Mega-Project M
M    P j t Management in th Oil & G Industry
                    t i the       Gas I d t
Improving Collaboration, Managing Costs & Delivering Results

Guy Barlow                               Kirk Blanchard
Industry Strategy                        Project Controls Specialist
Power Energy & Process Industries        Performance Contractors, Inc,
Oracle Primavera Global Business Unit
Agenda


• “Mega-Project” Overview
• What are the Key Challenges?
• Resolving the Challenges


• Motiva Project Overview
• T 5 Challenges
  Top Ch ll
• Moving Forward

• Q&A and Wrap-up
• Exit Survey
Mega-Project Overview
Managing Complex Coordination


                                                                  Owners
 Participant Activities                                           General Contractors
 • Fi
   Financing
          i          • R l t
                        Regulatory                                Construction Mgrs
 • Insurance         • Legal
                                                                        Architects
                                                                        Engineers
                                                                        Subcontractors
 Supply Chain Activities
   pp y
 • Eng. to Order  • Logistics                                              Labor Pool
 • Manufacturing  • Procurement                                            Suppliers
                                                                           Operators




                                              Impact
                              •   Poor Financial Performance
                              •   Reduced Operational Capabilities
                              •   Increased Legal Exposure
                              •   Greater Political/Regulatory Issues
What are the Key Challenges?
5 Distinct Pain Points


Document Control
Are we efficiently managing the thousands of documents?


Performance Reporting
How are we measuring and reporting project metrics?


Change Management
    g      g
Are the hundreds of change orders a growing liability?


Risk Management
Who’s managing project risk and what’s the mitigation strategy?


System Turnover
Are we able to easily transition to a start-up environment?
Resolving the Challenges
Collaborative, Integrated & Optimized

 Capital Plan / Project   Change Control
                                                                Operate & Maintain
 Bid Phase



                                                                            Project Close




                                                        Project Execution
      Plan, Design
      & Procure




                                           Business
                                           Management
Resolving the Challenges
Collaborative, Integrated & Optimized

Capital Plan / Project           Change Control
                                                                                  Operate & Maintain
Bid Phase



                                                                                              Project Close
                           P6 Analytics / P6 ERD / BI / Reporting

                              Business Process Management
                                                   g

                                                       Contract                  Portfolio
     Risk Analysis                  P6
       Quantitative Risk     Project Management       Management                Management
           Analysis           Risk Management        Change Management
                                                          g       g            Propose, Prioritize &
       Quantitative Risk      Project Scheduling     Contract Management         Select Initiatives
                                                                         Project Execution
         Management         Resource Management       Claim Management       Review, Track & Adjust
     Plan, Design                                     Issue Management               Portfolio
     & Procure
                           Oracle Universal Content Management
                                (or other content management system)

           Integration with other core applications (ERP, EAM, AutoVue, etc.)
                                                 Business
                                                     Management
PERFORMANCE Contractors
Kirk Blanchard, Project Controls Specialist




              Office Locations - Baton Rouge, Lake Charles, Freeport & Mobile
              Current States License Held to do Business
Communication
                                           Schedule and Cost
                                           Resource Management
                                           Information Management
                                           Timely Project Close-out




MEGA Projects are cross functional events which require
                    cross-functional events,
a great deal of communication and resources. There are
a number of fundamental task that must be in-place to
ensure that information is effectively prepared and
fundamental procedures are in place to execute the
p j
project.




                                                           Contractors
PERFORMANCE Contractors
H-Block Project Overview (Motiva Refining, Port Arthur Texas)




   H-Block Consist of Hydrocracker, Power Station, Naphtha, and
   Cat Feed Units
   • MOTIVA (Owner) Bechtel/Jacobs, (MC) PERFORMANCE
     Contractors (GC)


   MOTIVA + Bechtel/Jacobs + PERFORMANCE + Sub-Contractors

   • Bechtel/Jacobs Joint Venture, Managing Contractor

   Manpower Projections, 2000 Project Personnel on Site for H-Block
   including Sub-Contractors
             Sub Contractors
   • PERFORMANCE Contractors, LLC.
Top 5 Challenges
Massive, Complex & Risky

                       • Procedures
    Document Control   • Communication
                       • Control

                       • Quality
      Performance      • Timely
       Reporting       • Consistency
                         Co s ste cy

                       • Initiation
        Change         • Estimate
      Management           pp
                       • Approvals

                       • Guidelines
    Risk Management    • Monitoring
                       • Mitigation

                       • Completion
     System Turnover   • Final Inspection
                       • Pre Commission / Start-up
Moving Forward
       Best Practices & Lessons Learned




Risk Management         Best Practices    Desired Outcome
• Scope Creep           • Processes       • Safety
• Labor                 • Analysis        • Quality
• Schedule              • Reporting       • Schedule (Cost / Duration)
Moving Forward (continued)
         Best Practices & Lessons Learned




                                  P6 Analytics / P6 ERD / BI / Reporting


                                      Business Process Management

Risk Management                        Best Practices                          Desired Outcome
• Scope Creep                           • Processes              Contract • Safety            Portfolio
                                           P6
• Labor Risk Analysis                   • Analysis
                                   Project Management           Management Quality
                                                                          •                  Management
     Quantitative Risk Analysis
• Schedule                              • Reporting                           • Schedule (Cost / Duration)
                                                              Change Management       Propose, Prioritize & Select
                                    Risk Management
          Quantitative Risk                                   Contract Management             Initiatives
                                    Project Scheduling
           Management                                          Claim Management         Review, Track & Adjust
                                  Resource Management
                                                               Issue Management                Portfolio


                                  Oracle Universal Content Management
                                        (or other content management system)

                    Integration with other core applications (ERP, EAM, AutoVue, etc.)
<Insert Picture Here>



                                                 Quote Attribution
                                                   Title, Company


                                       “We are what we repeatedly
                                        do. Excellence, then, is not
                                        an act but a habit....”
                                                               Aristotle

For More Information Contact Kirk Blanchard
Performance Contractors, LLC.
Baton Rouge, Louisiana
225-751-4156
Q&A and Wrap-Up
Mega Project Management In The Oil &amp; Gas Industry

Contenu connexe

Tendances

Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessAlberto Sanchez
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksPankaj K Sinha
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendationsubk1411
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsNam N.N Tran M.Eng, PMP
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk managementIQPC
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 
Onshore modules construction – a fabricator’s view
Onshore modules construction – a fabricator’s viewOnshore modules construction – a fabricator’s view
Onshore modules construction – a fabricator’s viewMerrylyn Yeo
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank FarmAbhik Tushar Das
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoignitetribes
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 

Tendances (20)

Planning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning ProcessPlanning and Scheduling Construction Projects, Part 1: The Planning Process
Planning and Scheduling Construction Projects, Part 1: The Planning Process
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
 
Delay - EOT claims
Delay - EOT claimsDelay - EOT claims
Delay - EOT claims
 
Epc issues and recommendations
Epc issues and recommendationsEpc issues and recommendations
Epc issues and recommendations
 
Engineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projectsEngineering, procurement and construction (EPC) projects
Engineering, procurement and construction (EPC) projects
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
Epc contractor
Epc contractorEpc contractor
Epc contractor
 
CCP Technical Paper and Application
CCP Technical Paper and ApplicationCCP Technical Paper and Application
CCP Technical Paper and Application
 
Pmp integration management
Pmp integration managementPmp integration management
Pmp integration management
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
Delay Analysis and Concurrent Delay
Delay Analysis and Concurrent DelayDelay Analysis and Concurrent Delay
Delay Analysis and Concurrent Delay
 
Onshore modules construction – a fabricator’s view
Onshore modules construction – a fabricator’s viewOnshore modules construction – a fabricator’s view
Onshore modules construction – a fabricator’s view
 
Epc overview
Epc  overviewEpc  overview
Epc overview
 
CCP Material
CCP MaterialCCP Material
CCP Material
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank Farm
 
CV-Ahmed Al Jarrah
CV-Ahmed Al JarrahCV-Ahmed Al Jarrah
CV-Ahmed Al Jarrah
 
Second edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promoSecond edition epc project rule of credit and progress measurement promo
Second edition epc project rule of credit and progress measurement promo
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
Oil and Gas Risk Analysis
Oil and Gas Risk AnalysisOil and Gas Risk Analysis
Oil and Gas Risk Analysis
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 

Similaire à Mega Project Management In The Oil &amp; Gas Industry

1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01pmfigliola
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9John Streit
 
Portfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It BasicPortfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It BasicEPM Live
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio ManagementAnand Subramaniam
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capabilitysmcasas
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write UpStefan Afendoulis
 
V0202 Project Services
V0202 Project ServicesV0202 Project Services
V0202 Project Servicespittfkk
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 
SBS Group- Professional Services
SBS Group- Professional ServicesSBS Group- Professional Services
SBS Group- Professional ServicesSBS Group
 
Pmbok 4th edition chapter 8 - Project Quality Management
Pmbok 4th edition   chapter 8 - Project Quality Management Pmbok 4th edition   chapter 8 - Project Quality Management
Pmbok 4th edition chapter 8 - Project Quality Management Ahmad Maharma, PMP,RMP
 
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdfPrimavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdfInSync2011
 
G2 It Services Overview 09.07.01
G2 It Services Overview 09.07.01G2 It Services Overview 09.07.01
G2 It Services Overview 09.07.01wdgleaton
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)mandrew182
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change AgentSoftServe
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPSoftServe
 
Prince2 Complement Pmbok
Prince2 Complement PmbokPrince2 Complement Pmbok
Prince2 Complement Pmbokguest095b6b
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOKsundong
 

Similaire à Mega Project Management In The Oil &amp; Gas Industry (20)

1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
1844final 100811113357 Phpapp01
1844final 100811113357 Phpapp011844final 100811113357 Phpapp01
1844final 100811113357 Phpapp01
 
Strivent Service Offerings Differentiators Web 2 9
Strivent Service Offerings  Differentiators Web 2 9Strivent Service Offerings  Differentiators Web 2 9
Strivent Service Offerings Differentiators Web 2 9
 
Portfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It BasicPortfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It Basic
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capability
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up
 
V0202 Project Services
V0202 Project ServicesV0202 Project Services
V0202 Project Services
 
Project management office value
Project management office valueProject management office value
Project management office value
 
SBS Group- Professional Services
SBS Group- Professional ServicesSBS Group- Professional Services
SBS Group- Professional Services
 
Pmbok 4th edition chapter 8 - Project Quality Management
Pmbok 4th edition   chapter 8 - Project Quality Management Pmbok 4th edition   chapter 8 - Project Quality Management
Pmbok 4th edition chapter 8 - Project Quality Management
 
APO 2.0
APO 2.0APO 2.0
APO 2.0
 
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdfPrimavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
 
G2 It Services Overview 09.07.01
G2 It Services Overview 09.07.01G2 It Services Overview 09.07.01
G2 It Services Overview 09.07.01
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management  - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
Vijay Prasad - Project Management - part 2 (Ukrainian PM Community)
 
Project Management . The Change Agent
Project Management . The Change AgentProject Management . The Change Agent
Project Management . The Change Agent
 
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMPProject Management . The Change Agent Vijay Prasad M.Tech, PMP
Project Management . The Change Agent Vijay Prasad M.Tech, PMP
 
Prince2 Complement Pmbok
Prince2 Complement PmbokPrince2 Complement Pmbok
Prince2 Complement Pmbok
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOK
 

Mega Project Management In The Oil &amp; Gas Industry

  • 1. Mega-Project M M P j t Management in th Oil & G Industry t i the Gas I d t Improving Collaboration, Managing Costs & Delivering Results Guy Barlow Kirk Blanchard Industry Strategy Project Controls Specialist Power Energy & Process Industries Performance Contractors, Inc, Oracle Primavera Global Business Unit
  • 2. Agenda • “Mega-Project” Overview • What are the Key Challenges? • Resolving the Challenges • Motiva Project Overview • T 5 Challenges Top Ch ll • Moving Forward • Q&A and Wrap-up • Exit Survey
  • 3. Mega-Project Overview Managing Complex Coordination Owners Participant Activities General Contractors • Fi Financing i • R l t Regulatory Construction Mgrs • Insurance • Legal Architects Engineers Subcontractors Supply Chain Activities pp y • Eng. to Order • Logistics Labor Pool • Manufacturing • Procurement Suppliers Operators Impact • Poor Financial Performance • Reduced Operational Capabilities • Increased Legal Exposure • Greater Political/Regulatory Issues
  • 4. What are the Key Challenges? 5 Distinct Pain Points Document Control Are we efficiently managing the thousands of documents? Performance Reporting How are we measuring and reporting project metrics? Change Management g g Are the hundreds of change orders a growing liability? Risk Management Who’s managing project risk and what’s the mitigation strategy? System Turnover Are we able to easily transition to a start-up environment?
  • 5. Resolving the Challenges Collaborative, Integrated & Optimized Capital Plan / Project Change Control Operate & Maintain Bid Phase Project Close Project Execution Plan, Design & Procure Business Management
  • 6. Resolving the Challenges Collaborative, Integrated & Optimized Capital Plan / Project Change Control Operate & Maintain Bid Phase Project Close P6 Analytics / P6 ERD / BI / Reporting Business Process Management g Contract Portfolio Risk Analysis P6 Quantitative Risk Project Management Management Management Analysis Risk Management Change Management g g Propose, Prioritize & Quantitative Risk Project Scheduling Contract Management Select Initiatives Project Execution Management Resource Management Claim Management Review, Track & Adjust Plan, Design Issue Management Portfolio & Procure Oracle Universal Content Management (or other content management system) Integration with other core applications (ERP, EAM, AutoVue, etc.) Business Management
  • 7. PERFORMANCE Contractors Kirk Blanchard, Project Controls Specialist Office Locations - Baton Rouge, Lake Charles, Freeport & Mobile Current States License Held to do Business
  • 8. Communication Schedule and Cost Resource Management Information Management Timely Project Close-out MEGA Projects are cross functional events which require cross-functional events, a great deal of communication and resources. There are a number of fundamental task that must be in-place to ensure that information is effectively prepared and fundamental procedures are in place to execute the p j project. Contractors
  • 9. PERFORMANCE Contractors H-Block Project Overview (Motiva Refining, Port Arthur Texas) H-Block Consist of Hydrocracker, Power Station, Naphtha, and Cat Feed Units • MOTIVA (Owner) Bechtel/Jacobs, (MC) PERFORMANCE Contractors (GC) MOTIVA + Bechtel/Jacobs + PERFORMANCE + Sub-Contractors • Bechtel/Jacobs Joint Venture, Managing Contractor Manpower Projections, 2000 Project Personnel on Site for H-Block including Sub-Contractors Sub Contractors • PERFORMANCE Contractors, LLC.
  • 10. Top 5 Challenges Massive, Complex & Risky • Procedures Document Control • Communication • Control • Quality Performance • Timely Reporting • Consistency Co s ste cy • Initiation Change • Estimate Management pp • Approvals • Guidelines Risk Management • Monitoring • Mitigation • Completion System Turnover • Final Inspection • Pre Commission / Start-up
  • 11. Moving Forward Best Practices & Lessons Learned Risk Management Best Practices Desired Outcome • Scope Creep • Processes • Safety • Labor • Analysis • Quality • Schedule • Reporting • Schedule (Cost / Duration)
  • 12. Moving Forward (continued) Best Practices & Lessons Learned P6 Analytics / P6 ERD / BI / Reporting Business Process Management Risk Management Best Practices Desired Outcome • Scope Creep • Processes Contract • Safety Portfolio P6 • Labor Risk Analysis • Analysis Project Management Management Quality • Management Quantitative Risk Analysis • Schedule • Reporting • Schedule (Cost / Duration) Change Management Propose, Prioritize & Select Risk Management Quantitative Risk Contract Management Initiatives Project Scheduling Management Claim Management Review, Track & Adjust Resource Management Issue Management Portfolio Oracle Universal Content Management (or other content management system) Integration with other core applications (ERP, EAM, AutoVue, etc.)
  • 13. <Insert Picture Here> Quote Attribution Title, Company “We are what we repeatedly do. Excellence, then, is not an act but a habit....” Aristotle For More Information Contact Kirk Blanchard Performance Contractors, LLC. Baton Rouge, Louisiana 225-751-4156