & reserves Additional reserves Cat B enabled
P-4 AH Actual Drilled Wellpath – Geological Cross Section Not Ile 2 & 3 Ror Tilje 3 TVDMSL Tilje 1 & 2 Tilje 4, 5, 6 Ile 1 Garn 3 & 4 Garn 1 & 2 T1 T2 T3 T4 T5 Kick off 3871mMD Garn 3 P-4 H mother bore P-4 AH actual Drilled a world record of 1744m 5 ¾” TTRD sidetrack
Production P-4 ,[object Object],[object Object]
Status Category B Services  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Subsea well intervention; Learning from the past – planning for the future Trond Inge Ramsnes Project Leader Well Intervention trira@statoil.com, tel: +47 51 99 00 00 www.statoil.com Thank you

Contenu connexe

Tendances

Hwayoo - Lubricator assembly
Hwayoo - Lubricator assemblyHwayoo - Lubricator assembly
Hwayoo - Lubricator assembly
Hwayoo Petroleum
 

Tendances (20)

Coiled tubing Equipments .pdf
Coiled tubing Equipments .pdfCoiled tubing Equipments .pdf
Coiled tubing Equipments .pdf
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Well Control
Well ControlWell Control
Well Control
 
Tubing string
Tubing stringTubing string
Tubing string
 
Well intervention
Well interventionWell intervention
Well intervention
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
Hwayoo - Lubricator assembly
Hwayoo - Lubricator assemblyHwayoo - Lubricator assembly
Hwayoo - Lubricator assembly
 
Rig components
Rig componentsRig components
Rig components
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Rig Operations & Equipment
Rig Operations & EquipmentRig Operations & Equipment
Rig Operations & Equipment
 
Coil tubing and its application, failures and causes of failures
Coil tubing and its application, failures and causes of failuresCoil tubing and its application, failures and causes of failures
Coil tubing and its application, failures and causes of failures
 
4th Presentation
4th Presentation4th Presentation
4th Presentation
 
Wellhead
WellheadWellhead
Wellhead
 

En vedette

10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
Will Butler, P.Eng
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
Statoil
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Donnie Miller
 
JE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - LinkedinJE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - Linkedin
Rex Chen
 
GoM decommissioning conference
GoM decommissioning conferenceGoM decommissioning conference
GoM decommissioning conference
Dean Murphy
 
Decommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of MexicoDecommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of Mexico
piersfrench
 
Decommissioning presentations complete
Decommissioning presentations   completeDecommissioning presentations   complete
Decommissioning presentations complete
Nuclear Energy Insider
 
Team3 national oilwell_varco_final
Team3 national oilwell_varco_finalTeam3 national oilwell_varco_final
Team3 national oilwell_varco_final
Abdullah Mashuk
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
Muhammad Hassaan
 
Risk modelling in the Exploration and Production Industry
Risk modelling in the Exploration and Production IndustryRisk modelling in the Exploration and Production Industry
Risk modelling in the Exploration and Production Industry
Palantir_Solutions
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
tmhsweb
 
The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011
piersfrench
 

En vedette (20)

10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
Decommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & GasDecommissioning & Abandonment For Oil & Gas
Decommissioning & Abandonment For Oil & Gas
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility DecommissioningCost Estimating for Offshore Oil & Gas Facility Decommissioning
Cost Estimating for Offshore Oil & Gas Facility Decommissioning
 
JE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - LinkedinJE Technical Capability in shallow water - Linkedin
JE Technical Capability in shallow water - Linkedin
 
GoM decommissioning conference
GoM decommissioning conferenceGoM decommissioning conference
GoM decommissioning conference
 
Decommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of MexicoDecommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of Mexico
 
Decommissioning presentations complete
Decommissioning presentations   completeDecommissioning presentations   complete
Decommissioning presentations complete
 
2012 03 07 Dthp 881x475 Disappearing Tubing Hanger Plug
2012 03 07 Dthp 881x475 Disappearing Tubing Hanger Plug2012 03 07 Dthp 881x475 Disappearing Tubing Hanger Plug
2012 03 07 Dthp 881x475 Disappearing Tubing Hanger Plug
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Tco Completion Examples 20100907
Tco Completion Examples 20100907Tco Completion Examples 20100907
Tco Completion Examples 20100907
 
ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013
 
Team3 national oilwell_varco_final
Team3 national oilwell_varco_finalTeam3 national oilwell_varco_final
Team3 national oilwell_varco_final
 
Aasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerAasta hansteen ons speakers corner
Aasta hansteen ons speakers corner
 
Aasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerAasta hansteen ons speakers corner
Aasta hansteen ons speakers corner
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
 
Risk modelling in the Exploration and Production Industry
Risk modelling in the Exploration and Production IndustryRisk modelling in the Exploration and Production Industry
Risk modelling in the Exploration and Production Industry
 
RiskyProject for Oil and Gas Industry
RiskyProject for Oil and Gas IndustryRiskyProject for Oil and Gas Industry
RiskyProject for Oil and Gas Industry
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011The offshore decommissioning market review, 2011
The offshore decommissioning market review, 2011
 

Similaire à Subsea well intervention: Learning from the past - planning for the future

IOR drilling technologies
IOR drilling technologiesIOR drilling technologies
IOR drilling technologies
Statoil
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
John Grover
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
VR M
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
Charlie Bell
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
John Grover
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
Egyptian Engineers Association
 

Similaire à Subsea well intervention: Learning from the past - planning for the future (20)

Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement ops
 
IOR drilling technologies
IOR drilling technologiesIOR drilling technologies
IOR drilling technologies
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, RajasthanHDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
HDPE Pipes By Perfect Prime Piping & Agritech Private Limited, Rajasthan
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
G.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power PresentationG.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power Presentation
 
Shell Subsea Control.pdf
Shell Subsea Control.pdfShell Subsea Control.pdf
Shell Subsea Control.pdf
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
Silviu Livescu
Silviu LivescuSilviu Livescu
Silviu Livescu
 

Plus de Statoil

Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going north
Statoil
 
Challenge - Going North
Challenge - Going NorthChallenge - Going North
Challenge - Going North
Statoil
 
Ons 2012 unlocking the resources of the north - runi
Ons 2012   unlocking the resources of the north - runiOns 2012   unlocking the resources of the north - runi
Ons 2012 unlocking the resources of the north - runi
Statoil
 
Ons statoil a global exploration company
Ons statoil   a global exploration companyOns statoil   a global exploration company
Ons statoil a global exploration company
Statoil
 

Plus de Statoil (20)

Technologies to solve new energy challenges
Technologies to solve new energy challengesTechnologies to solve new energy challenges
Technologies to solve new energy challenges
 
Bakken Development: Pathway to Success, Roadmap to a New Tomorrow
Bakken Development: Pathway to Success, Roadmap to a New TomorrowBakken Development: Pathway to Success, Roadmap to a New Tomorrow
Bakken Development: Pathway to Success, Roadmap to a New Tomorrow
 
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
 
A collaborative approach to the Arctic
A collaborative approach to the ArcticA collaborative approach to the Arctic
A collaborative approach to the Arctic
 
Statoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of PossibleStatoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of Possible
 
Statoil in north america nacc otc lunch 050614
Statoil in north america   nacc otc lunch 050614Statoil in north america   nacc otc lunch 050614
Statoil in north america nacc otc lunch 050614
 
Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going north
 
Ons 2012 peregrino ior (rev2)
Ons 2012   peregrino ior (rev2)Ons 2012   peregrino ior (rev2)
Ons 2012 peregrino ior (rev2)
 
Ons 2012 us onshore torstein hole 4 3
Ons 2012 us onshore torstein hole 4 3Ons 2012 us onshore torstein hole 4 3
Ons 2012 us onshore torstein hole 4 3
 
Ons 2012 us onshore torstein hole
Ons 2012 us onshore torstein holeOns 2012 us onshore torstein hole
Ons 2012 us onshore torstein hole
 
Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going north
 
Ons 2012 sek@ior conference presentation fragrafisk-final_2
Ons 2012   sek@ior conference presentation fragrafisk-final_2Ons 2012   sek@ior conference presentation fragrafisk-final_2
Ons 2012 sek@ior conference presentation fragrafisk-final_2
 
Johan sverdrup ons 2012 speakers corner
Johan sverdrup ons 2012 speakers cornerJohan sverdrup ons 2012 speakers corner
Johan sverdrup ons 2012 speakers corner
 
Ons 2012 bkv@åsgard speakers corner
Ons 2012   bkv@åsgard speakers cornerOns 2012   bkv@åsgard speakers corner
Ons 2012 bkv@åsgard speakers corner
 
Skrugard for ons speakers corner
Skrugard for ons  speakers cornerSkrugard for ons  speakers corner
Skrugard for ons speakers corner
 
Arctic the final frontier
Arctic the final frontierArctic the final frontier
Arctic the final frontier
 
Technology will unlock the far north
Technology will unlock the far northTechnology will unlock the far north
Technology will unlock the far north
 
Challenge - Going North
Challenge - Going NorthChallenge - Going North
Challenge - Going North
 
Ons 2012 unlocking the resources of the north - runi
Ons 2012   unlocking the resources of the north - runiOns 2012   unlocking the resources of the north - runi
Ons 2012 unlocking the resources of the north - runi
 
Ons statoil a global exploration company
Ons statoil   a global exploration companyOns statoil   a global exploration company
Ons statoil a global exploration company
 

Subsea well intervention: Learning from the past - planning for the future

  • 1. Subsea well intervention; Learning from the past – planning for the future UTC 2010 Trond Inge Ramsnes
  • 3.
  • 4. Cumulative wells – Statoil NCS 0 100 200 300 400 500 600 700 1980 1990 2000 2010 Dry trees Wet trees
  • 5.
  • 6. Impact of well intervention – mature asset 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Oil Sm 3 / D No activity Drill New Maintenance
  • 7. Addressing challenges – realising opportunities Milling or high pressure jetting to remove scale Straddles or patches to repair tubing Wellbore cleanout, fill removal with long or reverse circulation Selective zonal isolation, mechanical or chemical Heavy duty fishing with simultaneous removal of fill Wellbore unloading with nitrogen Formation matrix or fracture stimulation Milling and underreaming to remove wellbore scale Perforating long sections Scale build-up in the upper completion Equipment problems SCSSV Access problems Restricted production Water influx Wellbore scaling Access problems Restricted production Formation damage (scale, fines, etc.) Restricted production “ Fishes” Access problems Restricted production Water holdup Wellbore sanding Access problems Restricted production Completion integrity issues
  • 8. Category A RLWI Category B Full range intervention & TTD Category C Drilling and completion • Wireline / tractor only • Limited bha length • Full range of through tubing services • Limited live well through tubing services High pressure light weight riser (8 - 5/8 ” ) Low pressure marine riser (21 ” ) standard HP concentric riser and SSTT required for live well intervention
  • 9. Cat B – fit for purpose concept Lightweight HP riser system (through tubing) Full DP or mooring assisted station keeping options Topside system sized for through tubing operations (2⅞” & 3 ½” drillpipe) Integrated high capacity coiled tubing package (2 ⅞” / 3 ½”) Full handling of live well returns Semi-submersible rig hull type
  • 10. LRP/EDP stack on BOP carrier SBOP In rack-back area Key components in riser system
  • 11.
  • 12.
  • 13. Protecting Horizontal XT (HXT) – used on all pipe runs - Classification: Internal 2010-04-12 HORIZONTAL XMAS TREE PIGGY BACK WEAR SLEEVE TUBING HANGER NIPPLE PROTECTOR
  • 14. Through Tubing Drilling (TTD) drilling through existing tubing (completion) Existing production tubing Production packer Whipstock Through Tubing Sidetrack Production from ’motherbore and new sidetrack simultaneously Reservoir SSD CHOKE
  • 15. Operational experience Åsgard P-4 < 300 kSm3 < 100 kSm3 < 50 kSm3 Decreasing target volume Increasing target count & reserves Additional reserves Cat B enabled
  • 16. P-4 AH Actual Drilled Wellpath – Geological Cross Section Not Ile 2 & 3 Ror Tilje 3 TVDMSL Tilje 1 & 2 Tilje 4, 5, 6 Ile 1 Garn 3 & 4 Garn 1 & 2 T1 T2 T3 T4 T5 Kick off 3871mMD Garn 3 P-4 H mother bore P-4 AH actual Drilled a world record of 1744m 5 ¾” TTRD sidetrack
  • 17.
  • 18.
  • 19. Subsea well intervention; Learning from the past – planning for the future Trond Inge Ramsnes Project Leader Well Intervention trira@statoil.com, tel: +47 51 99 00 00 www.statoil.com Thank you